Determination 801029

Scope of roof repair after faulty 2007 workmanship

FirmHollard
Decided2021-09-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

A homeowner's roof leaked because of defective insurer-authorised repairs from a 2007 claim, and she sought full roof replacement. AFCA ordered the insurer to replace the roof to current building standards and pay $1,000 for non-financial loss caused by claim delays and communication gaps.

The insurer must place the complainant in the position she would have been in had the 2007 repair been done properly, so the policy's repair-method choice does not apply to its own negligence.

Issues

Subjects and remedies

home or building damagepay non financial lossrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 801029 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 801029 Page 1 of 5 Case number: 801029 9 September 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). She lodged a claim for damage after her roof leaked and caused water damage. The insurer accepted the claim. It accepts the damage is due to faulty workmanship from previous repairs the insurer authorised on a claim in 2007. The insurer repaired the internal resultant damage. However, there is a dispute over the insurer’s liability for the roof. The insurer says it is willing to repair the roof. The complainant wants the insurer to replace the entire roof. 1.2 Issues and key findings What is the insurer’s obligation for the roof? The insurer is required to reinstate the roof to the condition it should have been repaired to in 2007. The roof would not be in its current condition had it been properly repaired in 2007. Is the complainant entitled to compensation? Compensation is warranted in the circumstances. Why is the outcome fair? The outcome is fair because the current issues with the roof were due to the insurer’s poor repair in 2007. I consider the fair outcome is for the insurer to replace the roof, ensuring the new roof complies with current building standards. 1.3 Determination This determination is in favour of the complainant. The insurer is required to replace the roof on the property and ensure it complies with current building standards. The insurer must also pay the complainant $1,000 in non-financial loss compensation. Determination | Case number: 801029 Page 2 of 5 2 Reasons for determination 2.1 What is the insurer’s obligation for the roof ? The insurer is required to reinstate the roof to the condition it should have been repaired to in 2007. The roof would not be in its current condition had it been properly repaired in 2007 . Parties dispute whether roof requires replacement The insurer does not dispute it is liable to repair the roof due to previous poor repairs from a claim in 2007. The insurer ’s appointed roofer (SR) attended the property on 26 March 2020 and confirmed the roof sheets were improperly installed during the 2007 repair. SR says:  ‘insufficient sheet length within roof sheets was installed which has created insufficient lap coverage below roll top r idge capping’  Australian Standards require a minimum of 150mm lap coverage, but the roof sheets have a lap coverage of approximately 130mm and 100mm above the ridge capping  this was the leading cause of recent water ingress and allowed wind-driven rain to enter below flashing and into roof cavity. SR further says a roof replacement could be carried out, however a ‘ more common sense practical repair would be a larger custom folded three-fold ridge capping installed, which will increase lap coverage over roof sheets preventing further water ingress occurring ’. SR also suggested foam infill strips be installed between roof sheets and flashing to further ensure no ingress occurs in future. SR says this repair method would meet Australian Standards. SR also stated the: sewer vent pipe penetrations have concerns within the dektite flashing present. The silicone throughout is deteriorated as well as this highlighted one which has been installed above sheet laps and has a high potential for future water ingress to occur. The insurer provided a scope of works based on SR’s alternate repair method. This is very brief and states it includes ‘3 FOLD RIDGE CAPPING – INCLUDING F OAM INFILLS’ . The insurer says it confirmed with the assessor that the proposed rectification repairs will include:  replacement of all existing ridge capping to the roof  the new ridge capping will be a custom folded three-fold ridge capping, which will be the same colour and material as the existing roof sheeting  the foam fill strips are included in accordance with SR’s recommendation and is an added precaution to ensure no future water ingress occurs  the insurer is willing to carry out and warrant the rectification repairs  these repairs will result in the roof meeting current code requirements. The insurer says it is not required to replace the roof in the circumstances. It says it is not required to settle anything more than what it would cost to place the complainant in the position she was in prior to the loss. Determination | Case number: 801029 Page 3 of 5 Complainant wants insurer to replace roof The complainant says the insurer should have installed the roof correctly the first time, by ensuring it complies with relevant building codes. She says t he insurer’s offer is a band aid solution to a problem that may have further issues in the future. The complainant also says the insurer has not explained how it will rectify the sewer vent pipe concerns SR raised in the report. Fair for insurer to reinstate the roof There is no dispute the insurer is liable to rectify the faulty workmanship to the roof from the 2007 claim. Under the 2007 claim, the insurer was required to provide a new roof that complied with relevant building codes and operated effectively. The insurer did not do this. The insurer has relied on policy wording to state it is entitled to choose the method of repair. However, as the loss flows from the insurer’s negligence, the policy wording does not apply in the circumstances. The insurer is required to place the complainant in the position she was in before the 2007 loss. Before the 2007 loss, the complainant did not have roof sheets that were of insufficient length or a modified ridge capping and foam infills to cover inadequate roof sheets length. I accept that the insurer’s proposed solution to its previous poor repair is essentially a band aid solution. If allowed, it does not change the fact the poor original repairs are still present on the roof. The complainant is entitled to expect her roof will look and operate as how a new roof should look and operate before the 2007 loss. Given this, I do not consider its proposed method of resolving the issue is fair. The insurer’s scope of works is also very brief. It does not address the aspe ct relating to the sewer vent pipe. I therefore cannot be satisfied it captures all damage required to be repaired . I consider the fair outcome is for the insurer to replace the roof, ensuring the new roof complies with current building standards. 2.2 Is the complainant entitled to compensation? Compensation is warranted in the circumstances. Compensation may be awarded in certain circumstances Under our Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with a complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim. The complainant lodged the claim in February 2020 for the current damage sustained to the property. She says the insurer did not accept the claim until September 2020. She says there were constant delays on the claim and other errors, including originally stating a different insurer was responsible, failing to find her original claim, and not responding to her requests for updates. Determination | Case number: 801029 Page 4 of 5 Complainant entitled to compensation The insurer provided the claim notes. Between February 2020 and September 2020, I am satisfied there were gaps in communication between the insurer and complainant. The insurer has not adequately explained why there was a delay in the claim acceptance and why there were gaps in communication in this period. I accept the insurer ’s handling of the claim caused the complainant stress and inconvenience. I consider it fair in all the circumstances for the insurer to pay the complainant $1,000 in non- financial loss compensation. Determination | Case number: 801029 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approac h is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.