Home / Suncorp Group / Determination 798357

Determination 798357

Claim handling and non-financial loss arising from contents damage claim

FirmSuncorp Group
Decided2022-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$6,849
SourceAFCA PDF

Summary

The complainant, overseas at the time, claimed contents damage after a unit leak and sought costs for a local builder, paint touch-ups and non-financial loss over claim handling. AFCA found the insurer handled the claim fairly overall and ordered no compensation.

The insurer is not liable for paint touch-ups, builder costs excluded by the policy and not caused by unreasonable handling, and non-financial loss is not warranted given shared delays and the overall fair handling.

Issues

Subjects and remedies

home or building damagethird party authoritytravel or overseasno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 798357 Financial firm AAI Limited Determination | Case number: 798357 Page 1 of 10 Case number: 798357 15 February 2022 1 Determination overview 1.1 Complaint The complainant claimed for damage to his home contents after relatives informed him of a leak at his unit on or around 3 June 2020. He was overseas at the time, and his contents were insured with the financial firm (insurer). The insurer accepted the claim, but the complainant is dissatisfied with its claims handling. He says the insurer poorly handled the claim, so it must compensate him for:  costs he incurred to hire local builder ‘JM’ to assist him with the claim  damage caused to some walls and stairs by its contractors, which require paint touch-ups  stress, anxiety, inconvenience and mental anguish he suffered. The insurer denies mishandling the claim or that any compensation is payable. 1.2 Issues and key findings Must the insurer pay the complainant for paint touch-ups? No. There is no evidence the claimed additional damage that require paint touch-ups was caused by the insurer’s contractors. Must the insurer pay the complainant for JM’s services ? No. The complainant hired JM because he was overseas and could not handle his part of the claim himself. It was not because the insurer unreasonably handled his claim. Must the insurer pay non-financial loss compensation? No. The exchanged information shows the claim was handled fairly and reasonably overall even though there were some service imperfections. The complainant and other factors also contributed to some significant delays and difficulties with the claim. It is not fair to award compensation for non-financial loss in these circumstances. Why is the outcome fair? The evidence in this complaint does not support that the insurer must pay compensation for the additional damage claimed, the cost of JM’s services and non-financial loss. Given this, it would not be fair to require the insurer to pay any compensation. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to pay any compensation or take any other action. Determination | Case number: 798357 Page 2 of 10 2 Reasons for determination 2.1 Must the insurer pay the complainant for paint touch-ups? No. There is no evidence the claimed additional damage that require paint touch-ups was caused by the insurer’s contractors . Policy does not cover the unit’s walls and stairs There is no dispute the complainant only has contents cover under his policy. This means the policy does not cover his unit’s walls and stairs, as these are part of the unit’s building . AFCA can award compensation for indirect financial loss AFCA can award a complainant compensation for indirect financial loss under its rules. Compensation is capped at $5,400 and is usually awarded where an insurer has acted in a way that caused a complainant to incur a loss they would not otherwise have incurred. Complainant says insurer’s contractors damage d unit’s walls and stairs The complainant says the insurer’s contractors left marks and slight damage on the paintwork of certain walls and the stairs of his unit. He says:  he relies on the ‘words’ of JM in saying this  it would cost $1,800 (plus GST) to touch-up such damage, which the insurer must pay. He also questions why the onus is not on the insurer to prove its contractors did not cause the claimed damage. The insurer denies the damage was caused by its contractors. No evidence insurer’s contractors caused the claimed additional damage On review of the exchanged information, I find no persuasive evidence the insurer’s contractors caused the claimed additional damage. While the complainant relies on JM’s ‘words’, it is unclear what those words are. Nor is it clear how JM necessarily knows the relevant contractors caused the claimed damage. There is no clear or substantiating information from JM about this. Complainant has onus to show insurer’s contractors caused claimed damage Since the complainant is making the allegation, it is an established legal principle he has the initial onus to prove his allegation. A mere allegation is not enough to satisfy this onus. The complainant must provide some satisfactory evidence to support the allegation. Complainant has not established insurer is responsible for paint touch-ups The complainant has not provided evidence to support his allegation. I am not satisfied he has satisfactorily shown the insurer’s contractors caused the cla imed additional damage. The insurer is not required to compensate the complainant for the paint touch-ups claimed. Determination | Case number: 798357 Page 3 of 10 2.2 Must the insurer pay the complainant for JM’s services? No. The complainant hired JM because he was overseas and could not handle his part of the claim himself. It was not because the insurer unreasonably handled his claim. Complainant says insurer exacerbated his cost for JM’s services The complainant says the insurer must compensate him $5,049, being cost he incurred to have JM attend to the claim for him. He says this cost was incurred or exacerbated because of the insurer’s poor planning, communication and management of the claim. The complainant says the insurer obtained an incorrect scope of works. It also showed him a sample of floorboards to select, only to later realise his selected choice was not in stock. These incidents caused him money as they necessitated JM’s attendance at:  his unit for a re-measure  a flooring showroom to choose an alternative floorboard. He further says the ins urer’s contractor ‘JL G ’ asked JM to coordinate the trades onsite as its project supervisor was going on holiday from 29 December 2020 to 11 January 2021. Insurer says the cost of JM’s services is excluded The insurer says the complainant engaged JM’s services in a private agreement. It did not approve or authorise JM’s engagement, and the policy excludes the cost. The insurer relies on the following exclusion in the relevant product disclosure statement (PDS): General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: … Consequential losses or extra costs following an incident covered by your policy consequential loss (financial and non-financial loss) or extra costs following an incident covered by your policy, such as:  loss of income or wages;  medical expenses;  loss or costs, including the cost of your time (e.g. inconvenience) to prove your loss or to help us with your claim (e.g. telephone calls, postage);  cost of hiring appliances after yours suffer loss or damage;  professional, expert, legal, consulting or valuation costs unless you obtained our prior written authority to incur these costs;  cost of replacing or reapplying pest control chemicals and baits in or around the insured address;  cleaning costs;  any costs related to stress or anxiety;  any costs not covered by your policy. Determination | Case number: 798357 Page 4 of 10 Complainant hired JM because he was overseas JM’s invoice shows he charged the complainant $5,049 for 51 hours of his time on the claim. This covered his attendances to the claim from June 2020 to January 2021. There is no dispute the complainant was overseas throughout this period due to restrictions in place because of Covid-19. If he was home, he would have had to directly engage the insurer and its representatives for purposes of access, assessment and repairs. He could not attend to these matters personally, so he hired JM to assist. This means he incurred the cost for JM’s services not because of the insurer’s claims han dling, but simply because he was not in Australia to handle these matters himself. Complainant can claim JM’s cost if caused by unreasonable claims handling I accept the policy does not cover this cost and specifically excludes it based on the exclusion relied on by the insurer. However, AFCA can require the insurer to compensate the complainant for this cost, if he establishes:  the insurer unreasonably handled his claim  he would not have incurred the cost but for the insurer’s unreasonable claims handling Evidence does not show insurer unreasonably exacerbated complainant’s cost The complainant says the insurer’s erroneous settlement of the scope of works and recommendation of a replacement floorboard caused him to incur extra cost with JM. If so, it is then unclear why he seeks full reimbursement of JM ’s charges and did not limit his claim to only these incidents. In any case, I am not satisfied the insurer is responsible for the cost arising from these incidents. It is not unusual for further damage to be found after an initial assessment, or when damaged material is being removed or some other works are being carried out. In such situations, it is not unusual for further inspections, assessments and revised scope of works to be required. It is also not unusual inadvertent mistakes can sometimes occur. The exchanged informati on shows the insurer’s restoration contractor ‘R’ discovered further damage when it was carrying out some works at the unit. The insurer’s contemporaneous claim notes indicate:  it rec eived JLG’s initial repair quote on or around 2 October 2020  R informed it of the discovery of additional damage on 6 October 2020, after which it instructed JLG to quote for the additional damage Since the insurer accepts liability for more recently discovered flooring damage, it will need to know what extra materials and work were required to cover such damage. Given this, it is not unusual or unreasonable that the insurer would require a further inspection of the unit. This is regardless of whether JLG sent an incorrect scope of works to the complainant. As policyholder and claimant, the complainant is expected to cooperate with the insurer on this. This is the case whether he is in the country and handling the claim on his own, or he had hired someone to assist him with it because he was overseas. I do not accept the suggestion R could necessarily have discovered the new damage earlier. R first inspected the unit in June 2020 and could only report on what was readily observable to it then. R could not also begin restoration works until late September 2020. By this time, it is not unreasonable floorboards which were initially restorable (or thought to be restorable) Determination | Case number: 798357 Page 5 of 10 may have become unsalvageable. It is also not unreasonable damage which may not have been apparent earlier to now show itself. Accordingly, while I accept the complainant may have incurred costs because of a further inspection, I am not satisfied it was because the insurer unusually or unreasonably handled the claim. The insurer was simply trying to finalise the scope of works and costings. I am also not satisfied the insurer unreasonably caused the complainant to incur extra costs just because JM attended the flooring installer’s showroom to select suitable floorboards. The insurer’s obligation is to replace the damaged floorboards like for like if it is possible to do so. Where it is not possible to do, it must provide the closest match possible. In this instance, the insurer’s builder JLG felt a particular floorboard (which I will call ‘ sample B’) was the closest match to the complainant’s original floorboards. It emailed the complainant with images of sample B, but the complainant felt it was difficult to confirm without comparing a real sample with the original floorboards. He then suggested a meeting between JLG and JM at his home, so JM could confirm if the match was satisfactory. This meeting occurred, and JM confirmed sample B was a good match. However, sample B would only be available in late January or early February 2021. As the complainant considered this unacceptable, he would need to select another alternative that could be supplied earlier. This means he would have had to attend the flooring contractor’s showroom to make another selection in any event. This is the case whether he does this himself or engages someone else to do it for him. Finally, I find no persuasive evidence JLG specifically asked JM to coordinate with trades because its project supervisor was going on holidays from late December 2020 to 11 January 2021. The relevant supervisor’s 29 December 2020 email indicates:  the flooring installation works were already organised before he went on leave  JM had the relevant trades’ contact details, so ‘he can handle them… if need be’. Further, there was already a key safe lock installed at the unit at the time, so the relevant trades could access it for repairs without requiring JM’s presence. Even if there was some discussion about this, the complainant would likely have incurred a cost for JM’s attenda nces anyway. The flooring replacement works were done over this period and the complainant’s own words were that he engaged JM to ‘safeguard, coordinate and oversee’ the insurer’s contractors. This means he would have required JM to attend over this period in any event, to oversee the flooring works being done. Insurer did not cause or unreasonably exacerbate cost for JM’s hire Ultimately, the root cause for why the complainant incurred a cost for JM’s time was simply because he was not in Australia to manage his part of the claim himself. The insurer did not cause the cost, nor am I satisfied it unreasonably exacerbated the cost. I am not satisfied the insurer is required to compensate the complainant for JM’s hire . Determination | Case number: 798357 Page 6 of 10 2.3 Must the insurer pay non-financial loss compensation? No. The exchanged information shows the claim was handled fairly and reasonably overall even though there were some service imperfections. The complainant and other factors also contributed to some significant delays and difficulties with the claim. It is not fair to award compensation for non-financial loss in these circumstances. AFCA can award compensation for non-financial loss in some situations Under its rules, AFCA can award the complainant compensation for non-financial loss where the insurer takes an unusual amount of time to resolve his situation, causes him unusual inconvenience or unusually interferes with his expectation of enjoyment or peace of mind. Such compensation is capped at $5,400. AFCA takes a conservative approach to compensation for non-financial loss. AFCA generally expects complainants to be moderately robust and bear the usual degree of stress and inconvenience experienced during an insurance claim or in ordinary dealings with an insurer. AFCA’s ability to award non -financial loss compensation is not intended to penalise an insurer just because it made some errors, or its service may not have been completely perfect. Complainant has raised numerous issues about the insurer’s claims handling The complainant raises numerous concerns abou t the insurer’s claims handling . Broadly, he says the insurer delayed his claim, lacked transparency and empathy, and made several errors with the claim. Some of his specific concerns include:  the insurer appointed and replaced contractors without prior indication and without explaining their relationships, failed to provide clear timeframes on when works would be done, failed to coordinate the return of his furniture with his in-law instead of JM, failed to inform him of an organic growth he needed to remove until two weeks after R discovered it  the insurer’s contractors attended his unit without prior indication, failed to identify damage at the outset, sent him an incorrect scope of works, sent him a contract to sign that implied he had to pay the repair cost, and failed to check that the floorboards it offered to him were in stock before offering it to him. The complainant says the insurer’s claims handling caused stress, anxiety, inconvenience and mental anguish, so he is entitled to the maximum amount payable under AFCA rules. Insurer says it did not mishandle the claim and compensation is not warranted The insurer denies mishandling the claim or that any compensation for non-financial loss is warranted. It says the claim was fairly and reasonably handled. It was drawn out because the complainant was overseas and contributed to the delay. The insurer maintains it was regularly and promptly working on the claim. This included regularly updating the complainant, settling repair quotes, and responding to his queries and concerns. The insurer also explained there were delays in:  informing the complainant about the discovery of organic growth at the unit because it only received R’s report on 20 November 2020  carrying out cleaning works at the unit because the complainant alleged its contractors caused additional damage, which it needed to investigate and respond to. Determination | Case number: 798357 Page 7 of 10 No dispute claim took several months to resolve On review of the exchanged information, I accept the complainant’s contents damage claim took several months to resolve. The claim was lodged in June 2020 but appeared to have been finally resolved in or around April 2021, some 10 months later. I also accept the insurer made some mistakes and some aspects of its claims handling were not perfect. I consider the insurer could have better handled some aspects, such as:  giving earlier notice on when the insurer was planning to retune the complainant’s piano  advising what building items needed to be removed for the floor replacement works clearly  finalising the correct scope of works required to repair the unit’s damaged flooring before sending it to the complainant for acceptance. However, I am not satisfied these matters justify an award of compensation after considering the overall circumstances of the claim. Insurer can decide on the contractors it wishes to appoint to the claim I accept the complainant may not have been consulted before the insurer appointed its contractors to attend to the various aspects of his claim. I also accept he may:  not have been notified of some of the contractors’ attendances at the property  be concerned about the security of his property and the cost of JM’s services . However, the insurer can decide who it wishes to appoint to assess, quote or carry out work at the unit. It does not need the complainant’s permission for this. T he insurer’s conduct in this regard is not unusual claims practice. There is also nothing to suggest the insurer’s contractors attended his property for purposes unconnected to the claim. Further, the insurer:  addressed the complainant’s concerns about safety in its 22 June 2020 email  clarified the various contractors it had appointed to the claim in its 21 October 2020 email. Insurer did not cause some of the significant delays with the claim The exchanged information also shows the insurer was not responsible for at least 13 weeks of delay that occurred with the claim. Following a query about settlement options, the insurer offered the complainant the option of a cash settlement if that was his preference. This offer was made on 23 June 2020 and the insurer sent a reminder to respond on 1 July 2020. The complainant did not respond to the offer until 14 July 2021, when he decided to proceed with repairs. This delayed progress of the claim by three weeks. Following confirmation of his settlement preference, the insurer wrote to the complainant the next day (i.e. 15 July 2020). Amongst others, the insurer asked the complainant to confirm when R can begin drying works at the unit. The complainant did not respond, so the insurer sent reminders on 29 July and 18 August 2020. The complainant only responded on 1 September 2020, nearly seven weeks after the insurer first asked. The complainant’s chronology suggest s the unit was undergoing some repairs from July to mid-August 2020. It is unclear if the insurer was aware of this, but it is clear it could not:  begin work at the unit until the complainant provided it with a date  be responsible for the delays that occurred up to 1 September 2020. In his 1 September 2020 email, the complainant also informed the insurer to begin works on 23 September 2020. This added another three weeks delay on top of the earlier delays. Determination | Case number: 798357 Page 8 of 10 The exchanged information further shows the insurer asked the complainant to provide information to resolve the rugs damage claim early in the claims process. The complainant did not respond to this until 13 January 2021. I also accept the complainant’s complaint about claims handling and claim for JM’s co sts complicated and contributed to a delayed resolution. The insurer had to expend resources and time to review and respond to these matters, while having to deal with the main claim at the same time. The exchanged information shows the complainant complained and sought compensation for JM’s cost 23 days after allowing R access to the unit to start restoration work. However, there was a host of preparatory work required before the insurer could begin flooring replacement works. This included obtaining and finalising scopes of works and quotes, packing and removing furniture, removing damaged flooring, selecting and ordering floorboards, allowing the relevant sub-floor areas to properly dry out before new floorboards are installed, and determining moisture levels are satisfactory before flooring repairs begin. Such matters would invariably take time. They would also make it difficult for the insurer to provide a clear timeframe for when repairs would be completed. Not fair to only consider one aspect of delay I acknowledge the complainant says the insurer took four to five months to repair his unit from the time the damaged floorboards were removed. However, this gives an incomplete view of the full circumstances that resulted in the delays that occurred. As indicated earlier, the complainant and other factors contributed to some significant delays that occurred with the claim. It is not fair that the insurer pays compensation for delay, when its ability to resolve the claim promptly was also impacted by factors outside its control. Insurer was still working in the background despite delays it did not cause Notwithstanding the delays, the exchanged information nonetheless shows that the insurer was still regularly reviewing and working on the claim in the background. This included:  sending the complainant regular updates about the claim and reminders to respond to its 23 June and 15 July 2020 emails  organising, assessing and finalising the repair quote for the flooring damage  attending to his queries and complaints. The insurer’s contemporaneous file notes and numerous emails supplied for this complaint show this. Ultimately, the exchanged information shows the new flooring was installed within 14 weeks from when R was first given access to begin restoration work. Considering the preparatory works required and other challenges presented with the claim, I do not consider the time taken to complete the flooring repairs to be so unusual or unreasonable it warrants an award of non-financial compensation. Insurer’ s communications were fair and reasonable overall I appreciate the complainant may not have like the way the insurer communicated with him. I also accept there were service imperfections with some of its communications. However, I find nothing particularly unprofessional or rude about them overall. Overall, I am satisfied the Determination | Case number: 798357 Page 9 of 10 insurer made reasonable attempts to attend to his claim and respond to his queries and concerns fairly. I acknowledge the insurer did not telephone the complainant although he had given an overseas telephone number. While a phone contact might have been ideal, I am not satisfied the insurer was necessarily obliged to do this. The complainant was overseas, and it appeared settled from the outset that they would communicate by email exchange. Insurer appears to have given the benefit of doubt on some aspects of the claim I accept there were delays in finalising the complainant’s claims for a piano retune, a missing vent and damaged lock, and a clean of his entire unit. However, this must be balanced against the fact the insurer:  needed to investigate and provide a decision on the complaint its contractors caused additional damage to the unit before arranging cleaning  agreed to cover these costs although there was no clear evidence it was necessarily responsible for them. There is nothing in the exchanged information that persuasively shows the insurer’s contractors lost the missing vent, damaged the claimed lock or caused the complainant’s piano to go out of tune to warrant a retune. The unit also underwent some prior building repair works and it is unclear if it was cleaned after such works. There is no information about the unit’s state of cleanliness immediately before the insurer began its work. It is also unclear if the insurer’s contractors necessarily dirtied the whole unit to warrant a whole unit clean. Not fair in all the circumstances to award compensation for non-financial loss Accordingly, while I accept there were delays and imperfections with some aspects of the insurer’s claims handling, I am satisfied it was handled fairly and reasonably overall. I am also satisfied the complainant and other factors contributed to the insurer’s difficulties in resolving the claim. Given these circumstances, I am not satisfied it is appropriate or fair to award compensation for non-financial loss in this instance. Determination | Case number: 798357 Page 10 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.