Home / Suncorp Group / Determination 795900

Determination 795900

Denial of additional water damage claim (wear and tear, gradual deterioration, settling, shrinkage)

FirmSuncorp Group
Decided2022-03-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$172,836
SourceAFCA PDF

Summary

The complainant sought $172,836.40 for additional water damage to their home after a 2014 leak, alleging a later ducted heating leak caused it. AFCA found the insurer could deny the additional damage claim as it was likely caused by excluded wear and tear, settling or similar factors.

The insurer's expert evidence established that the additional damage was likely caused by excluded wear and tear, gradual deterioration, settling or shrinkage, and the complainant's expert evidence did not persuasively show the ducted heating leak caused it.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 795900 Financial firm AAI Limited Determination | Case number: 795900 Page 2 of 21 Case number: 795900 21 March 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the insurer. The complainant lodged a water damage claim as a result of a leaking pipe on 12 March 2014. The insurer assessed the damage and accepted liability for the resultant damage caused by the water leak. Upon obtaining quotes for its portion of liability, the insurer cash settled the claim upon completion of its assessment. The complainant says following the drying out period it contacted the insurer and advised that additional damage has occurred. The insurer reviewed the additional damage and denied liability on the basis it was not caused by an insured event. The complainant is dissatisfied with the outcome and seeks $172,836.40 to repair the home and resolve the dispute. 1.2 Issues and key findings Can the insurer deny cover for the additional damage? Yes. This is because the available information shows the additional damage was caused by wear and tear, gradual deterioration, settling, or shrinkage. These are excluded under the policy. 1.3 Determination This determination is favour of the insurer. The insurer can deny the claim for additional damage and is not required to take any further action. Determination | Case number: 795900 Page 3 of 21 2 Reasons for determination 2.1 Can the insurer deny cover for the additional damage? Complainant has established a valid claim The complainant must establish, on the balance of probabilities, he suffered a loss caused by an event to which the policy responds. This is known as a valid claim. The policy covers specific insured events, including escape of liquid. The policy also covers accidental damage should the additional cover be taken. The certificate of insurance confirms the complainant has opted for this additional cover. Accidental loss, for the purposes of the policy, means ‘loss that is sudden, unforeseen and occurs without intent’. If the complainant establishes a valid claim, then the insurer has the onus of establishing exclusions apply which would entitle it to decline the claim. The complainant says additional damage was caused by a leak associated with their ducted heating system. This was identified around early 2016. This was a different leak to the one lodged in 2014 which involved a leaking sprinkler and where the resultant damage was accepted by the insurer. There were also issues discovered in the sewer and stormwater systems in between these two dates. However, the complainant does not say the additional damage was caused by this. The insurer disputes any of these events caused the additional damage. The insurer says the cause of the additional damage is wear and tear, inherent defects, gradual deterioration, settling, and shrinkage, which are factors excluded under the policy. Insurers position and expert reports The insurer’s expert evidence comprises of a leak detection report by G, a builder’s report by A and numerous engine er’s reports from C, F and MC. C was engaged to assess the leak in 2014. C concluded some of the movement and cracking damage was caused by the leaking sprinkler. However, C identified other damage that could not be related to this. This included external cracks to the western elevation and some internal cracks. C recommended a six month drying out period prior to commencing repairs. The insurer cash settled the resulting damage. Once the 6-month period had elapsed, C reattended to complete a further inspection. The complainant advised in this time the damage had worsened and C engaged plumber G to complete a leak detection test. G did not identify any leaks from the water supply pipes. However, numerous issues were detected to the sewer and stormwater pipes. C’s subsequent report confirmed damage to the north half of the west wing had worsened due to escape of liquid from the sewer and stormwater pipes and the damage to the south half of the west wing has worsened due to the drying effect of adjacent trees. C advised the defective pipework required repairs and a further one year drying out period was required. The complainant says the damage to the pipes were caused by movement of the footings due to the initial burst pipe. C disputes this. C says the damage to the pipes is from seasonal differential ground movement, long term dilapidation, and the drying effects of nearby trees. Determination | Case number: 795900 Page 4 of 21 The insurer appointed builder A to inspect the ductwork. A confirmed the system was leaking and rusted. The insurer then engaged engineer (F) to review the information. F concluded that the leak in the ducted heating system caused damage to the timber core boards directly below the header of the air conditioner. F stated they believe the remainder of the damage to the home had occurred due to differential footing movement and the general nature of the construction of the house. F further advised they largely agreed with C’s findings regarding the sewer and stormwater pipes and movement. In addition, F did not agree the leaking ducting system would have caused the damage as there was no localised heave. The insurer received a report from engineer MC dated 22 June 2021 following their attendance. In their report, MC did not agree the leaking ducted system caused the damage. MC outlined a range of issues unrelated to this that caused the damages. This included poor site drainage, the close proximity of trees and vegetation, seasonal moisture variation, absence of articulation joints, the construction of various items, long-term wear and tear and maintenance issues. The findings of this report can be found in section 3.3 of this determination. Complainant’s experts say damage is related to claimed event The complainant provided a report from plumber H disputing the findings of the in surer’s plumber G. H says some tree roots were found in both sewer and stormwater drains. H says, however, no breaks or collapses were found in the pipes and fittings. H also says the sewer is not blocking or holding water on a regular basis or flooding back to the building. H says stormwater pipes are laid flat and will hold water should it become blocked. H is of the opinion neither of the issues identified with these drains would have caused movement to the home and that regular maintenance of these pipes will keep both drains clear. The complainant provided several reports from an engineer LP to support his position. LP believes the additional damage was caused by the ducted system. In LP’s latest report dated 27 October 2020, he says previous floor levels taken by F indicate localised heave along the northern wall of the family room and kitchen. LP notes this area is not adjacent to abnormal moisture conditions such as the leaks found by the insurer’s experts. LP notes that as the timber core board lining under the ducting has been removed due to water damage, moisture egress from the ducting cannot be dismissed. Insurer can deny the claim Having carefully considered all of the available information, the panel notes the following. LP’s evidence is not p ersuasive in showing the additional damage was caused by the leaking ducted system. LP’s reports are brief. They do not consider and address all factors, such as the site drainage or localised trees and vegetation. These are plainly relevant factors when assessing the cause of foundation movement. At least two engineers engaged by the insurer (F and MC) have provided detailed and considered reports about the damage claimed. They included photos and other evidence to show a range of factors causing the damage claimed. These include:  site drainage issues allowing excessive moisture into the foundation:  localised effect of trees  lack of articulation joints in the brickwork  evidence of deterioration Determination | Case number: 795900 Page 5 of 21 These conclusions are plausible and logical. Whilst the complainant went through these reports to challenge various findings, his submissions were not substantiated by his expert reports. The panel is not prepared to place weight on the complainant’s opinion given he is not an expert on the issue in question. Further, there is no clear evidence the leak in the ducted system was as extensive as the complainant claims such that it could result in the widespread movement and cracking damage claimed. The insurer’s experts expressed several reservations about this. LP’s reports do not clearly identify that the leak was extensive enough to reach the founding soils and result in the widespread movement and cracking damage. Given all this, the panel is persuaded the additional damage being claimed was likely caused by either wear and tear, gradual deterioration, settling or shrinkage. As these all fall within policy exclusions, the insurer is entitled to deny the claim. Determination | Case number: 795900 Page 6 of 21 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as a [field of expertise]. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 795900 Page 7 of 21 3.2 Relevant policy exclusions Record Key points PDS Page 53 - 54 I n respect of all sections in the policy, we will not cover you for damage, loss or liability caused by, arising from or involving any of the following:  Wear and tear, lack of maintenanc e or inherent defect, including gradual det erioration.  Rust, corrosion, mould, mildew, wet or dry rot, rising damp and damage caused by your failure to keep your home in good order and repair.  The action of trees or their roots.  Structural def ects or faulty workmanship, settling, shrinkage or expansion. 3.3 Relevant expert reports Record Key points Determination | Case number: 795900 Page 8 of 21 Financial firm’s expert (C ) Report 5 May 2014 CONCLUSIONS: The soil in the vicinity of northern Victoria is known to contain reactive clay. An increase in moisture content of such soil will result in swelling, causing heave of foundations. Conversely, a decrease in moisture content will result in shrinkage, causing settlement of foundations . It is our opinion that differential movement of the building had occurred as a result of variance in moisture content of the reactive clay soil underlying the foundations. The differential movement had caused the observed damage to the residence. We obse rved no evidence to suggest that the building structure or foundations had been compromised. In our opinion the damage is cosmetic in nature. The movement to the building had occurred due to various contributing factors, as noted below: Heave from the irri gation system: Normal irrigation of the property surrounding the building would result in localised inc rease in moisture content of soil areas which are irrigat ed. The leak in the irrigation system would have caused a concentrat ed increase in moisture to s oil in the vicinity of the leak and this would have exacerbated heave of the northern elevation of the western wing. The heave from the irrigation is evident on the contour plan, with most significant heave occurring to foundations of the en - suite and en - s uite toilet. Settlement from the trees: Trees located near the building would have had a drying effect on soil under the building footprint, resulting in settlement of the foundations. This is also evident on the contour plan, with areas of settlement coin ciding with the location of trees and shrubs adjacent to the south and south - west of the western wing. Mode of Damage: Comments by the Insured were consistent with the observed damage and the expected series of events which would have occurred following th e pipe leak. It is our opinion that the events and damage had occurred in the following order: 1. The growt h of trees located to the south and south - west of the building resulted in gradual settlement of foundations located near the trees, resulting in the observed cracks to the brickwork of the western elevation and internal cracks to the southern wall. This foundation movement also caused tension within the ceiling, in a north south direction. This movement would have occurred over a period of several yea rs, steadily increasing over time with increased moisture demand as the trees grew. 2. Normal irrigation and leakage of the irrigation system would have caused a localised inc reas e in moisture, resulting in heave of the northern elevation of the western wi ng of the building. This would have res ulted in the observed movement to laundry wall tiles, the crack to the brickwork of the northern elevation and misalignment of the laundry doors. This would also have caused compression within the ceiling of the build ing in a north - south direction. In our opinion the damage associated with the irrigation leakage would have occurred within a period of bet ween several days to four weeks from when the leak first developed. 3. Following the repair of the irrigation system the soil under the Determination | Case number: 795900 Page 9 of 21 Financial firm’s expert (G ) Report 18 December 2014 WATER SERVICE There are two water servic es to the property No1 as per drawing, feeds the garden taps and toilets which has been pressure tested at 350kpa (t own pressure) and held for approximately 1hr and no leaks. No2 as per drawing feeding all other fixtures in house, has been tested at 350kpa also and held for approximately 1hr and no leaks. SEWER PIPES Sewer drains are earthenware 100mm (clay pipes) and through CCTV vision they are in poor condition due to tree roots entering drain through joins and I.O.S and cracks for approximately 22mtrs heading north away from back of house towards main. We have no footage of internals of pipes due to excessive tree roots filling camera head. We have loc ated via radio detection and marked the most effected spots on sewer plan and numbered for reference. No1 - Tree roots found at bottom of bend where the camera was placed down drain. No2 - At 3mtr and 5mtr I.O junctions have roots entering drain. No3 - 9mt rs and 10mtr tree roots are entering through joins. No4 - 13mtr and 15mtrs roots entering through cracks in pipe No5 - 22mts I.O bend is full of roots. STORMWATER Have sent CCTV up the stormwater pipe and again could not take footage due to large amounts o f debris and tree roots entering pipe through cracks and joins. Have located as Far as possible and marked on sewer plan and numbered for reference. No6 - Stormwater pipe is earthen ware 100mm pipe, the whole length of this pipe is in very poor condition a nd has collapsed at the 33mtr mark. Please note that the renewal of either the stormwater pipes or sewer drains would be extremely diffic ult due to limited access to side and rear of property. They both (stormwater and sewer) would most likely have to be h and dug. NOTE: I believe it would be a good idea to have a sewer machine put down that drains wit h a root cutter on it and then recamera the drains so that they can be inspected more thoroughly to establish whether or not the cracks are letting water seep into the surrounding area. Financial firm’s expert (C ) Report 22 December 2014 CONCLUSIONS It is our opinion that the damage to the north half of the west wing of the Insured’s residence has worsened over the past 6 months as a result of escape of water from the Insured’s sewer and stormwater pipes (which are partially blocked with trees roots). In our opinion, the damage to the south half of the west wing has wors ened over the past 6 mont hs as a result of the drying effect of Determination | Case number: 795900 Page 10 of 21 the adjac en t trees. The comparison of floor levels taken in May and December 2014 confirms our opinion that the damage has worsened over the past 6 months. Accordingly we do not recommend that repair works are undertaken at the Insured’s residence at this time, as da mage is likely to re - occur. RECOMMENDATIONS We reiterate the rec ommendations of our first report that all defective plumbing is to be repaired (blocked and leaking sewer and stormwat er pipes should be replac ed), and that the drying effect of trees is addre ssed. The Insured should refer to the CSIRO Document BTF18 – Foundation Performance: A Homeowner’s Guide, which Financial firm’s expert (C ) Report 14 January 2015 RESPONSE TO INSURED’S QUEERY We understand that the leaking sprinkler was repaired on 12/03/ 2014 and that the leaking sewer and stormwater pipes are yet to be repaired. The leak to the sprinkler was discovered on 12/03/2014 while the leaking sewer and storm water pipes were identified on 18/12/2014. No evidence was observed (during either o f our two inspections) that would allow us to determine when the leaks to the sprinkler, sewer or storm water pipes first occurred and when tree roots first entered the pipes. It is the Insured’s opinion that escape of water from the first of the three pip es to leak (the sewer, the stormwater or the sprinkler) caused differential ground movement which caused damage to the other two pipes (which subsequently leaked as a result of the damage). Refer to Figure 1, which shows five locations where the sewer pipe s are leaking. At least two of the leaks to the sewer are not located in close proximity to the leaks to the stormwater or the sprinkler. Therefore, it is our opinion that the leaks to the sewer were not caused by ground movement as a result of escape of w at er from the stormwat er or sprinkler pipes. Accordingly, it is our opinion that the sewer pipes were the first of the three pipes to leak. In our opinion, the damage to the sewer pipes was caused by seasonal differential ground movement, long term dilapid ation and the drying effect of the adjacent trees. It is our opinion that the primary causes of damage to stormwater pipe were seasonal differential ground movement, long term dilapidation, the drying effect of the adjacent trees and the secondary cause of damage was escape of water from the sewer pipes. We understand that the escape of water from the sprinkler occurred as a result of the sprinkler head being dislodged. It is our opinion that the damage to the sprinkler head is not related to differential g round movement and was not caused by an escape of water Event. Determination | Case number: 795900 Page 11 of 21 Whilst the footings to the residence have moved as a res ult of differential ground movement, the footings are not located in close proximity to the leaks in the stormwater or sewer pipes. It is therefore our opinion that the movement of the footings did not cause the leaks to the sewer or stormwater pipes. Financial firm’s expert (C ) Report 14 January 2015 CONCLUSIONS We reiterate our previously advised conclusions that it is our opinion that the damage to the north half of the west wing of the Insured’s residence occurred as a result of escape of water from the Insured’s sewer and stormwater pipes and the sprinkler pip e. In our opinion, the damage to the south half of the west wing occurred as a result of the drying effect of the adjacent trees. RECOMMENDATIONS We reiterate the rec ommendations of our first report that all defective plumbing is to be repaired (blocked an d leaking sewer and stormwater pipes should be replac ed), and that the drying effect of trees is addressed. We note that the sewer and stormwater pipe leaks have not been repaired and that the drying effect of the adjacent trees has not been addressed. Financial firm’s expert (A ) Report 14 March 2016 Loss Cause: Escape of Liquid - An expert building report was required to attend site and assess the damage to the subfloor ducting, using CCTV. In order to determine the full extent of the damage due to the burst heating coil, the duct work and heating coil above the ground level will be removed and the duct work inspected. - The heating system unit is situated in the plant room, at the east end of the house . The plant room hous es the heating coil. Air is pushed past the heating coil and travels down through the ducts. The ducts run under the concrete slab and feeds small vents in each room. The ducts beneath the flooring are made of three zones. The first du ct runs to the eastern zone, the second through the middle zone (kitchen/living area) and the third zone travels the entire length of the house and feeds the western end of the house. On Attendance: - Upon attendance to site, a plumber and additional trade were required to attend site in order to assess the heating unit and duct work. - The Insured advised they had a leaking pipe on the coil, which is situated in the plan room. They advised they had no knowledge of how long the wat er was leaking for, howeve r they believe it was ongoing for a long period of time, which had increased their water bill quite significantly. - Upon attendance, the wat er to the coil was turned off and the ducts had dried out. A camera was installed down each end on the three separa te ducts, and the rust damage was found in all ducts. Determination | Case number: 795900 Page 12 of 21 - Most of the duct work was in good order but on joints and junction points, there is a definite sign of rust. - The rust and deterioration is a result of water flooding int o the duct work, which is evi dent due to the water levels in the duct. The bottom of the duct is dirty and discolored, whilst the top of the duct is clean. This appears to be caused by the pipe being half filled with water. - The Insured advised there have been some severe movement si n the area of the property. Therefore it’s believed that the movement could be a result of the leaking water out of the coil in the plant room, which was running down the duct work and into the sub floor. - There was no disconnection of the metal duct work in the plant room, confirmed from inspection of the wat er flooding out of the coil area and into the plant room cellar. - As the metal duct work in the plant room has to be dismantled to repair the coil, it is recommended that the metal duct be removed in order to inspect the leaking coil. This would allow greater access to install a camera and ins pect the three ducts beneath the hous e. This would confirm the condition of the duct work and provide the route the wat er has travelled. - Please not e: There is a map attached, with circles indicating where the rust is evident. - We have re - attended to conduct the authorized exploratory works to the property. - On attendance, we have met with the ins ured and proceeded to pull out the large duct over the coil. This coil sits over the large duct that runs under the house approximately 1m x 1m. On pulling the duct apart, we were able to view the leak on the header pipe of the duct. - It appears the coil has leaked and the water has leaked onto the duct. Once the water has entered the duct work it can travel along the duct work, which travels the length of the house. - This duct is meant to be air tight, but is not water tight. It is believed that the water has leaked out of the joins in the duct. The worst of these lea ks would be in the middle of the house where the large square duct meets the round duct. - As the duct is so big we were able to gain access and view the duct. The duct is divided up int o three sections. They have used chip board to divide the ducts into th ree. - The leaking water has rotted the chip board causing the chip board to collapse. This chip board is lying on the bottom of the 1m x 1m duct. - The coil requires repair and the duct work requires repair/modification. The duct opening has been covered with chip board to stop vermin and cold air, however the ins ured is without heating. Financial firm’s expert (F ) Report 5.0 Conclusion 5.1 It is F’s opinion the leak in the water filled heat er coils of the Determination | Case number: 795900 Page 13 of 21 20 June 2016 ducted heating system located in the equipment room discovered in February 2016 did cause damage to the timber core boards directly below the header of the air conditioner as discussed in paragraph 4.16 this report. (The timber core boards divide the brick culvert into three separate air con ditioner zones.) 5.2 It is F’s opinion that except for the damage to the timber core boards directly below the header of the air conditioner, the leak in the water filled heater coils of the ducted heating system did not cause, nor contribute to, the damag e to the subject house as discussed in paragraphs 4.1 to 4.8 of this report. 5.3 It is F’s opinion that except for the damage to the timber core boards directly below the header of the air conditioner, the damage to the house has been caused by differentia l footing movement and the general nature of construction of the house, as discussed in paragraph 4.18 of this report. Financial firm’s expert (F ) Report 11 July 2016 1.2 Leak Related Damage (1) At the time of the leaks the HOUSE was OCCUPIED. (2) Based on the visual non - intrusive inspection of the building carried out by DE, Forensic Engineer at F, on 6 June 2016, the damage caus ed by the leaks includes, but is not necessarily limited to, the following:  Vertical crack up to 8mm wide located on the nort h wall outside the toilet [1].  Binding door located on the nort h wall of the laundry [2].  Vertical crack to brickwork located at the northwest corner of the dressing room [3].  Plaster joint to the ceiling has opened located in the hall [4].  Plaster joint to the ceiling has opened located between bedroom 1 and the dress room [5].  Damage to tile grout of the north wall of the laundry [6].  Typical separation of the hallway ceiling [7].  Damage to the ceiling trim and the door frame of bedroom 1 [8].  Horiz ontal cr ack to internal double brick wall shown typically located in the walk - in - robe [9].  Binding window located in the ensuite. 1.3 Building Defects and Damage not related to the leaks. (1) In F’s opinion the following observed building defects and damage are no t relat ed to the leaks which includes, but is not necessarily limited to, the following:  External brick wall cracks to the western elevation.  Internal cracks to walls at the southern side of the bedrooms and master bedroom. 1.4 On - going Building Movement (1) It must be understood that, after the repairs specified in this SOW have been completed, ongoing building movements and associated future damage may occur for the following reasons: Determination | Case number: 795900 Page 14 of 21  The clay soils at the subject site are reactive, and hence differentia l variations in soil moisture contents will result in differential foundation soil movements. Thes e soil moisture variations can occur due to seas onal weather, soil desiccation by the roots of nearby trees, variations in paving conditions around the buildi ng, soils restoring ‘normal’ moisture contents once the site improvement works have been completed, and the like.  It may not be practicable to ‘maintain’ the site strictly in accordance with the recommendations provided in the Australian Standard AS2870 - 20 11 Residential slabs and footings, and the CSIRO publication BTF 18 Foundation Maintenance and Footing Performance: A Homeowner’s Guide. Financial firm’s expert ( MC ) Report 22 June 2021 9.0 Conclusion 9.1. My instructions were to inspect and report on the following:  Attend site and submit a report.  Please attend to inspect the claimed damage and compile a scope of works of claim related damage.  For all damage that is not covered, please state why. 9.2. The following findings are based upon the evidence pr esented and these should be read in conjunction with the preceding comments in the body of this report. 9.3. MC cannot provide comment in relation to policy coverage in relation to damage. 9.4. The proximate caus e of the damage as outlined by the Insured i s provided below for your reference and policy determination. Proximate Cause and Effect 9.5.1. BRI CKWORK CRACKI NG: 9.5.1.1. Cracking to the external brickwork is a result of the cumulative effect of the following issues that have been pre - existing and dev eloping over a long period of time, resulting in moisture variations of the underlying soils causing subsequent long - term building movement reflecting to brickwork cracking: 9.5.1.1.1. The close proximity of significant trees, shrubs and vegetation drying out the underlying soils. 9.5.1.1.2. The removal of significant trees altering/hydrating underlying soil conditions. 9.5.1.1.3. Ground surface levels graded towards the home allowing surface stormwater run - off to flow towards and seep into the underlying f ounding soils causing soil moisture variations. 9.5.1.1.4. The absence of a surface stormwater drainage system to collect surface water run - off exacerbating the volume of water seeping into the underlying soils. 9.5.1.1.5. The close proximity of the sprink ler system adjacent to the building footings providing moisture to the underlying soils Determination | Case number: 795900 Page 15 of 21 during periods of watering. 9.5.1.1.6. Seasonal soil moisture variations. 9.5.1.1.7. Absence of articulation joints exacerbating the development of brickwork cracking. 9.5.1.2. Event related building movement, heave, subsidence and/or damage within the proximity of the purported leaks has not occurred. 9.5.2. EXTERNAL GARAGE PAVERS: 9.5.2.1. The inherent construction of the external pavers on a flexible base has resulted in long - term movement and subsidence of the paving. 9.5.2.2. The absence of a stormwat er drainage system to collect surface water run - off has allowed water to seep through the pavers exacerbating the settlement. 9.5.2.3. The pavers graded towards the home allowing water to pond and seep through to the underlying soils has provided an additional volume of wat er exacerbating the settlement. 9.5.3. CELLAR: 9.5.3.1. The absence of appropriate external ground surface levels and surfac e stormwater draina ge system allows moisture to seep through to the underlying soils resulting in efflorescence to the brickwork. 9.5.3.2. The presence of the soluble salts has exacerbated the extent of corrosion. 9.5.4. PLANT ROOM DOOR: 9.5.4.1. The plant room door is subje ct to long - term paint peel, rot, and moisture decay. 9.5.4.2. Poor quality repairs have been previously undertaken indicating a long - term and ongoing decay issue. 9.5.4.3. The damage to the plant room door is as a result of poor maintenance, wear, and tear . 9.5.5. VERANDA PAVI NG: 9.5.5.1. The veranda paving has not incurred subsidence. 9.5.5.2. The veranda paving was not constructed to the underside of the window frames and has not incurred the purported subsidence. 9.5.5.3. The veranda structure has not in curred movement or damage that would reasonably have developed if the veranda paving had incurred movement. 9.5.6. EXTERNAL PAVING: 9.5.6.1. The external paving is constructed on a flexible base and has incurred nominal differential movement between the pa ving and veranda tiled area. 9.5.7. VERANDA POST: 9.5.7.1. The veranda post has not twisted and is a pre - existing construction issue as noted with it having been fixed askew to the steel sub post. 9.5.8. EXTERNAL SLIDING DOORS: 9.5.8.1. The binding to the external sliding doors is due to Determination | Case number: 795900 Page 16 of 21 misalignment of the hanging tracks and rollers. 9.5.8.2. Misalignment of the tracks and rollers is a general maintenance, wear, and tear issue. 9.5.8.3. The doors and trucks require maintenance and adjustment. 9.5.9. ALCOVE : 9.5.9.1. The cracking and subsidence to the alcove is due to poor construction practice. 9.5.9.2. Reflective movement to the adjacent walls has not occurred. 9.5.9.3. The conc rete paving graded towards the home allows surface stormwater run - off to drain and seep through to the underside of the wall/slab. 9.5.10. INTERNAL CRACKING: 9.5.10.1. Internal cracking is consistent with nominal long - term building movement as a res ult of the following generally issues causing soil moisture variations: 9.5.10.1.1. Cl ose proximity of trees. 9.5.10.1.2. Removal of trees. 9.5.10.1.3. Ground surface levels graded towards the home. 9.5.10.1.4. Absence of surface stormwater drainage. 9.5.10.1.5. Close proximity of sprinkler watering system. 9.5.10.1.6. Seas onal soil moistur e variations. 9.5.10.2. Event related and/or localised building movement, heave, subsidence and/or damage within the proximity of the purported leaks has not occurred. 9.5.11. PAINT PEEL/CRACKING: 9.5.11.1. Paint peel and cracking to the cornice mouldings and window joinery joins/repairs is nominal drying and cracking of the enamel paint. 9.5.11.2. The paint peel and cracking is a general maintenance, wear, and tear issue. 9.5.12. INTERNAL CAVITY DOORS BINDI NG: 9.5.12.1. The binding of the internal cavity d oors is as a result of misalignment of the hanging track and rollers requiring general maintenance and adjustment. 9.5.12.2. The full height doors and lack of adequate clearance to the cavity is an exacerbating factor requiring regular and ongoing maintena nc e and adjustment. 9.5.13. FLOORBOARD GAPS: 9.5.13.1. The increase gaps to the hardwood floorboards is due to nominal drying of the natural timber products over time. 9.5.13.2. The rate of dry and gap development is exacerbated to areas exposed to direct sunlight. 9.5.13.3. Moisture related swelling of the floorboards has not occurred. 9.5.14. FLOORBOARD CREAKI NG: 9.5.14.1. Floorboard creaking is a natural phenomenon bet ween the drying of the floor walls, supporting battens/joist and the nailed fixings. Determination | Case number: 795900 Page 17 of 21 9. 5.14.2. Moisture related swelling of the floorboards has not occurred. 9.5.15. CRACKING TO ENTRY TILES: 9.5.15.1. The cracking along the entry title grout joint is located at the concrete slab construction joint to the entry extension. 9.5.15.2. The absenc e of an articulation joint to allow for nominal differential movement bet ween the two concrete slabs has resulted in cracking to the grout joint. 9.5.15.3. The cracking to the grout is a pre - existing construction defect. 9.5.16. Building movement as a res ult of the purported sprinkler head dislodging from the sprinkler system has not occurred. 9.5.17. Building movement as a res ult of water draining into the heater ducting has not occurred. 9.6. Pre - existing Issues 9.6.1. The items outlined wit hin the pr oximate cause and effect are pre - existing issues to the property as a result of: 9.6.1.1. Construction defects/issues. 9.6.1.2. External paving, drainage, and landscaping. 9.6.1.3. Seasonal factors. 9.6.1.4. Wear and tear.  9.6.1.5. Absence of adequate main tenance. Complainant’s expert Plumber (G) 7 April 2015 SEWER CAMERA REPORT After viewing the disc of the camera work on both the sewer and the storm water drains, the results show there are tree roots in the joins of the earthenware pipes, in both the sewer and the stormwater drains. The sewer drain shows only small roots in the joins, and no breaks or collaps es in the pipes and fittings. To date, the sewer is not blocking on a regular basis. The drain is not holding water, so it is not flooding back under the building. The stormwater drain also has tree roots in the joins and fittings. Stormwater drains are laid flat and will hold water if they bec ome blocked with tree roots, leaves dirt and sticks. My experience shows both the sewer or stormwater drains would not be causing the movement in the house. Routine maintenance of c leaning, both sewer and stormwater drains will help keep both drains clear. Complainant’s expert Plumber (FG ) Report 13 March 2014 To expose sprinkler heads in back lawn close to laundry, remove sprinkler heads to establish saturation point. Sprinkler cl osest to laundry was dislodged from irrigation pipe, refitted sprinkler capped off and tested all sprinklers in area for leaks - there were no other obvious leaks. Complainant’s expert Plumber (G ) Report Findings on Attendance: I attended the property to inspect and report on house hold Determination | Case number: 795900 Page 18 of 21 4 April 2018 pl umbing drains around nort h side of house The area is experiencing severe cracking, possibly due to water escaping from plumbing drain. My findings were as follows: Sewer pipe work outside ensuite On inspecti ng the sewer pipes outside the bathroom and ensuite I was able to install camera down the sewer inspection points. On doing this I found some slight cracking on the sewer main drain which runs from the toilet inspection point all the way to the sewer main connection point. On inspecting pipe work I found several areas slightly affected by the tree roots but none serious enough to obstruct the flow of water. My main concern is crack on the bottom of the D. T. This crack is on the bottom of the Vit clay D.T. f itting and is leaking during use. Please note: The D. T is meant to hold water and does not due to the crack. Possible cause of destabalization due to previous water leak. Areas Untested – There are several areas of pipe work untested. These pipe lines are under the conc rete slab and are extremely difficult to gain access to due to the ins pection points being under ground 1m. I have flow tested all fixtures and found water flowing correctly into the outside drains. I am slightly concerned of the connection p oints where the house fixture drains connect into the main sewer. There is slightly root infestation which could indicat e slight cracks in clay pipes. These roots are visible down the ensuite D.T. Areas that were untested were toilet sewer drain under conc rete floor, both ensuite and main shower fixture drains and bath fixture drain. Please note: Although not cameraed they flow tested okay. Caus e of Action Hous e drains on north side I recommend the D. T. be dug up and repaired. I also recommend the house fixture drains be inspected during this time. Complainant’s expert Engineer (LP ) Report 30 March 2016 Further to our site visits and perusal of engineering reports, and floor levels provided by your insurance company, and in conjunction with the report prepared by the (CA) we advise as follows. We were on site when the initial inspection was carried out b y the CA and water flows were identified, prior to the hydronic heating coil (heating system) being dismantled. We agree that further investigation should be carried out to determine the integrity of the under floor ducts in relation to the release of moi sture under the slab, in particular to the western end Determination | Case number: 795900 Page 19 of 21 of the dwelling where heave has been identified by previous investigations. The movement at this location is due to excessive moisture and the sub floor duct work, given the results of the latest inve stigations, could be a contributing factor due to the volume of water that could be released if the ducting was defective Complainant’s expert Engineer (LP ) Report 27 October 2020 Floor levels previously taken by F Engineering indicat e localized edge hea ve along the northern wall of the family room and kitchen. This area is not adjacent to alleged cause of the abnormal moisture conditions, i.e. sewer, storm water or damaged sprinkler. It is also noted that the surface adjacent to the family room and kitch en is covered by an impervious expanse of protective tile paving which would tend to stabilise moisture conditions under normal circumstances. We also note in C’s report (S Building Co - ordinator) that we stipulated that this area of tiling had heaved, we w ere in fact referring to the adjacent edge footing heave which would contribute towards the difference in level between the window sill and tiles. We are advised that the timber core board lining the under - floor brick ducting was in a state of disintegration and was removed due to the water damage. We are therefore of the opinion that moisture egress from the ducting cannot be dismissed. Complainant’s expert Engineer (LP ) Report 21 July 2020 INTRODUCTION: At this site a single storey solid masonry dwelling exists, constructed in 1969. Distress has developed over a period of time, due to excess sub - floor moisture. This company has been engaged to: 1). Inspect the site and provide relevant engineering comments. 2). Prepare a scope of work s for remedial works attributed to ingress of water at sub - floor level due to compromised under floor ducting. GENERAL OBSERVATIONS AND COMMENTS: We have reviewed several engineering reports, prepared on behalf of S Pty. Ltd., the owner’s insurer. We o riginally provided recommendations in relation to further investigation of the air conditioning/heating system subfloor ducting Determination | Case number: 795900 Page 20 of 21 in March 2016. Cons equently, the faulty ducting has been replaced and appropriate repair works carried out to the system. The scope of works incorporated in this correspondence relat es to damage and distress due to excess sub - floor moisture, i.e. heave of the clay foundation material, due to the faulty ducting. Whenever a reactive clay soil is subjected to an increase in moisture content it undergoes an increase in volume i.e. heave. This results in vertical movement of the ground surface and subsequent building distress and damage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.