water damage claim partially declined under policy exclusions for faulty workmanship and existing damage

FirmAIG Australia Limited
Decided2022-01-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$478,680
SourceAFCA PDF

Summary

The complainant claimed about $478,680 for water damage from a leaking waterproofing membrane after the insurer partly accepted the claim and offered $18,776.85. AFCA found the insurer was entitled to decline the rest under the faulty workmanship exclusion and that its offer was fair, with a 15% contingency uplift noted.

The non-compliant waterproofing membrane caused the loss, and exclusion VII applies by reference to subsequent loss rather than pre-existing condition, so section 46 of the Insurance Contracts Act does not assist the complainant.

Issues

Subjects and remedies

home or building damagethird party authorityno remedy

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 791774 Financial firm AIG Australia Limited Determination | Case number: 791774 Page 1 of 7 Case number: 791774 13 November 2021 1 Determination overview 1.1 Complaint The complainant (represented by his lawyer) holds home and contents insurance with the insurer. He lodged a claim via his broker on 6 December 2019, following discovery of a leaking water feature. The insurer appointed a loss adjustor to assess the claim and report on the cause of damage. The loss adjustor appointed an engineer and waterproofing specialist. Substantial further damage was discovered. The insurer partially accepted the claim, offering a settlement of $18,776.85 for resultant damage and other costs incurred (electrical services and technology repairs). It says it is not liable for the rest of the claimed damage, as the waterproofing membrane is defective and does not comply with Australian Standards, and the damage is consistent with moisture/water ingress from external areas into the building over an extended period of time. It cited the policy exclusions of existing damage, faulty, inadequate or defective planning and gradual deterioration, breakdown, wear and tear, in declining the rest of the claimed damage. The complainant does not accept the insurer’s decision. He argues Section 46 of the Insurance Contracts Act 1984 (the Act) applies. Further, he says the insurer has breached its duty of good faith and has unreasonably delayed the claim. He wants the insurer to cover all costs related to the water damage, investigation damage and additional water damage, for which a quote of $478,680 has been provided. 1.2 Issues and key findings Is the insurer’s offer of settlement fair in the circumstances ? The insurer’s offer o f settlement is fair in and in accordance with its obligations under its policy wording. Consistent with AFCA’s ap proach, the insurer is to add 15% to its offer to allow for any contingencies associated with the transfer of risk. Does section 46 of the Act assist the complainant? Section 46 of the Act does not assist the complainant, as the insurer is entitled to rely on the stated exclusion relating to defective workmanship. Has the insurer breached its duty of good faith and unreasonably delayed the handling of the claim? Based on the available information the insurer has not breached its duty of good faith or unreasonably delayed the handling of the claim. Determination | Case number: 791774 Page 2 of 7 Why is the outcome fair? The outcome is fair because the insurer should not be required to settle the claimed amount when it has shown the stated exclusions have been applied correctly. 1.3 Determination This determination is in favour of the insurer. It is not required to take any further action aside from the settlement offered, plus 15% for contingencies. Determination | Case number: 791774 Page 3 of 7 2 Reasons for determination Due to the nature of this complaint, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer advocacy and a member with extensive experience in the insurance industry. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. 2.1 Is the insurer’s offer of settlement fair in the circumstances? Cause of water leaking is non-compliant water proofing membrane The initial report from the loss adjustor (S) dated 9 December 2019, states the following about the claim circumstances: ‘ Our discussions with … indicate that over the last couple of months, the Insureds have noticed water stains appearing to the painted concrete ceiling and walls of the below ground garage. In the last couple of weeks, the escape of water has increased, and the Insured has also noticed water levels dropping in open-air water features at the front of the building (located directly above the garage). The Insured therefore concluded that water was leaking from these features/pools, and they requested their own building contractor attend to investigate. The Insured also informed us that since they purchased the property in late 2016 early 2017, there has been constant evidence of efflorescence to the open-air tiles in the front entry area adjacent to these wat er features. The Insured initially wasn’t concerned as they just thought it was excess moisture leaching from the tiles, however given the recent water leakage, the Insured now believes that in hindsight, water was likely leaking over an extended period. ’ Subsequent reports provided by the insurer’s experts, engineer (F) and water proofer (W), say the cause of the leaking was due to faulty and improper application of the water proofing membrane / system from the time of the building’s construction. Further, the membrane application is non-compliant with Australian Standard AS – 4654.2.2009 or AS-4654.2.2012 (Waterproofing membrane for external use above ground use – Design and Installation). On balance, and in the absence of any expert opinion to the contrary, the panel is satisfied the cause of the water leaking was the faulty and non-complaint application of the waterproofing membrane, causing water ingress over an extended period of time Policy exclusions apply to faulty workmanship and existing damage The insurer cites the following relevant exclusions in declining the settlement sought, its policy wording saying: Determination | Case number: 791774 Page 4 of 7 VI. Existing Damage We do not cov er any loss or damage which occurred prior to the Policy Period. VII. Faulty, Inadequate or Defective Planning We do not cov er any loss or damage caused by faulty, inadequate or defectiv e: a. planning, dev elopment, surv eying, siting; b. design, specifications, workmanship, repair, construction, renov ation, remodelling, grading, compaction; c. materials used in repair, construction, renov ation or remodelling; or d. maintenance; of part or all of any property whether on or off the Residence. Howev er, this exclusion does not apply to ensuing cov ered loss unless any other exclusion applies. IX. Gradual Deterioration, Breakdown, Wear and Tear We do not cov er any loss or damage caused by: a. wear and tear, gradual deterioration; b. inherent v ice, latent defect, mechanical or electrical breakdown that You: i. were aware of at the time this Policy was entered into; or ii. could have been reasonably expected to be aware of when this Policy was entered into; or c. warping or shrinkage, rust or other corrosion, wet or dry rot. The panel is satisfied that the installation of the waterproofing membrane pre-dated the policy inception and the membrane was non-compliant, however, it is not known if the membrane deteriorated further over time, or that the complainant could have been reasonably expected to be aware of any inherent vice or latent defect. 2.2 Does section 46 of the Act assist the complainant? Section 46 of the Act is interpreted correctly by the insurer In disputing the decision of the insurer, the complainant says it has misinterpreted section 46 of the Insurance Contracts Act (ICA) 1984, which states: Pre - existing defect or imperfection (1) This section applies where a claim under a contract of insurance (other than a contract of insurance that is included in a class of contracts declared by the regulations to be a class of contracts in relation to which this section does not apply) is made in respect of a loss that occurred as a result, in whole or in part, of a defect or imperfection in a thing. (2) Where, at the time when the contract was entered into, the in sured was not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer's liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing . (emphasis added). The complainant says that ‘ clauses VI and IX contemplate events that occurred or a condition present at the time or before the pol icy was entered into…’ Further, the complainant says ‘the aforementioned clauses are temporal in nature and are directed to defects which pre-existed the commencement of the policy such that section 46 of the ICA is operative. The complainant did not (and could not have reasonably known) about the defect at the time of taking out the insurance. Determination | Case number: 791774 Page 5 of 7 The complainant acknowledges that the insurer’s ‘partial declinature of the claim also relies upon clause VII, being the clause excluding Faulty, Inadequate or Defective Planning. While the complainant submits that section 46 of the ICA applies to this clause for the reason that it satisfies the limbs, the complainant acknowledges however that it may be arguable that the particular wording of clause VII is missing the distinctive temporal aspect discussed above, such that section 46 is not operative in respect of that sole clause’. The complainant reasons that the clause is not effectual in terms of ensuing losses, and therefore, the water damage, investigation and additional water damage must be covered. The panel acknowledges this argument but does not agree. This is because the Faulty, Inadequate or Defective planning exclusion does not reference the condition of the thing (the property) at a time before the contract of insurance was entered into. The panel is satisfied that exclusion VI I operates by reference to subsequent events of loss or dam age caused b y f a u lt y, i n a d e qu a t e or d e f ect i ve w o r km a ns h i p , co ns tr uc t i o n an d m a t e ri a ls us e d and therefore can be distinguished from an exclusion to which s46(2) applies, being an exclusion operating by reference to the condition of the property existing before entry into the insurance contract. The panel is satisfied that the cause of all the damage at the property is the non- compliant waterproofing mem brane and the insurer is entitled to rely upon exclusion VII to deny the complainant’s claim. For these reasons, the panel is satisfied the insurer has interpreted section 46 on the Act correctly and exclusion VII applies. Given this finding it is unnecessary to reach a conclusion as to exclusions VI and IX. The insurer has offered to provide a cash settlement of $18,776.85 being the amount it would cost the insurer to repair the accepted damage. It has provided itemised actionable quotes in support of its offer. Although the complainant has provided his own quotes for complete repair, including non-compensable repair, there is no evidence to show th at the insurer’s quotes are inadequate or would not address the resultant damage. The panel is therefore satisfied that the insurer’s offer of settlement is fair and in accordance with its obligations under its policy wording. Consistent with AFCA’s ap proach, the insurer is to add 15% to its offer to allow for any contingencies associated with the transfer of risk. 2.3 Has the insurer breached is duty of good faith and unreasonably delayed the handling of the claim? Claim has been handled fairly in the circumstances The complainant says the insurer has breached its duty of good faith by unnecessarily and unreasonably delaying the finalisation of the claim. He cites section 13 of the Act in doing so, which says (in reference to AMP Financial Planning v CGU Insurance ): “…The precise content of the concept of utmost good faith depends on the legal context in which it is used. In the context of insurance, the phrase encompasses notions of fairness, reasonableness and community standards of decency and fair dealing. While d ishonest Determination | Case number: 791774 Page 6 of 7 conduct will constitute a breach of the duty of utmost good faith, so will capricious or unreasonable conduct…” The complainant provided a response to the insurer’s claim notes and noted several instances where the insurer said it provided updates on the claim but said this was not the case. The insurer did not specifically address these points, saying only that: ‘ The Committee noted that there were some delays with receiving quotes from …and …, however, these quotes included also the non-coverable private works and required consultation with the contractors’ sub trades. The Committee also noted that the insurer had communicated its position on the policy response to the insured already in April 2020. After reviewing the timeline of the claim, the Committee agreed that the insurer had not caused any unreasonable delays in the claim or complaint process. The Committee agreed that the insurer had not failed to act with its duty of the utmost good faith’ . While noting the insurer partially declined the claim in April 2020, it is concerning there has been no detailed response from the insurer to the complainant’s refutations of the claim timelines provided. That said, the panel is satisfied given the insurer’s correct initial partial declination of the claim, there has been no breach of good faith on the part of the insurer. There are no standard timeframes set down for the processing of claims. However, insurers are required to operate in accordance with the General Insurance Code of Practice. When considering if an insurer delayed processing an insurance claim, AFCA will look at whether:  the insurer acted fairly and promptly to resolve the claim  there has been an unreasonable delay  there were factors which were outside the control of the insurer or otherwise unavoidable  the insured’s actions caused or contributed to the delay. If we decide the insurer unreasonably handled or delayed the claim, we will look at what loss (if any) stemmed from that conduct. In this instance the panel is satisfied no loss has stemmed from the conduct of the insurer. Is the outcome fair? The outcome is fair because the insurer should not be required to settle the claimed amount when it has shown the stated exclusions have been applied correctly. Determination | Case number: 791774 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.