The complainant claimed for ceiling and roof damage after a storm, which the insurer declined as caused by wear and tear. AFCA found no storm-caused loss but ordered $1,500 for non-financial loss because the insurer did not complete a make safe on the day of assessment.

Cover requires an identifiable insured storm event causing the loss; gradual deterioration and wear and tear are excluded, and the failure to make safe caused avoidable stress.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 800245 Financial firm Insurance Australia Limited Determination | Case number: 800245 Page 1 of 7 Case number: 800245 22 December 2021 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (insurer). On 15 March 2021 the complainant lodged a claim after he noticed the loungeroom ceiling was water marked and swelling. A water mark was also noticed in the adjoining kitchen. The insurer assessed the damage and the next day a section of the loungeroom ceiling collapsed. The insurer declined the claim because it says the damage is not from a recent or prior storm event but instead occurred due to maintenance issues and wear and tear. The complainant says he previously lodged a claim for storm damage in 2015. He believes the damage is related to this event, or it was caused by the storms in February and March 2021. 1.2 Issues and key findings Has the complainant shown a storm caused the damage? No. The exchanged information does not show the operative and dominant cause of the claimed ceiling and roof damage was an identifiable storm event. Instead, the information shows the water was entering the home over time due to deterioration and wear and tear. Is the damage related to the 2015 claim? No. The photographs from the 2015 claim show the subject roof tiles intact and undamaged. The exchanged information is not sufficient to establish the claimed damage is related to the 2015 claim, or the insure r’s repair work. Is the insurer required to compensate the complainant? Yes. It is fair in the circumstances for the insurer to compensate the complainant $1,500 for non-financial loss. I accept the ceiling collapsing and the consequential stress of this was avoidable if a make safe was carried out on 19 March 2021. The insurer has not sufficiently explained why it was reasonable not to do so. Why is the outcome fair? The terms of the policy set out the parties’ responsibilities and obligations under the c ontract of insurance. It would not be fair to require the insurer to cover the claimed damage when the exchanged information does not show the operative cause was an insured event. It is , however, fair that the insurer compensates the complainant for the stress caused by not completing a make safe during its initial site attendance. 1.3 Determination This determination is substantially in favour of the insurer. Upon notification of the complainant’s acceptance, the insurer is to pay the complainant $1,500. The insurer is not required to take any further action. Determination | Case number: 800245 Page 2 of 7 2 Reasons for determination 2.1 Has the complainant shown a storm caused the damage? No. The exchanged information does not show the operative and dominant cause of the claimed ceiling and roof damage was an identifiable storm event. Instead, the information shows the water was entering the home over time due to deterioration and wear and tear. Policy provides cover for damage caused by insured events, including storm The insurer’s policy does not provide cover for all types of loss or damage and it does not cover accidental or unexpected damage generally. It only provides cover when one of the specifically listed insured events cause loss or damage to the covered home or contents. When lodging an insurance claim, the complainant has the initial onus of proof to establish, on the balance of probabilities, an insured event occurred, and this caused the claimed damage. If the complainant can establish a claimable loss, and if the insurer seeks to limit its liability, the onus passes to the insurer to establish an exclusion applies or the claim is otherwise not covered. Relevant to this complaint, the insurer’s policy provides cover for loss or damage caused by a storm. This includes: • violent wind or thunderstorm (including a tornado or cyclone), • heavy rain, hail or snow. However, the policy excludes cover for loss or damage caused by: • water entering your home through an opening that was not created by the storm or flood, • water entering through an opening resulting from poor maintenance or defective workmanship, construction or design The insurer also excludes cover for any loss or damage arising from gradual deterioration, wear and tear. Rainwater was entering the home due to slipped roof tiles The complainant contacted the insurer after he noticed water staining and the ceiling sagging in the loungeroom. The complainant provided photographs which clearly show internal water damage. When the claim was lodged the insurer organised a builder (RI) and a roof assessor (AA) to attend the home. RI and AA both confirm the ceiling damage was caused by water ingress due to slipped roof tiles in addition to maintenance issues. They say there was no storm created opening and the slipped roof tiles are caused by age, and general wear and tear. AA carried out an external roof inspection using a drone. AA says the ridge and gable pointing on the right-hand side of the house was cracked due to age and this contributed to the slipped tiles. AA also says there is age related cracking to some other tiles which would be contributing to water ingress, and previous silicone repair was evident. AA says the damage is unrelated to a recent storm event. Determination | Case number: 800245 Page 3 of 7 Exchanged information does not show a storm event caused the tile damage There is no dispute rainwater was entering the roof and affecting the ceiling. However, for the complainant to establish a covered loss, the exchanged information must show an identifiable storm event caused the slipped tiles and the resultant water ingress. If the information shows rainwater ingress occurring over time due to general deterioration and wear of the roof tiles, the damage will not be covered. The insurer provided rainfall and wind data from the Bureau of Meteorology (BOM) for the weather station closest to the complainant. These show there was a day with strong winds in February 2021 and one in March 2021, before the claim was lodged. The BOM reports do not show heavy rainfall immediately prior to claim lodgement. However, the photographs from RI and AA’s reports show there had been recent rainfall in the area. The complainant says he does not understand how the roof tiles were not loosened by wind and rain. I accept wind and rain may have contributed to the loosened roof tiles over time. However, I am not satisfied the exchanged information is sufficient to show a one-off storm event caused the roof tiles to slip, consequently causing the resultant internal water damage. The insurer provided an aerial image of the complainant’s property dated 28 November 2020. This shows a dark area of the tiled roof that corresponds with the gap left by the missing tiles. I accept this image shows, on the balance of probabilities, the roof tiles were missing before any storm event in 2021. The material provided does not show an identifiable storm event caused the roof tiles to slip at any specific time prior to 28 November 2020. This means, the complainant has not established a claimable loss for storm damage under the policy terms. AA and RI say the cause of the roof tiles slipping is likely due to the cracking of the ridge and gable pointing . AA’s photographs clearly show damage consistent with dete rioration, and wear and tear of the roof and gable in the area surrounding the slipped tiles. I therefore consider the exchanged information is sufficient to show the cause of the external roof damage is an excluded cause under the policy terms. Insurer entitled to decline the cover under the new claim I am not satisfied the complainant has established a storm event caused the slipped tiles and resultant internal water damage. It therefore follows that the internal ceiling damage was caused by:  water entering the home through an opening that was not created by a storm, and  water entering through an opening resulting from maintenance issues. I accept it is fair in all the circumstances for the insurer to rely on the policy terms to decline cover for the claimed damage. I note the complainant also says the roof could have been damaged when the insurer attended in 2015 to carry out repairs for a previous claim. I have considered this below. 2.2 Is the damage related to the 2015 claim? No. The photographs from the 2015 claim show the subject roof tiles intact and undamaged. The exchanged information is not sufficient to establish the claimed damage is related to the 2015 claim, or the insurer’s repair work. Determination | Case number: 800245 Page 4 of 7 Insurer carried out roof repairs for an earlier claim The complainant had a previous claim with the insurer in April 2015. This claim was for damage to the pergola roof after it was partially blown off during a storm. The insurer accepted this damage and completed repairs. The complainant says:  the claim in 2015 involved the pergola roof being ‘peeled back’ by wind and landing on the house roof where the slipped tiles now are  the assessor did not inspect the house roof at that time despite it being reasonable to assume there would be roof damage from that event  the insurer’s builder made no mention of any roof deterioration in 2015. The complainant believes the blown off pergola roof could have damaged the roof tiles, subsequently causing the water ingress and damage now claimed. The exchanged information must therefore be sufficient to show, on balance, the 2015 claimed incident, or the insurer’s repair work, caused or contributed to the cracked and slipped tiles. The exchanged information shows the roof tiles were not damaged in 2015 The insurer and complainant provided photographs of the 2015 storm damage. I accept the pergola roof damaged in 2015 is on the same side of the house as the damage now claimed. This, on its own, is not sufficient to show the damage to the roof tiles is related to the same event. The insurer’s photographs show an overview of the roof in 2015. There was no observable damage to the roof tiles in the area now claimed. The photographs also show the damaged pergola roof was not impacting the roof tiles where they have now slipped. There is nothing to suggest the insurer would have been required to repair or work near the subject roof tiles. The photographs of the roof in AA’s report show there are now various tiles across the roof that have cracked, along with evidence of previous silicone repair This is not isolated to the end of the house that was the subject of the 2015 claim. I am not satisfied there is any information to show the slipped or cracked roof tiles are related to the 2015 claim. I am satisfied the exchanged information shows the damage is consistent with gradual deterioration and wear and tear. This is not a claimable event under the policy terms. 2.3 Is the insurer required to compensate the complainant? Yes. It is fair in the circumstances for the insurer to compensate the complainant $1,500 for non-financial loss. I accept the ceiling collapsing and the consequential stress of this was avoidable if a make safe was carried out on 19 March 2021. The insurer has not sufficiently explained why it was reasonable not to do so. Complainant raises conce rns with the insurer’s handling of the claim The complainant says the insurer delayed investigating the claim and this caused further damage when the loungeroom ceiling collapsed. Determination | Case number: 800245 Page 5 of 7 The complainant lodged the claim on 15 March 2021 and on 19 March 2021 RI and AA assessed the cause of damage. I do not consider this reflective of an unreasonable delay caused by the insurer. The complainant also says:  RI advised him the ceiling would not collapse and a carpenter would be sent out to board up the affected ceiling area  RI did not inspect the roof at any stage but instructed him to put a bucket under the sagging ceiling  a make safe was not completed that day. There is no dispute the loungeroom ceiling collapsed the day after AA and RI’s assessment. It is clear the debris on the loungeroom carpet is consistent with wet material and the photographs also show the insurer was required to install dryers. I therefore accept it had been raining at the time. Given the photographs of the internal ceiling damage show clear sagging and cracking in the loungeroom, I accept it would be reasonable to expect a make safe was completed on the day of assessment. The insurer has not responded to this aspect of the complainant ’s concerns, and it is not clear why a make safe was not completed or deemed unnecessary on 19 March 2021. Fair for the insurer to compensate the complainant $1,500 Under the AFCA Rules, we can award compensation for non-financial loss in limited circumstances. We will only award this type of compensation when there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with t he complainant’s expectations of enjoyment or peace of mind The insurer is not liable for the repair of the ceiling and roof tiles as these areas were already damaged. However, the complainant says he was specifically told his ceiling would not collapse and to use a bucket. It is clear this was not sufficient and subsequently caused the complainant a large amount of avoidable stress and inconvenience. The complainant was required to call the State Emergency Service during the night and he says he had been concerned for his safety prior to the collapse. He also had to move his contents out from the room and spend time with dryers installed in his home. I consider it fair in all the circumstances for the insurer to compensate the complainant $1,500 for the avoidable and unreasonable stress and physical inconvenience caused by this. 2.4 Why is the outcome fair? The terms of the policy set out the parties’ responsibilities and obligations under the contract of insurance. It would not be fair to require the insurer to cover the claimed damage when the exchanged information does not show the operative cause was an insured event. It is, however, fair that the insurer compensates the complainant for the stress caused by not completing a make safe during its initial site attendance. Fair for the insurer to rely on the available information and policy terms Insurance policies do not cover all circumstances that give rise to loss or damage. The insurer is entitled to determine the risks it intends to cover and those it intends to exclude as outlined in the policy terms. Determination | Case number: 800245 Page 6 of 7 In this instance, the exchanged material does not establish a listed insured event caused the claimed damage. Nor does it establish the damage is related to the prior claim in 2015. I am not satisfied the insurer made an error or incorrectly assessed the claim. It would not be fair to compel the insurer to cover the claimed damage in the circumstances. However, I consider it fair for the insurer to take the steps required to fairly address the complainant’s stress and suffering caused by the failure to complete a make safe when it was reasonably required. Determination | Case number: 800245 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.