Home / Suncorp Group / Determination 800738

Determination 800738

Denial of floor damage claim (Claim B) as gradual construction-defect damage

FirmSuncorp Group
Decided2022-01-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under home insurance for floor damage from water ingress through a deck. AFCA upheld the insurer's denial of the claim but ordered $1,000 for non-financial loss caused by claim handling delay and misunderstanding.

The claimant must first prove a loss from a single insured event, and gradual damage from a construction defect is not one.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 800738 Financial firm AAI Limited Determination | Case number: 800738 Page 1 of 8 Case number: 800738 17 January 2022 1 Determination overview 1.1 Complaint The complainants held home and contents insurance issued by the financial firm (the insurer). In 2020, the complainants lodged two claims on the policy following property damage. The insurer partially accepted the first claim, which related to a roof leak (Claim A). It denied the second, which concerned floor damage due to water ingress from an external deck (Claim B). The insurer concluded that the floor damage was not due to an insured event and had instead occurred gradually over an extended period, meaning the policy did not respond. The complaint initially concerned both claims, but the parties have now settled Claim A. Therefore, this determination solely concerns the insurer’s denial of Claim B. The complainants say that Claim B should be covered as they were not aware that there was any issue with the construction of the deck or that ongoing damage was occurring. They also say that a reasonable person in their position would not have been aware of the construction defect or of the gradually occurring damage. To resolve the complaint, the complainants want the insurer to cover Claim B. They also want the insurer to pay non-financial loss compensation for claim mishandling and delay. 1.2 Issues and key findings Is the insurer entitled to deny Claim B? Yes. The complainants have not established the floor damage was caused by a single insured event. Instead, the proximate causes of the damage are more likely a defect in construction and gradual deterioration, which are not covered. Are the complainants entitled to non-financial loss compensation? Yes. Claim handling issues have caused the complainants undue stress and inconvenience. The insurer is to pay the complainants $1,000 in compensation for non-financial loss. Why is the outcome fair? The claim denial outcome is fair because the complainants have not established a valid claim. This means the insurer is entitled to deny Claim B. It would be unfair for the insurer to have to pay the claim, when there is no policy requirement to do so. However, it is fair that the insurer pays $1,000 non-financial loss compensation for stress due to claim handling issues. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is entitled to deny Claim B and is not required to take any further action in relation to it. However, it is to pay the complainants $1,000 in non-financial loss compensation. Determination | Case number: 800738 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to deny Claim B? Yes. The complainants have not established the floor damage was caused by a single insured event. Instead, the proximate causes of the damage were a defect in construction and gradual deterioration, which are not covered. Complainants must show a valid claim exists The complainants are required to show, on the balance of probabilities, they suffered a loss caused by an insured event covered by the policy. This is known as a valid claim. Once the complainants establish a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proof in establishing the application of the exclusion. The standard of proof is the balance of probabilities. Proximate causes of loss - construction defect and gradual deterioration Relevant extracts of the product disclosure statement (PDS) are set out in section 3.2 of this determination. Subject to its conditions and exclusions, the policy provides cover for loss or damage caused by the insured events listed in the PDS, one of which is storm. The main issue in dispute is whether a storm was the proximate cause of the loss claimed. Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. The complainants say that there is no debate that the damage claimed is storm related. They note the insurer’s Notice of Response dated 27 May 20 21 (which related to the Claim A as well as Claim B) says tha t ‘ the Insurer accepted and assessed the storm-related damage in the insured property ’ . They say that there is also no debate that the damage has been caused by a design fault. For that purpose, they reference the insurer’s assessment report dated 18 Septe mber 2020, which includes the following: There is water damage to the flooring running across the rear of bedroom 1 which includes the ensuite. This damage is most likely related to a lack of or failed flashing across the rear of the house where there is a timber decking attached to the rear wall. This wall would get directional rain and the customer would be unaware that there is a leak. The complainants rely on the final statement in the above quote to submit that a reasonable person would not have been aware of the design fault. For that purpose, they also obtained an expert report dated 6 September 2021 from MK, builder. In his report, MK says:  the house looks to have been constructed in the early 1980’s Determination | Case number: 800738 Page 3 of 8  water damage has occurred due to rain on the external deck running along the joists that form the subfloor of the deck and the house’s internal flooring on the western side  rain has penetrated the joists, sheet flooring and, possibly, the wall frame from underneath the house due to a combination of wind and capillary action  water damage would most likely have begun occurring not long after the house’s construction  ‘ there is no way a reasonable person, without extensive knowledge of residential construction, would be able to recognise the damage to the subfloor, or understand how it occurred ’ . Contrary to the complainants’ submission, whether the damage is due to an insured event is in dispute. The comment they have quoted from the insurer’s Notice of Response date d 27 May 2021 does not mean it accepted both claims were storm related. Rather, the insurer was confirming i t partia lly accepted the Claim A as being so . The Notice of R esponse went on to confirm that the insurer considered that Claim B was:  not due to an insured event  not due to a single event, accident or occurrence, and  caused by a construction issue resulting in a gradual process of damage over time . The insurer has in its subsequent Notices of Response maintained its position regarding Claim B. The insurer relies on an expert report dated 3 December 2020 from HC, engineers . HC’s report includes the following observations and conclusions:  inspection of the underside of the floor of the dwelling and deck revealed water damage to the timber floor joists and yellow tongue flooring  inspection between the internal joists and deck joists revealed the timber floor joists cantilever out past the west wall of the dwelling  inspection of the timber balustrade posts and joists of the deck revealed water damage to the timber deck members  the water damage to the timber wall framing and yellow tongue flooring is due to the inadequate construction of the timber floor structure of the dwelling and deck.  inadequate flashing has allowed water to ingress to the external wall’s bottom plate and yellow tongue flooring and cause damage over a long period of time. On 27 August 2021, the insurer’s internal assessor and building co -ordinator undertook a site inspection. Both noted that the water ingress was due to inadequate flashing. This had resulted in damage and rot occurring over an extended time period. They confirmed that the damage was not the result of a single storm event. Further, they each considered that the damage was visible. The water staining and rot could clearly be seen from the workroom under the house (as demonstrated by photographs taken during the inspection). In the insurer’s final Notice of Response dated 22 October 2021, it conceded that the complainants may not have been aware of the water damage occurring. Nevertheless, the insurer maintained that the damage was due to construction issues and had occurred gradually over an extended period. It submitted it is has no liability for damage not due to a single insured event. It also noted that the policy excludes cover for damage which is caused by, arises from or involves gradual deterioration over an extended period of time. Insurer is entitled to deny Claim B Based on the information submitted by the parties, I am not satisfied that the complainants have established a valid claim. Determination | Case number: 800738 Page 4 of 8 To be entitled to cover, the complainants must show that the loss or damage claimed is due to one of the listed insured events happening during the policy period. The insured event must be a ‘single event, accident or occurrence’. The complainants have suggested the applicable insured event is ‘storm’. The available evidence, including the report of the complainants’ building expert, shows that:  the water damage the subject of Claim B has been caused by a construction defect; in particular, inadequate flashing between the external deck and the west wall of the house  the damage would most likely have begun to occur not long after the house’s construction about 40 years ago  the damage has continued to occur gradually over the extended period since then, and  no single insured event (storm or otherwise) has been identified as causing the damage. The structural defect general exclusion only applies to defects an insured knew about or should reasonably have known about but did not fix. The complainants argue this exclusion does not apply to their claim as they were not aware of the construction defect and ongoing damage, and that a reasonable person would not have been aware of them either. However, even if their argument is correct, it does not assist them. They must first establish they suffered a loss caused by an insured event covered by the policy before the insurer is required to prove an exclusion applies. They have not done so. Accordingly, I am satisfied that the claimed loss is not due to a single insured event occurring during the policy period. Instead, the damage has been occurring gradually over many years due to a longstanding construction defect. Whether the complainants knew or should reasonably have known about the defect is not determinative of whether or not an insured event has occurred. In the circumstances, the insurer is entitled to deny Claim B. 2.2 Are the complainants entitled to non-financial loss? Yes. Claim handling issues have caused the complainants undue stress and inconvenience. The insurer is to pay the complainants $1,000 in compensation for non-financial loss. Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Complainants entitled to non-financial loss compensation The complainants submit that the claim process has taken too long, including due to the insurer’s disorganisation and diversionary tactics. They say that they received poor service. They submit that they have suffered ‘ significant ongoing emotional and mental health impacts, significant impact on our work and some financial impacts ’ . Claim B was lodged with the insurer on 13 August 2020. It appears from the claim notes that on 21 September 2020, the insurer suggested to the complainants Claim B would be covered Determination | Case number: 800738 Page 5 of 8 but that further investigations were required. It was not until late February 2021, that they were told that Claim B would be denied. A formal denial letter was issued on 2 March 2021. It is apparent that the insurer has during the course of the claim and this complaint misunderstood what the complainants were claiming. For months the insurer was under the impression that the complainants were seeking coverage under the Escape of Liquid insured event for damage in their ensuite bathroom. They say they were not. Similarly, the insurer denied cover for repairs to external sections of the house, which were not being claimed. The insurer’s misunderstanding of the claim does appear to have resu lted in unnecessary confusion in and delay of the claim assessment process. Even acknowledging the complexity arising from Claim A and Claim B overlapping and the impact of COVID-19 lockdowns, Claim B could and should have been managed more efficiently. I accept that the insurer’s claim handling has caused the complainants a level of stress and inconvenience beyond the norm. Accordingly, taking into account the AFCA’s conservative approach to such matters, the insurer is to pay the complainants $1,000 in compensation for non-financial loss. 2.3 Why is the outcome fair? The claim denial outcome is fair because the complainants have not established a valid claim. This means the insurer is entitled to deny Claim B. It would be unfair for the insurer to have to pay the claim, when there is no policy requirement to do so. However, it is fair that the insurer pays $1,000 non-financial loss compensation for stress due to claim handling issues. Determination | Case number: 800738 Page 6 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 800738 Page 7 of 8 3.2 PDS extracts Pages 23 and 25 WHAT YOU ARE COVERED FOR – INSURED EVENTS … If you have a home insurance policy, we cover your home fo r loss or damage at the insured address caused by an insured event during the period of insurance. … Storm ✓ What is covered Loss or damage caused by a storm. … Pages 77, 79 and 83 GENERAL EXCLUSIONS You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: … Defect, structural fault or design fault a defect, structural fault or design fault that you knew a bout (or should reasonably have known about) and did not fix before the loss or damage occurred (e.g. if there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defect). … Wear, tear, mould, gradual deterioration and other conditions wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual det erioration such as, but not limited to : • tiles and their adhesive or grouting breaking down; Determination | Case number: 800738 Page 8 of 8 • weathering of roof tiles or roof ridge capping; • gradual weathering and breakdown of bricks, mortar or concret e. Further examples: Carpet worn from people walk ing on it. Gutters rusting after exposure to the elements. Pages 106-109 DEFINITIONS OF IMPORTANT WORDS AND PHRASES … Event or incident means a single event, accident or occurrence which you did not intend or expect to happen. … Insured events means the insured events on pages 23 to 37. In addition, an insured event is always a singl e event, accident or occurrence which you did not intend or expect to happen. … Storm means a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.