Home / Westpac / Determination 796333

Determination 796333

Claim denied for carport collapse based on design/construction defect exclusion

FirmWestpac
Decided2022-05-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's carport collapsed and the insurer denied the claim under a design or construction defect exclusion. AFCA found the insurer had not established the exclusion, ordered the claim paid by cash settlement with a 10% uplift, $1,000 non-financial loss, and up to $5,000 legal fees.

The insurer bore the onus of proving the design or construction defect exclusion and failed to establish that defect was the proximate cause, given council approval and engineering evidence of compliance with AS 1170.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionthird party authoritypay claimpay compensationpay non financial loss

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 796333 Financial firm Westpac General Insurance Limited Determination | Case number: 796333 Page 1 of 11 Case number: 796333 2 May 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy, and lodged a claim for property damage after his carport collapsed. The insurer first denied the claim following its expert A ’s findings, on the basis the policy excludes cover for damage caused by wear and tear. Further to its engineer L ’s assessment, it accepts there is no evidence of wear and tear, but says it is entitled to deny cover because the carport was not constructed according to building construction standards. 1.2 Issues and key findings Has the complainant established a valid claim for the carport damage? Yes. The complainant has established a claim for accidental damage. Is The insurer entitled to deny the claim? No. The insurer says its engineer’s evidence establishes the carport design was non- compliant and breached applicable construction standards, particularly Australian Standard 1170. However, the complainant ’s evidence establishes the carport was constructed in compliance with Part B1 of the Building Code of Australia (BCA), including AS 1170. Considering this alongside demonstrated deficiencies with L ’s assessment and reasoning, I am satisfied the insurer cannot establish a design or construction defect is the proximate cause of damage on the balance of probabilities. The complainant is entitled to a cash settlement for the reasonable cost of restoring his carport and 50% of the repairs to the damaged boundary fence. The insurer must also include a 10% uplift to the repair costs to account for contingencies and loss of warranty Is the complainant entitled to non-financial loss? Yes. The complainant is entitled to $1,000 non-financial loss. Is the complainant entitled to his solicitor’s fees? Yes. The complainant is entitled to up to $5,000 towards his solicitor’s cost s under the AFCA rules. The insurer must cover the complainant’ s reasonable cost of dealing with this complaint, on the basis his solicitor’s advice and assistance was warranted by the complex nature of this dispute. Further, this advice was of material assistance towards resolving this complaint. What is a fair outcome? This provides both parties a fair outcome on the information provided. The insurer has failed to establish the exclusion under the policy. Determination | Case number: 796333 Page 2 of 11 1.3 Determination This determination is in favour of the complainant. Within 14 days of this determination being accepted: - the insurer must pay the complainant compensation of $1,000 - p ay the complainant’s legal fees up to $5,000 (the complaint is to provide proof of the fees paid). The insurer is to pay this amount within 14 days of receipt - the complainant is to submit a quotation for the repairs to the carport and 50% of the fence. The insurer is to pay this amount together with a 10 % uplift within14 days of receipt. Determination | Case number: 796333 Page 3 of 11 2 Reasons for determination The complainant has established a valid claim for accidental damage, and I am satisfied the insurer cannot establish a reason to deny cover on the balance of probabilities. 2.1 Has the complainant established a valid claim? Complainant established a valid claim The complainant attributes the carport’s collapse to an accident occurring a few weeks before the claim event, where his car collided with a timber column in the carport. Impact damage is covered by the policy, and I see no reason to disbelieve the complaina nt’ s version of events as the insurer has not disputed it. However, given the circumstances it is more appropriate to consider this as accidental damage. The policy says accidental damage is damage caused by an ‘ accident ’ , defined as an event that happens by chance and is not expected in the normal course of events. Given the carport’s sudden and unexpected collapse , I am satisfied the evidence prima facie establishes a claim for accidental damage. Accordingly, the burden of proof shifts to the insurer to establish a reason to deny cover, either by way of the policy exclusions or on some other basis. 2.2 Is The insurer entitled to deny the claim? Onus on the insurer to prove exclusions The insurer confirms the policy excludes cover for damage caused by or arising from a defect in design or construction. The insurer appointed an engineer (L) who says there is evidence of such defects, which it considers the proximate cause of the carport’s collapse . L says the carport structure does not comply with AS 1170 of the BCA, which deals with both wind loads and dead loads. Its first/principal report says, in summary:  the carport structure has inadequate lateral bracing (stabilizing against lateral forces)  this would compromise its structural stability and make it vulnerable to progressive deflection and movement, resulting in loss of support and fixings failing  this means it can’t support its own weight over time, and makes it vulnerable to wind loads (forces) which it should withstand if constructed properly. The carport had a conventionally pitched timber roof frame, with the roof structure supported by a single pine roof beam. While L considers this beam insufficient to support the roof, it acknowledges the structure complies with AS 1684 (timber framing code) and AS 1720 (timber structure design methods). Its concerns relate solely to non-compliance with AS 1170. There is evidence the carport construction complies with the building code The complainant provided compelling evidence the carport was designed and constructed in a manner compliant with AS 1170. Determination | Case number: 796333 Page 4 of 11 This includes a construction report and footing recommendations from Engineers (T) who, consulting for O, who oversaw the construction of the insured premises rear extension in 2001. This included the carport. The complainant also provided evidence this information was assessed by the City of Unley, which issued development application approval on 18 April 2001 for the extension, including the carport. This approval was pursuant to the City of U Engineering report, which certifies the carport design complies with the provisions of Part B1 of the Building Code. Specifically, it confirms the structure is capable of resisting the loads determined in accordance with AS 1170.1 (minimum design loads on structures) and AS 1170.2 (structural design wind actions). While it does not confirm compliance with AS 1170.4, this standard deals with structural building elements for earthquake forces and has no relevance towards the issues in dispute. The insurer/L ’s arguments do not support its position In its initial advice, L says the carport structure cannot withstand what AS 1170.2 sets as compliant design loads because of what is considers as lack of lateral stability due to inadequate lateral bracing and insufficient support provided by the roof beam. In response to the evidence provided by the complainant to demonstrate compliance with AS 1170, L says:  the T Engineers report does not provide any information or design data on the carport frame, as it relates to the construction of the rear of the house  it does provide a footing layout which confirms the carport has not been designed with ‘cantilevered columns’ to resist lateral wind pressure, which confirms its position the carport was designed with inadequate lateral bracing  the design documents appear to confirm the carport has been constructed without any engineering design input, which increases the likelihood of construction defects. I disagree with L’s advice. O n review, T’s report is inclusive of the carport design and L does not appear to have considered the relevant report annexures, or the extract of the carport development plans which the complainant provided. The T report states all work including designs, calculations and architectural/structural drawings complies with AS 1170, among other listed standards (page 43). It further includes a wind speed determination confirming design wind speed is in accordance with AS 1170.2 wind loads. Taking this into account, I am satisfied the carport was constructed with engineering design input which specifically accounted for AS 1170. L ’s position is inconsistent with its own advice In its reports, L states there is no cross bracing between the columns or knee braces at corners, which is why it considers the carport has inadequate lateral bracing. In its final report, it says the demonstrated lack of cantilevered columns supports its argument. It is clear L is basing its arguments on what it considers a compliant design structure. However, this logic is inconsistent with the following statements made in its reports dated 4 March 2021 and 13 October 2021: Determination | Case number: 796333 Page 5 of 11  it can’t identify a specific breach of design standards  current building codes do not advise how a structure must be braced or mandate specific construction techniques  building codes provide minimum loads a structure must be designed to withstand and not design methodologies, which is for a builder and engineer to devise  different design procedures can be incorporated, and the outcome is dependent on the engineer’s design methodology  it is for this reason engineers provide permits to confirm compliance with design requirements. It is the responsibility of the building certifier (whether an engineer or the council) to confirm the design methodology meets the building code requirements. I do not consider the above supports the insurer ’s position, as it implies engineers have the discretion (freedom) to devise their preferred design standards and methodology, with building standards compliance to be assessed and determined by an appropriate authority. Accordingly, I find it highly persuasive towards the complainant ’s position that the plans for the complainant’s carport were assessed and approved by Unley City Council, whose engineering report confirms the technical details, calculations, drawings and specifications comply with both AS 1170.1 and AS 1170.2. Considering the above, I am satisfied the complainant has established the carport structure complies with Part B1 of the Building Code, including AS 1170. Given this, its sudden and unexpected collapse reinforces his position that this is an accidental damage event covered by the policy. Conversely, I am satisfied the insurer is unable to show a defect in design and construction was the proximate cause of damage on the balance of probabilities. This is because its position is based entirely on L ’s conclusions about the structure’s non -compliance with AS 1170/inability to withstand complaint loads and has not offered any other explanation towards the carport’s collapse. There are further inconsistencies with L ’s findings L has based its report findings on a number of assumptions because it conducted a desktop assessment and did not physically inspect the structure. One of the key assumptions is the carport’s collapse was likely to have been caused by progressive deflection and movement L’s conclusion was there inadequate lateral bracing. However, there is no evidence of deterioration from such movement and while the insurer ’s expert A first considered the damage to be a result of gradual deterioration, L says there is no evidence of such deterioration. Further, L says the failure of the structure is consistent with the failure of fixings or members over time due to the structure’s inability to support its own weight and resist wind pressure. However, there is no evidence to support this assumption. When considering the demonstrated concerns with L ’s findings and t he fact the insurer has not adequately dealt with the issue that the carport was built in accordance with engineering plans lodged at the time. I have also noted the council documents submitted by the complainant as evidence. I am satisfied that the structure was constructed in accordance with the Building Code that was relevant at the time of construction. Determination | Case number: 796333 Page 6 of 11 In view of the above, I am persuaded the that insurer is unable to establish its position on the balance of probabilities. The insurer must cover the cost of repairing the carport and fence The complainant is satisfied A ’s scope of works and estimate of $27,685.35 fairly represents the cost of restoring the insured damage. However, given the time that has elapsed since the claim event and the likely increase in the cost of materials, I consider the cost of repairs must be revisited and the insurer must cover the fair and reasonable cost of restoring the carport damage. Accordingly;  the insurer is to arrange for A to provide a new quote for the repairs  the claim is to be cash settled  the insurer must also cover 50% of the cost to repair the boundary fence damaged by the collapse, in consideration of an updated fair and reasonable repair quote for these works  the insurer must also include a 10% uplift to these repair costs to account for contingencies and loss of warranty. The complainant is entitled to recover his costs of dealing with the complaint I consider this dispute sufficiently complex to warrant the complainant obtaining the advice and support of his solicitor, which helped him obtain evidence materially useful towards resolving the issues in dispute. Accordingly, the insurer must cover his professional fees and disbursements, up to $5,000 being the AFCA limit, subject to the complainant providing evidence of such costs. The complainant is entitled to non-financial loss compensation Under the AFCA rules, we can award up to $5,400 compensation for non-financial loss. AFCA will only award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve a situation  interference with the complainant’s expectation of enjoyment or peace of mind . In assessing whether to award compensation for non-financial loss, AFCA expects complainants to:  be moderately robust  bear the normal degree of inconvenience experienced when a problem occurs, and  take reasonable steps to minimise the inconvenience suffered. The insurer previously put forward a goodwill offer of $1,000 to the complainant. When considering the length of time, the complainant and his family have gone without a carport and the demonstrated deficiencies in the insurer’s assessment, I consider the complainant is entitled to $1,000 in compensation in the circumstances. Determination | Case number: 796333 Page 7 of 11 2.3 What is a fair outcome? This provides both parties a fair outcome on the information provided. The insurer has failed to establish the exclusion under the policy. The complainant has established that the carport was constructed in accordance with the building code appropriate at the time it was constructed. It is fair the insurer pays the claim. Determination | Case number: 796333 Page 8 of 11 3 Supporting information 3.1 The AFCA Process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 796333 Page 9 of 11 3.2 Relevant Policy Terms Policy Documents Extract Insurance Policy Schedule 17 Jul 2020 – 17 Jul 2021 List of Ins ured Events Page 4 Accidental loss or damage to your building and/or cont ents at the site PDS Glossary of Defined Terms Page 55 Accidental loss or damage loss or damage caused by an accident Accident an event that happens by chanc e and is not expected in the normal course of events Supplementary Product Di sclosure Statement Changes to the PDS – General Exclusions Page 3 Your policy does not cover any loss or damage that is caused by or arises from: Maintenance and building  Defects in design, structure, materials, workmanship or construction 3.3 Extracts from Expert Reports Record Key points The City of U Engineering Report Development Application Number 318/2001 18/4/2001 [The report] hereby certifies that the technical details, calculations, drawings and specifications furnished with the above application have been ex amined and found to be in accordance with the provisions of Part B1 of the Building Code and more particularly: 1. The building o r structure is capable of resisting the loads determined in accordance with the following codes: SAA Loading Code AS 1170.1 SAA Loading Code AS 1170.2 L Report 16 March 2021  There is no evidence or analysis to support AJ G conclusion that deterioration is the cause of damage  Based on photographs of the carport structure, it is advised the carport has inadequate and non - complaint lateral bracing provisions . This will compromise the long - term lateral stability of the carport and make it susce ptible to progressive deflection or movement which can result in failure of fixings or loss of support causing eventual collapse  Photographs of the carport structure indicate the structure has been constructed without perceivable lateral bracing provision s  No cross bracing or knee joins between the post and beams were Determination | Case number: 796333 Page 10 of 11 Record Key points observed  The tiled roof structure is supported by a single pine roof beams… the beams fail in both strength and serviceability and therefore excessive deflection and eventual failure of the b eams is expected  Given the apparent inadequate design of the structure, it is advis ed that failure appears consistent with failure of fixings or members due to imposed loading conditions from the structures self - weight and/or loading from wind pressure. L Report 4 May 2021  The BCA, clause B1.2 identifies that the structure must be designed to resist the loads as per AS 1170. This includes the compliant wind loads and live and dead loads  Referenc e to a particular provision of the design standards canno t be made.  Design of a structure is completed in accordance with numerous provisions and design criteria. It is for this reason that the BCA requires design in accordance with an entire design standard.  We cannot point to a single provision of the design standard as the structure must comply with all provisions of the relevant standards applicable to that structure. L Report 17 September 2021  I confirm that the construction of the carport structure does not predate 1952.  Whilst our estimation of construction date and the applicable code was 1990, it is confirmed that even if the carport predates this, the analysis will remain the same and will not alter the findings as prior Standards on loading are commensurate . L Report 13 October 2021  No diagonal braces exist between columns and no knee braces exist at corners to provide a portal frame action. It is for this reason that I advise that the structure has been constructed non - compliantly to satisfy the provisions of the relevant Code enacted a t the date of construction.  The building codes of 1952 provide a minimum wind speed and wind pressure that buildings must be designed to withstand. Engineers are then engaged to design a structure that meets this complaint wind pressure through engineering principles.  Different design proc edures can be incorporated and the outcome is dependent on the engineer’s design methodology. It is for this reason that engineers or builders provide permits to confirm that the structure has been checked and c omplies with the design requirements.  It is the responsibility of the building certifier (whether that be an engineer, surveyor or council) to confirm that the design methodology meets the generic requirements of the relevant Building Code. Determination | Case number: 796333 Page 11 of 11 Record Key points  Therefore, Bui lding Codes and clauses do not exist mandating specific construction techniques. The building Codes provide general design paramet ers that must be met. It is for the building designer to decide how to design the structure to achieve the required loads impo sed by the Building Codes such as lateral stability to meet the wind requirements.  The Building Codes mandate the minimum load requirements that a structure must satisfy. It is for the engineers to design the structure to meet these requirements based on engineering principles.  The fact that a specific clause exists stating the structure must be able to withstand winds of 120 km/h and the structure failed to do so, indicates a defect in construction through deductive reasoning. L Report 21 February 2022  I have reviewed the provided documents and provide the following advice.  The attached doc ument does not provide any information or design data on the carport frame. The document relat es to the construction of a rear extension of the house and provides no information regarding the design or construction of the carport frame.  Th is document does however provide a footing layout which confirms that the carport structure has not been designed wit h cantilevered columns to resist lateral wind pressure.  the provided design documents seem to confirm that the carport has been constructe d without any engineering design input. This supports the finding that it has been inadequately constructed with insufficient lateral bracing.  I therefore advise that the provided document provided no additional information to alter the findings of our re port.  The documents seem to confirm that the carport has not been designed by an engineer which lends further weight to the analysis that a construction defect has occurred resulting in failure under nominal loads.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.