Text of the determination
Determination
Case number 793260
Financial firm AAI Limited
Determination | Case number: 793260 Page 1 of 11
Case number: 793260 8 March 2022
1 Determination overview
1.1 Complaint
The complainants hold a home building insurance policy (policy) with the financial firm
(insurer). On 19 February 2020, a claim was lodged for storm damage to the insured property
said to be due to a significant storm one month prior (19 January 2020).
The insurer accepted the claim. The complainants are dissatisfied with the insurer‟s
assessment of its liability and are seeking cover based on their preferred consultant „BC‟ s
assessment of the loss at $422,357.82 plus a further $57,929.06 in claim preparation
expenses, inclusive of BC‟s costs.
The insurer says the complainants ‟ scope includes items not related to the storm event.
The complainants are represented by their consultant BC in this complaint. The parties will
collectively be re ferred to as “the complainants”.
1.2 Issues and key findings
Is the insurers’ assessment of its liability fair in the circumstances ?
No. While the insurer‟s assessment of the damage caused by the storm event is reasonable,
it is fair in the circumstances that, the insurer increases the final settlement to $118,145.91
being:
20% ($16,357.65) to allow for the transfer of risk and contingencies arising from the
insurer‟s decision to cash settle the claim as opposed to arranging the repairs
$15,000 towards mould remediation and decontamination prior to the commencement of
repair of the property
$5,000 towards expenses incurred by the complainants in arranging consultants‟ reports to
assist with their claim.
The insurer has already paid the complainants $81,788.26, leaving $36,357.65 to pay.
Interest is payable on this amount, in accordance with section 57 of the Insurance Contracts
Act 1984 (Act), from the 9 October 2020 until payment is made.
Are the complainants entitled to non-financial loss compensation?
Yes. The insurer is to pay the complainants $1,500 in non-financial loss compensation in line
with the AFCA Rules.
1.3 Determination
This determination is in favour of the complainants.
The insurer must pay a further $36,357.65 plus interest from 9 October 2020 in full and final
settlement of claim.
The insurer is to also pay the complainants $1,500 in non-financial loss compensation in line
with the AFCA Rules.
Determination | Case number: 793260 Page 2 of 11
2 Reasons for determination
2.1 Is the insurer’s a ssessment of its liability fair?
It is fair for the insurer to increase its current offer to include:
a 20% ($16,357.65) contingency payment
$15,000 towards mould remediation and decontamination prior to the commencement of
repair
$5,000 towards expenses incurred in arranging consultants‟ reports to support their claim
interest on the final settlement payment in line with the Act from 9 October 2020 until
payment is made.
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including Storm. Cover under these benefits is subject to the conditions,
limitations and exclusions specified in the product disclosure statement (PDS).
The insurer provided the complainants with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to
rely on the policy provisions to assess its liability under the claim.
There is no dispute the complainant s‟ home suffered damage because of a storm event on 19
January 2020, which is an insured event under the policy. The panel is satisfied this
establishes a valid claim.
The onus, therefore, rests with the insurer to show an entitlement to decline or limit its liability
under the complainants ‟ claim in line with the policy provisions.
Facts relevant to the complaint
The panel notes that:
the insured building was uninhabited at the time of the loss with the complainant‟s living
overseas. The complainants inherited the property from a deceased estate.
the complainants‟ sought the assistance of BC to assess the insured property after the
storm event as well as provided an estimated cost of repairs
BC is also representing the complainants for this complaint lodged with AFCA
the insured building has since been purchased by BC‟s wife „K‟ from the complainants and
who says it has since been repaired
although K initially accepted to purchase the insured property for $1,730,000 she
subsequently negotiated a lower settlement and purchased the property for $1,248,000
K submitted and received approval of two permit applications from the local Council, one
for the total demolition and rebuild of the property and a second for the construction of a
patio and perimeters around the existing building
No information or evidence has been provided in support of any of the repairs and mould
remediation works said to have been completed at the property
The insurer says the insured building was subject to pre-existing damage as well as mould
before the storm event in January 2020. Also, the complainants‟ one-month delay in
lodging the claim after the storm damage to the external roof as well as internal water
ingress has caused further the damage to the property
Determination | Case number: 793260 Page 3 of 11
The complainants say the insurer‟s delay and failure to complete adequate make safe
works for months has resulted in further damage to the insured building, for which the
insurer is liable.
Parties disagree on scope of works and cost of repairs
There is no dispute between the parties that the complainants suffered a loss from a risk
insured under the policy. The insurer accepted the claim. However, the parties disagree as to
the adequacy of the insurer‟s assessment of its liability under the claim and proposed scope
of works (SOW) on which it has based its claim settlement.
The insurer offered a cash settlement of $81,788.26 based on repairer „JL‟s‟ SOW and
quotes. The complainants are not confident JL‟s quote reflects the total cost required to repair
the property. The complainants want the insurer to cash settle them based on their preferred
assessment of their loss.
The information shows BC initially provided a repair quote in the amount of $162,861.11 in
response to the insurer‟s initial assessment of the cost of repairs estimated to be just over
$50,000. However, after a joint assessment by JL and BC in November 2020, the insurer
increased and maintains the fair SOW and repairs costs are $81,788.26.
K has also submitted a SOW and repair quote from consultants „MB‟ dated 31 July 2020 in
the amount of $237,800 and BC submitted a second quote in or around June 2020 in the
amount $422,357.82. BC says the original quote was provided based on „mates rates‟.
BC has also sought a further $57,929.06 which he says represents expenses incurred by the
complainants in representing and defending their position under the claim. This includes close
to $30,000 for BC‟s services.
Finally, BC says given the sale of the property to K at a reduced price, the complainants‟ loss
is the difference, this being $482,000 (difference between $1,730,000 - $1,248,000). The
panel notes this is coincidentally quite similar to BC ‟s last SOW and repairs cost plus
expenses which total $480,266.88 ($422,357.82 and $57,929.06).
Insurer must settle claim fairly
The policy provides the insurer with a discretion whether to repair, rebuild, pay what it would
cost to repair or rebuild or pay the sum insured for the insured property under a claim. Such
discretion must be exercised fairly, reasonably and consistent with utmost good faith. A cash
settlement must be sufficient to place the complainants in the position they were in prior to the
loss.
If the cash settlement is based on a quote the quote must be actionable by the complainants
given the insurer does not intend to repair the damage. Further, when the insurer repairs the
building, it guarantees the workmanship and the quality of materials. This means, it will rectify
any issues related to poor quality workmanship or materials. A cash settlement means the
complainants would lose the lifetime repair guarantee. All the risk of the work transfers from
the insurer to the insured, including the risk of additional unforeseen damage and further work
required once repairs commence.
Given the available information, the panel notes the repairs to the insured building are said to
have been completed by K and not the complainants. The complainants did not repair nor
retain ownership of the property, rather they came to an agreement with K on a reduced sale
price of the property.
Determination | Case number: 793260 Page 4 of 11
The panel notes the insurer‟s reference to the demolition permit obtained by K and its view
that the intention of BC and K is to demolish and rebuild the property and not repair.
However, the panel accepts BC has provided reasonable information showing that the
planned demolition is not intended to take place for a few years and that K did intend to repair
and reside in the property. However, no information has been provided in support of the
position that K has completed the repairs and if so, at what cost.
The insurer’s assessment of the damage to be accepted under the claim is fair
The complainants submitted quotes from builder BC in the amount of $162,861.11 and MB in
the amount of $237,800. The complainants say the insurer ‟s delay and subsequent
inadequate make safe works to the insured property resulted in further water ingress and
damage to the building. The say the insurer is obliged to cover all the damage to the property
including mould remediation works based on a report from consultant „AM‟ who attended the
property on 10 October 2020.
The insurer relies on the reports and SOW provided by JL. JL originally attended the insured
property in March 2020 then May 2020 and finally in November 2020. JL in its initial
assessment of the insured property noted evidence of pre-existing damage to the building
consistent with ground movement as well as presence of mould damage/staining. This was
further confirmed by consultants „ FE ‟ in the ir report dated 26 May 2020. FE said a full strip out
would be required to remediate the property.
The insurer also notes the inclusion of unrelated items in BC ‟s SOW and which were not
damaged by the storm event and could be re-used in the repairs to the property, such as but
not limited to replacement of tap fittings and toilet replacement.
In the panel ‟s view, JL‟s quote is a fair reflection of the extent of damage caused by the storm
event and subsequent water ingress because of the failed make safe measurers completed
under the claim. The panel is not satisfied BC‟s assessment of the loss nor that of MB are a
fair reflection of the damage which is covered under the claim.
This is because these SOW and associated quotes include damage to the insured building
that pre-existed the storm event in January 2020. Also, these quotes include items that were
not damaged by the storm event and/or that can be re-used in the repairs to the insured
building. There is no evidence from BC, MB or K that can reasonably be accepted to support
the inclusion of the pre-existing damage or items that were not damaged by the insured event
or can be re-used in the repairs.
The panel finds the information provided in the assessments completed by JL, FN and
engineering consultants „H‟ in its report dated 30 July 2020 to be more persuasive. This is
further supported by the engineer report from „AA‟ dated 11 December 2020, provided by the
complainants. AA noted there were several inherent landscape and site drainage issues at
the insured property which were causing/contributing to pre-existing moisture damage,
staining, efflorescence in the area of the sub-floor and lower sections of the floors and walls
of the insured building.
AA notes that photographs from August 2019 of the insured building which formed part of its
sale advertising showed the presence of water stains and mould, which predates the storm
event in January 2020. AA formed the view these were issues which have existed over a
prolonged period. The panel is satisfied such damage pre-dates the insured event and the
insurer is not obliged to cover this damage under the claim.
Determination | Case number: 793260 Page 5 of 11
Given the pre-existing poor condition of the dwelling and the associated damage and mould
infestation, and given K‟s contention that repairs have been completed, the panel is satisfied
under the circumstances that the insurer should cash settle the complainants under the claim.
In any event the panel notes that loss of house value is not a valid basis for settlement as
contemplated by the policy coverage. However, in cash settling the claim it is fair to require
the insurer to increase the final claim settlement amount to include a 20% contingency
payment to account for the transfer of risk and possible contingencies.
Insurer is to contribute to the cost of mould remediation
There is no dispute the insured building was subject to mould infestation when assessed after
the storm event giving rise to the claim. The complainants are seeking cover in the amount of
$57,387.00 for mould remediation works based on the report from AM.
The insurer has not included any costs towards mould remediation as part of its assessment
and SOW to repair the storm damage to the insured building.
The panel does not accept the insurer‟s approach to the mould issue is fair in the
circumstances. The panel is satisfied the storm event and associated water ingress including
saturation of the almost the entirety of the roof void insulation and failed make safe measures
have contributed to the mould infestation.
The information shows the insured property had been subject to poor site drainage and
associated significant moisture damage and mould infestation for quite some time. The
complainants‟ failure to mitigate this damage and the fact they delayed lodging the claim by a
month has allowed the saturated insultation, plaster and other damaged items to develop
mould as well as stain and damage some floors.
It would not be fair in the circumstances to require the insurer to cover the claimed mould
remediation expenses in their entirety. However, the panel believes it is fair in the
circumstances to require the insurer to contribute $15,000 towards the mould remediation
expenses and to include this amount in its final claim settlement payment.
Complainants are not entitled to other costs sought
The complainants also seek reimbursement of costs for:
disconnection of electrical services $ 913.20
new keys cut $126.24
garden maintenance $1,069.20.
The complainants say these costs were incurred due to the adverse claims experience.
However, the above costs are not payable under the policy (refer to section 3). Financial
losses caused by a party‟s failure to comply with their contractual obligations can be
recoverable if they are within the reasonable contemplation of the parties when the contract
was entered.
Part of these losses are not recoverable. For example, the panel does not accept the costs
would have been within the agreement of the parties at the time the policy was issued. This is
because the complainants would normally need to maintain the garden and cut keys as part
of home ownership.
The panel is satisfied there is no substantive evidence to establish there was either a financial
loss or it was caused by the claims experience.
Determination | Case number: 793260 Page 6 of 11
2.2 Are the complainants entitled to compensation?
The insurer is to pay $1,500 in non-financial loss compensation
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
In this instance and considering AF CA‟s approach to compensation, the panel accepts the
insurer‟s management its obligations and associated delays in its attempts to make safe the
insured building after the storm were poor. This has caused the complainants an unusual
degree of stress, anxiety and contributed to the delays in bringing the claim to conclusion.
In line with AFCA‟s approach to compensation and the available information, the panel
determines the insurer is to arrange payment of $1,500 to the complainants by way of non-
financial loss compensation.
Insurer is not required to pay BC’s consultant’s fees
The complainants claim the cost of their advisor BC‟s consulting services . The complainant
says these costs were incurred due to the adverse claims experience.
The AFCA Rules provide that AFCA may determine an insurer contribute to legal or other
professional costs (capped at $5,000) incurred by a complainant during a dispute. AFCA
provides a free service for complainants and it is not usually necessary for either party to be
represented.
When determining whether an insurer should contribute to the payment of professional costs,
AFCA considers the complexity of the dispute, whether the advice was reasonably needed
and whether the costs incurred were because the expert advice was genuinely required.
The complainants provided costings from their consultant (BC) in the amount of $27,935.38
for assistance they received for the complaint. The costings indicate BC assisted in
corresponding and managing the claim and the assessment of the property.
The panel is not satisfied the cost of engaging a consultant was necessary. The service the
complainant received from BC was simply assisting them with correspondence and managing
the claim, rather than providing technical expertise. It is clear a number of expert opinions
were provided throughout the claim.
In the circumstances, the panel is not satisfied the insurer is required to reimburse the
complainants for the costs incurred.
The insurer is to contribute towards cost to obtain expert reports
The complainants provided costings to indicate they had to pay to obtain legal advice and
expert reports. In the panel ‟s view, there is no informat ion to show what legal costs were
incurred and if it was necessary in determining the relevant information to finalise the claim.
However, in these circumstances, the panel considers the insurer should make payment
towards the cost of obtaining expert report(s), subject to the complainants providing relevant
invoices for these costs. The panel is satisfied the appointment of experts, such as mould
experts and engineers assisted in assessing the claim and damage at the property.
Determination | Case number: 793260 Page 7 of 11
The complainants are to directly provide the insurer with copies of the paid invoice(s) for the
costs. The insurer is to then reimburse the complainants for the costs incurred up to a
maximum of $5,000.
Why is the outcome fair?
The panel is satisfied this outcome is fair in the circumstances because both parties accept
there is excessive mould at the property and as such, requires remediation and
decontamination before the property is repaired. The panel is of the view that an uplift amount
should be allowed considering the mould remediation required, the transfer of risk and loss of
the lifetime repair guarantee.
Determination | Case number: 793260 Page 8 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer advocacy
a member with extensive experience as an industry representative.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
Determination | Case number: 793260 Page 9 of 11
a) for a complaint relating to an individual‟s privacy rights - injury has occurred to
the Complainant‟s feelings or humiliation has been su ffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant‟s
expectation of enjoyment or peace of mind has occurred.
…
D.5.1 An AFCA Decision Maker may decide that the Financial Firm is to contribute to
the legal or other professional costs or travel costs incurred by the Complainant
in the course of the complaint.
D.5.2 Unless special circumstances apply, AFCA will not require the Financial Firm to
contribute more than $5,000 to these costs.
3.3 Terms of the policy
Provi sion Key points
How we settle building claims If we agree to pay a claim for loss, theft or damage to the building,
we will decide if we will:
• repair damage to the building;
• rebuild the building;
• pay you what it would cost us to repair or rebuild the building;
What we do not cover -
general exclusions (cont‟d)
You are not covered under any section of your policy for damage,
loss, cost or legal liability tha t is caused by, arises from or involves:
Consequential losse s or extra costs following an incident
covered by your policy
consequential loss (financial and non - financial loss) or extra costs
following an incident covered by your policy, such as:
loss of income or wages;
medical expenses;
loss or costs, including the cost of your time (e.g. inconvenience),
to prove your loss or to help us with your claim (e.g. telephone
calls, postage);
cost of hiring appliances after yours suffer loss or damage;
professi onal, expert, legal, consulting or valuation costs unless you
obtained our prior written authority to incur these costs;
cost of replacing or reapplying pest control chemicals and baits in
or around the ins ured address;
cleaning costs;
any costs related to stress or anxiety;
any costs not covered by your policy.
Determination | Case number: 793260 Page 10 of 11
3.4 Relevant expert information
Record Key points
Financial firm’s expert (HC )
Report
30 - 07 - 2020
A general internal inspection of the original dwelling showed that
the following issues occurred throughout these rooms:
Cracking and previously patched cracking to the internal wall
render
Cracking and previously patched cracking to the ceiling linings
Mould growth and water damage to the wall render.
Significant deflection of the timber floorboards
Noticeably uneven flooring in a number of locations.
Significant weathering of timber window frames (Photo 12).
Peeling of wallpaper in the bathroom (Phot o 13).
Internal inspection of the rear kitchen and m eals area showed
ceiling linings removed in some loc ations, that old cracking had
occurred to the ceiling linings,
Previously patched cracking occurred to the wall render in a
number of locations, and that water damage had occurred to the
timber window si ll in the meals area.
The flooring in this area was noticeably uneven when walked
upon.
Internal inspection of the rear bedroom at the sout h - eastern corner
showed previously patched cracking to the brickwork walls in a
number of locations.
Th e surface drai nage adjacent to the western and southern walls
was poor, with areas of uncapped soil, poorly graded and uneven
surface pavement, a lack of surfac e drainage and pooling water in
some locations .
An agricultural drain had been installed within the soil adjac ent to
the external wall of the building, and that efflorescence of the ba s e
brickwork had occurred.
The southern wall of the dwelling showed the downpipe in the
centre of the wall was not plumbed in at the base, and the
downpipe at the eastern end of this wall was severely corroded
and partially replaced at the bas e.
External inspection of the front porch showed long - term water
damage/ weat hering occurred to the timber soffit boards.
A general external inspection showed that cracking and previously
patched cracking occurred to the brickwork of the external walls in
a number of locations around the building .
Complainant’s expert (AA )
Report
11 - 12 - 2020
The broken tiles throughout the roof is consistent with damage
caused by impact from hail stones in January 2020.
The damaged roof tiles subsequently allowed the ingress of
rainwater into the root space of the dwelling.
Ponding of rainwater on the plaster ceiling resu lted
In bowing and collapse of the plaster ceiling.
Exposure to moisture contributed to damage observed to timber
Determination | Case number: 793260 Page 11 of 11
Record Key points
floorboards, including water staining and cupping.
Pre - existing Damages
Various cr acks to the walls of the Lounge.
Separation of the floor from the skirting board,
Mould growth to the base of the walls in Bedroom 2,
Water staining to the timber frame windows in the Meals area.
The plaster ceiling and floors in the rooms were in relatively good
condition prior to the hail storm event in January 2020.
Damage caused by rising damp was observed throughout the
dwelling, which include: Blistering and peeling paint along the bas e
of the i nt ernal brick walls,
Water staining with evidence of efflorescent on the surfac e of the
brick walls within the subfloor space.
Fretting and loss of mortar along the base of the external brick
wall.
Damage due to rising damp occurs over a prolonged period o f
time and not consistent with a one - off hail storm event.
Inadequate Site Drainage
The surface level of the subfloor soils is lower than the surfac e
level of the external ground adjacent to the dwelling.
The lack of surface drainage around the external p erimet er of the
dwelling allowed surface water runoff to seep into the subfloor
space beneat h the dwelling.
Water staining to timber stumps, damp subfloor soils and damage
due to rising damage are consistent with issues relating to
inadequate site drainag e over the long term.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.