Home / Allianz Australia / Determination 793107
Determination 793107
Claim declined for water ingress damage to rental unit; loss of rent also claimed
Summary
The complainant's landlord insurance claim for storm-related water ingress damage and loss of rent was declined by the insurer. AFCA decided in favour of the insurer, finding the water did not enter through a storm-created opening and the policy exclusion applied.
Rainwater entering through an opening not made by the storm is excluded under the policy, and the complainant did not establish the damage was caused by storm or accidental damage.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to rely on the policy exclusion and decline the claim for both storm damage and accidental damage.”
- Inadequate claim investigation secondary · not upheld
“I am not satisfied the complainant has established the plastic cup was in the downpipe on the date of the storm.”
Subjects and remedies
business interruptionhome or building damageno remedy
Text of the determination
Determination
Case number 793107
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 793107 Page 1 of 9
Case number: 793107 17 November 2021
1 Determination overview
1.1 Complaint
The complainant is represented. Where relevant, references to the complainant’s
representative include the complainant.
The complainant holds a landlord insurance policy with the financial firm (insurer) providing
cover for his unit which he rents out to a tenant. A claim was lodged under the policy in
December 2020 for internal damage due to water ingress via the roof, following an overnight
storm.
The insurer declined the claim saying water entered the property due to the faulty installation
of a box gutter. It also says damage caused by rainwater which enters the property through a
non-storm created opening is not covered by the policy.
The complainant says he could not have been aware of any installation issues and the rainfall
may have been significant enough to cause water ingress even if the box gutter had been
installed correctly. When debris and plastic cups were discovered on the roof, he claims this
is the cause of the damage.
The complainant requires the insurer to cover the resultant internal damage and loss of rent
for the period he says he has been unable to tenant the unit due to the damage.
The case manager provided the parties with a preliminary assessment on the issues in
dispute. The preliminary assessment was in favour of the insurer. As the complainant did not
accept the preliminary assessment , the complaint has been referred to me for determination .
1.2 Issues and key findings
Is the Insurer entitled to decline the claim?
The policy provides cover for storm damage and accidental damage, but the insurer is not
liable to pay for accidental damage if it is caused by an event which is otherwise excluded.
The insurer is not liable to pay for damage caused by storm or rainwater entering the building
through any opening not made by the storm. The rainwater did not enter the building through
an opening made by the storm. In those circumstances the insurer is entitled to rely on the
policy exclusion and decline the claim for both storm damage and accidental damage.
Why is the outcome fair?
The insurer is entitled to rely on its policy terms and the available material. As the available
material establishes the claim is excluded from cover because water did not enter the building
through a storm created opening, it would not be fair to require the insurer to pay the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or the complaint.
Determination | Case number: 793107 Page 2 of 9
Determination | Case number: 793107 Page 3 of 9
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having regard to
legal principles, applicable industry codes or guidelines, good industry practice and previous
relevant determinations of AFCA or predecessor schemes (which are not binding). I have
considered all the material submitted by the parties, both before and after the preliminary
assessment. I am satisfied that the documentation I have relied on has been provided to both
parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
No new material after preliminary assessment
After the preliminary assessment was rejected, the complainant made a further submission
but provided no new material. He notes rainwater needs to enter through a storm created
opening but submits the presence of the debris/rubbish in the downpipe is the proximate
cause and should be considered under the accidental damage cover.
2.1 Is the insurer entitled to decline the claim?
Material and submissions considered
On 16 December 2020 the complainant claimed there was water coming in through the roof
overnight which leaked through the ceiling in the lounge room of his rented property causing
damage and loss of rent.
The insurer appointed a builder. Relying on policy terms and the builder’s report , the insurer
declined the claim saying the damage was due to rain entering the building through an
opening not created by storm, gradual deterioration wear and tear and faulty design. The
builder said the cause of water entry was due to a non-compliant box gutter.
The relevant policy terms are set out in supporting section 3.2 of this determination.
A summary of the parties’ reports is set out in supporting section 3.3 of this determination.
The complainant says:
he was not aware the installation of the box gutter was faulty
the volume of rain was such that the box gutter may not have coped even if installed
correctly
photographs and a video show debris/rubbish filled the gutters from the neighbouring
building site
a clear plastic cup in the pipe might n ot have been visible to the insurer’s builder
the damage was caused accidentally (this was reiterated after the preliminary
assessment).
The insurer says:
the complainant’s claim is not payable under accidental loss or damage as it is specifically
excluded under the insured event of storm and the policy general exclusions
even if the complainant was unaware of the faulty installation of the box gutter section 46
of the Insurance Contracts Act (the Act) does not provide a remedy
when its builder inspected in January 2021, there was no evidence of the debris from the
adjacent building blocking the gutter.
Determination | Case number: 793107 Page 4 of 9
The complainant provided photographs and videos showing rubbish and debris including
plastic cups in the gutters from the site next door. These were provided by a builder who
undertook a make safe some months after the event.
The complainant also provided a report from a builder who inspected the roof on 3 June
2021. The builder says he found signs of both debris build-up and installation defects. He
says he found a lot of debris and rubbish on the roof including plastic cups in the gutters.
Although the roof sheeting is under pitched, he says the water ingress was caused by rubbish
in the box gutter blocking off the outlets causing the gutter to overflow into the roof space.
The complainant says as the downpipe running from the box gutter had a plastic cup lodged
in it, the volume of water that was able to escape was grossly reduced. He says as he was
unaware of the debris situation on the roof, this situation was both sudden and unexpected
(accidental damage).
The complainant provided a letter from the builder (HB) dated 9 June 21 who confirmed
debris was removed from gutters and downpipes. HB quoted $6,400 plus GST to repair water
damage.
Complainant must establish damage caused by storm or accidentally
The complainant must establish on the balance of probabilities he suffered a loss caused by
an event to which the policy responds. This is known as a prima facie or valid claim.
In the context of this claim he must establish the damage was caused by storm or caused
accidentally.
The policy provides cover for loss or damage caused by one or more of insured events.
The insurer will pay for storm damage (subject to policy exclusions) and pay for accidental
damage to the building unless it is caused by an event otherwise excluded.
The policy defines accidental loss or damage to mean:
damage to, loss or destruction of your buildings or contents caused by an
unintentional act, or a sudden or unexpected incident.
Therefore, to successfully claim, the complainant must establish the damage was caused by
a sudden or unexpected incident which was not otherwise excluded.
January 2021 photographs show little debris and no plastic cups on the roof
The complainant says the damage was caused by water coming into the building because a
plastic cup blocked the downpipe running from the box gutter. I note the photographs and
video provided. I accept when the photographs and video were taken there was a plastic cup
in the d ownpipe. Having considered the photographs and material provided by the insurer’s
builder, I am not satisfied the complainant has established the plastic cup was in the
downpipe on the date of the storm. This is because the insurer’s builder’s photographs show
little debris and no plastic cups on the roof at all when he inspected the roof in January 2021.
Insurer entitled to decline the claim as damage otherwise excluded
In any event even if an accidental damage claim was established, I do not accept the policy
responds to the claim. This is because the insurer will pay for accidental damage unless it is
caused by an event otherwise excluded.
Determination | Case number: 793107 Page 5 of 9
The insurer must prove on the balance of probabilities that an exclusion applies if it seeks to
deny or limit its liability for the loss.
The policy provides cover for damage caused by storm, rainwater or run off. However, it will
not pay for damage caused by rainwater entering the building through any opening not made
by the storm unless the damage is caused by run-off.
Run-off is defined in the policy to mean:
rainwater that has collected on or has flowed across normally dry ground or has
overflowed from swimming pools or spas.
In the context of this claim, the damage was not caused by run-off as defined. Rainwater
entered the building but not through a storm made opening.
As the insurer has established a policy exclusion applies, it is entitled to decline the claim
both under the insured events of accidental damage and storm damage.
Other issues were raised by the parties, but they are redundant in view of this finding and not
required to be addressed in this determination.
Loss of rent not payable by the insurer
The complainant provided material from his property manager who said due to the leaking
roof and the water damage to the property the tenants vacated the property because they
could not live there. The tenants vacated the property on 14 March 2021 before the lease
expired on 8 April 2021. The complainant claims $19,000 loss of rent.
The policy provides cover for rental costs after an insured event. But as I consider the
building was not damaged by an insured event covered by the policy, the insurer is not liable
to pay the complainant for loss of rent.
2.2 Why is the outcome fair?
The insurer is entitled to rely on its policy terms and the available material. As the available
material establishes the claim is excluded from cover because water did not enter the building
through a storm created opening, it would not be fair to require the insurer to pay the claim.
Determination | Case number: 793107 Page 6 of 9
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
Insured events we will pay
The policy covers loss or damage to your buildings and/ or contents (as applicable) caused by
one or more of the following insured events that occurs during the period of insurance. Your
schedule will show if you have cover for buildings, contents or both.
Accidental loss or damage
We will pay for accident al loss or damage to your insured buildings and/or cont ents, unless it is
caused by:
a. an event otherwise excluded under sections “Insured events we will pay” on pages 30 to 37
or “When we will not pay a claim under your policy” on pages 62 to 65;
….
Storm, rainwater or run-off
We will pay for loss or damage to your insured buildings and/ or cont ents caused by storm,
rainwater or run-off.
We will not pay for loss or damage:
caused by water seeping, percolating or otherwise penetrating into the buil dings as a result of:
structural defects;
faulty design of the buildings;
faulty workmanship; or
failure to adequat ely maintain the buildings;
caused by wind, rainwater, hail or snow entering the buildings through an open window or
door or any opening not made by the storm unless the loss or damage is caused by run -
off; or
Determination | Case number: 793107 Page 7 of 9
caused by water entering your buildings though an opening made for the purposes of
alterations, extensions, renovations or repairs.
When we will not pay a claim under your policy
The policy does not cover loss, liability, injury or damage directly or indirectly caused by, arising
from or in any way contributed to by:
Wear and tear depreciation, gradual deterioration, wear and tear;
Inherent defects or through inherent defects, faulty design, structural defects or poor
workmanship;
Unless we stay differently in your policy, we will not pay for
> … any loss or damage which is not caused directly by one of the ins ured events.
3.3 Extracts from material relied on by the parties
Date Actio n
Complainant’s builder
undated
Inspected 3 June 21. Ceiling collapsed in the centre of the
building due to water ingress.
Roof assessment required for three story building.
Property Type: Three storey apartment block
Building Height: 11metres
Approximate age of roof: 12 years
Condition of roof: Poor
Roof Pitch (degrees): Variable 3% - 23%
Roof Type (tiled/met al or other): Metal
Roof Profile (for metal roof only): Corrugated
Roof Colour: Surfmist
Tile Type and Manufacturer: N/A
Box Gutter M aterial: Colorbond
FOUND SIGNS OF: Choose: Impact / Weather Event
Damage / Debris Build up / Age Wear and Tear / Lack of
Maintenance / Vermin / Installation Defects / Corrosion
Inspection of the roof found a lot of debris and rubbish all
over the roof and gutters, paint and render splatter
covering the entire roof area, and impact dents in various
locations.
Inspection of the area of water ingress found plastic cups
and rubbish in the gutters. This area is a flat roof section
which the corrugated roof sheeting is under pitched to
current codes, but we are unable to determine if the
installation was to code in 2009 when the building was
built. Although roof sheeting is under pitch ed our
professional opinion is that the water ingress was caused
by rubbis h in the box gutter blocking off the outlets and
causing the gutters to overflow into the roof space. It was
also determined that gutter flas hing is in place.
Don't believe that the water ingress was caused by rusted
screws as the whole roof is in the same condition and the
only area of wat er ingress was under the box gutter.
Determination | Case number: 793107 Page 8 of 9
Recommended full roof replacement to rectify damages
caused by the building site next door and eliminat e rub bish
being thrown from the neighbouring building site.
Insurer’s builder (RN)
Report
21 January 21
Inspected and photographed property after accessing
roof 21 January 2021
Internal ceiling has been water damaged directly below
the box gutter located within the lounge room which is a
flow through area that flows through the kitchen, sitting
and rear wall.
Found area directly below the leak has a box gutter
installed above. T he box gutter is non - compliant as the
discharge point falls back towards the box gutter rather
than falling out towards the discharge. The box gutter
itself is a compliant size however given that the
discharge point falls towards the gutter not away raises
concern with water being able to escape accordingly.
Placed a degree level on the corrugated iron roof falling
towards the box gutter and found that this has been
pitched to a non - compliant standard being below 5
degrees on both pitches falling towards b oth box gutters.
Box gutter currently has a non - compliant f all towards the
discharge point. The pitched roof falling into the box
gutter has a non - compliant pitch being under 5 degrees
and as listed below under maintenance the roof has
rusty screws, exce ssive silicone work from previous
attempts to prevent water entry.
Observations include rusty screws, non - compliant pitch
falling into box gutter: non - compliant box gutter discharge
point: and excessive silicon work to surrounding area
preventing water entry.
Insurer’s builder (RN)
Email
5 March 21
Broker suggests the rain was of such a volume the box
gutter would not have coped even if installed correctly. Is
this possible? Absolutely not possible. If the box gutter was
installed correctly, it would have performed under the rain
volume. The box gutter is of a compliant size however back
falls away from the discharge point therefore under int ense
volume of rain it will not cope causing the back flow e ffect
which had occurred. Under light rain events yes it will
perform as it does not have the opportunity to fill up given
the depth of the gutter. See photo showing a box gutter on
the opposing side on the existing dwelling. Under the same
rain event and same conditions this gutter did not overflow
Affected RHS box gutter requires attention to allow it to
flow under all cond itions.
Photos show our level sitting in the discharge outlet and
back into the box gutter there is substantial back fall away
from the discharge into the gutter itself which is not ideal. It
wasn’t raining at the time of our ins pection and still the
Determination | Case number: 793107 Page 9 of 9
gutt er was holding water from previous rain.
Second photo shows an overall shot towards the section of
roof area with the affected box gutter. Box gutter visible on
the RHS is the affected area and the non - compliant box
gutter.
There is also a box gutter on the LHS on the same roof
within close proximity of the affected gutter. The LHS gutter
did not overflow or cause water damage during this event.
Rusty screws and excessive silicon are maintenance items
and not cause of wat er entry.
Insurer’s builder (RN)
Email
30 April 21
Reviewed photographs provided by complainant and say
100% new.
Our photos during our inspection showed no rubbish in the
box gutters.
Insurer’s builder (RN)
Email
3 June 2021
Box gutter must be installed with fall not less than 1:100
and be designed in accordance with AS/NZS 3500.3.
This particular gutter although having fall when it reaches
the discharge point it falls back into the box gutter itself
rather than falling 1:10 towards the discharge point. A
domestic gutter must be a minimum of 200mm wide and
75mm deep which this current gutter is however it is the
fact that at the point of discharge the gutter falls away from
the discharge point.
Refers to original photo showing gutter falling away from
discharge rat her than contin uous fall into the discharge
point.
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails.
Parties’ expert reports .
Photographs and video.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.