Home / Suncorp Group / Determination 799391

Determination 799391

Escape of water damage claim settlement - insurer sought to apportion loss to 70% based on earth movement exclusion

FirmSuncorp Group
Decided2022-06-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$67,120
Non-financial loss$1,000
Amount claimed$83,181
SourceAFCA PDF

Summary

The complainant claimed escape of water damage to their home after blocked stormwater pipes; the insurer accepted the claim but sought to pay only 70% of repairs due to earth movement exclusions. AFCA found the escape of liquid was the dominant cause, ordered cash settlement of $67,119.64 and $1,000 non-financial loss.

The escape of liquid was the proximate (dominant) cause of the damage and the insurer had not established pre-existing movement to justify apportionment under the earth movement exclusion.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 799391 Financial firm AAI Limited Determination | Case number: 799391 Page 1 of 6 Case number: 799391 3 June 2022 1 Determination overview 1.1 Complaint The complainant holds a Home & Contents Insurance policy with the financial firm (insurer) and in March 2020 lodged a claim for damage due to the escape of water from blocked stormwater pipes. The insurer accepted the claim but maintains it is liable only to 70% of the cost of repairs as other factors that fall within the policy exclusions were contributing to the movement of the house. The complainant disagrees and maintains the proximate cause of the damage to the home was the escape of liquid and that the insurer should pay for the repair of the home. The complainant is represented by a consumer advocate. Any reference to the complainant in this determination includes reference to submissions by the consumer advocate. 1.2 Issues and key findings Is the insurer required to cover the damage claimed in full? Yes. The engineering reports provided establish that most likely the proximate cause of the damage was the escape of liquid from the damaged stormwater drains and blocked sewer. How is the claim to be settled? It is fair that the insurer pays the cost to relevel the property using resin injection as quoted by MM in the sum of $46,997.50. In addition, the insurer should cash settle the internal and external repairs for $36,183.14 for to the property (total $83,180.68). The insurer can deduct $16,061.00 already paid leaving an outstanding payment of $67,119.64. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer’s handling of the claim has caused the complainant an unusual degree of inconvenience and in the circumstances, I consider it fair that the insurer pays the complainant $1,000 compensation by way of non-financial loss. Why is the outcome fair? The outcome is fair as it considers all the information provided, the terms of the policy and reasonably reflects the cost of repairs as provided by the various quotes. 1.3 Determination This determination is substantially in favour of the complainant. Within 21 days of the complainant’s acceptance of this determination, the insurer is to pay the complainant $67,119.64 in settlement of the complainant’s claim for the internal and external damage and the resin injection as quoted by the ground engineer MM. In addition, the insurer is to pay the complainant $1,000 compensation for non-financial loss pursuant to AFCA Rule 3.3. Determination | Case number: 799391 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable to meet the cost of repairs? Yes. The engineering reports provided establish that most likely the proximate cause of the damage was the escape of liquid from the damaged stormwater drains and blocked sewer. Complainant has established the claim falls within the terms of the policy It is established insurance law that a complainant bears the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of cover under the policy. This is commonly called a prima facie claim. The complainant’s Home & Contents Insurance policy provides cover for a series of insured events listed under the Product Disclosure Statement (PDS) including the escape of liquid (EOL) subject to several conditions and exclusions. The complainant lodged a claim on or about 25 March 2020 after noticing cracking and movement damage to the property that had been developing over a period of 12 months. The complainant provided the insurer with a plumbing report from SPD dated 4 March 2020 which confirmed the presence of water leaks from the stormwater drains and blocked sewer. The insurer appointed ABG to assess the damage and ABG engaged a second plumber BB to carry out relevant leak detection plumbing investigation. AI concluded that there was a strong possibility that the damage had been caused by water leaking out of the stormwater system as it came across several areas of concern. The insurer does not dispute that the property has suffered damage because of EOL. The insurer seeks to rely upon exclusions within the policy relating to earth movement to apportion its liability for the claimed damage and settle the claim based on 70% of the assessed repair quote. Escape of liquid the proximate cause of the damage As the insurer seeks to rely upon the exclusions within the policy, the insurer needs to establish on the balance of probabilities that a proximate cause of the damage to the property was due to one of the excluded factors under the terms of the policy. The proximate cause of damage is the dominant or effective cause of damage. This is a question of fact in each case and the proximate cause is not necessarily the first or last or sole cause of the loss. The insurer’s engineer GP reported in September 2020 that the site was likely to have highly reactive soil classification notoriously reactive to changes in moisture with heave and subsidence. It considered there may have been a slight contribution to movement of the foundation with trees and poor surface drainage contributing to the foundation movement. GP considered however that the leaking pipes were the dominant cause of the foundation movement resulting in the differential movement of the house and to the internal and external damage. The complainant provided an engineering report from SP. SP reported in June 2020 that while minor cracks had appeared a year ago, they had progressed to serious structural movement in the past three to four months. SP disagreed with GP’s apportionment of the Determination | Case number: 799391 Page 3 of 6 cause of damage and considered that the water leakage was the sole contributor to the cracking and damage to the house. A Geotech report provided by STM on 10 September 2020 confirms that the site classification was highly reactive with very high ground movement from moisture changes. I accept that this is an accurate description of the site. Clearly the site has been impacted by the moisture changes resulting from the leaking pipes. The pipes may have been leaking for 12 months or more. I accept that GP and SP agree the dominant or effective cause of the internal and external damage to the home is due to the EOL. No evidence has been provided to indicate damage had been occurring to the property because of seasonal changes or variations in swell/sink cycle. There is no indication of prior repairs to the property to suggest any significant movement. I do not accept the damage can be apportioned as indicated by GP in the absence of evidence from the insurer to indicate there was pre-existing movement or damage to the property. In the circumstances, I am satisfied that the insurer is liable for the internal and external damage sustained to the complainant’s home. 2.2 How is the claim to be settled? It is fair that the insurer cash settles the claim for the resin injection and relevelling as quoted by for and cash settle the internal and external repairs $36,183.14 (total $83,180.68). The insurer can deduct $16,061.00 already paid leaving an outstanding payment of $67,119.64. Insurer should settle based on the scope of works from GP and SP The insurer has offered the complainant $16,061.66 based on 70% of its builder AI’s scope of works plus a 10% uplift. The total scope of works is for $22,945.23. The quote provided by AIis said to be based on the scope of works from GP. There is no dispute that the complainant completed all relevant maintenance works recommended by the insurer’s engineer GP. In a report dated 29 January 2021, GP confirmed that the complainant had completed the recommended maintenance. Nearby trees were from the property and new pavement slabs installed consistent with the National Construction Code (NCC). The report indicated that there was some additional internal damage identified but largely the movement of the property had not significantly changed since its previous report in May 2020. I do not accept the quote from AI complies with the SOW from GP. The report from GP notes the floor deflection levels exceed tolerances and that resin injection underpinning was to be implemented particularly in the southeast corner of the foundation slab. GP recommended that, after allowing a 12-month stabilisation period from the completion of the maintenance works (20 January 2021), structural augmentation works could commence. No allowance for resin injection underpinning has been included in the assessment from AI. GP also recommended:  adjustment of the front door to facilitate easy operation after structural augmentation works  cut and refix architrave to the front entrance  adjust laminate flooring near floor entrance  replacement of bricks above the front entrance and repointing  patching and painting of the southern window moulding  patching and painting of the interior windows, hallways, bedrooms. Determination | Case number: 799391 Page 4 of 6 The complainants engineer SP also recommended slab jacking and grouting work be performed. As indicated, the AI scope of works did not allow for the relevelling of the house or adjusting of the laminate flooring. I note the insurer’s assessor in her report in August 2021 commented that the building did not require slab or grouting work as recommended by SR. The assessor also considered GP believed only one area slightly exceeds the floor deflection tolerances. This is inaccurate. GP’s report of 29 January 2021 was clear. It considered the floor deflection levels exceeded tolerances over the front of the dwelling and resin injection underpinning was to be implemented upon completion of the stabilisation period. I consider it fair the insurer pays the cost of the resin injection and pays for the internal and external damage as assessed by the engineers. Insurer is to cash settle the claim In March 2021 the complainant provided a quote from MM of approximately $11,000 to complete the resin injection. This quote was based on an inspection of the property in November 2020. The current quote provided on 16 February 2022 is $46,997.50. I sought clarification of this given the significant increase. I note the current quote follows a second inspection of the property on 8 February 2022, MM has advised that following receipt of the engineer’s report and the inspection, the d amage was considered worse. The insurer has not provided a response to the quote that was exchanged on 17 February 2022. In the circumstances, I consider it fair that the quote be relied upon and that the insurer cash settle the complainant for the cost of the resin injection and relevelling of the property in the sum of $46,997.50. As the quote is a current quote, interest is not payable. I also consider that in addition to the cost of the resin injection and relevelling it is fair that the insurer cash settles the claim for the remaining internal and external damage. However, I do not consider the quote provided by the complainant’s builder MHI fairly reflects the extent of the internal and external damage. I do not believe that following the resin injection, it will be necessary for the complainant to replace the doors, fly wire screens or windows of the home nor do I believe it will be necessary for the complainant to replace the entire laminate flooring. I accept that the amount quoted for the walls and ceilings of $13,500 is fair and reasonable. To this should be included an allowance of $500 to allow for a flooring contractor to adjust the laminate flooring near the front entrance as identified in the report from GP. The complainant’s quote from MHI of $28,050 to replace the concrete driveway and damaged post does not appear reasonable. The report from GP confirms that the complainant had already completed the new apron pavement slab and repaired the damage to the concrete pathways caused by the EOL. I consider the assessment contained from AI more fairly reflects the likely cost to repair the external pavement area including concreting, brick laying, demolition and caulking. The AI quote for this work comes to $17,463.60 including relevant builder’s allo wances, site supervision and GST. This brings the total cost of the internal and external repairs to $31,463.60. Given the age of the quotes and transfer of risk it is fair to allow a 15% ($4,719.54) uplift for contingencies. This brings the total cash settlement for the remaining internal and external repairs to Determination | Case number: 799391 Page 5 of 6 $36,183.14. The complainant has already been paid $16,061 in settlement of the claim on 10 May 2021. The insurer is entitled to deduct this from the total settlement payable of $83,180.64 making an outstanding cash settlement payable to the complainant of $67,119.64. 2.3 Is the complainant entitled to compensation for non- financial loss? Yes. The insurer’s handling of the claim has caused the complainant an unusual degree of inconvenience and in the circumstances, I consider it fair that the insurer pays the complainant $1,000 compensation by way of non-financial loss. AFCA can award compensation for non-financial loss AFCA can award compensation of up to $5,400 for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve the situation. AFCA takes a conservative approach to the award of compensation and expects the complainant to be moderately robust in dealing with the usual inconvenience associated with any insurance claim. Complainant suffered an unusual degree of inconvenience While the insurer accepted the complainant’s claim, the insurer’s decision to seek to apportion the loss even though there was little evidence of prior damage to the complainant’s property, has caused considerable inconvenience to the complainant. Further, the insurer’s offer based on the quote from AI without considering the scope of works provided by its own engineer GP, in particular, the need for the resin injection to level the foundations has led to further delays and confusion in the finalisation of the claim. While I accept an insurer is entitled to form its view based on the information available, I consider, considering the engineering reports exchanged that the insurer should have addressed the issues with respect to the relevelling of the property when making its settlement offers to the complainant. In my view, it is fair in the circumstances to award the complainant $1,000 compensation for non-financial loss. 2.4 Why is the outcome fair? The outcome is fair as it considers all the information provided, the terms of the policy and reasonably reflects the cost of repairs as provided by the various quotes. Given the fact that the insurer and it failed to assess the cost of the resin injection despite being aware of the need for the resin injection to level the property from February 2021, it is fair to rely on the quote provided by the complainant. Determination | Case number: 799391 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, havingregard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and eachparty has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or torequire third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are norelevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claimcannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.