Hail damage claim repairs to main roof and patio
Summary
The complainants disputed hail damage repairs to their main roof and patio, including mismatched second-hand tiles and excess silicone. AFCA decided the insurer must re-tile the main roof with matching new tiles, including 10-15 tiles it had treated as pre-existing, and remove excess silicone from the patio, but need not address gutters or downpipes.
The matching materials provision requires the closest possible match, which does not permit mixed or second-hand tiles, and the insurer must act fairly in applying it; damage from insurer-appointed make-safe silicone is the insurer's responsibility, while maintenance-related issues are excluded.
Issues
- Repairs or contractors primary · upheld
“Insurer is to arrange for removal of all second hand and multi-coloured roof tiles used to repair the main roof and replace them with closest possible match of same make, colour and quality.”
- Poor claim handling secondary · upheld
“The insurer has not provided any evidence in support of attempts made to locate matching roof tiles; complainants were not informed nor consulted.”
- Inadequate claim investigation secondary · upheld
“I am not satisfied this is fair in all the circumstances... insurer is to include the replacement of these 10-15 tiles under claim.”
- Policy cancellation or underwriting secondary · not upheld
“Pre-existing and maintenance related gutter fall and downpipe issues are excluded; insurer is entitled to decline these works under the claim.”
Subjects and remedies
home or building damagenatural disasterreassess claimrepair or rectify
Text of the determination
Determination
Case number 794238
Financial firm Youi Pty Ltd
Determination | Case number: 794238 Page 1 of 6
Case number: 794238 16 September 2021
1 Determination overview
1.1 Complaint
The complainants hold a home building and contents insurance policy (policy) with the
financial firm (insurer). On19 November 2019, a claim was lodged for hail damage to the
insured building.
The insurer accepted the claim and repairs were authorised. The complainants remain
dissatisfied with the repairs to the main roof and patio. The insurer says it has repaired all the
event related damage and the remaining issues were pre-existing and maintenance related,
which are not covered under the policy.
1.2 Issues and key findings
Is the insurer required to arrange further repairs/works under the claim?
Yes. The insurer is to arrange for replacement of additional tiles as well as ensure all the tiles
replaced are of the closest possible match in line with this determination.
The insurer is to arrange for the significant silicone applied to the flashing of the patio roof to
be removed. It is not required to take any further action with respect to the patio, guttering or
installation of an additional down pipe.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to arrange further works to the main roof of the insured building in line with this
determination.
The insurer is to arrange for the excessive silicon applied to the patio roof to be removed. It is
not required to take any further action with respect to the patio.
Determination | Case number: 794238 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer to arrange further repairs under the claim?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events, including ‘Storm’. Cover under these benefits is subject to the
conditions, limitations and exclusions specified in the product disclosure statement (PDS).
The insurer is entitled to rely on the policy provisions
The insurer provided the complainants with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
Insurer has not fulfilled its policy obligations regarding the main roof
There is no dispute the complainants have established a valid claim for the hail damage to
the insured building or that the insurer has accepted the claim. This complaint relates to the
complainants’ dissatisfaction with the quality/extent of repairs completed to the main roof and
patio under the claim.
The insurer relies on the evidence from its appointed consultants ‘OS’ and ‘AM’. It says all the
event related damage has been repaired and any remaining issues are maintenance related
or pre-existing, which is excluded under the policy.
The complaints say the insurer appointed multiple repairers to attend to the damaged main
roof. They say it seems these repairers have each used different coloured and quality tiles,
including second hand tiles. They are not satisfied that these replacement tiles are the closest
possible match to the original roof tiles. Of more concern is the fact that the roof has been left
with tiles of various colours and quality, which is not acceptable.
The insurer says the tiles used in the repairs are the closest possible match and that there
are around 10-15 roof tiles to which glue had been applied previously, so these were not
damaged by the hail event and are therefore not covered under the claim.
I have reviewed the information provided by the complainants and am not satisfied this shows
the insurer has fulfilled its obligations under the policy. I note the policy, in respect to
matching materials, states:
Matching materials
We will always try to match colours and materials, but where products are
unavailable we will use the closest possible match that is available.
Additional costs resulting from the unavailability of matching materials are not
covered. Whether we settle your claim by replacing, repairing or rebuilding, it will
only be for the damaged areas of your premises or damaged contents. We will not
pay for the costs to replace, repair or rebuild undamaged areas or contents items
that form part of any set.
Determination | Case number: 794238 Page 3 of 6
We may agree to pay you what it would cost us to repair, replace or rebuild the
damaged areas or contents and you can pay the balance of the cost.
I accept the insurer’s obl igation, in the instance exact matching roof tiles are not available, is
limited to providing the closest possible match available. The policy does not cover additional
costs that may arise from the unavailability of matching materials. However, in applying the
policy provisions to the claim, this must be done fairly and in line with the commercial
intention of the contract.
I am not of the opinion, it is consistent with the commercial intention of the policy to allow for
several different types of replacement roof tiles to be utilised in the absence of roof tiles to
match the original tiles. Further, having reviewed the policy provisions, I could not see any
reference to the insurer being entitled to use second hand roof tiles as part of repairs
authorised under the claim.
The insurer has not provided any evidence in support of attempts made to locate matching
roof tiles or of what efforts were made and what possible options were available as the
closest possible match. The complainants were not informed nor consulted regarding the
unavailability of the original roof tiles or of the possible replacement options. I believe it is
reasonable to expect homeowners to be informed and included in a decision regarding the
available options and choice of possible alternative replacement options.
Insurer is to cover the 10-15 roof tiles alleged to be pre -existing damage
The insurer says 10-15 tiles were damaged before the hail event and therefore not covered
under the policy. I am not of the same opinion. Having reviewed the reports from OS and
AM, I note OS (which first attended to complete make safe works) refers to instructions
received to temporarily apply silicone to some tiles to prevent water ingress into the home.
OS also notes there were no maintenance related issues on its first attendance dated 20
November 2019.
AM, having inspected the roof in December 2020, comments about these 10-15 tiles and
says:
There are also approximately 10-15 tiles that have been glued together possibly
from the event of pre-event it is hard to tell being the event was 1 year ago.
The insurer preferred to rely on the reference of these tiles being damaged pre-event.
However, I am not satisfied this is fair in all the circumstances, especially considering the
evidence points towards OS possibly being the ones who applied the glue/silicone to the tiles
as part of the make safe works. Therefore, I am satisfied the insurer is to include the
replacement of these 10-15 tiles under claim.
Insurer is to arrange further repairs
Given the above, I am not satisfied the insurer has fulfilled its obligations under the policy with
respect to the ma in roof’s tiles . I determine the insurer is to:
to arrange for the removal of the all the second hand and multi-coloured roof tiles used to
repair the main roof of the insured building
to arrange for these roof tiles to be replaced with new roof tiles of the closest possible
match, all of which are to be of the same make, colour and quality (albeit not an exact
match to the original roof tiles).
Determination | Case number: 794238 Page 4 of 6
Insurer is to arrange for excessive silicon to be removed from the patio roof
The complainants have raised concerns regarding the patio at the insured property which was
repaired under the claim. The repairs were limited to replacement of the patio roof sheeting,
which had been damaged by the hail event. The new roof sheets were installed to the existing
patio structure which was not damaged in the event.
The insurer had to send out consultants on a few occasions to rectify issues noted with the
patio roof (leaks). These issues were successfully repaired; however, the complainants say
there remains one issue. They say, on occasion and not every rainfall event, during heavy
rain water leaks into the patio from one side.
The insurer arranged for AM to investigate and leak detection specialist was also appointed
by AM. The evidence from the consultants identifies and recommends the following:
due to the pan flashing being completely siliconed by previous trades the water cannot
escape and flows up the roof sheet that is butted up to facia
rectification of this issue would be to fix the fall of the gutter and install an extra downpipe.
There is currently only one downpipe for 16m of guttering.
I am satisfied the issue relating to the excessive use of silicone to the pan flashing needs to
be rectified and that this falls to the insurer. This is because it was its appointed repairer who
applied the silicone, and so I determine the insurer is to arrange to have this rectified under
the claim.
With respect to the issues noted with the fall of the gutter and inadequate number of
downpipes installed at the insured property, this I accept falls to the complainants to address.
These are not issues that relate to the claimed event nor were damaged by the event. I am
satisfied these are pre-existing and maintenance related, and the insurer is entitled to decline
these works under the claim.
Why is the outcome fair?
Given the available information, it is fair that the insurer be required to complete/authorise
repairs to the main roof consistent with the provisions and commercial intention of the policy.
It would not be reasonable to permit the insurer to utilise several types of second hand and
mismatched tiles to repair the roof under the matching provisions of the policy.
It is fair in all the circumstances to require the insurer to rectify the main roof repairs
consistent with this determination as well as arrange for the removal of the excessive silicone
applied to the patio roof. Equally, it is fair in all the circumstances, that the insurer be
permitted to decline cover for the pre-existing and maintenance related issues identified
under the claim, in line with the policy.
Determination | Case number: 794238 Page 5 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy provisions
Matching materials:
We will always try to match colours and materials, but where products are
unavailable, we will use the closest possible match that is available.
Additional costs resulting from the unavailability of matching materials are not
covered. Whether we settle your claim by replacing, repairing, or rebuilding, it will
only be for the damaged areas of your premises or damaged contents. We will not
pay for the costs to replace, repair, or rebuild undamaged areas or contents items
that form part of any set.
We may agree to pay you what it would cost us to repair, replace or rebuild the
damaged areas or contents and you can pay the balance of the cost.
General Exclusions:
We will not pay for death or bodily injury to any person, or loss or damage to
property caused directly or indirectly by:
13. wear and tear, rust, corrosion, or deterioration.
Home cover exclusions:
We will not pay for:
Determination | Case number: 794238 Page 6 of 6
2. additional costs resulting from your buildings or any part thereof not being
compliant with the most recent building codes, laws, and regulations.
We will not pay for any loss, damage or legal liability caused directly or indirectly
19. by any failure to keep your property in good condition through appropriate
maintenance and repair.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.