Determination 793588

Claim denial for slab damage following burst hot water pipe; contents and temporary accommodation settlement disputes

FirmChubb
Decided2022-05-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$137,479
Non-financial loss—
Amount claimed$91,536
SourceAFCA PDF

Summary

The complainants claimed a total loss of their home slab and contents and additional rent after a burst hot water pipe. AFCA found most slab damage pre-dated the leak, but awarded a cash settlement for 10% of slab repair costs plus contingency, increased the contents settlement to $40,000 and ordered part of the rental claim paid.

Slab damage largely pre-existed the leak and falls under exclusions, but escaping water caused 10% of the damage, so the insurer must cash settle that proportion with a 15% contingency.

Issues

Subjects and remedies

home or building damagenatural disastertravel or overseaspay claimreassess claim

Related

All Chubb determinations · Find similar determinations

Text of the determination

Determination Case number 793588 Financial firm Chubb Insurance Australia Limited Case number: 793588 8 March 2022 Determination | Case number: 793588 Page 2 of 12 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). On 3 June 2019 they lodged a claim for damage after water escaped from a burst hot water pipe whilst they were overseas. Due to damage to the concrete slab the complainants say the home needs to be rebuilt and is a total loss in respect of the building as well as mould damaged contents. The insurer accepted the claim but denies liability for slab damage and disputes the amount for contents and accommodation. 1.2 Issues and key findings Is the insurer entitled to deny the claim for the damaged slab? No, most of the damage to the slab was pre-existing but the evidence shows a small amount of damage (assessed at 10%) caused by the volume of escaped water in the reactive soil. Is the insurer required to increase its settlement for contents? There has been a resurgence of mould due to the insurer being refused access for over a year. A moderate increase in the insurer‟s offer from $34,269 to $40,000 is warranted. Is the insurer required to increase its settlement for temporary accommodation? It is fair that the insurer increases its payment for rental expenses. Why is the outcome fair? The extensive cracks in the slab pre-date the broken pipe but were only revealed to the complainants as a result of the broken water pipe. The complainants had only been in their home for a year, suffered significant distress and were contemplating demolition and rebuild. However, the slab is repairable, and the insurer‟s response has been reasonable. A cash settlement will resolve the dispute and allow the complainants to make their own repair plans. 1.3 Determination This determination is substantially in favour of the insurer. Within 21 days of the decision being accepted the insurer is to:  obtain a scope of work and quotations for repair of the concrete slab and an updated quotation for home building repairs  cash settle the complainants for the home building repairs including 10% of the slab repair costs  include an uplift of 15% for contingencies and the absence of an insurer‟s warranty  pay $40,000 in settlement of the contents claim  pay $11,479 for accommodation costs and to separately ensure the rental payment for April 2020 is paid. Determination | Case number: 793588 Page 3 of 12 2 Reasons for determination 2.1 Is insurer entitled to deny the claim for the damaged slab? No, most of the damage to the slab was pre-existing but the evidence shows a small amount of damage (assessed at 10%) due to the volume of escaped water in reactive soil. The complainants have established a valid claim within the terms of the policy The complainants are required to show, on the balance of probabilities, they suffered a loss caused by a risk insured under the policy. This is known as a valid ( prima facie ) claim. If the complainants establish a valid claim, the onus shifts to the insurer to show, on balance, it is entitled to rely on an exclusion under the policy or can otherwise deny or limit its liability for the claim. The complainants were away on holiday (four weeks) when water was observed coming from under the front door. The policy covers accidental loss or damage to building and contents. There is no dispute a burst pipe caused a water leak as reported and the insurer agreed to cover resultant damage. On this basis, I am satisfied the complainants have established a valid claim. However, the complainants still need to show on the balance of probabilities that their loss extends to the concrete slab. The insurer then has the burden of proving any applicable exclusions. Coverage under the policy is subject to conditions and exclusions Coverage under the policy is set out in the policy documents, including the product disclosure statement (PDS). While the policy covers accidental loss or damage, cover for damage caused by erosion, landslide, subsidence or earth movement is limited to the following circumstances:  the loss or damage occurs within 72 hours of the event, and;  as a direct result of specified events, including escape of liquid. Further, the policy excludes cover for accidental loss or damage caused by:  erosion, landslide, subsidence or earth movement (except as described above)  settling, shrinkage or expansion in buildings, foundations, walls or pavements  water entering the home due to a structural defect, faulty design or faulty workmanship when the building was constructed that an insured knew about (or should reasonably have known about), and did not fix before the loss or damage occurred  rust, corrosion, gradual deterioration, depreciation, wear or tear  damage caused directly by tree roots. The insurer says the damage to the complainants‟ property was caused by some combination of these factors. Numerous and varied expert opinions The insurer engaged a specialist plumber, TB, who confirmed the leak was located under the floor of the loungeroom towards the rear of the building, from a leaking hot water pipe. The parties engaged experts, including geotechnical specialists and engineers, several whom produced multiple reports and commented on the reports of other experts. This Determination groups the reports for each expert and highlights their key points. Determination | Case number: 793588 Page 4 of 12 Pre-construction geotechnical report The evidence included a geotechnical report completed by SS when the property was constructed in 1990, noting the property comprised moderately reactive clay soil:  the load bearing ribs should be founded at least 100mm into natural undisturbed soil  there is up to 400mm of fill on the site  care must be taken to avoid the drying effect of trees causing differential ground movement. Post loss geotechnical reports Geotechnical specialists, SG and HR, reported on behalf of the insurer. SG found:  up to 900mm of fill on the site,  poor sub-surface drainage where clayey silts/filling overlying impermeable clay may become inundated during wet periods  the proximity and influence of established vegetation on neighbouring allotments  testing showed very high soil reactivity and potential for seasonal heave  the footings fall short of present-day specifications for this soil type. HR drilled four bore holes through the slab. It found significant moisture but no voids under the slab. Complainants maintain damage caused by broken pipe The complainants engaged an engineer (AE) who observed significant structural cracking in the slab. The cracks were extensive and between one to two millimetres in width. It says this is consistent with the highly reactive soils under the slab expanding due to high water/moisture levels due to the leak. Further it says:  the levels and pattern of cracking are consistent with heave around the back of the bathroom  the water leaking has caused packing sand to be washed up through the slab, potentially leaving voids under the slab. AE commented  the slab level was 50mm lower at the rear and100mm lower at the front of the building.  a leaking pipe can cause heave of up to 100mm.  there was evidence of heave under the middle areas of the slab Whilst the upwards heave of the slab was not adjacent to the broken pipe, AE explained that leaking pipe was near to the sewer pipe and trench, which acts as a conduit for water to move around under the slab. Ba sed on HR‟s results AE observed the moisture content analysis showed the moisture was highest in borehole 4, which was proximate to where the leak was detected. In a later report, AE recommended removing the large tree in the rear yard, saying the roots of this tree would have been attracted to the prolonged high levels of moisture under the house. Insurer’s engineering report The insurer‟s forensic engineer (FM), noted the foundation soils are highly reactive and that buildings founded on this type of soil may suffer movement damage from moisture due to the differential variations in the foundation soil. In other words, FM explains, if the moisture Determination | Case number: 793588 Page 5 of 12 content increases, the clay soils tend to swell resulting in „heave‟ of footings and if it decreases the soil shrinks, resulting in „settlement‟ of the footings. FM, challenges AE‟s findings and says the presence of paint, filler and adhesive inside slab cracks, confirm the cracks pre-existed the broken pipe FM found most of the movement damage was caused by the drying effect of trees, highly reactive soil and inadequate slab depth. It reported damage from the leak is limited to swelling of various members at base of walls (skirting boards, architraves, joinery, plasterboard) and mould. FM says of the cracks and misalignment in the slab:  slab cracks pre- existed the complainants‟ purchase of property (2018)  slab cracks were present before the parquetry floor was laid (2018)  slab misalignments occurred gradually over time, supported by age and maturity of trees  the majority of slab movement is settlement on the north and south ends of the house (toward the trees)  the leak is located at the south end of the living/dining room and is remote from the sitting room, so has not caused any significant heave or lifting of the slab. FM says the structural design of the slab in 1990 was inadequate and the slab has been founded on fill rather than natural undisturbed soil. Parties disagreed on cause of damage based on respective expert reports In early to mid-2020 there was a stand-off between the parties with their opposing expert opinions. The insurer proposed and ultimately the complainants agreed to jointly instruct an independent expert to provide a joint report. The insurer proposed IR and reluctantly the complainant agreed to this selection. The insurer stated that IR had not previously been retained by the insurer. Despite this, the complainant felt IR was not neutral, although there has been no evidence to prove any bias by IR. The complainants decided to separately brief their own preferred expert, RB. Complainant s’ engineering report RB reported that the cracking and movement within the building is relatively recent and caused by water from plumbing leaks, trapped in and under the building and/or in service trenches under the property. RB rejects the trees caused the cracking and says::  water usage showed a major spike at the time of the claim (the June 2109 quarter was four times the average),  water did n ot „escape‟ but was trapped in and under the slab and caused heave.  RB later commented that water from the burst pipe would have covered 2.1 square metres per day under the slab for at least three months Jointly instructed engineer says cracks in slab unrelated to leak The i nsurer‟s engineer , IR concluded multiple causes of damage to the slab included:  original construction being inadequate for the soil type  tree drying which caused foundation settlement at the north and south ends of property  unsuitable pavement construction, which caused heave in the central light-well courtyard. However, IR disagreed with FM that the water supply leak has not caused heave. IR says:  it has caused some heave, but that the heave was beneficial rather than detrimental Determination | Case number: 793588 Page 6 of 12  heave is not significant, given the low porosity of the clay and lack of a head to drive water into the clay. IR notes there has been 15-20mm recovery at the south end of the house. He says it cannot be said how much of the recovery is due to tree removal and how much is due to stopping the leak. IR considers the tree removal is predominant. IR agrees the slab was substantially under-designed. However, IR disagrees the slab is based on fill. In relation to what caused movement of the slab, IR concluded:  inadequate strength and stiffness of slab  the foundation settlement at both north and south ends are from tree drying and heave due to unsuitable pavement construction (IR says FM failed to identify porous pavement issue, incorrectly describing it as impervious)  insufficient perimeter drainage. Loose laid pavers held moisture and probably attracted tree roots at north and south ends of the site  long-term drying settlement at the north and south parts and some heave from poorly drained courtyard centrally  leak in the hot water service pipe did not contribute to the settlement of central heave but may have contributed to rebound heave recovery of southern part. Cracks pre-date broken pipe There is no dispute there has been accidental damage caused by water escaping from a broken pipe and that the damage includes floors, tiles, architraves, joinery and ongoing mould damage. The insurer has not raised any exclusion in respect of these items and has offered a cash settlement. There is also no dispute that the concrete slab is damaged and its integrity compromised. However, the insurer says the damage to the slab has been caused not due to the broken pipe but due to multiple factors comprising:  highly reactive soil  the drying effect of trees  inadequate construction/design  gradual slab misalignment since construction  insufficient perimeter drainage. The insurer says these matters fall outside the insuring clauses or are excluded. Significantly, the evidence revealed a number of locations where the cracking contained paint, adhesive and filler, indicating the cracks pre-existed the broken pipe and pre-existed the 2018 property purchase. The complainants had been living in the house only a year before the flooding damage and were likely quite shocked when the floor coverings were removed. The cracking is not localised to the area of the broken pipe nor any single part of the house. The more persuasive evidence is that the cracks have been present for some time and the photographs support this. The burden of proof is on the complainants to prove that the damage to the slab was caused by the escaping water from the broken pipe. The evidence indicates the damage or certainly the major part of the damage pre-dates the broken pipe. However, I have come to a view that the water leak should not be dismissed as having caused no damage to the slab. It is not disputed there was substantial moisture under the slab. The volume of escaping water was substantial, likely much more than tens of thousands of litres (AE says more than 100,000 litres). The water spread caused substantial damage Determination | Case number: 793588 Page 7 of 12 throughout the home. It may not have created the cracks in the slab but plainly it forced its way through existing cracks and forced sand through gaps in the slab. The engineer, IR, agrees that the escaping water caused heave, though he surmises this was not in the central part of the slab. Where ever that heaving occurred under the slab, the movement and distortion of the slab due to that heaving constitutes damage. It is not an answer to say that damage was counter-acting other damage (even if that were true). The movement of the slab was a further compromising of its integrity. Precise assessment is impossible and, in the circumstances, I consider it fair that 10% of the damage to the slab be apportioned to the escape of water from the broken pipe. The policy covers damage from earth movement as a direct result of escaping liquid but only if the loss or damage occurs within 72 hours of the escape of that liquid. In the present case the liquid was escaping over several days and it has not been suggested by the insurer that any damage from heave would have occurred after the 72-hour period. Having come to the view that escaping liquid was in effect the proximate cause of loss for 10% of the damage to the slab, it follows that the remainder of the slab damage was due to a combination of uninsured earth movement and or expressly excluded such as being caused by settling in foundations and defective design of the foundations. Support slab does not require replacement AE said that given the severe degree of slab level variation and extent of cracking, the stiffness of the slab has reduced and compromised the future performance of the structure. It says performance requirements for a slab in section 1.3 of AS2870-2011 cannot be achieved and the failed slab should therefore be replaced. Further AE says attempts at repair (ie ground injection, underpinning)would be unsatisfactory. FM agrees the slab will not perform adequately. IR says AE‟s per formance requirements for a normal site are based on the 2011 standard. IR says the original design was below the standard as required in 1988. IR found the cracking and deformation will not prevent the slab from performing satisfactorily if the site issues are resolved. He considered any compromise of slab integrity is comparatively minor. IR concluded:  the slab is not structurally impaired to the point of requiring re-construction or structural remediation works  there was no structural damage to the superstructure of the building  the few minor cracks to brickwork are not material to the structural integrity and repairable  structural integrity has been compromised but it is not significant and does not prevent the slab from performing satisfactorily While the complainants say the slab should be replaced, I am satisfied the damage can be repaired. Complainants seek insurer undertake the repairs The insurer offered to resolve the claim for resultant water damage to the building by providing a cash settlement of $86,340.14 (excluding GST) as per the higher quotation provided by SB. It says:  the offer is based on the insurer‟s position that the slab is excluded under the policy  a cash settlement has been offered due to the insurer‟s lack of confidence in the complainant to co-operate to complete works Determination | Case number: 793588 Page 8 of 12  if its offer is accepted, the insurer will apply a 10% contingency in good faith. The insurer says that in the event it is called to meet the claim for the slab, the damage can be repaired by underpinning instead of replacing it. The complainants say the insurer should undertake the necessary repairs and provide warranties. Fair in circumstances for insurer to cash settle The policy entitles the insurer to settle a claim by paying the cost of replacement or repair. The insurer has offered to make a payment to the complainants for the cost of repairs. In the circumstances I consider this to be fair and an appropriate way to proceed. There has been substantial unhappiness on the part of the complainant and a lack of trust on both sides. At times the complainant has declined to allow access to the insurer‟s contractors. I am satisfied the insurer is entitled to offer a cash settlement for repairs, subject to up-to-date quotations being obtained. Due to the nature of the work involved and the absence of the usual insurer warranty I consider a 15% contingency should be provided on top of the quote. 2.2 Is the insurer required to increase its settlement for contents? A moderate increase in the insurer‟s offer from $34,269 to $40,000 is warranted. Complainants say insurer’s actions caused mould to spread through home The complainants requested the insurer settle their claim for contents on a total loss basis namely in the sum of $131,294. The insurer says that since late 2019 it has not been allowed an opportunity to do its own assessment of contents. However, based on earlier information from its restorer RX, it is agreeable to offer $34,269 for non-restorable items. The complainants seek a total loss on the basis:  the insurer‟s drying out process (as carried out by its restorer RX), is said to have caused mould to spread through the home  the complainants‟ mould expert (BH) in October 2020 (17 months after the event) found the home contaminated with mould which posed an unacceptable risk to the occupants. Further BH reported:  the mould warrants extensive remediation, and no one should enter the home without protective equipment  The contents damaged by mould are uneconomical to repair Evidence shows insurer took appropriate steps in relation to mould The insurer denies the dehumidifiers installed by RX, caused mould to spread through the home. The insurer says RX acted to reduce the contamination to acceptable levels but from late 2019 to late 2020 the insurer was refused access and as a result re-contamination occurred. The insurer submits:  it took steps in early June 2019 to dry out the moisture in the home (following which normal moisture levels were reached in late June 2019) and to remove contents  RX regularly monitored moisture levels which were restored to normal levels  RX undertook containment measures to prevent spread of mould before installing dehumidifiers The insurer has provided evidence of its mould remediation efforts including: Determination | Case number: 793588 Page 9 of 12  progress updates from RX between 30 May and 28 June 2019  photographs of the measures taken to prevent the spread of mould (report 3 June 2019) showed sealed areas with plasterboard removed to contain the spread  installing containment to the cabinetry and doorways to prevent cross contamination  removing water damaged skirting boards and wall plaster  containing the home‟s pre-existing mould (7 June 2019)  regularly monitoring dehumidifiers and air movers to address the recorded moisture readings. The report from RX dated 19 June 2019 noted the moisture readings in the subfloor showed the hallway and walk in robe were within normal parameters. RX installed further drying equipment to return the subfloor to normal moisture and achieved this by 24 June 2019. Evidence shows increase in mould due to delay by complainants The evidence shows:  the complainants were non-responsive or very slow to respond to requests to inspect contents from about the end of July 2019.  the complainants did not allow access to the insurer‟s contractors to assess damage, including: > on 2 September 2019 when RX technicians attended to prepare an inventory and remove remaining contents from the home > further attempts made by insurer to assess contents between 2 and 16 September 2019 were unsuccessful > on 2 April 2020, the complainants‟ broker advised it did not want RX to attend the property > on 8 September 2020, the complainants agreed to a site attendance by EH, however cancelled this appointment > in October 2020 the insurer attempted to arrange an inspection with a different restorer (FR) to assess the remaining household contents and contents in storage, however there was no response from the broker despite follow ups through to January 2021  the complainants did not provide quotations of their own despite request. For the reasons above, and in the absence of evidence to the contrary, I am satisfied the insurer took appropriate steps to remediate and is not liable for the further damage to contents caused by mould. Further the insurer has not had an opportunity to examine the damaged items mentioned by BH and form its own view as to whether those items can be repaired or should be replaced. Nevertheless and despite the breakdown in communications, it is likely that there were other contents items which were damaged as at 2019 and which were repairable and on this basis I have increased the amount offered by the insurer to a total of $40,000. Insurer is not liable for pre-existing mould damage The insurer says some mould pre-existed the insured event because:  RX reported pre-existing growth to walls due to failed waterproofing in the adjacent shower  EH found bathroom shower had noticeable long-term water damage. Relevantly EH‟s report found:  bathroom shower had noticeable long-term water damage to the framing  visible mould and rot to the timber framework and wall linings directly behind the shower  the damage is from a long-term leak or waterproofing issue involved with the shower. Determination | Case number: 793588 Page 10 of 12 EH recommended the baseplate directly behind the south wall of the shower be replaced.I am satisfied the insurer is not liable for damage related to waterproofing issues in the shower area. 2.3 Is the insurer required to increase its settlement for temporary accommodation? It is fair the insurer pays an additional amount of $11,479. The complainants claim additional temporary accommodation The PDS provides that if an insured is “ unable to live in (your) buildings after loss or damage has occurred, we will pay for you to rent another property .” The PDS states it “ will pay these costs for up to twenty-four (24) months. The most we will pay for these costs is the greater of $20,000 or 20 per cent of the buildings sum insured”. On a sum insured of $550,000, 20% equates to $110,000. The insurer says it is not liable to reimburse rent incurred arising from delays by the complainants ( insurer‟s Notice of Response dated 1 December 2021). The insurer says a 6-month period was sufficient for repairs to have been conducted. The insurer has paid rental for over 15 months. The complainants claimed $91,535.96 for rent paid for temporary accommodation.:  $45,620 for the period 5 July 2019 to 17 April 2020 (10 months at Property 1 at $4,562 per month)  $45,915.96 for the period of 18 April 2020 to 17 April 2021 (12 months at Property 2 at $3,826.33 per month). The insurer provided information showing it had to date made rental payments (totalling $68,407) as follows:  $9,124 for the period of 5 July 2019 to 4 September 2019  $9,124 for the period of 5 September to 4 November 2019  $22,810 for the period of 5 November 2019 to 4 March 2020 (5 months at Property 1 at $4,562 per month)  $22,957.98 for the period of 17 May 2020 to 17 October 2020 (6 months at Property 2 at $3.826.33 per month). The information above, shows the insurer missed a payment of $4,562 for the month of April 2020. The complainants have claimed a further 6 months‟ rent at $3,826.33 per month, totalling $22,957.98 for the period of 17 October 2020 to 16 April 2021. Insurer argues unreasonable delays by complainants The insurer says it should not be held liable for temporary accommodation expenses arising from unreasonable delays by the complainants. The insurer outlines in particular:  on 22 September 2019, insurer provided FM‟s report and scope of works to complainants  assessor says it requested a response on 3 and 21 October, 3 and 3,18 and 20 November 2019 and only received a response on 20 November 2019  the complainants delayed, particularly refusing access in relation to the contents claim  the complainants did not provide an inventory or quotation for non-restorable items Determination | Case number: 793588 Page 11 of 12  on 25 February 2020, the insurer advised the complainants the slab did not warrant replacement and was not caused by an insured event and it was therefore unable to offer further temporary accommodation under the policy  considerable lapse of time between the insurer‟s internal dispute resolution response in May 2020 and the complainants lodging a complaint with AFCA in March 2021. The insurer says but for the complainants seeking replacement of the slab and demolition of the whole house, the repairs would have been completed in a timely manner by January 2020. It may well be arguable that 15 months was more than reasonable for completion of repairs. However, the policy contains no time limitation other than a 24-month cap. In the circumstances I propose to do an equal split of the outstanding claim by the complainant. The insurer is to pay half of $22,958, namely $11,479. In addition, if the rental payment for April 2020 remains outstanding, the insurer is to make that payment to the complainant. Why is the outcome fair? The extensive cracks in the slab pre-date the broken pipe but were only revealed to the complainants as a result of the broken water pipe. The complainants had only been in their home for a year, suffered significant distress and were contemplating demolition and rebuild. However, the slab is repairable, and the insurer‟s response has been reasonable. A cash settlement will resolve the dispute and allow the complainants to make their own repair plans. Determination | Case number: 793588 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.