Mould and water damage claims: insurer's cash settlement offer and further remediation
Text of the determination
Determination
Case number 798296
Financial firm Insurance Australia Limited
Determination | Case number: 798296 Page 1 of 9
Case number: 798296 22 December 2022
1 Determination overview
1.1 Complaint
The complainant is insured under a home and contents policy with the financial firm (insurer).
Between 14 July 2020 and 30 November 2020, three claims were lodged for damage caused
by escape of liquid and storm to the home.
The insurer accepted and agreed to cash settle the claims. It says the complainant ‟s failure to
complete the required maintenance and insured repairs has caused further damage for which
it is not liable. The insurer says the complainant hindered the investigation by not allowing it
to follow its normal procedures or its contractors to complete the mould remediation.
The complainant says the insurer failed to correctly diagnose the leak and failed to act within
an appropriate time frame, resulting in further damage. The insurer failed to keep her updated
on the process and her experience has been unprofessional, stressful and distressing. She is
seeking the insurer increase its cash settlement offer.
1.2 Issues and key findings
Is the insurer’s offer fair in all the circumstances?
No. The insurer should complete the mould remediation and cash settle the complainant for
any further claim related damage that may be identified once the complainant has
commenced repairs.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer‟s claims handling has caused the complainant an unusual degree of
inconvenience and in the circumstances compensation of $3,000 for non-financial loss is fair.
Why is the outcome fair?
The outcome is fair as it allows for the mould remediation to be completed and for
assessment of any additional damage. Any additional damage can then be cash settled and
allow for the finalisation of the three claims.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 days of the
complainants accepting the determination the insurer is to:
pay the complainant $19,375.82 in settlement of claim …0100
pay the complainant $3,000 compensation for non-financial loss
appoint an environmental hygienist to complete the mould remediation and provide a PRV.
The insurer is to continue to cover the temporary accommodation cost until completion of the
mould remediation. The insurer can then cash settle the complainant for any further damage
identified as set out in section 2.1 of this determination.
Determination | Case number: 798296 Page 2 of 9
2 Reasons for determination
2.1 Is the insurers offer fair in the circumstances?
No. The insurer should complete the mould remediation and cash settle the complainant for
any further claim related damage that may be identified once the complainant has
commenced repairs.
Complainant has established a valid claim
The complainants home and contents policy provides cover for a series of listed events
including storm and water or liquid damage. Water or liquid damage cover includes damage
caused by water or liquid escaping from items including a fixed pipe, bath, basin shower base
or wall, toilet or sink.
The complainant has lodged three claims on the policy between 14 July 2020 and 30
November 2020. The insurer has accepted liability for each claim. The insurer says that had
the complainant attended to all the required maintenance issues and completed the known
repairs at the time of being cash-settled for the claims, that many of the ongoing costs and
further damages would simply not have occurred. The insurer says it has in good faith
continued to offer further settlements for the claims which would ordinarily be denied as per
the PDS.
While there is no significant dispute as to the damage arising from each event, mould has
developed. The property is currently unsafe to live in and has caused some health issues for
the complainant and her family.
I will briefly summarise each claim
Claim …6081 lodged for escape of liqu id on 14 July 2020
The complainant first lodged a claim on 14 July 2020 for damage to a loungeroom roof. The
description of the loss was:
“noticed water inside the porch light. Complainant has also noticed water dripping in the
lounge room light shade, th e spare bathroom is above the lounge room”.
The insurer investigated the leak after the complainant obtained her own plumbers report. At
the time the suburb was in lockdown because of the COVID-19 pandemic, and the States
pandemic response. The complainant was also experiencing some personal matters and
asked that the claim placed on hold for a month.
The insurer appointed building group BBG to assess the damage. BBG identified the damage
was caused by a leaking shower recess and screen but was unsure as to the extent of any
sub floor damage.
The insurer settled the claim as follows:
cash- settlement for the „known‟ damages to the bathroom of $14,332.36 on 16 December
2020
$7,518.50 for carpets on 24 December 2020
Timber Floor - $15,142.51 plus 20% uplift - $3,028.50 = $18,171.01 – paid 30 November
2021
Carpet $3,840.65 plus 20% uplift - $768.13 = $4,608.78 paid 30 November 2021
Determination | Case number: 798296 Page 3 of 9
The insurer says the complainant failed to complete necessary repairs and now the mould
and damage is now much greater than what it should have been. The insurer acknowledges
there may be damage to the subfloor and are willing to consider any damages to the area
underneath the bathroom that may have occurred from the above claim once repairs have
commenced. The insurer is willing to consider a variation payment once the complainant has
completed the bathroom repairs.
The insurer has offered to pay $5,072.17 for the mould remediation. It says as the mould
remediation requires a strip out of the bathroom and it has cash settled the complainant for
this damage it is unable to complete the mould remediation.
Claim …0100 lodged for storm damage to balcony/porch on 9 November 2020
When investigating the first claim the complainant obtained a leak detection report in October
2020. At that stage a second claim was identified caused by water damage following heavy
rains.
The second claim was lodged on 10 November 2020 with the date of loss recorded as 27
October 2020. The claim was:
“ found water stains along the ceiling of the kitchen, the front door has swollen,
there is water leaking from the front porch light and the ceiling has started
cracking ” .
BBG provided a SOW and quote to repair the balcony/porch of $26,880.32. The SOW
included the strip out of the balcony. The insurer noted as the cause of the leak is failed water
proofing it has excluded all repairs associated with the repair of the leak. The insurer notes no
damage can be repaired until the leak is fixed.
The insurer offered to settle for the resultant damages only for $16,146.52 plus a 20% uplift of
$3,229.30 ($19,375.82)
Claim …5546 for escape of water lodged 30 November 2020
The complainant lodged a third claim on 30 November 2020 for damage said to have
occurred on 10 November 2020. The description of this claim was:
“ the complainant noticed a yellow stain on the ceiling of the kitchen. Plumber
from another claim stated it doesn‟t look like water damage, suggested it was
maybe a possum. She felt it and her finger went through it. BBG attended and
advised it was water damage. Leak test and pressure test obtained, and the toilet
has been leaking out the back into the membrane to the ceiling ”.
The insurer says it offered to complete mould remediation on 19 July 2021 however the
complainant asked for this to be placed on hold until she received independent advice.
On 2 December 2021 the insurer cash settled the damage claim for $4,912.06 and on 17
February 2022 offered to complete the mould remediation to the kitchen and lounge room
areas. Alternatively, the insurer offered a cash-settlement of $12,373.98 so the complainant
could have one contractor to complete both the bathroom mould remediation under claim
… 6081 and the kitchen and lounge area (total mould remediation cash-settlement offer for
both claims = $17,446.15).
Determination | Case number: 798296 Page 4 of 9
Insurer relied on consultants in forming its view
The insurer has relied on the views expressed by its consultant builder CFT and specialist
UBS in determining its liability. CFT, attended on 8 January 2021 and 16 April 2021.
CFT considered the damage to the balcony/porch was due to design flaws or defective
building work and not result to a single insured event. CFT considered most of these matters
had been occurring over the life of the building and without the knowledge of the complainant.
CFT considered the kitchen had been damaged by water ingress was occurring from the
window frame in the ensuite whilst thermal imaging showed water ingress from the toilet,
caused by the PVC pipe that feeds the water cistern to the bowl not being correctly fitted or a
failing seal.
CFT water damage to the plasterboard is on the southern side of the balcony doors in the
rumpus room. It inspected the roof directly above the water damaged rumpus room ceiling.
CFT reported that the valley gutter deposits rainwater directly onto the roof tile through the
open end of the gutter, and through a hole that has been cut into the bottom of the gutter. It
also noted a roof tile at the northern wall of the balcony is distorted and damaged, leaving a
gap between the roof tile and the tile above it, flashing had also been installed on top of the
lower tile to stop any water ingress, which it considers to be defective workmanship.
The insurer requested repair specialist UBS review the report and provide a scope of works
(SOW) for the resultant damage. UBS concluded that as it had not attended the property it
would recommend contacting CFT to confirm whether, following the complainant completing
the maintenance items raised, a warrantable repair could be completed for the resultant
damage to the lounge and kitchen.
UBS referred the matter back to the insurer after providing a SOW for the repair of the kitchen
and lounge ceiling for $4,097.02. The SOW also noted that it must ensure the timber ceiling
frame in both the kitchen and the lounge area were in a suitable condition and if drying out or
treatment was required a variation in the SOW would be required.
Complainant disputes the insurer ’ s findings
The complainant says the reports from the insurers experts UBS and CFT are not conclusive
in their findings and does not agree that some of the damage was due to maintenance. She
further noted the engineers were not sourced to identify the leak and the inspection was
completed under specific instructions by the insurer.
The complainant obtained reports from an engineer RBA dated 23 February 2022 and 30
May 2022, and from their hygienist BE, dated 5 April 2022.
RBA‟s report final report dated 30 May 2022 reported that:
particleboard flooring in the main bathroom is stained and weakened, appears capable of
supporting the tiles and toilet above it, however it will require replacement
timber wall structures on the northern and western side of the shower enclosure will need
to be replaced (main bathroom), as well as part of the lounge room ceiling
the kitchen ceiling will require replacement.
BE reported that:
mould is present in the kitchen ceiling and would require significant remediation
due to the missing tile in the back wall of the shower in the main bathroom, mould is likely
to be within the ceiling cavity and in nearby wall cavities, as with the particle board.
Determination | Case number: 798296 Page 5 of 9
BE further commented on the complainants concerns with her family‟s health and living within
the property. BE had also provided comment to the potential likely and unlikely causes of the
mould.
The complainant confirmed that it was not made clear to her or within the reports before the
CFT report dated 23 April 2021, as to where the leak in the kitchen ceiling was coming from.
She did however confirm in July 2021, that she had replaced the toilet in the ensuite, outlining
that her plumber confirmed the seal was worn and contributing to the leak in the kitchen. She
confirmed on 5 July 2021, that there had been no further leaks after the toilet was replaced
and this had led her to believe that the ensuite window did not contribute to the damage.
Mould spread throughout house
The insurer does not dispute that mould is present throughout the house, having spread over
the course of the claims. The insurer maintains it largely due to the complainant‟s failure to
allow the insurer to complete the remediation and failure to complete the necessary
maintenance works.
The insurer says the complainant was aware of the leaking toilet from November 2020. I do
not agree. The insurers notes indicate leak detection revealed a possible leaking toilet and
measures had been put in place to stop it in December 2020. There is no indication the
complainant was informed of any ongoing leak. JLG says in February 2021 that an invasive
leak detection test was necessary to determine the cause of water damage. The claim notes
indicate JLG recommended mould remediation in March 2021, but this was not done.
I accept the complainant was not aware that the toilet leak was the cause of further damage
until March/April 2021 and acted reasonably in having the leak repaired.
The complainant‟s environmental assessment confirms the likely spread of mould through
cross contamination throughout the house due to the delays in completing the mould
remediation. I accept the delays have been contributed to by the complainant and the insurer.
Insurer to complete mould remediation
I acknowledge the insurer has cash settl ed claim ….6081 including the costs of the known
damage to the bathroom. I accept the failure to complete the bathroom repairs in a timely
manner may have exacerbated the mould damage.
In my view however, the complainant was in a difficult position. Victoria was in lockdown due
to Covid-19, trades were not readily available and there was uncertainty as to the cause and
extent of damage added to by the two additional claims lodged in November 2020.
The insurer was aware that at the time the complainant was a vulnerable person. It was
informed of issues faced by the complainant and noted in its file notes the complainant was
„very vulnerable‟ . It was not unreasonable for the complainant in these circumstances to delay
any mould remediation until all sources of water damage were identified. I accept the
complainant acted promptly in having the leaking toilet repaired once it was confirmed as a
source of the leak.
The insurer has acknowledged possible subfloor damage. The SOW for mould remediation
dated 29 September 2021, confirms that if the second story subfloor and timbers have been
affected, additional works may be required, as well as further identification of mould within the
ceiling cavity. I am satisfied that the insurer is liable for the damage and remediation to the
subfloor, bearers and joists, should this be identified once the repairs have commenced
Determination | Case number: 798296 Page 6 of 9
In my view in the circumstances it is fair that the insurer completes the necessary mould
remediation. On completion of the remediation the insurer must provide a post remediation
certificate (PRV) prior to the complainant returning to the home.
Once the mould remediation is completed as the insurer has already settled the claim for
damage to the bathroom (…6081 ) , kitchen and lounge (…5546) the complainant can
commence the repairs. The complainant should notify the insurer once the repairs have
commenced so that an independent engineer can be engaged to assess the subfloor area
and prepare an actionable quote to cover any additional repairs.
The independent engineer should be one agreed to by the parties. This can be done by the
insurer providing a list of three engineers that the complainant can choose one from.
Alternatively, the complainant can provide three choices for the insurer to choose one – the
engineer‟s costs are to be borne by the insurer . Once the engineer completes a scope of
works, each party can obtain at least one, and no more than two, actionable quotes based on
that scope of works. To clarify, an actionable quote is one where the builder is prepared to do
the works for the complainant. The insurer can then cash settle the claim based on that quote
plus a 20% contingency. The contingency is to address the likely variances that may arise in
a complicated job like this and the fact the risks of the works are passing to the complainant.
Temporary accommodation to be covered until mould remediation completed
The insurer initially did not consider temporary accommodation was required. It was not until
29 September 2021 that RX identified a large amount of organic growth in the kitchen and
that temporary accommodation was required.
I accept the insurer has since acted fairly in providing temporary accommodation. Temporary
accommodation will be necessary because of the health risks posed by the mould. It is fair
that the insurer continues to cover the temporary accommodation costs until the mould
remediation is completed and PRV provided.
Cash settlement otherwise fair in circumstances
I am satisfied that the insurers cash settlement of claim …6081 and …5546 is otherwise fair
in the circumstances
The complainant has not provided any persuasive information to suggest the settlement
offered was not sufficient to meet the known damage. I accept that should further claim
related damage be identified during the repair process then the insurer should cash settle the
complainant for this damage subject to obtaining a SOW and actionable quote as indicated
above.
I also consider the cash settlement offer of $19,375.82 inclusive of a 20% uplift for the
damage to the porch/balcony (…0100) is fair in the circumstances. The complainants report
from RB does not advise of any inconsistencies within the SOW dated 9 March 2021. It does
say that the SOW “ appears to be acceptable as far as it goes, but the replacement of the
structural members will require a building permit and associated engineering documentation
and extensive mould remediation ” . The insurers SOW provides an allowance for this within its
preliminaries. Any mould remediation is covered above.
Considering the above, I am satisfied that this offer is reasonable in the circumstances.
Determination | Case number: 798296 Page 7 of 9
2.2 Is the complainant entitled to compensation for non-
financial loss?
Yes. The insurer‟s claims handling has caused the complainant an unusual degree of
inconvenience and in the circumstances compensation of $3,000 for non-financial loss is fair.
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Complainants say insurer mishandled claim
The complainant says that the insurer had failed to:
provide a single point of contact to manage her claims
contact her in a timely manner after her complaint was raised with AFCA
to reallocate her complaint to another customer relations specialist after she had a
threatening and intimidating call on 14 March 2022
provide appropriate notice for trades and make safe attendance
appropriately address and diagnose the leak from the ensuite toilet
engage mould inspection and testing
provide the updated SOW or assessments from March 2021
notify her as to the reasons why some claims were either withdrawn or closed.
impacted the family‟s physical and mental health, as well as their wellbeing, due to a loss
of enjoyment
meant they have been unable to have family and friends attend their house due to the
state of the property causing embarrassment.
Complainant entitled to compensation for non-financial loss
I accept there were delays with receiving and exchanging reports and a failure to respond or
undertake mould testing from in January 2021. There were also periods throughout the claim
where the claim manager did not respond in a timely manner and the claims were closed
without notification to the complainant, as well as delays with providing reports and
information to the complainant. This occurred despite the insurer being aware the
complainant was a vulnerable person.
The complainant raised concerns relating to the health risk caused by the mould growth
within the property. The insurer left the property until December 2021 despite being ware of
the health risk at least from the receipt of the report from RX dated 29 September 2021.
Not all the delays were solely caused by the insurer. It is clear there were delays in the
complainant engaging experts or not wanting trades or builders attending due to the COVIC-
19 pandemic conditions. The delays experienced in advocating this dispute cannot be
attributed to the insurer. However, I do accept there are times where the complaint and claim
has not been managed appropriately.
Therefore, I consider it fair in all the circumstances the insurer pays the complainants a total
amount of $3,000 in non-financial loss. This encompasses the delays and service received
Determination | Case number: 798296 Page 8 of 9
throughout the claim, as well as the lack of advice as to what was causing the leak appearing
in the kitchen and delays with exchanging reports.
2.3 Why is the outcome fair?
The outcome is fair as it allows for the mould remediation to be completed and for
assessment of any additional damage. Any additional damage can then be cash settled and
allow for the finalisation of the three claims.
Determination | Case number: 798296 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.