The complainant disputed the insurer's cash settlement offer for flood damage to her home and sought a total-loss rebuild, plus compensation. AFCA found the building repairable, required the cash settlement to be increased with a 20% margin, and ordered interest, temporary accommodation, utilities, legal fees and $5,400 non-financial loss.

Under the policy and the prior AFCA determination the insurer may cash settle repairs, but a 20% margin is fair given the transfer of repair risk, and non-financial loss arises from poor claim management under AFCA Rule D.3.3.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossprovide documents

Related

All Commonwealth Insurance Limited determinations · Find similar determinations

Text of the determination

Determination Case number 792819 Financial firm Commonwealth Insurance Limited Case number: 792819 17 February 2022 Determination | Case number: 792819 Page 2 of 11 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (the insurer). In May 2019, a claim was lodged for damage to the insured property (building and contents) because of flooding caused by the failure of a neighbour’s stormwater drainage. A dispute arose between the parties regarding cover under the policy which was brought before AFCA. On 14 July 2020, AFCA issued a determination (679588) in favour of the complainant. It determined the insurer was liable for a significant portion of the damaged insured property. This complaint says the insurer has failed to fulfil its obligations under the AFCA determination and has therefore raised this complaint for consideration. The complainant says the insurer’s offer is insufficient to restore the property to its pre- loss condition and is seeking:  cash settlement for a complete rebuild of the insured building in the amount $478,960.00 plus $15,950.00 for demolition of the damaged property, or alternatively  for the insurer to remediate all the damage to the insured building including further mould treatment and removal of the mould effected heating ducts  confirmation the insurer will continue to cover temporary accommodation for the complainant and her pet until such time the home is liveable  non-financial loss compensation for the significant stress, anxiety and physical inconvenience experienced because of the insurer’s poor management of the claim. 1.2 Issues and key findings Is the insurer’s offer fair and reasonable? The available information does not establish the insured building is a total loss. However, the insurer is to increase its final claim settlement payment to the complainant in line with this determination. Is the complainant entitled to non-financial loss? The insurer should pay $5,400 in non-financial loss compensation in line with the AFCA Rules (Rules), given its poor claims handling and service under the claim. Determination | Case number: 792819 Page 3 of 11 1.3 Determination This determination is significantly in favour of the complainant. The insurer is required to:  increase its cash settlement offer to $390,964.85 which includes a 20% margin considered to be fair in the circumstances  pay interest on this amount pursuant to section 57 of the Insurance Contracts Act 1984 (Act) from 19 March 2021 (date of offer for the cash settlement) to date of payment  pay the complainant a payment towards temporary accommodation for the complainant and her pets covering a six-month period from the date final settlement payment is issued under this determination  pay the complainant a final payment towards the utilities in the amount $1,000  on completion of the repairs to the insured building, appoint an appropriately qualified consultant to complete comprehensive mould testing to ensure it is safe to occupy. In the instance it is not safe to occupy, the insurer is to arrange and pay for the necessary remediation works and cover the complainant’s temporary accommodation for this period  pay the complainant $500 towards legal fees to assist in reviewing the insurer’s settlement contract  pay the complainant $5,400 in compensation for non-financial loss pursuant to AFCA Rule D.3.3. Determination | Case number: 792819 Page 4 of 11 2 Reasons for determination 2.1 Is the insurer’s offer fair and reasonable? No. Although the insurer is not required to settle the claim on the basis the insured building is a total loss (new build) considering what is fair in all the circumstances, the insurer is to increase the final settlement cash settlement in line with this determination. Insurer liable for all event related damage The previous AFCA Determination found the flooding of the subfloor significantly contributed to movement and cracking damage. AFCA determined the insurer was liable for the damage caused by the flooding. The determination found the insurer is to:  complete the mould remediation and to meet the costs of replacing the heating unit and heating ducts and repairs to the flooring as required  inspect the complainant’s contents and either restore or replace any contaminated contents identified  extend the allowance for temporary accommodation to cover any such costs incurred until the mould has been remediated and the house declared habitable  complete the drying of the subfloor and remove any contaminated sub floor soil  continue to cover the complainant’s ut ility bills incurred during the drying process  obtain a detailed scope of work from KMA as set out under Section 2.1 of this determination. The insurer can then either complete the repairs or cash settle the claim for the repairs subject to agreement between the parties  pay the complainants professional costs of $3080 for E and $3799.40 and $2,299.00 for KMA pursuant to AFCA Rule D.5.1 and D.5.2  pay the complainant $5,400 in compensation for non-financial loss pursuant to AFCA Rule D.3.3. Insurer is not entitled to limit its liability under the claim The insurer appointed engineers ‘GP’ to provide a comprehensive causation report and comment on building damage related to the claim. The panel notes this was not in line with AFCA’s original determination and served only to further aggravate the complainant, the relationship between the parties and delay finalisation of the claim. This will be considered further under section 2.2 of this determination. GP ’s forensic engineer’s report dated 1 February 2021 prov ides the opinion that 70% of the damage was attributable to the stormwater event ingress event and 30% of the damage relates to maintenance issues. This includes 15% caused by poor footing Determination | Case number: 792819 Page 5 of 11 maintenance and non-compliant capping around the dwelling and 15% due to the seasonal movement of the highly reactive soils. GP also recommended:  installation of paved surfaces which are to be graded away from the dwelling to prevent water pooling against the footings of the structure  an extensive below ground drainage network to be installed around the dwelling perimeter to drain out the subsoil  an additional 12 month drying out period once the recommended maintenance works were completed before commencing the rectification works. The panel having considered the informa tion from GP is not satisfied this establishes nor entitles the insurer to limit or reduce its liability as set out in AFCA determination 679588 (original determination). The panel notes , to require the complainant to complete extensive additional drainage works and the further delay of 12 months to commence repairs is not reasonable nor required given the scope of works provided by KMA (in line with the original determination). The panel notes the KMA ’s scope of works includes installation of subfloor draining consistent with the requirements to align the repairs with current industry codes and for which the insurer is liable under the policy. Therefore, the panel does not consider this a maintenance issue rather GP’s recommended drainage works are more consistent with upgrades to the property’s drainage requirements. Given this, the panel believes the insurer is not entitled to reduce its liability or require the complainant to fund the additional recommended works in line with GP’s report. Insurer is not obliged to settle on the basis the insured building is a total loss The insurer has obtained a repair quote from J based on information and a scope of works provided by engineer KMA as required by the original determination. The insurer has elected to cash settle the claim which the panel accepts it is entitled to do in line with the policy and original determination. Based on the KMA scope of works and J’s repair quote the insurer ha s offered to pay the complainant $358,385.06. This includes $272,034.97 (inc gst) for repairs to the building, $53,769.74 (inc gst) for underpinning works and $32,580.46 which is a 10% mark-up on the quoted repair costs. The complainant disputes the insur er’s offer. She says the property cannot be repaired or remediated without the risk of further mould infestation. She is of the opinion the insurer should be required to settle the claim on the basis the insured building is a total loss and requires a new build. Determination | Case number: 792819 Page 6 of 11 The complainant obtained a scope of works and quote for a new build from consultants ‘M’ in the amount of $478,960.00. She also seeks $15,950.00 for demolition of the existing contaminated building as quoted by ‘ A ’ . The insurer says the quote is excessive and there is no evidence the property is a total loss. The insurer says it is only liable for event relate damage and the recommended maintenance is not event related, rather, it is to reduce the possibility of further damage after repairs. Having considered the available information, the panel is not satisfied this shows the insured building to be a total loss requiring complete demolition and rebuild. Rather, the panel is satisfied the evidence from the appropriately qualified consultants KMA, GP and J supports a finding that the insured building is repairable. Insurer is to increase the final claim settlement offer for building repairs The panel having considered the available information has formed the opinion it is fair in all the circumstances that the insurer increases the final claim settlement offer for building repairs to include a 20% margin (as opposed to the 10% offered by the insurer.) This is because of the insurer’s election to cash settle the claim, transfers the risk in arranging the repairs to the complainant including possible variations in the cost of repairs once works commence. It is reasonable to accept there may be minor variations to the required repairs given:  the SOW indicates that underpinning and specific structural repairs are dependent on the condition of the property following the drying repair references  the extent of mould throughout the structure is unknown  the market is experiencing volatility due to Covid-19. Accordingly, the insurer in addition to its obligations set out in the original determination, is to pay the complainant $390,964.83 (inc gst) towards to cost to remediate and restore the damaged insured building under the claim. Insurer entitled to cash settle for the replacement of heating ducts The complainant says the insurer has failed to arrange removal of the mould effected sub-floor heating ducts and sub-soils as per the original determination. She says this will only have resulted in further and ongoing mould infestation within the insured building. The insurer says these works are not possible given the limited space available within the sub-floor. However, that these works do form part of the quote from J and will take place once repairs to the insured building commence. Determination | Case number: 792819 Page 7 of 11 The insurer confirms that make safe works have been completed to the heating system which it says will prevent further mould infestation within the home. The insurer has also provided evidence from a hygienist and says the expert confirmed the internal environment is now clear of mould and safe to commence works . The complainant refutes the insurer’s position and notes the hygienist’s assessment and related report is a Condition 2 (Cleaning) Report only which is limited in its scope of assessment and cleaning of the dwelling. No material remediation works were completed, any analytical results should only be reflective of the Condition 2 clean. The panel notes there is evidence which supports that the appointed hygienist misunderstood the event (giving rise to the damage) and thought it was only ground water ingress under the property as opposed to a flooding of the building event. However, the consultant confirms given the degree of repairs including stripping down of the internals, doing a mould test now would be pointless and not recommended. The recommendation being that further testing be completed once the structural damage has been repaired which will include the strip out, floor replacement and after the heating ducts have been removed from the property. Without persuasive evidence to the contrary, the panel is satisfied the insurer has shown the heating ducts and sub-floor soils cannot first be removed before repairs to the building commence. It is reasonable that these works form part of the repairs and scope of woks quoted by J. The panel determines, on completion of the repairs to the insured building, the insurer is to arrange and pay for a suitably qualified consultant to attend and complete a comprehensive assessment of the dwelling to ensure it is free from mould and safe to inhabit. If the mould infestation remains unresolved and further remediation works are needed the insurer is to arrange and cover the expenses for the necessary remediation works. The insurer is to also, if required, co ver temporary accommodation to the complainant and her pet for the period of mould remediation (if this falls outside the temporary accommodation payment by the insurer discussed below). Insurer to pay for further temporary accommodation and utilities expenses The original determination required the insurer to continue to pay temporary accommodation for the complainant and her pets and reimburse her the cost of electricity and gas being used at the insured property. However, given the insurer has elected to cash settle the claim the above direction no longer applies to the circumstances. The panel notes the insurer in the interim has continued to cover these expenses pending the outcome of this complaint. The panel Determination | Case number: 792819 Page 8 of 11 acknowledges the complainant’s concerns relating to the insurer’s management of these payments, these will be considered further in section 2.2. In the interest of bringing the claim to finality and considering what is fair in all the circumstances. The panel determines the insurer is to pay the complainant temporary accommodation (for her and her pet) for a period equal to six months. The panel is of the opinion, given the complainant has not appointed a builder and the current impact of Covid-19 on availability of labour and materials, this will allow the complainant reasonable time to complete the repairs to the insured building. The six months period is to be taken from the date final cash settlement is made to the complainant under this determination. The insurer is to also pay the complainant a further $1,000 towards utilities as full and final payment towards these expenses as part of its final settlement payment to the complainant. Insurer to contribute towards legal fees The insurer offered to settle the complainant $500 towards legal fees for assistance with reviewing the final settlement agreement. Given there is no dispute surrounding this, the panel considers this appropriate. The insurer is to cash settle the complainant $500 when it issues the terms of settlement. 2.2 Is the complainant entitled to non-financial loss? Insurer’s offer for non -financial loss is fair in the circumstances The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The panel has considered circumstances which have occurred since the previous determination was issued on 14 July 2020. It notes the insurer, in appointing GP, contrary to the spirit of the original determination, only further aggravated the relationship between the parties and has which caused a further significant delay in bringing the claim to conclusion. Although the insurer has continued to cover the temporary accommodation and utilities expenses in line with the original determination. The available information shows this was poorly managed month after month with delayed payments and the complainant having to continuously follow up the insurer. The panel acknowledges the insurer’s position that because these payments were being made outside the complainant’s policy entitlements, each month the necessary approvals had to be obtained to make payments. Determination | Case number: 792819 Page 9 of 11 This may be so, however, given these were ongoing payments the insurer knew it was obliged to make, the panel believes the insurer could reasonably have managed this in a much more efficient manner ensuring the relevant approvals were obtained in a timely fashion every month. The insurer’s poor management of the payments only further increased the level of stress, anxiety and inconvenience the complainant and her children have been experiencing over an extended period of time. Therefore, the panel determi nes the insurer is to pay the complainant $5,400 in non- financial loss compensation in line with the AFCA Rules. 2.3 Why is the outcome fair? Outcome is fair in the circumstances The outcome is fair because the insurer is entitled to settle the claim within the terms of the policy, however, the evidence indicates it is reasonable that the insurer increases the final claim settlement offer under the claim. Also, given the additional delays and poor management of the temporary accommodation and utility payments over this time, it is fair in the circumstances the insurer pays the complainant non- financial loss compensation. Determination | Case number: 792819 Page 10 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in a ll the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as an insurance industry expert. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. Determination | Case number: 792819 Page 11 of 11 We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffere d by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.