Fire damage building claim settled by cash settlement of $33,000; complainant sought sum insured; temporary accommodation and claim handling disputed
Text of the determination
Determination
Case number 793779
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 793779 Page 1 of 10
Case number: 793779 16 November 2021
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm (insurer).
On 19 January 2021, the complainant lodged a claim for fire damage to his home. The insurer
noted the complainant incepted the policy in December 2020. As a result, the insurer
investigated the circumstances of the claim.
The insurer has offered to cash settle the complainant the sum of $33,000. This was based
on the loss of value in the property and land due to the fire. The insurer says this is in
accordance with the policy. In addition, the insurer paid the complainant temporary
accommodation costs.
The complainant is dissatisfied with the settlement for the home building and is seeking the
sum insured. The complainant is also dissatisfied with the amount paid for the temporary
accommodation. Further, the complainant is seeking compensation for the way the claim was
handled.
1.2 Issues and key findings
Should the insurer increase its settlement?
Yes. The available information does not show the insurer is entitled to settle the claim in the
manner it did. Instead, it should pay the complainant the reasonable cost to rebuild the
property.
Are further temporary accommodation costs warranted?
No. The panel is not satisfied the available information shows the complainant is entitled to
further temporary accommodation costs.
Is the complainant entitled to compensation?
Yes. The insurer made a serious allegation in its submissions that was unsubstantiated and
unreasonable. This upset the complainant. The insurer should pay $2,000 in non-financial
loss.
1.3 Determination
This determination is mostly in favour of the complainant.
The insurer should settle the building claim as set out in section 2.1.
The insurer is not required to pay further temporary accommodation.
The insurer should pay $2,000 in non-financial loss.
Determination | Case number: 793779 Page 2 of 10
2 Reasons for determination
2.1 Should the insurer increase its settlement?
Insurer relying upon a specific provision
There is no dispute that:
the complainant has suffered damage from a fire, or
the policy responds to the loss.
The issue is the extent of the insurer’s liability.
The insurer is relying upon the provision in the policy under the heading ‘What if you don’t
want to repair or rebuild’.
This provision provides the insurer with two options to settle the claim. One of the options is
for the insurer to pay the ‘difference between the value of the land and buildings at the
insured address immediately before and after the loss or damage occurred’. The insurer is
limiting its liability based upon this provision.
Insurer must show the provision applies
The provision above is found in page 60 of the Product Disclosure Statement (PDS). This
page is headed ‘How we settle your claims’ . That heading has prominence.
The key provisions under this are set out in section 3.
Underneath this is a sub- heading for ‘Building claims’. It first begins by saying:
If we agree to cover your claim for loss of or damage to your buildings, we will pay
the reasonable cost of repairing or rebuilding the damaged part of your buildings
to the same condition as when it was new
It then later says that ‘at our discretion’, the insurer may either repair or rebuild the home or
pay the complainant the cost of doing so. Effectively, it provides the insurer with two options
as to how to settle the building claim.
The next paragraph discusses when original materials are not available. This is not relevant
here.
The following paragraph then says repair or rebuilding must commence within six months of
the loss or damage. If it does not, then the insurer will:
… not be liable for any costs beyond the repair or rebuilding costs as the date the
loss or damage occurred.
Importantly, this provision does not say anything about the insurer being able to settle the
claim on an indemnity basis if repairs are not undertaken in this timeframe or at all.
Up to this point, all these provisions note the extent of the insurer’s liability will be the repair or
rebuilding costs. There is no mention of indemnity costs or any different method. This extends
even when repairing or rebuilding has not commenced within six months.
Determination | Case number: 793779 Page 3 of 10
It is only after this that the policy discusses changing the nature of the settlement to a
situation more similar to an indemnity basis. This is set out under the heading ‘What if you
don’t want to repair or rebuild’.
The wording under this heading begins with saying:
If we have chosen to repair or rebuild your damaged buildings, but you don’t want
to repair or rebuild, we will pay you either …
Significantly, upon reading this, this section of the policy is only engaged:
if the insurer has ‘chosen’ to repair or rebuild the damaged building , and
the complainant does not want to repair or rebuild.
That is, the insurer must show it has exercised its discretion to repair or rebuild the building
and the complainant does not want the insurer to repair or rebuild. It therefore cannot apply if
the insurer chooses to cash settle the claim.
If the intention was that this provision would apply regardless if the insurer chose to
repair/rebuild or cash settle, then the provision would have simply stated something like ‘If
you don’t want to repair or rebuild , we will pay you either …’ .
It does not.
In addition, this section of the policy provides the insurer with two choices. It can either settle
the cost of repair (less an amount of depreciation) or the difference in value of the land and
building. The policy provides no guide as to which method the insurer will choose or why.
The examples in the policy provides no assistance. The only example provided for a situation
when the building is totally destroyed notes the sum insured would be payable.
As the insurer to relying on this provision, it must be able to demonstrate it intended to repair
the damage or rebuild the property.
Insurer first expressed an intention to repair the property after it was sold
On this point, the panel notes the following relevant background.
According to the claim notes, it appears the insurer accepted the claim on 8 April 2021. It
engaged a loss adjuster to assist in assessing the claim. The loss adjuster provided a first
report dated 25 April 2021. This report said the house was likely uneconomical to repair due
to significant structural and environmental upgrades. It estimated a rebuild cost, inclusive of
demolition and other costs, of almost $560,000. This was more than the sum insured
($543,000).
The loss adjuster then provided options with how the claim would be settled. Three options
were provided. One was paying out the sum insured plus benefits. The other two were based
on the methods set out under the provision ‘What if you don’t want to repair or rebuild’.
Following this, the loss adjuster was then engaged to obtain a scope of works and quotes.
The loss adjuster provided a second report dated 14 June 2021 not ing a scope of works was
obtained with two quotations from C and J for $114,112.28 and $84,263.52 respectively.
Neither the scope of works, nor the quotations, were included in the insurer’s response.
Importantly, in the loss adjuster’s report , was the following proviso:
Determination | Case number: 793779 Page 4 of 10
Both contractors have noted that significant upgrades will more than likely be
required which would attract major variations if awarded the job.
The loss adjuster said a 100% contingency would not be unreasonable given the remote
location. It is not clear how reasonable, or feasible, this contingency is given the loss
adjuster’s first report and the significant extent of these upgrades.
Importantly, before the second report was completed, the complainant had informed the
insurer on 17 May 2021 that he had sold the property.
Following this second report, the insurer then wrote to the loss adjuster on 30 June 2021
about how to proceed with the claim. The insurer did so after referring to solicitors and getting
sign off from management. In this email, the insurer said:
The first option is to offer repairs based on the quote from [C].
However, if insured confirms he does not want to proceed on repairs then our
settlement will be based on the option for "the difference between the value of the
land and buildings at the insured address immediately before and after the loss or
damage occurred’
This is the first time the insurer ever expressed any intention of undertaking the works. There
was nothing in its claim notes, or other correspondence, showing it had any intention to repair
the property, or rebuild it. Importantly, it did so:
more than a month after it was informed by the complainant that he had sold the property,
based on quotes that were plainly not actionable, and
in circumstances when it knew the damage could not be repaired.
This position also came about after the following background:
the insurer had investigated the claim as it had concerns with the genuineness of the event
the insurer says, and continually maintains, the property was over-insured
the insurer has maintained the complainant has not acted with utmost good faith in the way
he nominated the building sum insured
the complainant was under financial difficulty
Insurer has not shown it can settle the claim in the way it did
Based on all this, the panel notes the following.
The panel is not persuaded the insurer intended to repair or rebuild the property. The email it
sent to the loss adjuster was provided more than a month after it was already told by the
complainant he had sold the property. In none of the documents prior to this did the insurer
ever express an intention it would seek to repair or rebuild the property.
In particular, based on the loss adjuster’s first report, a cash settlement was being proposed
given the property was likely a total loss and the complainant preferred a cash settlement.
Further, the loss adjuster’s second report does not demonstrate the property was repairable.
Whilst a scope of works and quotes were obtained, the panel notes these were plai nly
insufficient to get the works done given it did not include the required upgrades. Further,
these upgrades were significant given the loss adjuster said a 100% contingency would not
be unreasonable.
Determination | Case number: 793779 Page 5 of 10
In addition, the loss adjuster did not recommend that the repairs can, or should be,
undertaken. Neither did the loss adjuster amend the reserve to reflect the repair cost.
Therefore, it is difficult to accept the insurer ’s email expressed an intention to repair the
property in circumstances when:
the scopes of works were incomplete,
the cost of repairs was uncertain,
it would have to provide a lifetime guarantee for these works noting the significant
upgrades required,
it never expressed any such intention previously,
when it communicated this email, it knew it would not have to follow through with this given
the property was sold, and
the insurer knew it could only settle the claim in the way it is now proposing is if it can
show it chose to repair or rebuild the damage.
Given all this, the panel is not persuaded the insurer has established it did, or would have,
repaired or rebuilt the property. It follows the insurer has not shown it can rely on the
provision set out under ‘What if you don’t want to repair or rebuild’ to settle the claim.
Insurer must settle the claim in this way
It follows the only method the insurer can settle the claim under the policy is to:
… pay the reasonable cost of repairing or rebuilding the damaged part of your
buildings to the same condition as when it was new
The panel is not persuaded the settlement should be based on the repair quotes or the scope
of works referred to in the loss adjuster’s second report . These quotes and scope of works
are plainly incomplete and not actionable. No scope of works has been obtained for the actual
repair cost.
The loss adjuster initially accepted the property was uneconomical to repair due to the
‘significant structural and environmental upgrades required to comply with Building Codes
and Local Council ’ . The loss adjuster did not say he changed his position in his second
report. Whilst he provided quotes and scope of works pursuant to the insurer’s instructions,
the panel notes the following:
these quotes did not cost, or scope, the significant structural and environmental upgrades
to determine if the property could be repaired
the loss adjuster also got costs to replace the property
the loss adjuster did not change the reserve based on these repair quotes
the loss adjuster did not recommend the house can, or should be, repaired noting the
significant upgrades required
Given this, the panel accepts it is fair to accept the property would need to be rebuilt. This is
consistent with the loss adjuster’s initial recommendation. The subsequent information is not
persuasive in showing the house is economic to repair.
The loss adjuster, in his initial estimate, noted the cost was about $560,000. This included
demolition costs and an allowance for architect and development costs. In the second report,
the loss adjuster obtained an estimate from C for a demolition and rebuild quotation totalling
$461,802.
Determination | Case number: 793779 Page 6 of 10
This second report also referred to a transportable building option. However, no quotation
was obtained for this and no details has been provided about the option considered.
The panel c onsiders it fair to base the settlement on the loss adjuster’s estimate. The costing
has been set out. It was based on an estimate of $3,000 per square metre that was verified
by contractors C and J as being fair. It includes an allowance for complying with bush fire
standards.
It is not clear if C’s rebuilding quote includes these factors or factors the remote location of
the site. It is also not clear if C’s quote is actionable as the insurer knew the property was
being sold at that time.
As the complainant has sold the property, it is fair to remove the costs of demolition, architect
and developmental fees. This is because the policy only pays for these amounts if they are
incurred and it is clear they will not be.
This leaves a total of $432,616.40. The panel also considers providing a 10% contingency
given the likelihood of unforeseen additional costs that would have occurred in the rebuilding
process.
Therefore, the panel accepts the insurer is required to settle the building claim in the following
way:
paying $475,878.04, minus the amounts already paid and any applicable policy deductions
interest on this amount pursuant to section 57 of the Insurance Contracts Act 1984.
Interest is payable from 30 June 2021, being when the insurer first sought to settle the
claim, until payment is made.
2.2 Are further accommodation costs warranted?
Policy provides cover for temporary accommodation
Page 28 of the PDS details the cover for temporary accommodation. The benefit is payable in
these circumstances:
If your home building is damaged by an insured event during the period of
insurance to such an extent that you can’t live in it, we’ll pay the rental costs for
accommodation for you and your pets while we repair or rebuild your home
building
The insurer paid the complainant a total of $7,800 for temporary accommodation.
No further entitlement of temporary accommodation
The complainant submits the insurer agreed to provide settlement for temporary
accommodation at a weekly rate of $420 for a period of 26 weeks. The 26 weeks was for the
period of reinstating the property.
The insurer submits the $420 weekly rate for temporary accommodation costs was for a fully
furnished property.
The panel notes there is no evidence the insurer agreed to pay accommodation at the rate
proposed by the complainant.
Determination | Case number: 793779 Page 7 of 10
Regardless, the available information does not show the complainant has incurred temporary
accommodation costs beyond that paid by the insurer. Given this, and the fact the property is
not going to be rebuilt, the panel does not accept the policy entitles the complainant to further
payments in this regard.
2.3 Is the complainant entitled to compensation?
Compensation paid in some circumstances
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
AFCA adopts a conservative approach to the award of compensation for non-financial loss
and expects complainants to be moderately robust and bear the usual stress and
inconvenience associated with an insurance claim.
Insurer should pay $2,000 in non-financial loss
The complainant raised concerns regarding the management of the claim. In particular, the
complainant was dissatisfied with the time taken, the investigation and the settlement of the
claim. The complainant was dissatisfied with the insurer appointing an investigator to
investigate the circumstances of the claim. The complainant submits the insurer did not
consider his circumstances regarding his health issues. He was also dissatisfied with some of
the insurer’s allegations.
The panel accepts the insurer’s decision to investigate the claim was rea sonable. The loss
was significant and occurred within a month of the policy being taken out.
However, the panel is concerned by some of the insurer’s allegations. In its response to
AFCA dated 5 August 2021, which was after it accepted the claim, the insurer continued to
allege the complainant has ‘failed to act with utmost good faith by nominating a sum insured
for his building and contents that far exceeds its worth’.
An allegation of failing to act with utmost good faith is serious. This allegation was also made
without any reasonable basis, particularly in context of the building sum insured, given the
following:
the insurer is confusing the fact the policy insures the building for its replacement cost, not
its market value
if the complainant were to nominate a sum insured for what he bought the property for,
being $38,000, it would have been manifestly inadequate and significantly underinsured
the insurer’s loss adjuster, in its first report, noted both an online calculator, and its own
calculations, showed the cost of rebuilding was significantly higher than $38,000 and close
to the sum insured.
The complainant was upset by these allegations and remains so. Given this, the panel
considers it is fair the insurer pays $2,000 in non-financial loss given this.
Determination | Case number: 793779 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 793779 Page 9 of 10
3.2 Relevant policy wording
How much you’re covered for – page 12
It’s up to you to decide the sums insured, and the type and level of cover that you want to
take out. People general want enough insurance to cover the property/s estimate
replacement value. If you don’t have enough cover, you could end up having to cover some of
the costs yourself.
Remember, we will only pay up to the amount of your loss or the sum insured, whichever is
the lesser – so you should be careful not to over insure.
Alternative accommodation for you and pets – pages 28-29
If your home building is damaged by an insured event during the period of insurance to such
an extent tha t you can’t live in it, we’ll pay the rental costs for accommodation for you and
your pets while we repair or rebuild your home building.
When we pay
…
the loss or damage has made your home buildings uninhabitable
How much we will pay
the weekly rent equivalent to your building’s rentable value prior to the damage, up to 10%
of your buildings sum insured in total, and
How long we will pay
For a time, we agree is reasonable necessary up to a maximum of 12 months.
Determination | Case number: 793779 Page 10 of 10