Determination 801029
Scope of roof repair after faulty 2007 workmanship
Summary
A homeowner's roof leaked because of defective insurer-authorised repairs from a 2007 claim, and she sought full roof replacement. AFCA ordered the insurer to replace the roof to current building standards and pay $1,000 for non-financial loss caused by claim delays and communication gaps.
The insurer must place the complainant in the position she would have been in had the 2007 repair been done properly, so the policy's repair-method choice does not apply to its own negligence.
Issues
- Repairs or contractors primary · upheld“I consider the fair outcome is for the insurer to replace the roof, ensuring the new roof complies with current building standards.”
- Delay secondary · upheld“The insurer has not adequately explained why there was a delay in the claim acceptance and why there were gaps in communication in this period.”
Subjects and remedies
home or building damagepay non financial lossrepair or rectify
Related
Text of the determination
Determination
Case number 801029
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 801029 Page 1 of 5
Case number: 801029 9 September 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
She lodged a claim for damage after her roof leaked and caused water damage.
The insurer accepted the claim. It accepts the damage is due to faulty workmanship from
previous repairs the insurer authorised on a claim in 2007.
The insurer repaired the internal resultant damage. However, there is a dispute over the
insurer’s liability for the roof. The insurer says it is willing to repair the roof.
The complainant wants the insurer to replace the entire roof.
1.2 Issues and key findings
What is the insurer’s obligation for the roof?
The insurer is required to reinstate the roof to the condition it should have been repaired to in
2007. The roof would not be in its current condition had it been properly repaired in 2007.
Is the complainant entitled to compensation?
Compensation is warranted in the circumstances.
Why is the outcome fair?
The outcome is fair because the current issues with the roof were due to the insurer’s poor
repair in 2007. I consider the fair outcome is for the insurer to replace the roof, ensuring the
new roof complies with current building standards.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to replace the roof on the property and ensure it complies with current
building standards.
The insurer must also pay the complainant $1,000 in non-financial loss compensation.
Determination | Case number: 801029 Page 2 of 5
2 Reasons for determination
2.1 What is the insurer’s obligation for the roof ?
The insurer is required to reinstate the roof to the condition it should have been repaired to in
2007. The roof would not be in its current condition had it been properly repaired in 2007 .
Parties dispute whether roof requires replacement
The insurer does not dispute it is liable to repair the roof due to previous poor repairs from a
claim in 2007.
The insurer ’s appointed roofer (SR) attended the property on 26 March 2020 and confirmed
the roof sheets were improperly installed during the 2007 repair. SR says:
‘insufficient sheet length within roof sheets was installed which has created insufficient lap
coverage below roll top r idge capping’
Australian Standards require a minimum of 150mm lap coverage, but the roof sheets have
a lap coverage of approximately 130mm and 100mm above the ridge capping
this was the leading cause of recent water ingress and allowed wind-driven rain to enter
below flashing and into roof cavity.
SR further says a roof replacement could be carried out, however a ‘ more common sense
practical repair would be a larger custom folded three-fold ridge capping installed, which will
increase lap coverage over roof sheets preventing further water ingress occurring ’. SR also
suggested foam infill strips be installed between roof sheets and flashing to further ensure no
ingress occurs in future. SR says this repair method would meet Australian Standards.
SR also stated the:
sewer vent pipe penetrations have concerns within the dektite flashing present.
The silicone throughout is deteriorated as well as this highlighted one which has
been installed above sheet laps and has a high potential for future water ingress
to occur.
The insurer provided a scope of works based on SR’s alternate repair method. This is very
brief and states it includes ‘3 FOLD RIDGE CAPPING – INCLUDING F OAM INFILLS’ .
The insurer says it confirmed with the assessor that the proposed rectification repairs will
include:
replacement of all existing ridge capping to the roof
the new ridge capping will be a custom folded three-fold ridge capping, which will be the
same colour and material as the existing roof sheeting
the foam fill strips are included in accordance with SR’s recommendation and is an added
precaution to ensure no future water ingress occurs
the insurer is willing to carry out and warrant the rectification repairs
these repairs will result in the roof meeting current code requirements.
The insurer says it is not required to replace the roof in the circumstances. It says it is not
required to settle anything more than what it would cost to place the complainant in the
position she was in prior to the loss.
Determination | Case number: 801029 Page 3 of 5
Complainant wants insurer to replace roof
The complainant says the insurer should have installed the roof correctly the first time, by
ensuring it complies with relevant building codes. She says t he insurer’s offer is a band aid
solution to a problem that may have further issues in the future.
The complainant also says the insurer has not explained how it will rectify the sewer vent pipe
concerns SR raised in the report.
Fair for insurer to reinstate the roof
There is no dispute the insurer is liable to rectify the faulty workmanship to the roof from the
2007 claim. Under the 2007 claim, the insurer was required to provide a new roof that
complied with relevant building codes and operated effectively. The insurer did not do this.
The insurer has relied on policy wording to state it is entitled to choose the method of repair.
However, as the loss flows from the insurer’s negligence, the policy wording does not apply in
the circumstances. The insurer is required to place the complainant in the position she was in
before the 2007 loss. Before the 2007 loss, the complainant did not have roof sheets that
were of insufficient length or a modified ridge capping and foam infills to cover inadequate
roof sheets length.
I accept that the insurer’s proposed solution to its previous poor repair is essentially a band
aid solution. If allowed, it does not change the fact the poor original repairs are still present on
the roof. The complainant is entitled to expect her roof will look and operate as how a new
roof should look and operate before the 2007 loss.
Given this, I do not consider its proposed method of resolving the issue is fair.
The insurer’s scope of works is also very brief. It does not address the aspe ct relating to the
sewer vent pipe. I therefore cannot be satisfied it captures all damage required to be repaired .
I consider the fair outcome is for the insurer to replace the roof, ensuring the new roof
complies with current building standards.
2.2 Is the complainant entitled to compensation?
Compensation is warranted in the circumstances.
Compensation may be awarded in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss where there has
been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim.
The complainant lodged the claim in February 2020 for the current damage sustained to the
property. She says the insurer did not accept the claim until September 2020. She says there
were constant delays on the claim and other errors, including originally stating a different
insurer was responsible, failing to find her original claim, and not responding to her requests
for updates.
Determination | Case number: 801029 Page 4 of 5
Complainant entitled to compensation
The insurer provided the claim notes. Between February 2020 and September 2020, I am
satisfied there were gaps in communication between the insurer and complainant. The insurer
has not adequately explained why there was a delay in the claim acceptance and why there
were gaps in communication in this period.
I accept the insurer ’s handling of the claim caused the complainant stress and inconvenience.
I consider it fair in all the circumstances for the insurer to pay the complainant $1,000 in non-
financial loss compensation.
Determination | Case number: 801029 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approac h is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.