Claim settlement, mould remediation, temporary accommodation and loss of rent dispute following earlier AFCA determination
Text of the determination
Determination
Case number 798129
Financial firm Insurance Australia Limited
Determination | Case number: 798129 Page 1 of 22
Case number: 798129 7 April 2022
1 Determination overview
1.1 Complaint
In February 2019, the complainants’ property was damaged because of a sewer overflow.
The complainants lodged a claim with the insurer on their home building (only) policy, for
resultant damage to the property. The insurer accepted the claim.
Several issues arose with the claim and a complaint was lodged with AFCA. AFCA issued its
final determination on the previous complaint on 11 June 2020.
The complainants lodged a second complaint with AFCA in April 2021 (the current complaint).
The complainants claim ed further issues with the claim, the insurer’s management of the
claim and the insurer’s compliance with the determination. Until the complainants remediated
mould damage at the property themselves, they said the property was unsafe to live in and
that ot her losses have flowed from the insurer’s management of the claim.
The insurer says it has complied with the previous AFCA determination. It acknowledges
further issues have arisen but says it has adequately compensated the complainants.
1.2 Issues and key findings
Is the insurer liable to increase its offer for the repairs?
No. Based on the available material, further mould and other damage to the home was due to
the complainants’ delay in commencing claim related repairs. The insurer has cash settled
the complainants for its liability incurred after the determination, by paying the complainants
pursuant to the complainants’ own quotation. The insurer is not liable to increase its offer for
repairs.
What is the insurer’s liability for mould remediation?
The insurer is liable for a further $5,422.90 plus interest for mould remediation works.
Is the insurer liable to increase its offer for contents?
No. The available information establishes the insurer is not liable to increase its offer for
contents.
Is the insurer liable to increase its settlement for storage?
No. The available information establishes the insurer is not liable for any further storage
costs.
Is the insurer liable to increase its offer for temporary accommodation?
Yes. It is fair the insurer pays the complainants a further $10,404.44 plus interest for
temporary accommodation.
Determination | Case number: 798129 Page 2 of 22
Is the insurer required to pay more for loss of rent?
No. The available information shows the complainants were paid lost rent pursuant to the
previous determination. As for the further claim for loss of rent, the insurer is not liable to
compensate the complainants for temporary accommodation and loss of rent in respect of the
same area of the home. The complainants have not established the downstairs area had
been ten anted, or that the insurer’s actions caused a loss of rent.
Are the complainants entitled to compensation?
Yes. The insurer is required to pay the complainants $1,500 compensation.
Is the insurer liable for any other costs?
Yes. The insurer is to pay the complainants $2,250.05 plus interest for the mould expert
report.
Why is the outcome fair?
The panel has considered the circumstances of this complaint and the findings in the previous
AFCA determination, as are relevant to the claim and this complaint. The panel has also
considered the numerous submissions, the expert evidence, and the actions taken by both
parties since the earlier determination was made. This panel considers this determination is
fair because the insurer has identified all the losses and costs for which the insurer is liable,
given the findings of, and responses to the first determination. It would be unfair to require the
insurer to make payments for which it has no liability under the policy or is otherwise not
responsible. Based on the available information together with the findings of the first
determination, the panel considers the amounts awarded herein are a fair reflection of the
extent of the insurer’s liability.
1.3 Determination
This determination is substantially in favour of the insurer.
Should the complainants accept this determination, then within seven days of notification of
acceptance the insurer is to pay to the complainants:
$10,404.44 towards temporary accommodation costs
interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on
$10,404.44, from 15 October 2021 (date of the insurer’s final decis ion on the issue) until
payment
$5,422.90 towards mould remediation
$2,250.05 for the mould expert report
$1,500 compensation.
The insurer is also to pay interest pursuant to section 57 of the Act on $5,422.90 and on
$2,250.05, from the date the mould expert was paid until payment is made by the insurer.
Should the complainants accept this determination, then within 7 days they are to provide the
insurer with proof of payment to the mould expert, so the interest calculation can be made.
Otherwise, the insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 798129 Page 3 of 22
2 Reasons for determination
2.1 Is the insurer liable to increase its offer for the repairs?
Background to repairs to the insured property
The insurer paid for claim related repairs (resulting from the sewer overflow in February 2019)
as per the previous AFCA determination . It accepted the complainants’ quote for the repairs.
The complainants say the cash settlement for repairs was inadequate because it was based
on an incomplete Scope of Works (SOW). They say the SOW could not be completed until
the property was made safe from mould contamination.
The complainants contend they were unable to commence repairs until the property was
cleared as safe. They advised that there was both mould and bacteria present at the property.
In the complainants’ view, ‘make safe’ means when there was no mould or bacteria at the
property.
They also had concerns with the timber beams supporting the upstairs area and believed
these were affected by mould.
In its initial response, the insurer advised that should the final repair costs exceed the quoted
amount and additional funds are required, it would consider these costs, on provision of an
itemised quotation, invoice, and details of the increased costs.
It has since advised it is not liable for the cost of any further repairs, as the complainants have
not commenced claim related repairs or mould remediation works (after it cash settled the
complainants for both), and therefore further damage (if any) arose because of the delay in
attending to repairs.
Parties’ submissions and material considere d
The complainants say they did not receive a detailed scope of works (SOW) from the second
round of damage, sustained from the insurer’s failed decontamination process in 2020.
The complainants also say the insurer’s failure to remove the contaminated int ernal timber
walls and ceilings at the time of the incident in February 2019 caused extensive damage.
The complainants submitted the insurer had not settled them for all the cost of the repairs and
mould remediation. They referred to their new builder’s q uote (BH quote dated 23 December
2020) and say that this quote was separate, and in addition to, the compensation awarded for
building damage in the previous AFCA complaint/determination.
The complainants submit the following building work is outstanding, due to the insurer’s
decontamination process:
Significant structural damage was sustained as a result of [insurer/mould removal
expert] decontamination process, including the removal of concrete bathroom
floor and form work/replacement of new concrete bathroom flooring, construction
of new load bearing internal walls - including jib-rock/plastering, primer/base coat
painting etc (this is different and in addition to any top coat painting provided in
former quote), new full bathroom incl water proofing, tiling, wc, vanity, mirror,
Determination | Case number: 798129 Page 4 of 22
bathtub, heated towel rails, mechanical exhaust, lighting, new ceilings throughout
complete lower level, including cornices – plastering, priming/base coat
preparation etc, repair/replace sections of garage ceilings, garage lighting, new
laundry bench and laundry tub.
Note, we had considered installing carpet downstairs, which [BH] had incorrectly
included into this quote. Kindly discount carpet, as floor coverings had been
factored already.
Given this quote is now over 6 months old a minimum 30% uplift should be
added, as building cost and materials have been impacted by Covid; the Govt
Stimulus Package and global supply disruption.
Reports covered by [news outlet] on Thursday, 13th May 2021 explain a
nationwide shortage of timber could push construction costs up a further 30%.
A further contingency should be applied to the [BQ] quote to allow for unknowns
when removing the concrete slab and/or any COVID lockdowns etc. [sic]
The insurer says it settled the claim based on the quotation provided by the complainants
from their preferred builder (BH).
The insurer notes it appears the complainants believed the BH quotation was in addition to a
previous quotation (from another builder) provided for the works which were the subject of the
earlier determination, and that the two amounts should be combined.
The insurer says the additional damage overlapped and was intermixed with the original
damage, so the two cannot be split. It decided the best way forward was to provide a scope of
works for all works required. The insurer submits the quotation it has relied onto compensate
the complainants (the BH quotation) is for all claim related and additional damage.
The insurer also said that, other than mould remediation works, its builder confirmed no other
work is required, other than the originally identified claim related works, which had been
already accepted and settled by the insurer as part of the previous AFCA complaint.
Further, the insurer submits mould has returned to the property because the claim related
works have not been undertaken by the complainants and due to the environment in which
the property sits. It relies on its contractor (EC) who re-attended the property in June 2021
and found no additional damage relating to the claim.
Both parties have provided extensive material in support of their positions. Extracts from
relevant material is summarised in supporting section 3.2 of this determination.
Insurer’s expert confirmed no further works required
The complainants say they were unable to begin claim related repairs until the property was
made safe (free from mould).
The insurer says the complainants wanted a guarantee that no mould would return.
The insurer relies on EC who says no make safe work was required or could be carried out to
prevent any other mould damage.
Determination | Case number: 798129 Page 5 of 22
The insurer also relies on its contractor (NC) who says due to the location of the building and
the complainants’ failure to commence repairs, the mould was likely to return.
The pane l accepts the insurer’s view that once a cash settlement was provided, the onus was
on the complainants to begin the repair works, to mitigate loss. The complainants did not do
this. They did not arrange for claim related repair works to commence.
There w as also a delay with the complainants electing not to proceed with the insurer’s mould
remediation expert.
Based on the available information, the panel does not accept the repair works could not
commence once the cash settlements were paid to the complainants.
Insurer not liable for further claimed damage to home
Based on the available evidence and after careful consideration, the panel is satisfied that the
further mould and other damage to the property was due to the complainants’ delay in
commencing claim-related repairs.
The evidence from the mould remediators (NC) (discussed below) outlined that the unrectified
damage to the upstairs dwelling and garage may be the major contributing factor to the
elevated spore count.
The panel considers that the complainants did not mitigate their losses, because they did not
commence claim related repairs and mould remediation works. This was outside of the
insurer’s control.
The insurer is not liable for any further damage or further payment for the cost of repairs.
Timber beams supporting upstairs area considered
As discussed below in the mould remediation section, the insurer is not liable to replace the
timber beams supporting the upstairs section. It is sufficient that these beams are treated for
mould, as per the advice of the insurer’s expert (NC).
Insurer not liable to pay anything further for garage damage
The complainants said damage to the garage was not addressed.
NC said damage in the garage yet to be rectified may be a major contributing factor to the
elevated spore count and items stored in the garage might be contaminated.
The panel is satisfied that any existing damage to the garage is due to the claim related
repairs not being rectified by the complainants after they were cash settled pursuant to the
AFCA determination (15 July 2020) and after the insurer made a further payment pursuant to
the BH quote on 10 June 2021.
BH’s quote includes $9,700 including GST to repair the garage. This amount has been paid
as part of the insurer’s cash settlement.
The insurer is not liable for any further claims for damage to the garage raised by the
complainants.
Determination | Case number: 798129 Page 6 of 22
Insurer not liable to pay anything further for plumbing
Pursuant to the previous AFCA determination, the insurer was to pay to the complainants
$4,910.40 for plumbing costs. Having reviewed the available information, the panel is
satisfied this amount has been paid.
The complainants say this payment was separate from any later plumbing work undertaken to
remediate the property.
The insurer is not liable for any further plumbing costs as these costs were already
considered in the previous determination, and the insurer has already made payment for
these, as per the amount awarded in the previous determination.
The panel notes the plumbing quote provided b y SP refers to ‘Sewerage Cleanup/Removal’
and ‘blocked sewer’. These are items that were considered in the first AFCA complaint, in
relation to claim related damage, arising out of the sewer overflow.
Further, BH’s quote includes the cost of plumbing. This amount has been paid as part of the
insurer’s second cash settlement.
As set out earlier, the panel is satisfied the complainants have been adequately compensated
for the cost of repairs, as the insurer relied on the complainants’ own quote from BH. The
panel considers the complainants have not provided persuasive evidence to show there are
new costs that arose since the previous determination, due to the actions of the insurer or a
claimable event.
Insurer entitled to cash settle and not required to increase its offer
The complainants said they had wanted the insurer to complete repairs, rather than provide a
cash settlement. The available evidence shows the insurer attempted to liaise with the
complainants (e.g., in initially arranging the mould remediation), but the complainants did not
accept its proposition.
The available information also shows the difficulties in assessing the claim related repairs as
compared with the repairs required after the determination. In this regard, the panel accepts
the insurer has acted fairly by assessing its liability against the complainants’ own quote from
BH and cash settling the claim.
The previous determination held the insurer was to make a cash settlement. In the
circumstances of the subsequent damage, the panel considers a cash settlement was fair
and appropriate.
2.2 What is the insurer’s liability for mould remediation?
The previous AFCA determination required the insurer to arrange the attendance of a mould
remediator to assess the property.
The property was rented in February 2019 at the time of the original claim event. The
available information shows in February 2019 tenants rented the upstairs unit until June 2019 ,
while the complainants were overseas, and during this time the complainants’ contents were
stored in the downstairs unit.
After returning from overseas in late 2019, the complainants moved into the property to
minimise their loss, as they say it could not be leased in its damaged state.
Determination | Case number: 798129 Page 7 of 22
After AFCA determination, mould assessment undertaken
In compliance with the previous AFCA determination, the insurer organised for the mould
remediator (NC) to conduct a mould assessment in early July 2020. NC determined
mould/bacteria existed at the property. The complainants vacated the property and the
insurer paid temporary accommodation until November 2020.
The insurer took over the cost of storage and agreed to indemnify the complainants for some
mould damaged contents.
The insurer agreed several contents were contaminated by mould because of the original
event, but the insurer’s contracto r had not identified the mould.
NC subsequently provided a clearance certificate on 31 October 2020. By letter dated 5
November 2020, the insurer sent the clearance certificate to the complainants.
The panel accepts the insurer made a typographical error in the covering letter, saying the
property was not safe instead of saying it was now safe.
The complainants disagreed, so the insurer arranged for NC to test and inspect again on 27
May 2021. NC noted further mould but stated that until all rectification works and repairs were
attended to, the property would continue to have ongoing issues with mould and bacterial
contamination. This was supported by EC, who said no make safe work was required or could
be carried out to prevent any other mould damage.
The insurer says that the mould was due to the repair work and mould remediation not being
undertaken. The complainants say they were not given sufficient time to address their
preferred option for remediation, despite the insurer providing extra time.
The insurer says mould is considered an urgent health matter and Covid-19 restrictions did
not apply.
In July 2021, the insurer cash settled the further cost of mould remediation by paying
$9,952.80, which included a 20% uplift on NC’s quotation. It asserted it was entitled to cash
settle the claim and that the complainants must mitigate their loss.
The insurer noted, should the works cost more than what it had settled, it would be prepared
to consider the additional costs, providing the same scope of works was being undertaken.
The insurer extended temporary accommodation until 4 August 2021.
The complainants arranged for their mould remediation specialist (PP) to attend on 12 July
2021.
PP undertook further mould remediation and provided a clearance certificate on 13 December
2021. Because of his findings, the complainants continue to assert the insurer’s mould
remediation was not thoroughly executed.
The complainants paid for temporary accommodation from 4 August 2021 until 20 December
2021.
Extracts from the material from NC and PP are set out in supporting section 3.2 of this
determination.
Determination | Case number: 798129 Page 8 of 22
Review of further mould testing
NC concluded the damage to the main dwelling upstairs and garage, which was yet to be
rectified, may be the major contributing factor to the elevated spore count. NC noted that the
items stored in the garage were possibly contaminated. NC said there would continue to be
ongoing issues until the rectification works were attended to.
In the downstairs unit, NC noted that there was visible staining, and water damage, which
suggested recent heavy rains had ingressed into the area. He also noted the timber beams in
the downstairs unit could be successfully remediated for mould contamination.
The insurer continued to assert any further requests for time were unreasonable in
circumstances where it had already engaged NC, who could do the work immediately and
have the work completed within a week.
Various proposals were discussed, including that the insurer could repair/make safe the
property, providing that the complainants reserved the right to have re-testing in three
months.
The parties were unable to agree.
The insurer reviewed PP’s material. It argues:
the report highlights building and environmental issues which do not relate to the claim
these issues are the reason for mould returning to the property
items such as waterproofing and closing off external pathways to the basement level are
improvement or maintenance costs, and not covered by the policy.
It says the items it identified as non-claim related improvements and/or maintenance costs
total $20,400 including GST and are excluded from cover.
It submits it is not required to indemnify the complainants for PP’s costs given the insurer
provided an actionable quote for required remediation works and was willing to authorise
these works, despite the building issues which require rectification by the complainants.
It noted the quotation includes post remediation testing and this would be a cost it would pay
for had it been permitted by the complainants to proceed with the remediation works. The
insurer agreed to include that cost quoted at $2,970, including GST together with a margin of
19%: a total of $3,534.30. Correspondence indicates this amount was paid in September
2021. The complainants rejected the offer.
The panel has considered PP’s report and the various and considerable submissions from the
parties on this point. The panel accepts the relationship between the parties had broken
down. In the circumstances, the panel accepts it was fair for the complainants to obtain their
own opinion from PP.
The panel also considers it is fair the insurer considers PP’s quotation , even though PP’s
work cost more than what it had settled, as it was prepared to consider additional costs.
Further, the panel considers this is fair given the reasonable health concerns which attach to
mould damage.
The panel notes the submissions made by the complainants in relation to the timber. Having
considered the available material, it is satisfied the insurer is not liable to replace timber
supports and that mould mediation to the timber is sufficient.
Determination | Case number: 798129 Page 9 of 22
Insurer required to contribute some additional costs
Having considered the insurer’s submission and carefully considering the PP’s quote , the
panel agrees the insurer is not required to pay for some items claimed because the items
were not present prior to the claim event, and are an improvement or maintenance cost,
which is not covered by the policy. These items total $20,400 including GST. The items are:
$6,840 for closing off the external air pathways to the basement level
$650 for structural drying to the floor slab
$8,865 for negative waterproofing to the internal wall and floor areas
$4,045 for installing an acrylic render to internal basement walls.
The complainants claim the $43,1 75 for PP’s work plus $8,600 (20% contingency) .
PP’s quote dated 4 August 2021 totals $39,310 including GST. In the absence of any further
material from PP, the panel accepts the total cost of PP’s work was $39,310 including GST.
The insurer has already contributed to remediation works as follows:
$9,952.80 on 30 June 2020 (based on NC’s quote plus 20% uplift)
$2,970.00 (post remediation testing as per quote from NC)
$564.30 (19% margin on this amount).
The panel notes PP allowed $2,805 including GST for post remediation verification so the
amount paid by the insurer for this item was fair.
In all the circumstances, the panel is satisfied it is fair the insurer make further payment for
remediation works in the sum of $5,422.90, made up as follows:
$39,310 PP quote dated 4 August 2021
less $20,400 excluded items
less $9,952.80 amount paid 30 June 2020
less $2,970.00 amount paid September 2021
less $564.30 amount paid September 2021
$5,422.90 total.
The insurer is to pay interest pursuant to section 57 of the Act on $5,422.90, from the date PP
was paid until payment of $5,422.90 is made by the insurer.
Should the complainants accept this determination, then within 7 days they are to provide the
insurer with proof of payment to PP, so the interest calculation can be made.
2.3 Is the insurer liable to increase its offer for contents?
Insurer not liable to pay for damaged contents pursuant to the policy
The complainants say that in March 2019, the insurer denied cover for contents. Most of their
contents were destroyed, and the remaining items were placed into storage.
Pursuant to the previous AFCA determination, the insurer paid for storage costs.
The panel notes that the complainants had a home building policy only. The panel notes the
previous determination, with which it agrees:
The policy is a building only policy and does not extend to cover contents. The
insurer is entitled to decline the contents portion of the claim.
Determination | Case number: 798129 Page 10 of 22
Insurer paid $63,430 for damaged contents caused by its contractor
Following the AFCA determination on 11 June 2020, the insurer provided cover for the
complainants’ contents that were on site plus in storage, which were contaminated and non -
salvageable. This is because these items were damaged because of its contractor’s conduct.
By letter dated 1 April 2021, the insurer offered to cash settle the complainants $63,430 for
their non-salvageable contents items. It attached a list with costs and based its settlement
offer from the list.
The complainants were also provided with time, and then an extension of time, to retrieve the
non-salvageable items (including the sentimental items) they wished to keep.
Insurer not liable to pay anything further for sentimental items/other contents
The complainants seek further compensation for contents, in particular for sentimental items,
because they say that the insurer neglected to ask them to account for the sentimental
items/personal effects from the non-salvageable list.
They are seeking a further $50,000 for these sentimental contents. The complainants said:
As it essentially wiped out our family history of holidays souvenirs and photos
(pre-digital) and special, irreplaceable artwork sourced from around the world. Our
children’s favourite books/toys/handwritten cards. Christening clothes/blessing
vests/ baby 1st shoes.
Work awards/course notes/study texts etc. Sporting memorabilia, including
uniforms, photos, gear, as my husband played Representative Football and my
son played representative sport locally.
All items that we held dear.
Ultrasound images/Medical scan/reports/baby diaries. We are still trying to piece
together all that is lost. Citizenship Certificates and other important documents.
The insurer says it is not responsible for any loss the complainants say relates to the
sentimental value of their items.
The panel acknowledges the effect the loss of the sentimental items must have had on the
complainants and their family.
However, the panel notes that the insurer already cash settled the complainants for their non-
salvageable items.
The insurer also said the complainants retained some previously determined non-salvageable
items. It says it will not be offering settlement for these items.
While the complainants say that they did not have an opportunity to quantify the sentimental
non-salvageable items, it appears the insurer may have previously settled the complainants
for some of the sentimental contents items in the contents settlement. For example, the
children’s Christening items are listed on page 12 of the schedule attached to the insurer’s
letter dated 1 April 2021.
Determination | Case number: 798129 Page 11 of 22
The complainants have not provided evidence showing that these items were not included in
the first contents list, or the value of all the items sought.
While the panel empathises with the complainants, it is not satisfied the insurer is liable to pay
a further amount for these items.
Insurer not liable to pay a further $10,000 to the complainants
The complainants say because the insurer’s decontamination was not carried out correctly in
2020, they have now experienced another round of loss.
They are seeking $10,000 for these items. They say their hygienist will determine non-
salvageable items/loss when carrying out remediation work.
The insurer says this contents loss is yet to be quantified or assessed. It says it requested the
complainants provide details of the contents damaged, including a list of the items and their
values for further consideration, and that it was willing to consider this part of the claim.
The insurer also said the complainants retained some previously determined non-salvageable
items. It says it will not be offering settlement for these items.
The panel has carefully considered the material provided by the parties and their lengthy
submissions. Neither the complainants’ hyg ienist nor the complainants have provided the
further information requested by the insurer.
Based on the available information, the panel is not satisfied the insurer is liable to pay
$10,000 or any other amount to the complainants for damaged or lost contents.
2.4 Is the insurer liable to increase its offer for storage?
Insurer not liable for any further storage costs
The complainants seek storage costs from July 2020 until February 2021 in the sum of
$3,599.35.
They also seek further storage costs from July 2020 while the property was made safe. An
invoice was provided showing storage costs from 1 July 2020 until 2 February 2021 in the
amount of $4,072.
On 4 August 2020 the insurer paid the complainants $10,134.50 for storage costs of contents
incurred to that date, which did not include the six weeks referred to in the AFCA
determination.
Once the mould damage was discovered by its mould specialist, the insurer agreed to pay for
contents storage until the end of January 2021.
The insurer said it would pay for ongoing costs to store the contents until repairs were
completed, on the condition the complainants authorised their builder to commence repairs
within 7 days of the payment being made to them for repairs, and on provision of further
confirmation of some items from their builder. No such confirmation was received.
The insurer also said it was not responsible for storing non-restorable contents, particularly if
these items had been disposed of.
Determination | Case number: 798129 Page 12 of 22
In its response of 1 September 2021, the insurer reviewed the complainants’ costs for storage
fees of contents. It confirmed it agreed to pay for storage of contents whilst the remediation
was in process after the initial AFCA determination was issued.
It said it was willing to pay the incurred costs of $509 per month from 1 July 2020 to
1 December 2020 (five months): a total of $2,545.
It also agreed to pay for the storage of contents through remediation, which it estimated
would take a week. It allowed a period of three weeks, plus an extra week, to account for
discussions/negotiations, and a period to move contents back at the completion of the work.
Therefore, a further month of cover was provided: $509.
In addition, it says builders estimated the claim related repairs ought to be completed within a
three-month period, so it contributed an additional month to allow for any unforeseen claim
related concerns. It allowed a further four months payment at $509 a month, totalling $2,036.
In short, it agreed to contribute a total of 10 months storage costs for $5,090. This amount
was paid in September 2021.
The panel notes storage costs were paid until 4 August 2020. The panel also notes PP
provided a clearance certificate on 13 December 2021.
The insurer has paid 10 months storage since August 2020. The panel acknowledges the
complainants claim more for storage costs.
In all the circumstances, the panel is not satisfied the insurer is required to pay more towards
storage costs. Having carefully considered all the available information and the lengthy
submissions made by both parties, the panel considers it is fair the parties share storage
costs as both parties bear some responsibility for the delays which have occurred in bringing
about finalisation of the claim.
Insurer not liable to pay removalist costs
The complainants also claim $2,490 for removalist costs. They have provided an invoice
dated 2 September 2021 for storage relocation costs. The complainants have not provided an
adequate explanation for this expense. The insurer has not addressed this expense.
The panel notes that the complainants stored their contents in the home while they were
overseas; it is also noted that the contents were not insured with the subject insurer and may
have been uninsured. The insurer has accepted some responsibility for contents damaged by
mould, and as noted has adequately recompensed the complainants for their loss; it has also
assisted with storage costs including an additional sum as noted in this determination.
In normal circumstances where costs are incurred in respect of contents following an insured
event, these costs are borne by the contents insurer. As noted, the subject insurer did not
insure the complainants’ contents.
The issue of contents relocation had not previously been sought in the first determination, and
it is unclear why this has been raised now; the complainants have not submitted any reasons
or evidence as to why the insurer should be responsible for this, or indeed what is the nature
of the relocation.
In the absence of any compelling evidence, the panel determines that the complainants have
not demonstrated an entitlement to these costs, and the insurer is not required to meet these
costs.
Determination | Case number: 798129 Page 13 of 22
2.5 Is the insurer liable to increase its offer for temporary
accommodation?
Background to loss of rent and temporary accommodation costs
At the time of the claim event in February 2019, the home was a rental property. Tenants
rented the top floor. The complainants’ contents were stored on the ground f loor.
The complainants later moved into the top floor to mitigate their losses. They say they could
no longer rent out the basement apartment as it was contaminated.
The complainants moved from the top floor into temporary accommodation, because of the
mould damage and requirement for mould remediation.
Loss of rent was considered in the previous AFCA determination
AFCA determined the insurer was to pay $5,500 for six weeks loss of rent.
The insurer paid $5,500 for lost rent to the complainants on 11 July 2020.
The complainants seek loss of rent (for the basement garage) and temporary accommodation
(since moving out of the top floor) since the AFCA determination (made 11 June 2020). This
is because the determination ordered that the insurer complete mould assessment and
remediation works, and the complainants say that the insurer did not complete the mould
assessment correctly.
The insurer extended the temporary accommodation payments several times, before ceasing
on 4 August 2021 once it cash settled the complainants for repairs and mould restoration.
Fair the insurer pays $10,404.44 for temporary accommodation costs
The complainants seek 20 weeks’ temporary accommodation (from 4 August 2021 - 20
December 2021) at a cost of $367 per day or $2,601.11 per week. They have provided
several invoices from Quest apartments.
The insurer ceased paying for temporary accommodation from 4 August 2021. It says it is not
liable to pay anything further as it cash settled for repairs and for mould remediation. It
asserts the complainants have not mitigated their loss.
The insurer notes it provided an actionable quote to remediate damage and was prepared to
do the remediation work. It also says mould damage continued because the complainants
had not undertaken repairs.
The complainants consider that they are entitled to temporary accommodation because the
home was not made safe from bacteria and mould. They say the insurer offered impossible
ultimatums and unrealistic deadlines in view of their concerns and Covid-19 lockdowns.
The complainants advised of the remediation work required and said it would take eight
weeks to carry out the remediation works. The complainants also sought an additional 4
weeks of temporary accommodation, as in August 2021, PP had a backlog of work.
The panel notes PP’s letter 4 August 2021 says:
Determination | Case number: 798129 Page 14 of 22
We anticipate a project timeframe of 6 weeks to complete this scope of works
given the current COVID environment. We have a lead time of 3 weeks on current
projects. A commencement in late August 2021 would be anticipated.
The ins urer considered PP’s report. The insurer reiterated the property was as safe as it
could be and that nothing further could be done to ensure mould would not return. It reiterated
the reason for the mould returning was because of the location of the property and that the
original claim related repairs have not been done. It says the mould has not reoccurred
because of its assessments or mould remediation activities but because the property
remained in disrepair.
Having considered the available material, the panel accepts:
PP’s remediation work would take about 6 weeks
about half of the work was payable by the insurer
PP had a lead time of 3 weeks
the relationship between the parties had broken down
it was fair for the complainants to obtain their own opinion from PP
it was fair for the complainants to engage PP to conduct the work.
The panel has carefully considered the parties’ competing arguments. In the circumstances,
the panel considers it is fair the insurer makes some contribution to the temporary
accommodation costs incurred by the complainants.
Having considered the available material, the panel considers it is fair the insurer contributes
50% to about 8 weeks temporary accommodation.
Should the complainants accept this determination, the insurer is to pay to the complainants
$10,404.44 towards their temporary accommodation costs.
The insurer is to pay interest pursuant to section 57 of the Act on $10,404.44, from 15
October 2021 (date of the insurer’s final decision on the issue) until payment.
2.6 Is the insurer required to pay more for loss of rent?
Parties’ submissions conside red
The complainants seek loss of rent at $925 per week for 52 weeks, from 24 June 2019 (from
when the tenants vacated) until 11 June 2020 (when NC confirmed mould remediation was
required). They acknowledge AFCA awarded 6 weeks rent to cover time taken to undertake
repairs but says this does not address the financial loss incurred keeping the property vacant
while awaiting mould remediation and repairs.
Upon further review they claimed an additional period from 5 November 2020 to 9 June 2021
which repres ents the date the insurer declared the property still ‘not safe for habitation’.
The complainants supplied a tenant ledger and lease agreement.
The complainants say the insurer advised it would reimburse them the loss of rent claim when
their tenant vacated. The complainants referenced Annexure 6 to their original submission as
supporting this claim.
The panel considers this email correspondence does not evidence this. The insurer refers to
the jurisdictional component of the claim, in respect of loss of rent.
Determination | Case number: 798129 Page 15 of 22
The insurer says it is not liable to pay loss of rent because:
AFCA awarded six weeks loss of rent covering the expected repair time frame due to noise
levels and construction required downstairs
the tenants vacated the property in June 2019, about three months after the event
occurred
since AFCA’s decision , no loss of rent has occurred as the complainants were living
upstairs and their contents were stored downstairs
it provided temporary accommodation to the complainants for the time it took to remediate
the mould
the complainants cannot claim temporary accommodation and loss of rent for the same
period, when the part of the property previously leased was occupied by the complainants.
AFCA determination dealt with lost rent until June 2020
The previous AFCA determination awarded $5,500 for loss of rent. This amount represented
the 6- week repair timeframe that had been indicated by the complainants’ builder at the time.
The complainants sought loss of rent in this complaint from 24 June 2019 until 11 June 2020.
The panel notes that this period predates the AFCA determination on 11 June 2020, and the
issue was considered in that complaint.
This part of the claim is outside jurisdiction, as the previous AFCA complaint dealt with this
claimed loss.
Complainants seeking loss of rent and temporary accommodation concurrently
The first AFCA determination noted it was not in dispute that the tenants originally lived
upstairs.
The complainants later moved into the upstairs level (as opposed to the downstairs area,
where the claimed event occurred) to mitigate their losses, as they say they could not rent out
the property.
The complainants seek to be compensated for both loss of rent and temporary
accommodation.
The panel notes the tenants lived in the upstairs area, and the complainants moved into the
upstairs area when they returned from overseas.
The panel accepts the complainants should not be compensated for the claimed loss twice.
They have been reimbursed for temporary accommodation due to moving out of the upstairs
area because of mould. They are not entitled to be reimbursed for loss of rent due to being
unable to rent out the same area of the home due to the damage and mould.
The complainants have provided a tenant ledger and rental agreement. They have not
provided evidence to show that the downstairs basement apartment area was rented out or
that they have suffered loss of rent for this area, due to the insurer’s actions.
The panel is satisfied the insurer is not liable to pay for loss of rent for the same upstairs area
for which the complainants have already been paid temporary accommodation costs.
Determination | Case number: 798129 Page 16 of 22
2.7 Are the complainants entitled to compensation?
Compensation paid in some circumstances
AFCA will award compensation for non-financial loss if there has been an unusual degree or
extent of physical inconvenience, time taken to resolve a complaint or interference with the
complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because a complainant has suffered some inconvenience and delays. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The insurer previously paid the complainants $2,500 compensation after the previous AFCA
determination. Many service issues were considered in that determination, and compensation
awarded for those issues.
The insurer acknowledged shortcomings with its service in this complaint, apologised and
offered further compensation of $1,000.
The complainants claim $5,000 compensation.
The complainants say they suffered significant stress during the insurer’s processing of the
complaint. They described experiencing multiple delays and service issues. They say the
insurer’s contractors placed their health at risk and the insurer showed little concern for their
trauma, particularly considering the COVID-19 pandemic.
The complainants described the severe emotional impact the loss of their sentimental non-
salvageable items had on them.
The complainants say the insurer made false claims that the property was safe for
occupation, and that this caused them and their family significant stress.
Fair the insurer pays the complainants $1,500 compensation
The panel accepts the insurer made a typographical error in respect of the clearance
certificate, which had cleared the property for occupation.
The complainants said that the insurer provided hours’ notice for them to move into temporary
accommodation in July 2020. The panel accepts this was after the insurer had afforded time
already to the complainants for their response, and that the matter was of an urgent nature.
The panel has carefully considered all the material and the significant submissions on this
issue. The panel accepts there was a breakdown in the relationship between the
complainants and the insurer, causing some delay and stress. For reasons set out elsewhere
in this determination, the panel does not accept the insurer is entirely responsible for the time
taken to resolve the complaint and the interference with the complainants’ peace of mind.
The panel considers it is fair the insurer pays the complainants $1,500 compensation.
Determination | Case number: 798129 Page 17 of 22
2.8 Is the insurer liable for any other costs?
Insurer to pay the complainants $2,250.02 for the expert report
The complainants requested the insurer to reimburse them for the cost of arranging their own
mould expert report.
The insurer said it would not contribute to these costs, as it had already completed these
tests.
Pursuant to its Rules, AFCA can require the insurer to contribute to professional costs. AFCA
considers the complexity of the complaint and whether the complainants needed to incur the
costs to understand or establish the claim.
As set out earlier in this determination, the panel considers the relationship between the
parties had broken down. Further, issues of mould remediation are complex. In these
circumstances, the panel considers the complainants needed to incur this cost to understand
and establish the claim.
Therefore, the panel is satisfied it is fair for the insurer to contribute to the cost of PP’s report.
The insurer is to pay the complainants $2,250.02 for the report.
The insurer is also to pay interest pursuant to section 57 of the Act on $2,250.02, from the
date of payment for the report until settlement. Should the complainants accept this
determination, then within 7 days they are to provide the insurer with proof of payment to pay
PP, so the interest calculation can be made.
2.9 Why is the outcome fair?
The panel has considered the circumstances of this complaint and the findings in the previous
AFCA determination, as are relevant to the claim and this complaint. The panel has also
considered the numerous submissions, the expert evidence, and the actions taken by both
parties since the earlier determination was made. This panel considers this determination is
fair because the insurer has identified all the losses and costs for which the insurer is liable,
given the findings of, and responses to the first determination. It would be unfair to require the
insurer to make payments for which it has no liability under the policy or is otherwise not
responsible. Based on the available information, together with the findings of the first
determination, the panel considers the amounts awarded herein are a fair reflection of the
extent of the insurer’s liability.
Determination | Case number: 798129 Page 18 of 22
3 Supporting information
3.1 The AFCA process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances, having
regard to the legal principles, applicable industry codes or guidance, good industry practice
and previous decisions of AFCA or its predecessor schemes (which are not binding).
A full exchange of the relevant information has taken place between the respective parties.
Each party has had the opportunity of addressing any issues raised. All the provided
information has been reviewed and considered. The parties have raised numerous issues in
their submissions to AFCA. However, commentary in this determination is restricted to those
issues considered relevant to the outcome.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination. The panel
comprises the ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience in the insurance industry.
The panel has decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry practice and
previous relevant determinations of AFCA or predecessor schemes (which are not binding).
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Extracts from material relied on by the parties
Date Action
Post remediation
verification certificate (NC)
31 October 2020
On 28 October 2020 the (insured) property has
undergone a post - remediation verification assessment
in regard to possible bacterial cont amination to the
concrete bedding in the downstairs bathroom.
Determination | Case number: 798129 Page 19 of 22
N C hereby certifies that based on a vis ua l inspection
and laboratory analysis of the sample location; no
bacterial contamination was detected.
Please note that bacterial growth may recur if any
further events take place.
Site Assessment report
(NC)
1 June 20 21
Photographed, i nspected, and undertook tests and
samples 27 May 21
Based on the site assessment and information gleaned
from the (complainant s ) :
> No repairs have been undertak en to the garage, and
no repairs have been undertaken to the main
dwelling upstairs.
> There are visible signs that the downstairs flat has
again been affected by the recent heavy rains.
Reviewed these laboratory analysis reports and prior
results, which suggest the following;
Main Dwelling Upstairs ;
> It would appear that the existing damage which is yet
to be rectified may be the major contributing factor to
the elevated spore count.
Garage;
> It would appear that the existing damage which is yet
to be rectified may be the major contributing factor to
the elevated spore count,
> The items stored within th e garage are possibly
contaminated.
Downstairs Flat;
> Visible staining, debris and wat er damage would
suggest recent heavy rains have again ingressed
this area.
Taking the above int o consideration, until repairs to the
main dwelling upstairs and garage are undertaken and
works undertaken to halt water ingress to the
downstairs flat and garage , this will continue to be an
ongoing issue.
Please also refer to SW report dated 8 October 2020.
Recommendations
> Until all non - relat ed rectification works are attended
to, the downstairs flat and garage will continue to
have ongoing issues with mould and/or bacterial
contamination.
Insurer’s builder (EC)
15 June 2021
Estimator re - attended and photographed the property
and met with (complainant s ) , who advised that the
restoration company had ret urned recently to deal with
some mould that had reappeared .
Inspected the house and found no additional damage
relating to the claim.
Determination | Case number: 798129 Page 20 of 22
Did not appear to be any make safe work required or
that could be carried out to the house to prevent any
other damage.
Downstairs area needs to be repaired back to its
original state. The area is not currently sealed as there
is plywood over a door opening and gaps between
floor joists.
No further damage or make safe required .
No temporary accom modation required .
Complainant s ’ mould report
(PP)
4 August 20 21
Inspected and photographed on 12 July 21 and
laboratory analysis for sampling for mould and
bacteria .
Noted remediation works previously conducted to
upstairs and basement levels .
Moisture survey found the substrates returned
abnormal values , indicating those substrat es are
impacted by moisture.
Basement level external walls on eastern and western
elevations of the building indicating saturation and
common wit h lateral dampness .
C onc rete floor slab around the perimeter of the
basement level returned levels indicating saturation of
the floor slab .
Floor timbers in the hallway returned slightly elevated
moisture levels , with some minor cupping evident .
No other substrates surveyed which recorded moisture
content which would be deemed abnormal. Additional
substrates observed, where water intrusion has
occurred include the following:
Roof members in the garage where it appears there is
a roof leak, we observed water dripping from the
underside of the roof sheets .
No malodour was detected on the upstairs level;
however, a noticeable malodour common with
dampness and mould was detected on the basement
level. A noticeable damp, musty odour was evident in
the garage, where visible water d amage from a leaking
roof was observed.
No visible mould was detected on the upstairs level –
refer to the mould sampling results in Section 10.
Observed visible mould and water stains to the
external walls of the bas ement level and visible mould
was obs erved to the int ernal side of the door, and door
jamb on the southeast elevation and to the window on
the northeast elevation of the basement level.
Observed cracks to the external side of the basement
level adjacent to the driveway .
Observed the impact of lateral dampness to the
Determination | Case number: 798129 Page 21 of 22
external walls on the driveway side of the basement
level.
Took samples from the kitchen (sample indicates
recent mould growth) , hallway (sample indicates recent
mould growth) , front of building (no fungus) , rear of
building (fu ngus detected) , internal air basement level
(sample indicates recent mould growth) .
Using the IICRC definitions - the upstairs levels of the
home are rated as Condition 2 – an indoor
environment which is primarily contaminated with
settled spores or fungal fragments that were dispersed
directly or indirectly from a Condition 3 area, and which
may have traces of actual growth.
While the total spore count det ected in the airborne
mould samples collected from the upstairs level is less
than 2,000 spores/ m3, the presence of fungal
fragments indicates further (Condition 2) remediation is
required.
Using the same definiti ons - the basement level of the
home is rated as Condition 3 - an indoor environment
contaminated wit h the presence of actual mould
growth, associated spores, and fungal fragments.
Actual growth includes growth that is active or
dormant, visible, or hidden .
Upstairs level of the home in its current condition
should not be occupied by individuals predisposed to
mould sensitivity (if they experienc e symptoms related
to mould exposure as diagnosed by a medical
practitioner) prior to Condition 2 remediation be ing
conducted. Use of HEPA type air purifiers would
reduce airborne mould concentrations and thus
exposure to mould by inhalation.
Basement level of the home should not be occupied,
and re - occupancy can only occur after Post
Remediation Verification (Clea ranc e) has been
provided.
Provided scope of works for upstairs level of the
building and bas ement .
Remediation of home contents not within scope.
Can commence late August 2021 and will take about
six weeks.
Certificate (PP)
13 December 2021
All non - salvageable water damaged and mould
contaminated materials related to the claim have been
safely removed and disposed .
3.3 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails .
Determination | Case number: 798129 Page 22 of 22
Expert reports.
Photographs.
Invoices.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.