Home / Auto & General / Determination 790326

Determination 790326

Storm and leaking dishwasher claims: delay, mould, cash settlement and denial

FirmAuto & General
Decided2022-02-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$231,000
SourceAFCA PDF

Summary

The complainants claimed storm and leaking dishwasher damage and mould; the insurer offered $16,624.24 for storm repairs and denied the dishwasher claim. AFCA found the insurer could cash-settle, was not liable for mould, and could deny the dishwasher claim.

Delays were mostly caused by the complainants, the mould was excluded and not caused by an insured event, and the dishwasher damage was long-term rather than a sudden or accidental escape of liquid.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 790326 Financial firm Auto & General Services Pty Ltd Determination | Case number: 790326 Page 1 of 12 Case number: 790326 7 February 2022 1 Determination overview 1.1 Complaint The complainants hold a home insurance policy with the financial firm (the insurer). They lodged claims for:  damage caused by a storm in February 2020  damage caused by a leaking dishwasher in November 2020. In March 2021, the complainants lodged this complaint with AFCA. They said the insurer was taking an unreasonably long time to resolve their claims, and their home had become contaminated with mould. In May 2021, the insurer offered to settle the storm claim by paying $16,624.24 for the cost of repairs. The complainants say:  the insurer is not entitled to cash-settle the claim, and must settle the claim by repairing the damage  if the insurer cash- settles the claim, it must pay the amount quoted by the complainants’ builder: $231,000. In May 2021, the insurer denied the leaking dishwasher claim. 1.2 Issues and key findings Did the insurer cause unreasonable delays? No. The claims were delayed because the complainants:  did not respond to the insurer’s attempts to contact them about the storm claim  did not lodge the leaking dishwasher claim until almost two months after they say they discovered the leak  delayed or cancelled inspections by the insurer’s contractors. On one occasion, the insurer’s builder inspected the home, but did not complete a report. The insurer is responsible for this error. However, this error only caused a relatively minor delay. Most of the delays were not the insurer’s fault. Is the insurer liable for mould at the home? No. The available information does not show the mould was caused by:  the storm in February 2020  the leaking dishwasher in November 2020  any other insured event  any error by the insurer. Is the insurer entitled to cash-settle the storm claim? Yes. The building has defects which were not caused by the storm, so the insurer’s builders cannot warrant repairs. Therefore, it is fair for the insurer to cash-settle the claim. The complainants’ builder’s quote includes items the insurer is not liable for (such as mould remediation). The insurer’s offer of $ 16,624.24 is sufficient. Determination | Case number: 790326 Page 2 of 12 Is the insurer entitled to deny the dishwasher claim? Yes. The available information does not show the home was damaged by water leaking from the dishwasher. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this complaint. Determination | Case number: 790326 Page 3 of 12 2 Reasons for determination 2.1 Did the insurer cause unreasonable delays? Complainants responsible for initial delay The complainants ’ home was damaged by a storm on 8 February 2020. The insurer did not start assessing the claim until 28 July 2020. The parties disagree as to who was responsible for this initial delay. Initially, the insurer said the complainants did not lodge a claim until 28 July 2020. However, it later found records showing the complainants lodged a claim on 9 February 2020. The claim was lodged online with the following information: Have a back courtyard area and with the wind and rain we have received it has extensive damage to the roof (falling down and gyprock and insulation falling down and a cracks in glass doors and screens. The insurer says it emailed the complainants saying it had received their claim and it would contact them to discuss the next steps. It tried to call the complainants on 11 February 2020, 12 February 2020, and 21 February 2020, but the complainants did not respond. On 21 February 2020 and 22 February 2020, the insurer sent letters to the complainants saying: We refer to your claim and our requests for information in order to assist with the processing of your claim. To date we have not received this information and have therefore closed your file. On 28 July 2020, the complainants called the insurer and said their home was damaged by a storm on 8 February 2020. The insurer recorded this as a new claim. The complainants provided a detailed timeline of events. According to the timeline:  on 8 February 2020, their home was damaged by a storm  in February 2020, they lodged a claim with the insurer  on 21 February 2020, the insurer asked them for further information  on 30 July 2020, the insurer emailed them to say it had appointed a builder to inspect the home. The complainants’ timeline did not say they tried to contact the insurer between Febr uary 2020 and July 2020. They now say they called the insurer during this time, but they cannot say when they made the calls. The complainants have provided a copy of phone records showing they called the insurer on 28 July 2020. They say they made other calls, but they are unable to obtain phone records showing this. Having considered the information provided by both parties, the panel believes the initial delay occurred because the complainants did not respond to the insurer’s attempts to contact them. Determination | Case number: 790326 Page 4 of 12 The complainants lodged a claim on 9 February 2020, the day after the storm. However, by 21 February 2020, they knew the insurer needed further information, and the claim would not proceed if they did not provide it. They did not take any further action to progress the claim until 28 July 2020. Claims subject to further delays The insurer appointed a builder (PB) on 29 July 2020. PB booked an inspection of the home for 14 August 2020, but the complainants asked to reschedule. PB inspected the home twice in August 2020 or September 2020 (both parties gave inconsistent information about when the inspections occurred). PB said the home had been damaged by the storm on 8 February 2020. PB said the complainants would need to complete maintenance work on the roof before it could repair the storm damage. On 30 October 2020, the complainants told the insurer they had completed the maintenance work. On 9 November 2020, PB said the insurer had authorised it to begin repairs. However, the complainants were not satisfied with PB’s scope of works . PB said it would inspect the home again to determine whether the scope of works should be amended. PB arranged an inspection for 19 November 2020. From 12 November 2020 to 17 November 2020, the complainants were away from home. During this time, they say water leaked from their dishwasher and flooded the kitchen, dining room, and hallway. On 19 November 2020, when PB was due to inspect the home, the complainants say they cancelled the inspection ‘ due to an expected work commitment ’ . On or about 15 December 2020, PB inspected the home. PB said the employee who performed the inspection left the company without completing his report, so it would have to arrange another inspection. PB said they tried to contact the complainants and arrange another inspection in January 2021, but were unable to. On 18 January 2021, the complainants lodged a claim for damage caused by the leaking dishwasher. The insurer appointed a restorer (FR), who inspected the home on 16 February 2021. FR said there was moisture and mould at the home. FR performed make-safe work, which included installing drying equipment. FR said the complainants needed temporary accommodation. From 16 February 2021 to 30 June 2021, the complainants moved into temporary accommodation provided by the insurer. FR returned to the home to perform make-safe work on 19 February 2021, 24 February 2021, and 10 March 2021. On 23 February 2021, PB and the insurer’s assessor inspected the home. In April 2021, the complainants asked that PB have no further involvement in the claim. The insurer appointed a building consultant (QB), who inspected the home on 14 April 2021. QB produced a report dated 19 May 2021. QB said the report was delayed by ‘delays in re ceiving information promised by the Insured’. On 26 May 2021, the insurer emailed the complainants saying:  it would settle the storm damage claim by paying $16,624.24  it had denied the leaking dishwasher claim. Determination | Case number: 790326 Page 5 of 12 Insurer not responsible for delays The compla inants’ claims were subject to significant delays. The insurer did not finalise its decisions about how to settle the claims until 26 May 2021. This was about 16 months after the storm, and about six months after the alleged dishwasher leak. Having considered the information provided by both parties, the panel believes most of the delays were caused by factors outside the insurer’s control . Most significantly, the complainants:  did not respond to the insurer’s attempts to contact them about the storm claim for almost six months  did not lodge the leaking dishwasher claim for two months  cancelled PB’s inspection on 19 November 2020 (two days after they allegedly discovered the dishwasher leak). The insurer says that on several other occasions, the complainants rescheduled or cancelled inspections, declined to allow inspections, and denied its contractors access to the property. PB inspected the home on or about 15 December 2020, and did not complete a report. The insurer is responsible for this error. However, this error only caused a relatively minor delay. Most of the delays were not the insurer’s fault. 2.2 Is the insurer liable for mould at the home? Mould damage consistent with poor ventilation and drainage The insurer’s restorer (FR) inspected the home on 16 February 2021. FR’s report said there was moisture and mould at the home, but did not say why. The insurer’s building consultant (QB) inspected the home on 14 April 2021. QB’s report said: Extensive mould damage throughout the residence is related in my opinion to the residence being closed up and also extremely poor subfloor ventilation combined with the perimeter surrounding the residence being substantially higher than the subfloor, providing no drainage or natural drying function. The complainants appointed a builder (NIS), who inspected the home in or about June 2021. NIS said the mould came fro m ‘the external damaged area’ and ‘the dishwasher area under the sink’. NIS did not say how they determined the source of the mould. NIS said a report from a mould expert would provide ‘a more in depth look at the cause’ of the mould. The complainants appointed a mould expert (CIR), who inspected the home on 21 June 2021. CIR found high levels of mould in the home. CIR said the mould in the home was consistent with high humidity and minimal ventilation (as stated by QB), but was also consistent with water damage. CIR said the storm (in February 2020) and the dishwasher leak (in November 2020) happened so long ago, it was impossible to tell whether they contributed to the mould. CIR said these events, combined with the long delay before the start of any drying or other make- safe work (in February 2021) could have caused or contributed to the mould. Determination | Case number: 790326 Page 6 of 12 Insurer not liable for mould damage The policy excludes cover for damage caused by mould. However, the panel considers the insurer would be liable for mould damage if it was directly caused by an insured event, or by the insurer’s error. The available information does not show the mould was caused by the storm, the leaking dishwasher, or any other insured event. The insurer’s expert (QB) said the mould was caused by poor ventilation and poor drainage. The complainants’ expert (CIR) said the mould could have been caused by high humidity and low ventilation. CIR said the storm or the leak could have contributed to the mould, but there was no way to confirm this. The ava ilable information does not show the mould was caused by the insurer’s error. There were long delays between when water entered the home and when drying equipment was installed. The panel considers this may have contributed to mould growth. However, as stated above, most of the delays were not the insurer’s fault. The available information indicates the mould damage was not caused by an insured event, or by the insurer’s error. Therefore, the insurer is not liable for the mould damage. 2.3 Is the insurer entitled to cash-settle the storm claim? Insurer decided to cash-settle storm claim The policy covers damage caused by a storm. PB said the storm on 8 February 2020 had damaged some exterior parts of the home, including the courtyard roof sheeting. PB said it could repair the damage. However, the relationship between the complainants and PB broke down, and the complainants asked that PB have no further involvement in the claim. QB said the courtyard roof sheeting was pitched at 3.5 o , which was below the minimum pitch recommended by the manufacturer. Furthermore, the cap flashing had no storm seal, or any other way to prevent water entry. QB said the courtyard roof structure was ‘non - compliant’, and was likely not built with Council approval. After receiving QB’s r eport, the insurer decided to settle the claim by paying the cost of repairs instead of repairing the damage. Policy entitles insurer to cash-settle claim The policy says the insurer can settle a claim by repairing damage, or by paying the cost of repairs. AFCA expects insurers to be fair when deciding how to settle a claim. The insurer says it cannot repair the storm damage because its builders cannot warrant repairs. QB’s report indicates the courtyard roof structure has defects which were not caused by t he storm. The complainants have not provided information refuting QB’s findings. Based on the available information, the panel is satisfied that the structure has defects which were not caused by the storm. The insurer is not liable for these defects. In November 2020, PB was willing to begin repairs. However, based on the new information provided by QB, the panel considers it reasonable for the insurer to say its builders cannot warrant repairs. Determination | Case number: 790326 Page 7 of 12 The panel considers it fair for the insurer to settle the storm claim by paying the cost of repairs. Insurer can change its mind about how to settle claim The policy contains the following statement about how the insurer will settle a claim: We will choose to do one of three possible things:  repair the damaged property to the same standard, specification, or quality as it was when it was new  replace the damaged property where available, or with the nearest equivalent property available in Australia  pay you the amount it would cost us to repair or replace the prope rty to ‘as new’ condition. The complainants say the policy allows the insurer to choose any of these options, but does not allow the insurer to choose more than one option. They say the insurer is not entitled to repair some damage, then pay the cost of repairing the remaining damage. They say if the insurer authorises any repairs (including make-safe work, such as installing drying equipment), it must complete all repairs, and cannot cash-settle any part of the claim. The panel does not accept the complain ants’ argument. An insurer may decide to repair a property, then decide to cash-settle the claim instead. This may be because circumstances change, because new information is discovered after repairs begin, or because the insurer realises its decision to repair the property was wrong. Depending on the circumstances, a cash settlement may be the fairest outcome, even if repairs have started. Make-safe work often needs to be done as soon as possible. Policyholders benefit when insurers authorise make-safe work before they have had time to decide how they will settle a claim (or even whether they will accept the claim). It would be unfair and unreasonable to conclude the insurer cannot authorise make-safe work without losing its right to decide how to settle the claim. In this case, the panel considers it fair for the insurer to cash-settle the claim. Therefore, the insurer is entitled to cash-settle the claim, even though it previously decided to settle the claim by repairing the damage. Insurer not required t o accept complainants’ builder’s quote In September 2020, PB quoted the cost of repairing the storm damage at $10,609.39. In May 2021, the insurer obtained a quote from another builder (SH) totalling $13,854.72. The quote is itemised. It includes repairs to the areas PB said were damaged by the storm. It includes a builder’s margin of 23%. The insurer settled the claim by paying the amount quoted by SH, plus a 20% contingency, a total of $16,624.24. The complainants ’ builder (NIS) inspected the home in or about June 2021. NIS provided a quote dated 29 June 2021 totalling $231,000. The quote included demolishing the house ‘back to the frame’ to uncover potential mould damage. As stated above, the insurer is not liable for the mould damage at the home. The panel believes most of the work quoted by NIS is not necessary to repair damage caused by the storm. Determination | Case number: 790326 Page 8 of 12 The complainants have not provided information showing the work included in SH’s quote is insufficient to repair damage caused by the storm, or that the amounts quoted by SH are unreasonably low. The panel considers it fair and reasonable for the insurer to settle the claim based on SH’s quote. Insurer has paid contingency When the insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers this risk to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power. AFCA considers that where an insurer settles a claim by paying the cost of repairs, it should consider paying an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs. The insurer paid the amount of the highest quote it obtained, plus a 20% contingency. The panel is satisfied that this is sufficient to discharge its policy obligations. 2.4 Is the insurer entitled to deny the dishwasher claim? Complainants lodged claim for leaking dishwasher From 12 November 2020 to 17 November 2020, the complainants were away from the home. During this time, they say water leaked from their dishwasher and flooded the kitchen, dining room, and hallway. The complainants say a ‘handyman friend’ disconnect ed the dishwasher and installed a new dishwasher. The complainants’ friend did not cha rge the complainants, and did not provide a written report or invoice. On 18 January 2021, the complainants lodged a claim for damage caused by the leaking dishwasher. Experts said water damage was long-term The insurer’s restorer (FR) inspected the home on 16 February 2021. FR’s report said there was moisture and mould at the home, but did not say why. On 23 February 2021, PB and the insurer’s assessor inspected the home. The complainants said the leak was caused by a rat chewing through the dishwasher hoses. However, PB and the assessor inspected the old dishwasher (which was in the complainants’ yard) and found no damage to the hoses. PB observed ‘ significant water damage and deterioration ’ around the kitchen sink, next to the dishwasher. Photographs show deteriorated and discoloured timber flooring in front of the sink. PB said the damage appeared to have occurred over 24 to 36 months. The assessor said the damage appeared to have occurred over ’12 months or longer’. PB and the assessor said the complaina nts ‘ would have reasonably been aware ’ of the damage. The insurer appointed a building consultant (QB), who inspected the home on 14 April 2021. The complainants told QB they returned home in November 2020 to find the dishwasher leaking and about 100mm of water flooding the home. However, QB said there were no signs Determination | Case number: 790326 Page 9 of 12 of widespread water damage. QB said MDF kickboards in the kitchen were undamaged, which was not consistent with the flooding described by the complainants. QB said the damage to the flooring in front of the sink was ‘ not consistent with a short-term or single event ’, and could only have been caused by ‘ long-term constant exposure to moisture ’. The discoloured section of flooring was the size and shape of a mat. QB said a mat would have retained moisture in the timber flooring, and this was ‘consistent with the damage noted’. QB did not say whether the complainants would have been aware of the damage. QB found water damage in a linen cupboard in a hallway. QB said this had been caused by water leaking from a shower on the other side of the wall. The policy excludes cover for damage caused by leaking showers. Insurer entitled to deny claim The policy covers:  damage caused by a sudden escape of liquid  ‘damage from liquid that has escaped slowly over time that you couldn’t be reasonably aware of ’  damage caused by an accident (which the policy defines as an event that is ‘ sudden, unintended, and unexpected ’). The insurer has provided expert reports indicating the water damage in the kitchen occurred over a long period of time: more than a year, and possibly several years. The complainants have not provided information refuting the experts’ findings. Th e panel believes the damage was not caused by a sudden escape of liquid. PB and the assessor said the complainants ‘ would have reasonably been aware ’ of the long - term water damage. The discoloured section of timber was in a highly visible area, directly in front of the kitchen sink. The panel does not consider this damage, or the water causing the damage, to be something the complainants ‘couldn’t be reasonably aware of’. The available information indicates the damage was not caused by a sudden and unexpected event. Therefore, it was not caused by an ‘accident’, as defined by the policy. The available information does not show the complainants’ home was damaged by water leaking from the dishwasher. The area near the dishwasher may have been damaged by a leak, but it was not one of the types of leaks the policy covers. Therefore, the insurer is entitled to deny the leaking dishwasher claim. Determination | Case number: 790326 Page 10 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with experience in consumer and small business advocacy  a member with experience in insurance. 3.2 Relevant policy terms Certificate of Insurance Home Insurance (page 1) Accidental Damage Included Product Disclosure Statement How to make a claim and what happens next (pages 17 – 22 ) How we settle your claim If we agree to pay a claim for loss, theft, or damage to your home, contents, or personal effects, we will pay up to the limits stated in your policy documents. We will choose to do one of three possible things:  repair the damaged property to the same standard, specification, or quality as it was when it was new  replace the damaged property where available, or with the nearest equivalent property available in Australia  pay you the amount it would cost us to repair or replace the property to ‘as new’ condition. The amount it will cost us is the retail price of an item to repair or replac e the property, allowing for any trade discount that we’re entitled to… Determination | Case number: 790326 Page 11 of 12 Your Insurance Cover (pages 23 – 62) Storm s and rainwater  You are covered for Loss or damage caused by storms and rainwater … Escape of liquid  You are covered for Loss or damage at the insured address caused by the sudden escape of liquid. You are also covered for damage from liquid that ha s escaped slowly over time that you couldn’t be reasonably aware of. …  You are not covered for … Loss or damage:  caused by leaking shower floors or bases, shower and bath combinations, tiled roman baths, or shower recess walls … Optional Cover: Choose more cover to suit your situation You may need more cover to suit your situation, so we provide the following options. The optional covers you have purchased and we have agreed to cover, and the premium you will pay, will be stated on your Insurance Certif icat e. … Accidental Damage Accidental damage is loss or damage caused by a sudden, unint ended or unexpected event that is not the result of a deliberate act. For ex ample, spilling red wine on carpet, or dropping and breaking a fragile item, such as a vase. …  You are covered for loss or damage caus ed to your insured home and contents by an accident at your insured address ... General Exclusions: What thi s policy will never cover Some events and causes are never covered by this policy. Thes e are known as ‘General Exclusions’ and apply to the whole policy. You are not covered for any loss, damage, or legal liability you incur res ulting directly or indirectly from events and caus es listed below. …  Defects, structural faults, or design faults You are not co vered for loss, damage, or any legal liability you incur caused by a defect, a structural fault, or design fault that you knew about, or should reasonably have known about, and was either:  caused by you not taking reasonable care of the home or contents  no t fixed by you within a reasonable time before the loss or damage occurred. …  Gradual deterioration You are not covered for loss or damage caused by rust, corrosion, rot, mould, rising damp, mildew, wear, tear, fading, or ot her gradual deterioration. … Determination | Case number: 790326 Page 12 of 12  Poor condition You are not covered for loss or damage you incur because:  you have not done building work to the home requested by a relevant authority before the loss or damage occurred; or  you have not kept the home or cont ents in good condition and exi sting defects or faults contribut ed to or caused the loss or damage. …  Vermin We will not cover loss or damage caused by ter mites and ot her insects, birds, lizards, rodents, or vermin. … Definitions of words and phrases (pages 68 – 72 ) Term Definition accident An event that is sudden, unintended, and unex pected, and that is not the result of a deliberat e act. good condition Your insured home and contents have no defects or faults that pose a risk to what is covered under your policy. This includes but is not limited to the home having:  no leaks, holes, damage, rust, or wood rot in the roof, gutters, windows, floors, fences, or anywhere else  a sound and solid structure with no damage to foundations, walls, steps, flooring, ceilings, gates, and fenc es  no damage from or infestation of termit es, ants, vermin, or other creatures  no broken or boarded - up windows.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.