Text of the determination
Determination
Case number 790756
Financial firm AAI Limited
Determination | Case number: 790756 Page 1 of 8
Case number: 790756 24 March 2022
1 Determination overview
1.1 Complaint
The complainant holds a business insurance policy with the financial firm (insurer), for the
building from which it operates a business. A claim was lodged under the policy in January
2020 after a leaking pipe on a neighbouring property caused damage to the insured building.
The insurer accepted the claim and both parties obtained expert reports and quotes.
Following receipt of the various reports, the insurer formed the view that while the leaking
pipe had exacerbated cracking damage to the property, there was evidence of pre-existing
cracking and repairs, indicating long-term movement. The insurer made several offers to
settle the claim, and ultimately agreed to repair all the claimed cracking damage.
However, a dispute has arisen regarding the repair method for the slab. The complainant
wants the building to be stabilised and underpinned, using resin injection under the slab. The
insurer says its expert reports indicate this is not necessary to repair the claim-related
damage.
The insurer’s cash settlement offer totals $148,107.96, while the complainant is seeking
$251,144.33 to resolve the complaint.
1.2 Issues and key findings
Is the insurer’s settlement offer fair in the circumstances ?
Yes. On the available evidence, the repair method allowed for in the insurer’s cash settlement
will return the slab to its functional pre-loss condition. The complainant has not provided
compelling expert evidence to show resin underpinning of the slab is necessary to repair the
damage that is claim-related and for which the insurer is liable.
Why is the outcome fair?
The insurer’s cash settlement includes allowance to repair all of the cracking damage to the
building, including areas that show signs of pre-existing cracking and previous repairs. That is
despite the fact the insurer is not liable, under the policy, for damage other than that caused
by the insured event (water leak). The evidence shows, on balance, the insurer’s proposed
repair method (on which the cash settlement offer is based) will repair the claim-related
damage. It would not be fair to require the insurer to cover more than the damage for which it
is liable, or which it has already offered.
1.3 Determination
This determination is in favour of the insurer. The insurer is not required to increase its
settlement offer. It is, however, required to now pay the unpaid portion of $105,985.88,
together with interest on that amount, calculated from 16 March 2021, to the date of
settlement.
Determination | Case number: 790756 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair in the circumstances ?
Parties disagree on slab repair method and settlement amount
After the insurer’s building consultant (S) assessed and provided a scope of works for the
accepted claim, the insurer initially told the complainant that the claimed damage would be
accepted in full. The insurer accepts this was an error on its part and apologises for any
confusion caused, however it notes the complainant did not act on this information in any
case.
Both parties engaged experts, and the complainant most recently supplied its own report from
engineer KC. The complainant also submitted a quote totalling $251,144.33 from its building
expert B, based on KC’s report .
The insurer obtained further opinion from its engineering expert DW. Based on this, the
insurer concluded that B’s quote was excessive, due to the repair method used – namely,
resin injection to underpin and stabilise the slab. It is the insurer’s opinion that this repair
method is not necessary to repair the claim-related damage, but rather that this would rectify
previous foundation movement and otherwise non-compliant slab in-fill and footings (for
which it is not liable under the policy).
The insurer considers that the repair method it has allowed for in its settlement offer (based
on its expert reports) is sufficient to repair the claim-related damage. That involves cutting out
strips along the cracks in the concrete, and reforming with new concrete with the same mesh
as existing, along with steel dowels drilled and grouted into the edge of the existing ground
slab.
The insurer ultimately made an amended cash settlement offer of $148,107.96, which was
based on the scope of works and quote from the complainant’s expert B , less the cost of slab
and footing re-levelling with resin. That is to cover repair of all the claimed cracking (including
what the insurer considers to be some pre-existing cracking with evidence of previous
repairs).
The complainant maintains there was no significant cracking to the building prior to the
occurrence of the leaking pipe. The complainant also says that without properly addressing
the foundations by underpinning the slab with injected resin, the slab will not be effectively
repaired and further damage may continue to occur. It is seeking settlement of the full amount
of $251,144.33 quoted by B.
Insurer’s experts indicate concrete repair sufficient to restore slab
The insurer initially arranged for building consultant (S) to attend the property on 23 January
2020 and assess the claimed damage. S noted while the complainant had been operating its
business from the insured building for about 8 years, the original section of the building is
approximately 90 years old, with additions about 10 years ago. S noted the building appeared
to be in reasonable condition for its age.
The complainant is reported as having advised S that on returning after the Christmas break,
water was found on the concrete floor in the reception area and office (located in the western
side of the building); it was difficult to open the steel doors attached to the front of the
workshop area, which had not previously been the case; pre-existing, minor cracks in the
Determination | Case number: 790756 Page 3 of 8
walls and concrete floor of the building had become worse; some cracks had previously been
repaired before the complainant purchased the building; and several bricks in the north east
corner of the building had dislodged and moved. It was only later discovered that the leaking
pipe at a neighbouring property was responsible for water and moisture around the property.
S ’s own inspection identified cracking in the wall linings and concrete floor of the building,
which it considered consistent with having been caused by movement, and it also noted the
office floor was still slightly damp. S was of the view localised repairs to the walls and floor
would be required.
The building consultant attended the property on 3 March 2020 and found that cracking in the
floor slabs throughout the property was pre-existing due to shrinkage cracking in large
concrete panels, but that it was also evident there had been recent movement that increased
some of the pre-existing cracks in the slab. S accepted that the recent movement could be
attributed to the neighbouring leaking pipe event.
Given the evidence of historical ground movement at the property, S considered it would not
be reasonable to attribute all of the damage in the building to the recent insured event.
However, S determined that repairs to the following three main areas of the building were
required and should be covered, and provided a scope of works:
office/showroom – two lines of cracking in the floor slabs running west to east
garage workshop – brickwork cracking at the large door opening on the front elevation and
cracking in the floor slab adjacent to the toilets
store – cracking the floor slab at the interface between the two slabs.
S indicated it was difficult to attribute a percentage to the claim-related repairs needed, given
the pre-existing ground movement identified, but said cracking damage to the three slabs
identified, as well as the front entry crack, could be 100% attributed to the insured event.
The insurer also obtained a report from engineering expert DW. DW found there were various
areas of cracking throughout the property, some new, some aged, and evidence of previous
repairs. DW says the extent of some of the previous repairs indicates there was significant
pre-existing cracking, and that the new cracking was comparatively minor in these areas. DW
concluded the insured event likely caused minor settlement of the perimeter foundations,
causing minor differential settlement cracking.
DW recommended repairing the damage to the slabs by saw-cutting each side of the cracks,
installing horizontal galvanized dowels and mesh and placing concrete infill in these locations.
Complainant’s experts say resin underpinning of slab and footings is required
After S’s attendance, the complainant reported further new cracking to the building, and
obtained an initial quote from B, totalling $205,686.92. It is clear that a large portion of this
cost (over half) is attributable to the slab repair method recommended by B, which consists of
raising the slab and footings back to level using resin.
The insurer obtained updated advice from DW and its building co-ordinator, but the
complainant remained dissatisfied with the insurer’s initial offer to settle the claim. The
complainant then obtained its own report from engineering expert KC.
KC noted that the original foundations, being typical for their age, are not likely compliant with
current Australian Standards regarding strength or stiffness. KC further noted the previous
performance of the building has necessitated crack repairs and patching; saying that was
consistent with founding soils at the site being classified as highly or extremely reactive,
though these repairs were not major, with no signs of demolished or reconstructed masonry.
Determination | Case number: 790756 Page 4 of 8
KC said survey levels indicated that a total of 30-40mm of differential movement has occurred
to the office area, with a fall from the south to north, and concrete separation in between the
office/reception walls and adjacent slabs. KC says this is consistent with settlement of the
foundations along the northern side of the office/reception area, causing movement and
rotation of walls. Based on the observations and measurements of floor separation and
cracking, KC considered it likely that up to 20mm of the differential settlement was recent.
While KC acknowledged there had been significant rainfall in January and February (after the
leaking pipe event), they did not consider this rainfall was material to the damage observed.
KC concluded that the water leak and subsequent drainage issue was the primary cause of
the new damage and of exacerbation of previous damage. Amongst other external repairs,
KC recommended resin injection or underpinning of piers to the northern wall. However, with
regard to repair of the internal slabs, like DW, KC recommended saw-cutting either side of the
cracks, installing dowels and mesh, and placing concrete infill.
KC noted that due to the reactive nature of the foundation soils, it is possible future damage
may occur due to ongoing changes in the soil moisture content and the age of the building.
The complainant then submitted an updated quote from B, totalling $251,144.33. Like B’s
initial quote, this included an allowance of $115,116.25 to raise the slab and footings back to
level, using resin.
More recently, the complainant has provided a letter from B (dated 8 June 2021) in which B
says the soil is saturated with water under the slab and cutting out sections of the slab and
dowelling back together will not solve the problem. Rather, B says the soil needs to be
stabilised and the void between the soil and the slab removed by applying underpinning resin.
B says if a good base is not achieved before the repairs are undertaken, then further repairs
will be required in the future.
On balance, resin underpinning not required to repair claim-related damage
S provided a further report dated 8 July 2021. S says the damage caused by the leaking pipe
was clay heave which resulted in raised floor levels, that then increased pre-existing cracking
in the slabs and brickwork; B’s proposal to raise the slab and footings back to level with resin
is contrary to the requirement to reduce the raised floor levels caused by the leaking pipe and
is therefore an inappropriate repair solution.
S also says the raised floor levels from the leaking pipe caused an increase in pre-existing
cracking in the slab in three areas and an increase in cracking at the large door opening on
the front elevation that was now affecting the serviceability or use of the building, creating
new trip hazards in the concrete slab and moisture penetration into the office. S therefore
maintained its view that the proposed repairs of concrete patch repairs and brickwork repairs
are an appropriate repair methodology to reinstate the aged commercial building to its pre-
loss condition.
Additionally, S said it is not practical or reasonable to level the floor sla bs in the complainant’s
building, which comprises a collection of structures and slabs built at different times to
different standards, and which would therefore have been off-level prior to the leak event.
The insurer maintains its accepted repair method (saw cutting the cracks and repairing with
dowels, mesh and infill concrete) will repair the cracking and restore the slab to pre-loss
condition and that the allowance of a 12-month drying out period would reduce lifting and
provide a more suitable base to carry out repairs, as per S ’s comments . The insurer says the
stabilisation of the slab with resin and underpinning is not required to repair the damage
Determination | Case number: 790756 Page 5 of 8
caused by the insured event, but rather is intended to prevent ongoing ground movement
causing further damage in the future. The complainant acknowledges there was at least some
pre-existing movement at the property, and the insurer says it is not liable for this aspect of
repairs.
Having weighed the available expert evidence, the panel is satisfied the insurer’s proposed
repair method addresses the claim-related damage and will effectively return the slab to its
pre-loss condition. The insurer is not liable for issues (including ground/foundation movement)
and damage not caused by the leak event; nor for further damage which might arise from
those issues in the future.
The panel also notes that it appears only B, who has not provided a detailed report on the
cause of damage, has indicated the slab as a whole requires raising and underpinning with
resin. KC, on the other hand, only recommended resin injection and underpinning of the piers
to the northern wall, and otherwise recommended the same slab repair method as the
insurer’s experts. KC did not explain why resin underpinning was required. As well, S
comments that B did not include details of the proposed resin injection in their quote, but the
cost of $115,116.25 for the resin injection indicates that a substantial amount of resin is
proposed to be pumped under the building; the high volume of resin also indicates that B’s
proposal of ‘raising’ the slab and footings would mean raising areas of the building that were
unaffected by the leak event.
The only expert opinion the complainant has provided to explain why resin underpinning is
required is the letter from B dated 8 June 2021. There B says the soil is saturated under the
slab, and the soil and void between the soil and the slab need to be stabilised via resin
injection. The panel notes B has not provided any expert report on the cause of the damage
(only quotes); has not shown that any void under the slab was caused by the leaking pipe.
The complainant’s expert report from KC makes no mention of a void under the slab.
The insurer accepts that cracking may re-appear over time, however it says this would be due
to the ongoing ground movement which has been occurring over a long period due to reactive
founding soils, age of the building and lack of building joints. The insurer is not responsible for
rectifying this under the terms of the policy.
Insurer not required to increase its offer
T he panel is satisfied the insurer’s current cash settlement offer of $148,107 (less the
$42,122.08 it has already paid) is fair in the circumstances.
This is because the insurer has accepted the complainant’s quote based on B’s rates for
repairs to all of the cracking damage. That includes those cracks which may have been pre-
existing and where there are signs of previous repairs, and for which the insurer would not be
strictly liable under the policy.
However, on the basis the balance of $105,984.92 has not yet been received by the
complainant, it is fair that statutory interest be added to that amount (calculated from the date
of the insur er’s IDR letter ) to the date of settlement.
Determination | Case number: 790756 Page 6 of 8
2.2 Why is the outcome fair?
Insurer only liable for damage caused by insured event
The policy provides cover f or loss or damage to the complainant’s building caused by various
insured events, including ‘water damage’. The policy defines an event as ‘one incident or all
incidents of a series consequent on, or attributable to, one source or original cause.’
The insu rer’s cash settlement includes allowance to repair all of the cracking damage to the
building, including areas that show signs of pre-existing cracking and previous repairs (not
caused by the water leak).
The available information supports that the repair method for the slab allowed for in the
insurer’s cash settlement will cover claim-related repairs and return the slab to pre-loss
condition. It would not be fair to require the insurer to pay for damage/repairs for which it is
not liable under the terms of the policy.
Determination | Case number: 790756 Page 7 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
During the claim and the complaint process the complainant has been represented by his
broker. For the purposes of this determination, any reference to the complainant includes
submissions made on his behalf.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 790756 Page 8 of 8
3.2 Product disclosure statement (PDS) wording
PDS page 28:
Policy Section 1: Fire and other damage
…
About thi s policy section
This section of the policy covers physical loss of or damage to your property from insured events
listed in this section, including but not limited to events such as fire, light ning and explosion. We do
not cover the theft or breakdown of you r property under this section.
Your insurance under this policy section
We cover
Provided ‘Fire and ot her damage’ is shown under ‘Sections Insured’ in the schedule , we will insure
you for loss of or damage occurring during the period of insurance to buildings , business
contents , stock or specified items , arising from an insured event specified below occurring at the
si tuation .
…
PDS page 31:
5. Water damage
We cover
This is limited to loss or damage caused directly or indirectly by:
a. the discharge or leaking of water from any damaged pipe, water system (including a fire
protection system such as a sprinkler system), tanks or drains installed in and servicing t he
building ; or
b. water from a damaged water main in the immediate vicinity of the building .
…
PDS page 45:
…
Reinstatement or replacement is subject to the following conditions:
a. the work of rebuilding, replacing or repairing must be commenced and completed by you wit hin a
reasonable time otherwise the amount we pay will be the indemnity value of the property . This
means we will reduc e the amount we pay you to take into account age, wear, tear and
depreciation.
b. when rebuilding at another site, we will not pay more than we would pay to rebuild at the
si tuation .
c. when any property is damaged , but not destroyed, we will not pay more than the amount that
we could have been called upon to pay for if that property had been destroyed.
d. we will only pay to return the property to a condition substantially the same as, but not better or
more extensive than, its condition when new, using building materials readily available and in
common use in The Commonwealt h of Australia.