Home / Suncorp Group / Determination 792331

Determination 792331

Electrical fire claim settlement offer and scope of rewiring works

FirmSuncorp Group
Decided2022-05-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$47,333
Non-financial loss—
Amount claimed$180,000
SourceAFCA PDF

Summary

The complainant's home was damaged by an electrical fire and he sought $180,000 plus temporary accommodation and non-financial loss. AFCA found the insurer's offer mostly fair, ordered settlement of $47,333.13 including a 35% contingency with interest, and ordered temporary accommodation based on a 35% contingency on the works timeframe, but refused non-financial loss.

The insurer's scope of works for rewiring is fair under AS/NZS 3018 and consistent with pre-existing wiring, but a substantive contingency is warranted for the risk of further asbestos removal.

Issues

Subjects and remedies

health or medicalhome or building damagepay compensationpay interestreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 792331 Financial firm AAI Limited Determination | Case number: 792331 Page 2 of 10 Case number: 792331 3 May 2022 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (insurer). He lodged a claim on 14 November 2020 for damage caused by an electrical fire. The insurer assessed the claim and offered the complainant $42,207.63 to resolve the claim. The complainant is dissatisfied with the offer and seeks $180,000, temporary accommodation costs and non-financial loss. 1.2 Issues and key findings Is the insurer’s offer fair and reasonable? Mostly. The panel accepts the insurer’s scope of works and quote fairly reflects its obligations under the policy. However, it should include a substantive contingency to address the real risk that further asbestos removal could be required during the works. Is the complainant entitled to non-financial loss? No. The complainant has not established the insurer caused unusual delays or mismanaged the claim. 1.3 Determination This determination is partly in favour of the complainant. The insurer is to settle the complainant’s claim in the manner set out in section 2.1 . Determination | Case number: 792331 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer’s offer fair and reasonable? Policy covers fire damage There is no dispute an event covered by the policy occurred or that the insurer is liable to repair the damage. The substantive issue is whether the insurer’s proposed scope of works for the r ewiring is fair. Review of expert evidence Both parties obtained expert evidence to support their position. The insurer relied upon reports from RCC and S. The complainant obtained a report from electrician SVE and is relying on KBA’s quote. KBA is a cont ractor engaged by the insurer. The details of the reports are set out in section 3 of this determination. Following several assessment and quotations, all experts agreed the property requires complete re-wiring. However, the experts conflict on whether the removal of all asbestos sheeting is required. The complainant seeks for the insurer to cash settle him for $180,841.23. This is based on KBA’s quote that includes removal and replacement of all the asbestos sheeting. This method is consistent with that proposed by SVE. The insurer has based its cash settlement offer on RCC’s revised quote totalling $35,061.58. SVE’s report indicates the wiring does not meet today’s standards and cannot be clipped along the wall as it currently is. It also says it is near impossible to complete the re-wiring without disturbing the asbestos in the walls. The insurer disagrees. It provided a report from expert S who says as per ‘ AS/NZS 3018 – Electrical Installations – Domestic ’, surface mounting of cabling is acceptable when mechanically protected (i.e. inside a conduit). RCC’s quote allows for the use of conduits to protect the wiring and for it to be nailed into the wooden beams (to ensure the sheeting is not disturbed). The insurer obtained further information from S rega rding the application of the ‘ AS/NZS 3018 – Electrical Installations – Domestic ’. This included a copy of the relevant excerpt which states surface mounted cabling is acceptable if it is provided with adequate mechanical protection to prevent damage. Compl ainant’s position is not persuasive The panel is not persuaded all the asbestos walls need to be replaced. S’s evidence is persuasive in showing surface mounted cabling is acceptable. They have quoted relevant standards. RCC agreed with this. Whilst KBA has provided a quote for replacing all the asbestos walls, they have not commented on why the insurer’s proposed method could not be done. SVE says it will be nearly impossible not to disturb the walls. This is not persuasive given S notes:  most of the wiring and conduits are fixed to timber battens or timber weatherboard Determination | Case number: 792331 Page 4 of 10  similar methods could be employed for the new wiring. The insurer’s position is also consistent with the pre -existing nature of the wiring. The photos include several examples of the wiring being external to the walls. The insurer’s proposed method is consistent with reinstating the wiring to its pre-existing condition. Therefore, the panel does not accept KBA’s quote is fair and reasonable. Insurer should allow a substantive contingency The panel is concerned that RCC’s allowance for asbestos removal is low. Only ten square metres has been allowed for its removal and replacement at a cost of $1,300 (exclusive of builder’s margin and GST) for the sleepout area. There seems to be a legitimate risk that further removal of asbestos would be required whilst the repairs are undertaken. This is because it is not clear that:  all the wiring in the other rooms could all be secured on timber battens or weatherboard, or  no other asbestos sheeting would be disturbed during the re-wiring process Therefore, the panel accepts a substantive contingency should be added to account for this risk. In this regard, the panel considers 35% is fair. Whilst this is higher than the amount AFCA would normally allow, the panel notes the following factors specific to these circumstances:  the additional cost of removing and replacing asbestos can result in a significant increase as evident by the substantial differences between RCC and KBA’s quote  the insurer’s own initial estimates were substantially undervalued ($19,148.10 compared to the current quote of $35,061.58) which shows the final cost is not easy to estimate  there is a real risk further works would be required if any asbestos becomes disturbed, or is likely to be disturbed, during the works. Therefore, the insurer should pay the following in full and final settlement of the claim:  $47,333.13, minus any amounts it has already paid and any outstanding applicable policy deductions (e.g. excess)  interest on the above outstanding amount pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from thirty days after RCC issued its quote until payment is made. Insurer is to settle temporary accommodation in this way There is no dispute the complainant is entitled to temporary accommodation whilst the repairs are being done. The insurer is to obtain an estimate from RCC as to how long it would take for the works to be completed. Once this is done, the insurer should add a 35% contingency on the timeframe and then provide temporary accommodation benefits for the overall period of time pursuant to the policy. 2.2 Is the complainant entitled to non-financial loss? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical Determination | Case number: 792331 Page 5 of 10 inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer managed claim reasonably well The complainant seeks compensation for stress and inconvenience (non-financial loss) due to the way the insurer handled their claims. The complainant says the insurer breached its duty of good faith by failing to finalise the claim in a timely manner. He says the delays resulted in his family living without appropriate heating throughout winter due to the number of functioning power points in the property. The complainant lodged the claim on 14 November 2020. The claim notes show the insurer offered the complainant the option for temporary accommodation on 17 November 2020 and 2 December 2020. These were rejected. The claim was assessed, and multiple scopes of work were drawn. The complaint was lodged with AFCA on 25 March 2021. Having reviewed this information, the panel is not satisfied there is sufficient information to show the insurer mismanaged the claim. Given the type of damage and that fact the claim occurred prior to Christmas, the panel is satisfied the insurer managed the claim appropriately. The panel notes the circumstances of the claim itself were unfortunate and limited. However, temporary accommodation was offered to the complainant and it was rejected. The complainant does not appear to have returned to the insurer to request it at a later stage. Given this, the panel is not satisfied the complainant established the insurer mismanaged the claim such that an award of non-financial loss is warranted. Determination | Case number: 792331 Page 6 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 792331 Page 7 of 10 3.2 Relevant policy terms What you are covered for – Insured events You can choose to take out insurance for your home or your contents at the insured address, or both. The cover you have chosen will be shown on your certificate. If you have a home insurance policy, we cover your home fo r loss or damage at the insured address caused by an insured event during the period of insuranc e. If you have a contents insurance policy, we cover your contents for loss or damage at the insured address caused by an insured event during the period of ins urance. There are some things we do not cover and these are shown in the ‘We do not cover’ section of the following tables on pages 28 to 41 and in the ‘General exclusions’ on pages 76 to 83. Fire We cover Loss or damage caused by fire (burning with flames), including bushfire. We do not cover Loss or damage arising from: • heat, ash, soot and smoke when your home or contents have not caught on fire unless it is caused by a burning building within 10 met res of the insured address; • arcing, scorching or cigarette burns, unless and only to the extent that a fire spreads from the initial burn spot; • pollution or vapour from a home heater or a cooking appliance unless a fire spreads from the initial source. Temporary accommodation when you have home cover We cover When an ins ured event damages your home to the extent you cannot live there, and we agree, we will pay for your reas onable temporary accommodation costs for the time it will take to repair or rebuild your home to a liveable condition. We will also pay for temporary accommodation for your domestic pets in a commercial boarding establishment for the same period that we pay for your temporary accommodation. The most we will pay it: • up to 4 weeks in short term accommodation agreed to by us (e. g. standard rates for a hotel, motel or serviced apartment), then if necessary; • up to another 48 weeks in residential accommodation of a similar standard to your home. Lifetime guarantee on home repairs Determination | Case number: 792331 Page 8 of 10 When we repair or rebuild your home, we guarante e the quality of materials and workmanship of that work for the lifetime of the home if we: • authorise; • arrange; and • pay the builder or repairer directly for this work. 3.3 Relevant expert evidence Record Key points Complainant’s expert ( SVE ) Report 20 - 11 - 20  Electrical fault cased a fire to start in the right room of the house. This has damaged 2 circuits which will need replacing. Also, the wiring does not meet today’s standards and cannot be clipped along the wall like it has been.  To prevent any further fire an insulation resistance test was done on all circuits. Majority of the circuits failed. Only 2 lights and 2 PowerPoints passed the test and are operating correctly.  Bringing the home up to standard will require full re - wire but will be near impossible without disturbing the asbestos in the walls. Majority of exterior and interior walls are made from asbestos and I also believe the insulation may be asbestos too. This will require the removal of all asbestos to rewire the home to AS3000 Standards. Financial firm’s expert ( RCC ) Report 20 - 11 - 20  Switchboard is in OK condition for its age, however does not have RCDs (safety switches), it is asbestos, and the service mains are not compliant (they are not mechanically or electrically protected).  In our opinion without any works taking place the switchboard and sub - circuit wiring was compliant at time of install and as such is compliant wit hout additions or alterations. The Consumers mains are not protected but the event of this claim h as not affected the mains.  In closing, we confirm the damages to the sub - circuit wiring is a result of the fire and the switchboard and consumers mains will need to be upgraded to allow the repair work to be carried out, but the remainder of the sub - circui ts can just be tested at time of switchboard replacement. If cabling tests OK according the AS 3019, they are fine to be rec onnected. Financial firm’s expert ( asse ssor ) Report 17 - 12 - 2020  Assessor has reviewed RC’s report following their site attendance o n 20 November 2020. RCC confirmed there was electrical wiring to have caught fire which has caused damage to the wiring, wall and ceiling linings as well as carpet. RCC requested an Electrician specialist to attend and inspect the property for scope.  RCC Electrician has advised the switchboard and mains will need Determination | Case number: 792331 Page 9 of 10 Record Key points to be upgraded to allow repairs work to the remainder of the work to be carried out but the remainder of the sub circuits came just be tested at the time of the switchboard replacement. RCC co nfirm if the cabling tests OK, according to AS 3019 they are fine to be reconnected.  The customer has provided their own electrical report. This report advis ed the wiring is not to today’s standards and can now be clipped along the wall like it has been.  They advised most of the circuits failed insulation resistance testing and only 2 lights and 2 power points were operating correctly.  They have noted to bring the home up to standard they will require a full re - wire but will be near impossible without di sturbing asbestos. Financial firm’s expert ( KBA ) Report 23 - 12 - 2020  Your a dvice would be to upgrade the switchboard and bring it up to current Australian Wiring Rules Standards 3000:2018. Rewire the VIR circuits and rewire/provide mechanical protection to the non - conformant cabling. However, testing of the wall and ceiling linings for asbestos would be required. Which could ultimately mean as bestos removal before any works can proceed.  Upon inspection of the property, and the information provided to us by our electrician. The damage has been caused by an electrical short. The existing wiring is not compliant to today's standards, including the installation locations of the wiring. The property has several metal conduits on the external face of the wall and ceiling linings that house the old wiring. To carry out repairs, these wires will need to be remove, replaced and relocated into the wall and ceiling cavities. The existing wall and ceiling linings contain asbestos. All the associated wall and ceiling lini ngs will need to be replaced during and prior to the electrical repairs commencing. Upgrade the switchboard and bring it up to current Australian Wiring Rules Standards 3000:2018. Rewire the VIR circuits and rewire/ provide mechanical protection to the non - conformant cabling. However testing of the wall and ceiling linings for asbestos would be required. Which could ultimately mean asbestos removal before any works can proceed. Financial firm’s expert ( S ) Report 23 - 12 - 2020  The repairs required to reinstate the residence aft er the fire include the replacement of the damaged wiring (2 circuits) and switchboard including re - running the consumer mains and the replacement and or repainting of the wall and ceiling linings in the s leepout.  The RCC tender amount for the reinstatement of the residence due to the fire damage is $19,148.10 and should be considered.  Any electrical circuits not damaged by the fire, which when tested are not serviceable, should be the responsibility of the insured to replace/repair up to current standards. Determination | Case number: 792331 Page 10 of 10 Record Key points  A review of AS/NZS 3018 – Electrical Installations – Domestic has indicated that surface mounting of cabling is acceptable when mechanic ally protected, ie inside a conduit.  With regards to the need t o remove all the asbestos, as shown in the electrical report, the majority of the wiring and conduits currently installed are fixed to timber battens or on timber weat herboards and can be replaced without disturbing the asbestos sheeting below.