Home / IAG / Determination 797063

Determination 797063

Settlement amount dispute for water damage claim, mould and flooring repairs, and loss of rent

FirmIAG
Decided2022-01-13
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$70,000
SourceAFCA PDF

Summary

The complainants, landlord insurance holders, sought about $70,000 for repairs, mould remediation, loss of rent and non-financial loss after a water leak. AFCA decided the insurer need not increase its cash settlement, pay further loss of rent or non-financial loss, until the complainants allow access for assessment, after which a settlement is to be determined.

The complainants did not provide reasonable access to assess newly raised mould and flooring issues, so the insurer is not required to increase its settlement; loss of rent limit was paid and no evidence the property was uninhabitable.

Issues

Subjects and remedies

business interruptionno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 797063 Financial firm Insurance Australia Limited Determination | Case number: 797063 Page 1 of 11 Case number: 797063 13 January 2022 1 Determination overview 1.1 Complaint The complainants hold a landlord insurance policy with the financial firm (the insurer). They lodged a claim for their investment property on 7 April 2020 after the ground floor kitchen area was damaged by a leaking pipe from the upstairs shower on 27 March 2020. The insurer accepted liability for the resultant damage. However, a dispute has arisen over the settlement amount. The complainants say the offer is insufficient to complete the works and that the insurer has not made any allowance for mould remediation. They seek that the insurer to honour their quotes, pay loss of rent for the period while repairs are being completed and pay non-financial loss for a poor claims experience. The insurer says its offer is fair and reasonable and the complainants are not entitled to compensation. It says that to the extent any mould has developed that this has occurred during the period where the complainants caused claim delays and refused to allow access to the property. Regarding any entitlement to loss of rent, the insurer says the complainant had a previous claim for the same property and the full sum insured for loss of rent was paid under that claim. It further says there is no evidence the property is uninhabitable. 1.2 Issues and key findings Should the insurer increase its offer? No. The complainants have not provided reasonable access to the property to enable the insurer to properly assess all of the repairs and remediation sought. Therefore, the insurer is not required to increase or reconsider its settlement unless the parties agree to proceed in the manner set out in section 2.1. Are the complainants entitled to loss of rent benefits? No. The insurer has already paid the full 12 months loss of rent entitlements allowable under the policy for the relevant period. The delays that have occurred have been mainly due to the complainants’ failure to provide the insurer with reasonable access to further assess the damage. Are the complainants entitled to compensation? No. The available information does not show the insurer has mismanaged the claim and the complainants are not entitled to an award for non-financial loss. Why is the outcome fair? The complainants only raised concerns relating to mould and full replacement of the parquetry flooring after the insurer had completed a scope of works, accepted the claim and offered to authorise repairs. The complainants then refused to allow the insurer access to the property to inspect these newly raised issues. Determination | Case number: 797063 Page 2 of 11 Until such time as the complainants allow the insurer access to properly assess the newly raised issues, it would not be fair to expect it to authorise settlement based on quotes provided by the complainant from experts, who either did not attend the property, or of which one of the complainants is company director. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to increase its cash settlement offer at this time. Nor is the insurer liable to pay for any more loss of rent or for non-financial loss. The claim is to be settled as set out in section 2.1 of this determination. Determination | Case number: 797063 Page 3 of 11 2 Reasons for determination 2.1 Should the insurer increase its offer? Complainants are seeking circa $70,000 for repairs and mould remediation The complainants want the insurer to increase its cash settlement for repairs because it does not provide adequate allowance for the parquetry flooring to be properly repaired. While the quote obtained by the insurer from its building expert (BB) allows for sanding and refinishing of the floor, the complainants say the floor is split and lifting and requires replacement. Additionally, the complainants say significant amounts of black mould have developed on the plaster ceiling in the kitchen and family room area and this requires remediation. The complainants have provided four quotes, two from building experts for the repairs, and two for mould remediation. They say they are seeking acceptance of the lower of the quotes for repairs and mould remediation respectively. They are therefore seeking acceptance of their building repair quote from CB totalling $34,122 and their mould remediation quote from AC totalling $32,000 (I note review of the CB quote shows that it totals $38,522 and is the more expensive of the complainant’s two building quotes). They are also seeking reimbursement of the invoice from the plumber who repaired the leak, totalling $327.25. The complainants say this is all related to the claim. This is significantly higher than the insurer’s initial assessments. The insurer’s quote from its exper t BB totalled $11,571.57. The insurer has also accepted reimbursement of the plumber’s invoice for $327.25 . The insurer paid the complainants $10,871.57 ($11,571.57 less $700 deductible) via cheque on 9 December 2020 and it has arranged for the remaining $ 327.25 to be paid for the plumber’s invoice. The insurer says it was prepared to do the repairs, but the complainants insisted on a cash settlement. Further, the insurer says the complainants have not provided it with reasonable access so that it can fully assess all of the claimed damage. This includes additional issues the complainants identified during the course of the dispute, primarily the presence of mould in the kitchen and living area ceiling. The complainants dispute this and say the mould was pr esent at the time the insurer’s expert (BB) undertook its inspection in April 2020. Additionally, the complainants say the repair method for the floor contained with BB’s quote, which consists of sanding and refinishing, is insufficient to properly repair the floor and that the floor requires replacement. In a submission made to AFCA on 3 June 2021, the complainants say, ‘ a large amount of water has gone under the new timber parquetry flooring in the kitchen and family area, through the adjacent laundry and others walls cavity and through the gaps between the timber floorings slats and through the skirting gaps, causing trapped moisture to generate mould under the timber flooring. ’ The insurer initially argued the complainants had a previous malicious damage claim for the same property, the settlement for which included an allowance to replace the parquetry flooring. The insurer said the complainants had not provided any evidence to show they had undertaken repairs to the floor prior to the current claimed event. However, the complainants have subsequently provided photos to show they replaced the parquetry flooring prior to this most recent claim, and the insurer has accepted this, overturning its decision not to cover damage to the parquetry floor. The insurer’s cash settlement of $11,571.57 included allowance for sanding and refinishing of the parquetry floor as per BB’s quote. Determination | Case number: 797063 Page 4 of 11 Complainants have not fully complied with their obligations The insurer maintains it has been prejudiced by the complainants’ failure to allow it to adequately assess the all of the claimed damage. Following BB’s inspection of the property, the insurer accepted the claim and on 19 May 2020 it advised the complainants it would authorise BB to undertake the repairs as outlined in the scope of works. The complainants did not sign the contract to authorise repairs to commence but instead advised they would provide their own quotes for consideration. The complainants did not contact the insurer again until 9 July 2020 when they informed the insurer there was mould at the property which would need to be remediated before repairs could commence. The complainants also advised they were going away but would contact the insurer in mid-July 2020. The complainants then provided a quote from LC for repairs to water damage totalling $32,886.70. They then submitted a further quote from CB on 27 August 2020 totalling $38,522.00 and another quote from AC on 18 August 2020 for mould remediation totalling $32,000.00. The complainants say the insurer has sent various contractors to inspect the damage and that the insurer’s contractors attended the property on at least six occasions . This included the insurer’s building expert BB . The complainants say they have sent many photos, reports and quotes to substantiate the claim. I note the complainants are seeking a significantly higher amount that what is indicated in the insurer’s quote . I do not accept it is reasonable to expect the insurer to pay for quotes without having an opportunity to engage its own experts to review all of the damage. This is particularly so given the greatest areas of discrepancy between the complainant’s and the insurer’s quotes appear to be in relation to area s of damage only highlighted or disputed by the complainants after the insurer accepted the claim and offered to authorise repairs. These areas of damage are what the complainants say is widespread mould to the kitchen and living area ceiling, and their di ssatisfaction with the insurer’s proposed repair method to the parquetry flooring – namely sanding and refinishing. Further, the insurer stated it was prepared to do the claim related repairs and it in fact authorised repairs on 19 May 2020. However, the complainants sought their own quotes and are seeking a cash settlement based on these. The policy provides the insurer, not the complainants, with the discretion as to how to settle the claim. The complainants only advised the insurer on 9 July 2020 that mould had developed within the property, however, they would not allow the insurer to arrange for a mould remediation specialist to the attend the property and report on the mould damage claimed. BB’s previous inspection did not make note of any damage caused by mould, and the insurer says subsequent enquiry with BB confirms no mould was present at the time of its inspection in April 2020. The complainants ’ building repair quote from CB does not make any mention of mould having caused damage to the property. The complainant’s other building repair quote from LC does mention what is described as severe mould visible on the ceilings in the kitchen and family area, however no photos or other commentary on this are provided. Further, the insurer says further enquiries have revealed one of the complainant’s is a director of LC and the complainants have not disputed this. While the complainants have made submissions disputing what they say is the insurer ’s attempts to question the legitimacy of LC as a company, they have not disputed that one of Determination | Case number: 797063 Page 5 of 11 the complainants is a director of LC. This being the case, I do not consider the quote from LC can be considered independent. Meanwhile, the insurer says enquiries with CB indicate it is based in another state and that it never attended the property. The complainant confirms CB did not attend the property and says this is due to Covid restrictions in place at the time, and that he therefore provided information to CB via a Zoom call. The available information shows the complainants did interfere with its ability to inspect and review the damage. The complainants raised concerns about the insurer’s and BB’s approach to repairing the damage, saying the fact it wanted to repair the damage prior to mould remediation and the fact it wanted to commence repairs at all during a period of Covid lockdown indicates its conduct was unprofessional. Nothing has been provided to me which convinces me this is so. Mould damage and the request for full replacement of the parquetry flooring are new issues only raised after BB had inspected, completed its scope of works and the insurer had accepted the claim and offered to authorise repairs. The insurer was entitled to consider whether this damage was caused by the claimed event or by other factors, including but not limited to delays caused by the complainants. Further, it is clear a mould expert was required to assess the mould. However, the complainants did not afford the insurer the opportunity to have a mould expert independently inspect and conduct tests. Further, the insurer is entitled to obtain its own quotes for the repairs. This is because the insurer is entitled to base a cash settlement on its own competitive rates given it was prepared to authorise the repairs, but the complainants are seeking a cash settlement. However, the insurer has not been able to do so given there has been limited access provided and it cannot confirm the full scope of works for the issues subsequently raised by the complainants. I am not persuaded the complainants’ engineer reports conclusively establish there is widespread mould throughout the ceiling requiring remediation, especially given the insurer’s settlement allows for replacing a significant portion of the ceiling anyway. Their reports were focused on the claimed event and how this could have led to the mould. However, these reports did not provide any substantive evidence of actual mould levels at the property and this could not be fully investigated given the complainants refused to allow further access to the property. Complainants have not established they are entitled to further repairs or mould remediation beyond existing scope I have reviewed the photos of apparent mould on the ceiling in the kitchen area provided by the complainants. The areas show two relatively small areas with some dappled dark marks on the ceiling. From the photos I cannot tell exactly what these stains are. The complainants have also provided a photo of the cavity above the ceiling saying this shows significant mould. I do not agree with this – having reviewed this photo I am unable to see any clear evidence of mould. BB has indicated there was no evidence of mould at the time of its inspection, and the complainants have caused delays since then and refused to allow further access. The mould quotes provided by the complainants do not show any details relating to moisture test results (other than to say there were high moisture readings) and no details of mould sample tests. Determination | Case number: 797063 Page 6 of 11 I note BB’s quote allows for removal and replacement of 12m2 of plasterboard. It is not clear from the complainants’ photos that the small amount of potential mould shown would not be removed and replaced during this process. The small amount of apparent mould shown appears to be next to the skylight, which from the photos contained within BB ’s report, looks to only be a metre or so away from the hole which was made to repair the leak. I am therefore satisfied it is likely BB ’s quote contains allowance to replace this portion of the plaster. To the extent that any further mould may have developed in the interim, I consider it fair the insurer is entitled to inspect and conduct tests. Likewise, I am not satisfied the complainan ts have established the insurer’s repair method of sanding and refinishing the parquetry flooring is insufficient to rectify the claim-related damage. This accounts for most of the disparity between their quotes for building repairs and the insurer’s quote . Up until recently, the complainants had not provided any images showing the claimed damage to the floor, and as discussed above, have refused to allow any further access to the insurer following them submitting quotes for full replacement of the parquetry flooring. More recently, the complainants have provided some close-up photos of the flooring. In my view, these photos do not show major damage to the flooring and only show some minor opening of gaps between the floor boards in certain places. I am not satisfied that the evidence provided shows that sanding and refinishing (which would likely fill these small gaps) will be insufficient and that full replacement of the flooring is required. To the extent the complainants are concerned the flooring cannot be satisfactorily repaired via the insurer’s method, I consider it fair in th e circumstances the complainants allow the insurer access to the property to have an inspection by an independent flooring expert. Insurer not required to increase cash settlement until complainants co-operate Given all of the above, I do not accept the complainants are entitled to the amount sought. The compla inants are seeking an amount significantly higher than the insurer’s quote from BB. This includes significant mould remediation and full replacement of the parquetry flooring. Limited opportunity has been provided to the insurer to investigate these issues. Photos and reports obtained by the complainants are not enough for the insurer to fairly assess the claim. Instead, the insurer was entitled to engage its own experts and builders to review the items and determine:  which areas it accepts is related to the claim, and  determine what the likely cost is to repair those items. Therefore, until the complainants co-operate with the insurer’s request to undertake the se activities, I am not satisfied it is fair for the insurer to increase or reconsider its settlement. This is because the complainants’ failure to comply with their policy obligations prejudiced the insurer’s ability to fairly assess all aspects of the claim. Claim should be resolved in this way I consider it fair in all the circumstances for the claim to be resolved in the following way. The insurer should be given an opportunity to fully assess all aspects of the complainants’ claim. This will require the complainants providing access to the insurer and its contractors to access the property. Such contractors would likely include a mould remediation expert and a flooring expert to quote for the claim related damage and its assessors. Determination | Case number: 797063 Page 7 of 11 Once this is done, the insurer must decide as to a fair cash settlement amount. As the insurer would have conducted the claim related repairs, it is entitled to rely on quotes that would have been available to it in making this assessment. It should also add a 15% contingency for the possibility of additional variations. All of this should be done no more than 8 weeks after this determination is accepted. This timeframe is subject to the complainants providing timely and full access to the property. Whilst this timeframe is short, this is an investment property with a loss of rent component attached to it that warrants this tight timeframe. If the parties are unable to agree on the quantum, the complainants can lodge a new dispute with AFCA for a decision on this point. If the complainants do not agree to this method, then the insurer is not required to increase its cash settlement for this claim or take the matter any further. 2.2 Are the complainants entitled to loss of rent benefits? Complainants not entitled to further loss of rent The complainants want the insurer to cover further loss of rent and have indicated they are seeking a total of $17,900 in further loss of rent payments. The insurer has paid $48,900 for the relevant policy period 11 September 2019 to 11 September 2020. This represents the policy limit for loss of rent during the relevant period of insurance. The policy covers the rent lost during the reasonable time it should take to repair or rebuild the property, for up to 12 months from when the listed event took place if the property becomes uninhabitable as a result of the insured event. The insurer says the policy benefit does not cover indefinite loss of rent. It only covers the loss of rent incurred during the time it should take to repair or rebuild the property. The insurer also says the complainants failed to mitigate their loss by not commencing repairs, preventing the insurer from fully assessing the damage and insisting on cash settlement when the insurer was willing to cover repairs. The insurer further says that if the complainants allow its contractors to inspect the property, so they may report to it on the further claimed damage, it will be in position to consider if there is any further cover available for loss of rent under the complainants’ current policy I accept the insurer’s position. The insurer has not been able to proper ly assess the claim or been given the opportunity to repair the claim related damage. This is due to the complainants not allowing access to the property and seeking a cash settlement. Further, these actions have delayed the claim and at this point, there is insufficient basis to decide on a fair cash settlement. Further, there is no evidence to show the damage caused to the property by the insured event rendered it uninhabitable or that the required repairs would require the tenants to vacate the property. Therefore, the I do not accept the insurer is required to pay for any further lost rent. Determination | Case number: 797063 Page 8 of 11 2.3 Are the complainants entitled to compensation? Compensation for non-financial loss payable in certain circumstances The complainants seek compensation for stress and inconvenience (non-financial loss) due to the way the insurer handled the claim. We will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind Insurer is not required to pay non-financial loss The complainants seek $5,000 non-financial loss for the poor claims experience. This includes claim delays, the insurer’s failure to offer a re asonable cash settlement and the insurer’s failure to consider expert building and mould remediation reports submitted by the complainants. The insurer says the claim delays were caused by the complainants requesting time to obtain their own reports, going on a holiday, refusing to allow access to the property and not being satisfied with the settlement figures. I have reviewed all the submissions from both parties. In its response to AFCA, the insurer provided a claim timeline and the complainants have not disputed this timeline, rather they have provided reasons for their actions at various points during the claim process. I am satisfied the insurer maintained contact and followed up assessment reports in a timely manner. Most of the delays were due to the complainants seeking a cash settlement and restricting access to the insurer’s contractors. This is not the insurer’s fault. Given this, I am not satisfied there is any basis to award non-financial loss. 2.4 Why is the outcome fair? Complainants have not allowed access or substantiated additional repairs and remediation are required The complainants only raised concerns relating to mould and full replacement of the parquetry flooring after the insurer had completed a scope of works, accepted the claim and offered to authorise repairs. The complainants then refused to allow the insurer access to the property to inspect these newly raised issues. Until the complainants allow the insurer access to properly to assess the newly raised issues, it would not be fair to expect it to authorise settlement based on quotes provided by the complainant from experts including one who did not attend the property and one of which one of the complainants is company director. Determination | Case number: 797063 Page 9 of 11 3 Supporting information 3.1 The AFCA process AF CA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 797063 Page 10 of 11 3.2 Policy wording Product disclosure statement (PDS) page 6: Accidental damage cover We will cover your buildings or contents for any accident al loss or damage. There are also a number of incidents we will cover under specific conditions – these are listed on the following pages. If you make a claim, you will need to pay any excesses that may apply – you will only need to pay this amount once. Any cover we provide is subject to exclusions. Incident cover provided under specific conditions … PDS page 9: … Water or liquid damage We will over your buildings or contents of loss or damage caused by water or liquid. We will also cover the cost of finding where the water or liquid escaped from, including the cost of repairing any damage that occurs while looking for the cause. … We will cover the cost of repairing the item that caused the escape of water or liquid. … PDS page 12: Optional cover you can add to your policy You can broaden the scope of your cover by adding any of the following options. You will need to apply for this cover and pay an additional premium. Any options that we agree to add to your policy will be listed on your current schedule. Any cover we provide is subject to exclusions. … PDS page 13: … Loss of rent With this option, if your buildings or sections of your buildings suffer loss or damage and are uninhabit able as a result, we will cover any loss of rent equal to the weekly amount as stated on your rental agreement or periodic tenancy agre ement for up to 12 months. The most we will pay is up to the sum insured, as listed on your schedule. If you choose this option it will be listed on your schedule as ‘Loss of rent’. This cover applies when:  loss or damage to your buildings or contents occurs as a result of an incident as listed in this PDS  access to your rental property is prevented due to loss or damage to other property located near your rental property. We will only cover loss of rent while your rent al property is uninhabitable. … PDS page 21: Your Re sponsibilities To Us Your re sponsibilities when you are insured with us … PDS page 22: Your re sponsibilities when you are making a claim Determination | Case number: 797063 Page 11 of 11 When you make a claim must meet a number of responsibilities You must: …  take safe and reasonable steps to prevent any further loss, damage or liability occurring …  keep all damaged buildings or cont ents so we can inspect them if required  give us any information or assistance we require to investigate and process your claim …  not repair or replace any damaged buildings or contents without our consent. … If you do not meet your responsibilities If you do not meet your responsibilities, we may refuse or reduce a claim, cancel your policy, or do both. If we cancel your policy, we will advise you in writing. PDS page 28: How To Make A Claim … 2. Contact us or your insurance adviser to make a claim You need to make your claim as soon as possible. Any delays may:  reduce the amount that we pay, or  prevent us from paying a claim. We will give you immediate advice and assistance with your claim, 24 hours a day, 7 days a week. We will ask you a range of questions to help us assess your claim. We may: …  need to inspect your buildings or contents  need quotations from a repairer. 3. If you need emergency repairs If you need to make emergency repairs, we will arrange assistance through our preferred repairers and suppliers. PDS page 29: How we settle a buildings claim 1. We will decide how we will settle your claim If your buildings suffer loss or damage, we will decide whet her to:  repair  rebuild, or  pay you the cost to repair or rebuilt that part of your buildings that suffered loss or damage. If we do, we will: …  only repair, rebuild or pay you for the part or parts of the building that actually sustained loss or damage, including damaged portions of fixed coverings to walls, floors and ceilings only in the room, hall or passage where the damage occurred …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.