Determination 793183

Storm damage claim denied as caused by inadequate drainage and earth movement; complainant sought reimbursement of 2015 rectification costs

FirmWestpac
Decided2022-02-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$22,440
SourceAFCA PDF

Summary

The complainant claimed under home insurance for a 2020 storm damage claim and sought $22,440 plus GST, including reimbursement for 2015 drainage works. AFCA found the damage was proximately caused by inadequate drainage and earth movement, which are excluded, and that the insurer was not liable for the 2015 works costs.

The complainant bears the onus of showing loss caused by an insured event; expert evidence showed inadequate drainage and earth movement as the proximate cause, which the policy excludes.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 793183 Financial firm Westpac General Insurance Limited Determination | Case number: 793183 Page 2 of 10 Case number: 793183 1 February 2022 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (the insurer). In 2015, he lodged a claim for storm damage to his home. The insurer accepted the claim for internal damage and recommended the complainant complete rectification work to the property’s drainage . In 2020, the complainant lodged a further claim for storm damage. The insurer denied the claim because it says the damage was caused by inadequate drainage. The complainant is dissatisfied with the outcome and further says he suffered financial loss due to being required by the insurer to carry out rectification works in 2015 which the evidence indicates was not necessary. The complainant seeks $22,440 plus GST, to raise the rear of the house, add additional stumps, remove, and replace timber flooring, sanding and sealing floorboards, rectification of damaged plaster and repairs to rear bifold doors (which remain inoperable) and compensation for being misled. 1.2 Issues and key findings Has the insurer established a valid claim within the policy? No, the complainant has not shown that storm was the proximate cause of the damage. Is the insurer entitled to rely on exclusions to deny the claim? Yes, even if there was storm damage, the loss would be excluded due to being caused by earth movement and defective design and construction. Did the complainant suffer a loss due to actions of the insurer? No, the complainant has not established the insurer is liable for the costs of the 2015 corrective works which failed to prevent further loss. Why is the outcome fair? This outcome is fair because the complainant has not shown the policy responds to the damage nor that he was misled. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 793183 Page 3 of 10 2 Reasons for determination 2.1 Has the complainant established a valid claim within the policy? No, the complainant has not shown that storm was the proximate cause of the damage. Complainant has onus to establish a claim within terms of policy The initial onus lies with the complainants to show, on the balance of probabilities, they suffered a loss caused by a risk insured against under the policy. Only if the complainants establish a valid claim, does the onus shift to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The complainant ’ s policy provides cover for insured events, subject to conditions and exclusions. The policy will only cover the damage if it was caused by one of the insured events. The complainant must establish the claimed damage falls under a listed event. Insured events include storm. The policy says it covers, “ Loss or damage caused by storm, including cyclone, hail, wind, snow or rain”. The complainant has identified dates of relevant storm events. However, the complainant has not identified any damage directly caused by the storm, such as a broken roof or window. He says in effect that the water runoff from the storm caused damage including lifted tiles, jammed doors, warped door frames, gaps in floorboards and dropping of the floor. Expert evidence indicates reactive soil and inadequate drainage is damaging property I reviewed expert reports from 2015 and 2020. In investigating the 2015 claim, the insurer obtained multiple reports from CC. CC completed a report dated 10 March 2015 which noted the damage was consistent with large volumes of stormwater runoff. This water enters the wall cavities and onto the floors below. CC recommended modifications to the exterior drainage to prevent further water entry. CC reinspected the property on 23 May 2016 after the complainant identified additional water ingress. CC noted the complainant had completed maintenance to external areas, removing water from the brick walls which are installed into the slope of the land. CC identified silicon sealant had been applied to the joints between brickwork and concrete paths negating further water entry in recent times. CC concluded that if the complainant experiences further water entry, it would recommend removal of concrete paths and installation of appropriate drainage material. In 2016, the complainant completed works surrounding the drainage at the retaining wall. The complainant provided a copy of the plans for works completed by its engineer E in 2016. He also provided compliance certification for the work. Following the lodgement of a further claim in 2020, the insurer obtained a report from builder P dated 26 March 2020. P inspected the property and found the timber flooring had dropped around one degree. It advised the damage was caused by the rear of the house sinking in two corners due to a lack of suitable ground drainage to divert water away from the underside Determination | Case number: 793183 Page 4 of 10 of the home. It also allowed water to pool under the home and compromise the stumps causing them to sink. The insurer also engaged engineer NJA in April 2020. NJA confirmed the movement in the floor to the rear of the dwelling is the most likely consequence of inadequate drainage allowing water to become trapped in the subfloor area, wetting the clay soil around the base of the retaining wall resulting in localised heaving of the foundation. The complainant maintains it completed corrective actions and the work was completed by certified engineers, inspected, and approved at each stage of construction by recognised certifiers and given final sign off on the drainage and retaining works by the insurer. The fact that the previous drainage improvement works were conducted does not by itself show that the latest damage was not caused by inadequate drainage. Inadequate draining is proximate cause of loss To determine whether the cause of damage is accepted under the policy, it is necessary to consider what the primary or proximate cause of damage is to the property. Having reviewed the expert evidence, I am satisfied the proximate cause of damage to the property is inadequate drainage which is allowing water to become trapped in the subfloor area for a prolonged period, compromising the reactive soil and causing heaving in and around the property. Earth movement and inadequate drainage are not listed events. 2.2 Is insurer entitled to rely on exclusions to deny claim? Yes, even if there was storm damage, the loss would be excluded due to being caused by earth movement and defective design and construction. Exclusion for damage caused by earth movement The policy exclusions set out in section 3 of this determination exclude damage from soil or earth movement as well as defects in design and construction. The available evidence establishes that most likely the proximate cause of damage is earth movement caused by inadequate draining on the property. It follows the insurer is entitled to deny the claim. 2.3 Did the complainant suffer a loss due to actions of the insurer? No, the complainant has not established the insurer is liable for the costs of the 2015 corrective works which failed to prevent further loss. Insurer is not liable for costs arising from retaining wall works The complaint says he suffered a financial loss by spending money in 2015 on drainage works which have proved unsuccessful. The complainant says he was directed by the insurer at that time to do work identified by the insurer’s builder or otherwise he would not be insured. The complainant says the 2015 rectification works for the retaining wall cost $216,000. The complainant seeks the insurer reimburse him for financial loss incurred. The complainant has Determination | Case number: 793183 Page 5 of 10 in the alternative claimed interest on monies borrowed and has requested the insurer refinance him. The 2015 reports from C do contain recommendations for maintenance but the recommendations are broad in nature. They are not directions from the insurer. The complainant has been unable to locate any written directions or threats from the insurer. He says the directions were made in conversations. It is not entirely unusual that an insurer may say to an insured something to the effect that a failure to do maintenance may result in a property or types of losses being uninsured or uninsurable. Potentially this could be said in a way which might be interpreted as threatening and improper. However, there is no such evidence in the present case. The complainant has not identified what exactly was said, the date of the conversation or who was present. The complainant has not provided evidence to support the amount of $216,000 nor that he received no value for the work done. The complainant has not established the insurer is liable for the cost of completing the corrective works or that he suffered a financial loss due to completing the works. 2.4 Is the outcome fair? This outcome is fair because the complainant has not shown the policy responds to the damage nor that he was misled. Determination | Case number: 793183 Page 6 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms 3. General Exclusions Maintenance and building • defects in design, structure, materials, workmanship or construction, • failure to keep the property insured watertight, well maintained, structurally sound and secure, • failure to undertake building work that a relevant authority required you to undertake befor e the loss or damage occurred, or • obtaining permits or permissions to replace structures that were illegally erected by you. Wear and tear, and environmental conditions. • wear and tear, gradual deterioration, or fading, • rust, corrosion, oxidisation, mould, mildew or atmospheric conditions, • earth or soil movement (other than earthquake) including landslide, subsidence, or erosion, Determination | Case number: 793183 Page 7 of 10 • settling, expansion, shrinkage or vibration, • hydrostatic pressure, or • tree roots. Covered Storm, flood, fire, lightning, earthquake, impact, explosion Loss or damage caused by storm, including cyclone, hail, wind, snow or rain. ✓ Storm cover excludes damage to gates, fences, and freestanding walls. Fire cover excludes damage caused by smoke where there was no flame at the site. Not covered. Loss or damage caused by: • storm for a period of 48 hours, or • cyclone for a period of 5 days, from the date the cover was initially provided by us, unless the policy is replacing another policy with equivalent storm or cyclone cover and there has been no gap in cover and no change to the sum insured, or you have entered into a contract to purchase the property and the risk has passed to you as purchaser. Loss or damage to: • gates, fences or freestanding walls that were not in good condition prior to damage occurring, • retaining walls, paths, driveways, bridges or landscaping, • fabric awnings, blinds or shade sails, unless professionally installed and less than 5 years old, • plastic liners or covers for swimming pools or spas, • water in swimming pools or spas, or • ex ternal paint or coatings caused by rain. Loss or damage caused by or resulting from: • gradual deterioration from rain, • rain entering the building due to poor maintenance, or wher e openings, doors or windows are not closed, • rain entering the building while construction work, alterations or additions are being carried out, or • water seeping or running through or down the sides of earth or earth fill that is up against your building. SPDS replaced above wording (Storm – Not covered) Loss or damage caused by or resulting from: • gradual deterioration from hail, wind, snow or rain, • hail, wind, snow or rain entering the building: –– while construction work, alterations or additions are being carried out, –– as a result of doors, windows or other man-made openings not being closed, or –– through an opening not created by the storm or other insured event, • water seeping or running through or down the sides of earth or earth fill that is up against your building, or • actions or movements of the sea or high water (other than storm surge and tsunami). Determination | Case number: 793183 Page 8 of 10 3.3 Relevant expert evidence Record Key points F inancial firm’s expert (C ) Report 05 - 03 - 2015  RESULTING DAMAGE  Damage has occurred to the downstairs rumpus room skirtings and walls where they've become cracked and damaged requiring repairs.  CAUSE OF DAMAGE  The damage we inspected is consistent with that which would come from large volumes of stormwater runoff during storm conditions which has caused an escape of liquid to enter into the wall cavities and onto the floors below.  MAINTENANCE ISSUES  Although t he cause of damage was from large volumes of storm water runoff during storm conditions we recommend the insured seek the services of a suitably qualified professional in the near future to carry out any modifications to the exterior drainage in attempt to prevent any further water entry in the near future. F inancial firm’s expert (C ) Report 23 - 06 - 2016  A re - inspection to investigate possible additional damage at this property was carried out on the  11/05/ 2016. The primary building is approximately 55 years old, constructed of a corrugated roof, timber framed and cladded walls and is maintained in a good condition, in our opinion the inspected damage is consistent with storm damage.  RESULTING DAMAGE  Additional damage has been noted by the policyholder to have occurred to the 6 tiles at the base of the int ernal staircase.  CAUSE OF DAMAGE  The floor tiles are loose showing cracks to grouting and evidence that the tiles have lost their fixing.  It is o ur opinion damage has occurred to the tiles due to moisture entering the property for the original claim in February 2015. Moisture from the original water ent ry has now tried as such the tiles are lifted.  MAINTENANCE ISSUES  The policyholder has complete d maintenance to external areas to remove water from the brick walls which are installed into the slope of the land. Silicon sealant has been applied to joints between brickwork and concrete paths which has negated any further water ent ry in more recent ti mes.  If further wat er entry is experienced by the policyholder, we have recommend removal of concrete paths and installation of appropriate drainage material. F inancial firm’s expert (P ) Report 26 - 03 - 2020  We have been advised that around 2 weeks ago he noticed that the bi folding doors weren't opening as they were before the storm. He engaged a carpenter to have a look at them and he planned about 5mm off the bottom, so they can still use the rear yard. Determination | Case number: 793183 Page 9 of 10 Record Key points  On inspection of the property we found that the timber flooring had dropped around 1 degree and you could feel to rear of the house has sunk. The bi folding doors to the rear were hard to open.  Based on our site inspection and information obtained P can confi rm that the claimed resultant damage has been caused by the rear of the house sinking in the two corners due to a lack of suitable ground drainage to divert water away from the underside of the home. This has allowed water to pool under the home and compro mise the stumps  causing them to sink.  Maintenance Issue s:  On inspection of the insureds property we have found the following maintenance issues directly relating to the claimed resultant damages:  * A better designed ground drainage system is required to divert away from underneath the home.  It is the insureds responsibility to ensure this is rectified prior to any proposed result ant damage repairs commencing. No allowance has been made for maintenance related items within our scope of works. Financial firm’s expert (NJA ) Report 22 - 04 - 2020  The timber flooring has been laid directly on the joists and does not include any form of subfloor or vapour barrier to prevent changes in the moisture content of the timber. This lack of moisture regulation, combined with the high humidity of the flooded subfloor area can be expected to result in swelling, and subsequent shrinkage of the timber flooring after the area had dried. This is consistent with the distress to the timber flooring observed during our inspection.  In relation to the levels of the floor, it is not possible to confirm what movement has occurred, if any, without knowing the original floor profile. However, in our opinion it is most likely that the floor was originally laid flat to within a reasonable tolerance. Further, it is considered more likely that level of the retaining wall has risen, rather than both the front and rear of the lounge area subsiding at approximately the same rate.  Heaving of the retaining wall foundation is consistent with what w ould be expected on a reactive clay site where a substantial amount of water is placed against the foundation. This further correlates with Mr Moschonas' advice that water infiltration had been observed around the base of the wall.  The movement in the flo or to the rear of the dwelling is the most likely consequence of inadequate drainage allowing water to become trapped in the subfloor area, wetting the clay soil around the base of the retaining wall resulting in localised heaving of the foundation. Improv ements to the drainage under the subfloor area should allow doe drying of the soil and a return to the original alignment. Determination | Case number: 793183 Page 10 of 10

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.