Determination 791795

Flood damage claim to home; insurer's claim handling and repair quality disputed

FirmSuncorp Group
Decided2022-03-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed$250,000
SourceAFCA PDF

Summary

The complainant sought replacement of her flood-damaged home or payment for her own engineer. AFCA found the damage was caused by the 2011 flood and inadequate repairs, but the property was repairable, and ordered an independent expert process and $2,000 non-financial loss compensation.

The policy covers flood damage and no ground movement exclusion was found; the insurer must have an independent expert reassess the damage with the complainant having some say in the selection, and the complainant must cooperate.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossprovide documentsreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 791795 Financial firm AAI Limited Determination | Case number: 791795 Page 1 of 6 Case number: 791795 4 March 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy with the insurer. It accepted and paid a flood damage claim to the insured property in January 2011. The complainant has ongoing concerns about the structural safety of the house. The complainant wants the insurer to pay for replacement of her house or to cover costs for an engineer of her choice to assess the property. 1.2 Issues and key findings Is there damage due to the 2011 flood event? The damage including the rafters, wall cracks and cornices were caused in whole or substantial part by the 2011 flood event. Is the property beyond repair? No, the evidence shows the property is repairable. Is the complainant entitled to have insurer pay for complainant’s costs of instructing her own expert? No, however the insurer has offered to reassess the property and it is appropriate in the circumstances the complainant have some say in the selection of a new engineering consultant. Is the complainant entitled to compensation for non-financial loss? A moderate award of $2,000 is appropriate in the circumstances. Is the outcome fair? The insurer is open to conducting a further assessment of the property. The complainant is to cooperate in the process. It is not a significant additional burden to require the insurer to give the complainant some say in the selection of the person who is to assess the complainant’s home. 1.3 Determination The determination is partly in favour of the complainant. Within 21 days of acceptance of this determination:  the insurer is to follow the process for appointment of an independent expert as set out in para 2.3 herein, to report on the extent of damage to the home resulting from the 2011 flood and subsequent inadequate repair work.  The complainant is required to cooperate in that process.  The insurer to pay $2,000 compensation to complainant for non-financial loss. Determination | Case number: 791795 Page 2 of 6 2 Reasons for determination 2.1 Is there damage due to the 2011 flood event? Background There is sufficient evidence that the damage including the rafters, wall cracks and cornices were caused in whole or substantial part by the 2011 flood event. The insured has stated that the house was inundated by the 2011 flood up to the ceiling for over several days. I have not seen the reports of the damage at that time. The insurer has not disputed the original damage alleged. The insurer says it settled the damage by payments of $12,895 in 2011, $19,324 and $14,283 in 2014, $1,211 in 2015, $2,337 in 2018. In 2020 the complainant complained in particular as to ongoing delamination to the cornices, cracking in walls and exposed roof rafter beams having dropped and being unsafe. Photographs confirm the damage. Crude temporary repairs have been implemented to brace and make safe the rafters. The complainant contends the ongoing damage is due to the flood compromising the whole structure of the house, the insurer doing repairs before the structure had properly dried out and poor-quality repair work. Further, the complainant has expressed dissatisfaction with the competence of the experts and contractors engaged by the insurer. The insurer reviewed the claim and sent a letter of 20 April 2020 to the complainant relying on exclusions for ground movement and lack of maintenance. I could not find these exclusions, nor the policy referred to. The relevant policy is the 2008 Product Disclosure Policy (PDS) which was in force in 2011 and in which Flood is a defined event. There is no exclusion for ground movement. Page 10 of the 2008 PDS enables the insurer to either conduct repairs or cash settle the complainant in respect of defined events. By further letter dated 21 May 2020 the insurer agreed to indemnity but stated due to ongoing ground movement it could not warrant the repairs and accordingly it would cash settle. In 2020 the insurer proposed to make a cash settlement of about $11,561. The complainant says she refused to bank a payment made to her which may be this last-mentioned sum. The damage remains unrectified. The insurer has appointed multiple experts to reassess the property including in 2013, 2014, 2017 and 2020. Relevant extracts from the more recent reports are contained in section 3.2 of this determination. In 2013, the insurer appointed CQ which concluded in its report that the damage to the previously repaired cornices was due to a product fault and not consistent with water damage. An inspection by CQ inside the roof space found no obvious leak due to water damage. In 2017, the insurer’s consulting engineer, JH, found damage was caused by differential foundation movement. JH stated, “ differential movement can occur due to the affects of flooding. This is probably a minor contributing factor to movement over the last couple of years. ” The builder AG reported soil movement as the reason behind the crackin g at the property. In 2017 the insurer replaced the insulation and cornices. The 7 February 2020 and 19 March 2020 engineering reports by KM referred to internal wall cracking and rafter damage from “ abnormal ground movement from the soil returning to its Determination | Case number: 791795 Page 3 of 6 natural moisture equilibrium after the flood event. This would have occurred within 1 to 3 years from the event. It is unlikely to have occurred within the 72 hours of the event .” The report from KM appears to reflect an understanding that only damage by earth movement within the first 72 hours is covered. I have not seen any such provision in the policy. The remark appears to have no relevance. Unfortunately, the reports by both JH and KM are vaguely expressed. Nevertheless, both reports appear to acknowledge the potential for long standing effects of the flood event especially on reactive soils. KM concludes that the cracking walls, rafter damage and cornice damage are attributable to the flood event and poor-quality repair work. KM is the insurer’s exper t and It is therefore surprising that the insurer’s Notice of Response dated 9 April 2 021 submits that based on the current evidence the ongoing cracking is likely to have occurred due to natural ground and foundation movement. This submission cannot be sustained. The evidence indicates the proximate cause being flood (and inadequate repairs) even though that flood event was 11 years ago. 2.2 Is the property beyond repair? No, the damage to the house is capable of being repaired. Despite several requests the complainant has not provided any expert evidence to support her argument that the inundation of the house has fundamentally destroyed its structural integrity and made it unsafe. The complainant wants the insurer to pay $250,000 for the replacement cost of her house in full and final settlement of the claim. KM gives his opinion that despite the above-mentioned damage the overall structural integrity of the building is unaffected. The complainant has not provided any supporting information which indicates the property is unrepairable and should be considered a total loss. 2.3 Is the complainant entitled to have insurer pay for complainant’s costs of instructing her own expert? There is no express obligation in the policy requiring the insurer pay the costs of an expert hired by the complainant. There are however express and implied obligations of cooperation, good faith and fairness as between insurer and insured. Further this matter is now 11 years old. The complainant indicated she would like the insurer to cover an engineer of her choice because she says the insurer’s contractors are not up to standard. Further, the complainant submitted photos and chronologies to show the insurer’s reports are incorrect and their quality is below regulatory requirements. Some parts of the original flood damage have already been twice repaired and still require fixing such as the cornices. The complainant has been asked to engage her own expert to support her claims but has not done so. The complainant is a widow, about 80 years of age and a carer for her mother. The property is the family home. The insurer has stated on several occasions it is willing to attend the complainant’s property again to address her concerns and undertake a reassessment of the property. The complainant has rejected these requests and the insurer’s contractors. The complainant is however expressly required to cooperate if she expects the insurer to meet its obligations under the policy. Determination | Case number: 791795 Page 4 of 6 In the circumstances I propose to direct that the insurer provide the details of three appropriately experienced engineering consultants (which do not and in the last year have not worked for the insurer). The complainant is to nominate one of those consultants and must thereafter cooperate in the instructing and requisite attendances by that consultant for the purpose of providing a report on the extent of damage to the home resulting from the 2011 flood and subsequent inadequate repair work. Further the consultant is to prepare a scope of work or provide instructions for preparation of a scope of work for rectification of that damage. The costs up to and including that report are to be borne by the insurer. The brief to the consultant may include this Decision and any supporting material requested by either party. The consultant is to act as an independent expert and comply with the code of conduct for experts witnesses in the courts of Queensland. 2.4 Is the complainant entitled to non-financial loss? Non-financial loss includes claims for stress or inconvenience caused by an error of the financial firm. The maximum amount AFCA awards for non-financial loss is $5,400. AFCA will only award this type of compensation if there has been an unusual degree or extent of inconvenience. This approach recognizes that an insurance claim experience can go hand in hand with stress and anxiety, even if the insurer conducted itself correctly during the process. I acknowledge the complainant disputes the quality of contractors appointed to her property. I also acknowledge the insurer’s level of service during this claim was not up to the standard expected by the complainant. The complainant has suffered trauma over the last 11 years but generally this has not been the fault of the insurer. If the Determination is accepted, there is a prospect that with mutual cooperation, the outstanding issues can be resolved. In the circumstances a moderate order of compensation in the sum of $2,000 will be made. 2.5 Why is the outcome fair? The insurer is open to conducting a further assessment of the property. The complainant is to be required to cooperate with the process. It is not a significant additional burden to require the insurer to give the complainant some say in the selection of the person who is to assess the complainant’s home. Determination | Case number: 791795 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. 3.2 Relevant sections of the policy PDS Key points Page 10 Home insurance cover If your home suffers loss or damage caused by an event listed below, we will choose to do one of the following:  Repair the damaged portion of your home,  Replace your home,  Compens ate you for the amount we would have paid for repair or replacement. Page 43 Making a claim – Assi st us with your claim You will need to give us any information relevant to your claim which we may need to handle, assess, or investigat e your claim, in order to arrive at a settlement of your loss. Cooperate with us When requested, you must provide us with all proof, informa tion, cooperation, and assistance in relation to a claim, including giving evidence in court as we may reasonably require. Assessment reports Relevant extracts CQ – Page 1 JH – Page 4 It is our opinion that paper face of the polystyrene cornice has come away from the polystyrene due to a manufacturing fault, which has occurred prior to installation. An inspection of the roof cavity was undertaken and no water penetration was observed within the roof cavity. Determination | Case number: 791795 Page 6 of 6 KM – Page 10 The conclusion from our structural engineering investigation is that the cracking to the internal finishes and the damaged rafter to roof beam could be attributed to the single flood event. The peeling of the wall tape is due to t he repairer’s construction method and is a construction defect. The ceiling cornice bubbling noted is due to the suitability of the product and an inherent flaw with the cornice product.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.