Determination 792819
Cash settlement of flood damage claim and non-financial loss
Summary
The complainant disputed the insurer's cash settlement offer for flood damage to her home and sought a total-loss rebuild, plus compensation. AFCA found the building repairable, required the cash settlement to be increased with a 20% margin, and ordered interest, temporary accommodation, utilities, legal fees and $5,400 non-financial loss.
Under the policy and the prior AFCA determination the insurer may cash settle repairs, but a 20% margin is fair given the transfer of repair risk, and non-financial loss arises from poor claim management under AFCA Rule D.3.3.
Issues
- Claim amount dispute primary · upheld
“The insurer is to increase its cash settlement offer to $390,964.85 which includes a 20% margin considered to be fair in the circumstances”
- Poor claim handling secondary · upheld
“Insurer appointed engineers GP contrary to original determination, aggravating relationship and delaying claim finalisation”
- Poor communication secondary · upheld
“Temporary accommodation and utilities payments poorly managed month after month with delayed payments and repeated follow-up”
- Repairs or contractors secondary · upheld
“Insurer is to arrange and pay for a suitably qualified consultant to complete comprehensive mould testing; remediation required if unsafe”
Subjects and remedies
health or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossprovide documents
Text of the determination
Determination
Case number 792819
Financial firm Commonwealth Insurance Limited
Case number: 792819 17 February 2022
Determination | Case number: 792819 Page 2 of 11
1 Determination overview
1.1 Complaint
The complainant holds home and contents insurance with the financial firm (the
insurer). In May 2019, a claim was lodged for damage to the insured property
(building and contents) because of flooding caused by the failure of a neighbour’s
stormwater drainage.
A dispute arose between the parties regarding cover under the policy which was
brought before AFCA. On 14 July 2020, AFCA issued a determination (679588) in
favour of the complainant. It determined the insurer was liable for a significant portion
of the damaged insured property.
This complaint says the insurer has failed to fulfil its obligations under the AFCA
determination and has therefore raised this complaint for consideration. The
complainant says the insurer’s offer is insufficient to restore the property to its pre-
loss condition and is seeking:
cash settlement for a complete rebuild of the insured building in the amount
$478,960.00 plus $15,950.00 for demolition of the damaged property, or
alternatively
for the insurer to remediate all the damage to the insured building including further
mould treatment and removal of the mould effected heating ducts
confirmation the insurer will continue to cover temporary accommodation for the
complainant and her pet until such time the home is liveable
non-financial loss compensation for the significant stress, anxiety and physical
inconvenience experienced because of the insurer’s poor management of the
claim.
1.2 Issues and key findings
Is the insurer’s offer fair and reasonable?
The available information does not establish the insured building is a total loss.
However, the insurer is to increase its final claim settlement payment to the
complainant in line with this determination.
Is the complainant entitled to non-financial loss?
The insurer should pay $5,400 in non-financial loss compensation in line with the
AFCA Rules (Rules), given its poor claims handling and service under the claim.
Determination | Case number: 792819 Page 3 of 11
1.3 Determination
This determination is significantly in favour of the complainant. The insurer is required
to:
increase its cash settlement offer to $390,964.85 which includes a 20% margin
considered to be fair in the circumstances
pay interest on this amount pursuant to section 57 of the Insurance Contracts Act
1984 (Act) from 19 March 2021 (date of offer for the cash settlement) to date of
payment
pay the complainant a payment towards temporary accommodation for the
complainant and her pets covering a six-month period from the date final
settlement payment is issued under this determination
pay the complainant a final payment towards the utilities in the amount $1,000
on completion of the repairs to the insured building, appoint an appropriately
qualified consultant to complete comprehensive mould testing to ensure it is safe to
occupy. In the instance it is not safe to occupy, the insurer is to arrange and pay for
the necessary remediation works and cover the complainant’s temporary
accommodation for this period
pay the complainant $500 towards legal fees to assist in reviewing the insurer’s
settlement contract
pay the complainant $5,400 in compensation for non-financial loss pursuant to
AFCA Rule D.3.3.
Determination | Case number: 792819 Page 4 of 11
2 Reasons for determination
2.1 Is the insurer’s offer fair and reasonable?
No. Although the insurer is not required to settle the claim on the basis the insured
building is a total loss (new build) considering what is fair in all the circumstances, the
insurer is to increase the final settlement cash settlement in line with this
determination.
Insurer liable for all event related damage
The previous AFCA Determination found the flooding of the subfloor significantly
contributed to movement and cracking damage. AFCA determined the insurer was
liable for the damage caused by the flooding. The determination found the insurer is
to:
complete the mould remediation and to meet the costs of replacing the heating unit
and heating ducts and repairs to the flooring as required
inspect the complainant’s contents and either restore or replace any contaminated
contents identified
extend the allowance for temporary accommodation to cover any such costs
incurred until the mould has been remediated and the house declared habitable
complete the drying of the subfloor and remove any contaminated sub floor soil
continue to cover the complainant’s ut ility bills incurred during the drying process
obtain a detailed scope of work from KMA as set out under Section 2.1 of this
determination. The insurer can then either complete the repairs or cash settle the
claim for the repairs subject to agreement between the parties
pay the complainants professional costs of $3080 for E and $3799.40 and
$2,299.00 for KMA pursuant to AFCA Rule D.5.1 and D.5.2
pay the complainant $5,400 in compensation for non-financial loss pursuant to
AFCA Rule D.3.3.
Insurer is not entitled to limit its liability under the claim
The insurer appointed engineers ‘GP’ to provide a comprehensive causation report
and comment on building damage related to the claim. The panel notes this was not
in line with AFCA’s original determination and served only to further aggravate the
complainant, the relationship between the parties and delay finalisation of the claim.
This will be considered further under section 2.2 of this determination.
GP ’s forensic engineer’s report dated 1 February 2021 prov ides the opinion that 70%
of the damage was attributable to the stormwater event ingress event and 30% of the
damage relates to maintenance issues. This includes 15% caused by poor footing
Determination | Case number: 792819 Page 5 of 11
maintenance and non-compliant capping around the dwelling and 15% due to the
seasonal movement of the highly reactive soils.
GP also recommended:
installation of paved surfaces which are to be graded away from the dwelling to
prevent water pooling against the footings of the structure
an extensive below ground drainage network to be installed around the dwelling
perimeter to drain out the subsoil
an additional 12 month drying out period once the recommended maintenance
works were completed before commencing the rectification works.
The panel having considered the informa tion from GP is not satisfied this establishes
nor entitles the insurer to limit or reduce its liability as set out in AFCA determination
679588 (original determination). The panel notes , to require the complainant to
complete extensive additional drainage works and the further delay of 12 months to
commence repairs is not reasonable nor required given the scope of works provided
by KMA (in line with the original determination).
The panel notes the KMA ’s scope of works includes installation of subfloor draining
consistent with the requirements to align the repairs with current industry codes and
for which the insurer is liable under the policy. Therefore, the panel does not consider
this a maintenance issue rather GP’s recommended drainage works are more
consistent with upgrades to the property’s drainage requirements.
Given this, the panel believes the insurer is not entitled to reduce its liability or require
the complainant to fund the additional recommended works in line with GP’s report.
Insurer is not obliged to settle on the basis the insured building is a total loss
The insurer has obtained a repair quote from J based on information and a scope of
works provided by engineer KMA as required by the original determination. The
insurer has elected to cash settle the claim which the panel accepts it is entitled to do
in line with the policy and original determination.
Based on the KMA scope of works and J’s repair quote the insurer ha s offered to pay
the complainant $358,385.06. This includes $272,034.97 (inc gst) for repairs to the
building, $53,769.74 (inc gst) for underpinning works and $32,580.46 which is a 10%
mark-up on the quoted repair costs.
The complainant disputes the insur er’s offer. She says the property cannot be
repaired or remediated without the risk of further mould infestation. She is of the
opinion the insurer should be required to settle the claim on the basis the insured
building is a total loss and requires a new build.
Determination | Case number: 792819 Page 6 of 11
The complainant obtained a scope of works and quote for a new build from
consultants ‘M’ in the amount of $478,960.00. She also seeks $15,950.00 for
demolition of the existing contaminated building as quoted by ‘ A ’ .
The insurer says the quote is excessive and there is no evidence the property is a
total loss. The insurer says it is only liable for event relate damage and the
recommended maintenance is not event related, rather, it is to reduce the possibility
of further damage after repairs.
Having considered the available information, the panel is not satisfied this shows the
insured building to be a total loss requiring complete demolition and rebuild. Rather,
the panel is satisfied the evidence from the appropriately qualified consultants KMA,
GP and J supports a finding that the insured building is repairable.
Insurer is to increase the final claim settlement offer for building repairs
The panel having considered the available information has formed the opinion it is fair
in all the circumstances that the insurer increases the final claim settlement offer for
building repairs to include a 20% margin (as opposed to the 10% offered by the
insurer.)
This is because of the insurer’s election to cash settle the claim, transfers the risk in
arranging the repairs to the complainant including possible variations in the cost of
repairs once works commence. It is reasonable to accept there may be minor
variations to the required repairs given:
the SOW indicates that underpinning and specific structural repairs are dependent
on the condition of the property following the drying repair references
the extent of mould throughout the structure is unknown
the market is experiencing volatility due to Covid-19.
Accordingly, the insurer in addition to its obligations set out in the original
determination, is to pay the complainant $390,964.83 (inc gst) towards to cost to
remediate and restore the damaged insured building under the claim.
Insurer entitled to cash settle for the replacement of heating ducts
The complainant says the insurer has failed to arrange removal of the mould effected
sub-floor heating ducts and sub-soils as per the original determination. She says this
will only have resulted in further and ongoing mould infestation within the insured
building.
The insurer says these works are not possible given the limited space available within
the sub-floor. However, that these works do form part of the quote from J and will take
place once repairs to the insured building commence.
Determination | Case number: 792819 Page 7 of 11
The insurer confirms that make safe works have been completed to the heating
system which it says will prevent further mould infestation within the home. The
insurer has also provided evidence from a hygienist and says the expert confirmed
the internal environment is now clear of mould and safe to commence works .
The complainant refutes the insurer’s position and notes the hygienist’s assessment
and related report is a Condition 2 (Cleaning) Report only which is limited in its scope
of assessment and cleaning of the dwelling. No material remediation works were
completed, any analytical results should only be reflective of the Condition 2 clean.
The panel notes there is evidence which supports that the appointed hygienist
misunderstood the event (giving rise to the damage) and thought it was only ground
water ingress under the property as opposed to a flooding of the building event.
However, the consultant confirms given the degree of repairs including stripping down
of the internals, doing a mould test now would be pointless and not recommended.
The recommendation being that further testing be completed once the structural
damage has been repaired which will include the strip out, floor replacement and after
the heating ducts have been removed from the property.
Without persuasive evidence to the contrary, the panel is satisfied the insurer has
shown the heating ducts and sub-floor soils cannot first be removed before repairs to
the building commence. It is reasonable that these works form part of the repairs and
scope of woks quoted by J.
The panel determines, on completion of the repairs to the insured building, the insurer
is to arrange and pay for a suitably qualified consultant to attend and complete a
comprehensive assessment of the dwelling to ensure it is free from mould and safe to
inhabit.
If the mould infestation remains unresolved and further remediation works are needed
the insurer is to arrange and cover the expenses for the necessary remediation
works. The insurer is to also, if required, co ver temporary accommodation to the
complainant and her pet for the period of mould remediation (if this falls outside the
temporary accommodation payment by the insurer discussed below).
Insurer to pay for further temporary accommodation and utilities expenses
The original determination required the insurer to continue to pay temporary
accommodation for the complainant and her pets and reimburse her the cost of
electricity and gas being used at the insured property.
However, given the insurer has elected to cash settle the claim the above direction no
longer applies to the circumstances. The panel notes the insurer in the interim has
continued to cover these expenses pending the outcome of this complaint. The panel
Determination | Case number: 792819 Page 8 of 11
acknowledges the complainant’s concerns relating to the insurer’s management of
these payments, these will be considered further in section 2.2.
In the interest of bringing the claim to finality and considering what is fair in all the
circumstances. The panel determines the insurer is to pay the complainant temporary
accommodation (for her and her pet) for a period equal to six months.
The panel is of the opinion, given the complainant has not appointed a builder and the
current impact of Covid-19 on availability of labour and materials, this will allow the
complainant reasonable time to complete the repairs to the insured building.
The six months period is to be taken from the date final cash settlement is made to
the complainant under this determination. The insurer is to also pay the complainant a
further $1,000 towards utilities as full and final payment towards these expenses as
part of its final settlement payment to the complainant.
Insurer to contribute towards legal fees
The insurer offered to settle the complainant $500 towards legal fees for assistance
with reviewing the final settlement agreement. Given there is no dispute surrounding
this, the panel considers this appropriate. The insurer is to cash settle the
complainant $500 when it issues the terms of settlement.
2.2 Is the complainant entitled to non-financial loss?
Insurer’s offer for non -financial loss is fair in the circumstances
The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or
extent of inconvenience, delay or interference. AFCA takes a conservative approach
when considering any award of compensation.
The panel has considered circumstances which have occurred since the previous
determination was issued on 14 July 2020. It notes the insurer, in appointing GP,
contrary to the spirit of the original determination, only further aggravated the
relationship between the parties and has which caused a further significant delay in
bringing the claim to conclusion.
Although the insurer has continued to cover the temporary accommodation and
utilities expenses in line with the original determination. The available information
shows this was poorly managed month after month with delayed payments and the
complainant having to continuously follow up the insurer.
The panel acknowledges the insurer’s position that because these payments were
being made outside the complainant’s policy entitlements, each month the necessary
approvals had to be obtained to make payments.
Determination | Case number: 792819 Page 9 of 11
This may be so, however, given these were ongoing payments the insurer knew it
was obliged to make, the panel believes the insurer could reasonably have managed
this in a much more efficient manner ensuring the relevant approvals were obtained in
a timely fashion every month.
The insurer’s poor management of the payments only further increased the level of
stress, anxiety and inconvenience the complainant and her children have been
experiencing over an extended period of time.
Therefore, the panel determi nes the insurer is to pay the complainant $5,400 in non-
financial loss compensation in line with the AFCA Rules.
2.3 Why is the outcome fair?
Outcome is fair in the circumstances
The outcome is fair because the insurer is entitled to settle the claim within the terms
of the policy, however, the evidence indicates it is reasonable that the insurer
increases the final claim settlement offer under the claim. Also, given the additional
delays and poor management of the temporary accommodation and utility payments
over this time, it is fair in the circumstances the insurer pays the complainant non-
financial loss compensation.
Determination | Case number: 792819 Page 10 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in a ll the circumstances,
having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information,
and each party has had the opportunity to address any issues raised. We have
reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted
this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The
panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an insurance industry expert.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
Determination | Case number: 792819 Page 11 of 11
We give more weight to documents created at the time the events occurred. If there
are no relevant documents, we will decide what most likely occurred based on the
available information.
If there are conflicting recollections and these are evenly weighted, we may find that a
claim cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to
compensate the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has
occurred to the Complainant’s feelings or humiliation has been suffere d
by the Complainant; or
b) for other complaints – an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the
Complainant’s expectation of enjoyment or peace of mind has occurred.