Text of the determination
Determination
Case number 789693
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 789693 Page 1 of 8
Case number: 789693 9 September 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
The complainant lodged a claim on her home and contents insurance policy following a storm
on or around 9 February 2020.
The complaint was subject to a determination made by an AFCA Panel on 16 December
2020. In that determination, the panel considered it fair in all the circumstances for the dispute
be resolved in a particular manner. Those findings are summarised in section 3.2.
The parties have returned to AFCA because they could not agree on quantum.
1.2 Issues and key findings
How should the building claim be settled?
The insurer ’s offer for the building claim is fair. The building claim should be settled in this
way.
Should the insurer pay other costs?
Yes. The insurer should pay the mortgage discharge costs as agreed and the complainant’s
legal costs up to $5,000 subject to the production of invoices.
Is the complainant entitled to compensation for non-financial loss?
No. The available information does not show compensation is warranted in these
circumstances.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer is required to do the following:
settle the claim as set out in section 2.1
pay the mortgage discharge costs and the complainant’s legal f ees (up to $5,000 and
subject to the production of invoices).
Determination | Case number: 789693 Page 2 of 8
2 Reasons for determination
2.1 How should the building claim be settled?
The claim was accepted
The insurer accepted the claim. This complaint stems from what has happened since the
previous panel determination.
The building claim
Directions were made about how the building claim should be settled. This included for the
parties to engage a structural engineer to prepare a scope of works.
Once the scope of works was done, the parties were to then obtain no more than two
actionable quotes based on the scope of works.
The parties agreed to the appointment of an engineer, BE. BE provided a report. This
included a scope of works. Each party then obtained two quotes they say were based on the
BE’s report and scope of works.
The complainant obtained two quotes, one from JC and another from OB. The insurer
obtained quotes from NS and LB.
There was a substantial difference between the quotes. This was mainly due to the parties
disagreeing with BE’s opinion about the required scope of works.
To assist in resolving this difference, the parties agreed to instruct BE to review the quotes.
However, due to BE wanting to charge a substantial amount for this, the insurer instead made
an offer to resolve the entire claim.
The insurer offered to pay the remaining sum insured for the building plus allowances. This
totals $396,677.48.
The complainant countered this with an offer that exceeded the policy limits. This is because
the complainant said there are two claims. The first was essentially for the storm damage.
The second claim was for the damage caused by the insurer’s builders.
Complainant’s quotes are not persuasive
Having carefully considered the available information, the panel is not persuaded the house
needs to be demolished and rebuilt.
BE’s report sets out a scope of works to repair the damage. Later, in its conclusion, BE then
says:
It is our recommendation that it will be cost effective the buildings (main house
and shed) be demolished and be built as new for quality assurance rather than
partially fix part others non-conformance workmanship.
Having read the report entirely, the panel does not accept BE’s opinion is that the claim
related damage cannot be repaired. The comment above only says BE considered it more
economical to demolish and rebuild, not that the damage cannot be repaired. This shows BE
Determination | Case number: 789693 Page 3 of 8
accepts the damage can be repaired. This is consistent with the fact BE’s report sets out a
scope of works.
Regarding BE ’s opinion that it is more cost effective to demolish and rebuild, it is not clear
how he has arrived at this conclusion.
The complainant’s quotes are to demolish and rebuild the home. They provide no
comparative quote that follow s BE’s scope of works. Instead, t he complainant’s builders say
they will not warrant any repairs due to obvious structural flaws. This has not been expanded
in much detail.
BE’s report makes no reference the repairs cannot be done because no builder could warrant
the works. If the works could never be warranted, then the panel would expect BE would have
concluded the damage cannot be repaired. BE did not.
Given all this, the panel is not persuaded the damage cannot be repaired or the property must
be demolished and rebuilt.
The insurer’s quotes attempt to be more consistent with the scope of works. However, there
appears to be potential gaps, as highlighted by the complainant. These include the following:
it is not clear if the quotes include reinstatement of roof trusses that are sagging in the
middle section
reinstatement of the septic tank
no Schmidt-Hammer test costs
the costings of internal bracings.
The insurer has highlighted issues with the complainant’s costings . These include saying the
quotes do not replace the building like for like and include items that were not shown to be
damaged. Having reviewed the complainant’s quotes, there does appear to be some
discrepancies. These include the following:
above ground swimming pool was not damaged but has been included by the
complainan t’s builders
the quotes include a concrete driveway, rendered brick walls and pool fences – the
property did not appear to have these prior to the event
having a fourth bedroom when the property only had three bedrooms.
Insurer’s offer is fair
Having carefully considered the available information, the panel notes the following.
The panel is not persuaded that due to the claim related damage, the property needs to be
demolished and rebuilt. BE’s report does not say this. BE only suggests this is the more
economical way to proceed.
Therefore, the panel accepts the damage can be repaired.
The available information does not show it is more economical to replace the property. The
quotes provided by the complainant, compared to the insurer’s quotes, suggest othe rwise.
Also, the panel is concerned the complainant’s quotes do not provide a like for like
replacement of the building. Therefore, they do not appear to reflect a fair cost to replace the
complainant’s building in line with the policy.
Given this, the panel is not persuaded the complainant’s quotes provide a fair cost to repair
the claim related damage.
Determination | Case number: 789693 Page 4 of 8
The panel acknowledges there are gaps in the insurer’s costings. However, the panel
considers it is likely their costs are closer to the repair cost com pared to the complainant’s
builders. This is because their quotes are a closer match to BE’s scope of works. T he
complainant’s builders provide no reference to the scope of works. They have quot ed for the
replacement cost which the available information does not show is fair.
The insurer has offered to pay an additional $396,677.48. The insurer’s quotes were just
under $150,000. Whilst the panel accepts there are gaps, the insurer’s offer is almost triple
this amount. This should more than make up for the potential gaps between its quotes and
BE’s scope of works.
Therefore, the panel accepts the insurer’s offer for the repair cost is more than fair.
Accordingly, the panel does not accept the insurer is required to pay anything further towards
the building claim.
2.2 Should the insurer pay other costs?
The claim for temporary accommodation
The insurer says it has paid $108,768.70 for temporary accommodation and the policy benefit
is limited to $50,000.
The previous panel determination considered this point. It said
“In this case, the panel accepts the insurer’s settlement would not have been sufficient
to allow the complainant to repair the damage. Further, it is clear the complainant did
not have the financial capacity to do so. As a result, she has not been in a position to
do the claim related repairs for almost 12 months.
The relevant benefit is based on a time limit of 12 months. However, it is not fair for
this time to include any period where:
the insurer has yet to fairly cash settle the claim
the complainant cannot reasonably be expected to repair the damage
she has been unable to live in the property during the whole time
Therefore, the panel considers it is fair for the 12-month period to begin from the time
the insurer has fairly cash settled the claim. This means that up to the point the claim
is cash settled, the insurer should be paying temporary accommodation. ”
Therefore, the panel does not accept the policy limit necessarily applies.
The insurer raised a concern the complainant has not shown she spent all of the temporary
accommodation benefits paid. Whilst the insurer paid part of the benefits to an
accommodation provider ($15,701.04), the remaining amount was paid to the complainant
($93,067.66). According to the insurer, the complainant remained on site in a cabin on the
property for most of this time.
Due to this cabin subsequently suffering damage, the complainant says she has been
residing in a granny flat. However, a ‘Rent Receipt’ document was provided which showed
she was renting these premises at $750 per week for a four-week period beginning on 25
June 2021. No other evidence has been provided to show she has incurred temporary
accommodation costs before then.
Determination | Case number: 789693 Page 5 of 8
Even if the panel accepts it would take 12 months to repair the property, the total amount
payable at $750 per week is $39,000. If the panel were to add an additional six months to
allow for the time between when the complainant first resided in this granny flat to when the
insurer pays the remaining cash settlement, the total would be $58,500. This is well within the
amount the insurer has already paid to the complainant.
Given all this, the panel does not accept it is fair in all the circumstances to award more
temporary accommodation. This is because the available information does not show the
complainant will incur costs beyond what the insurer has already provided to her.
Specified and other contents
The panel understands the complainant has claimed for loss of a specified content, a bike, at
a nominated sum insured of $1,000. This has only been raised recently. The insurer has
already paid the contents sum insured. No information has been provided to show the
damage to this bike. The insurer s not required to pay for this.
There was also a request for guest’s contents destroyed. No information has been provided
about this. No allowance is made for this.
Mortgage discharge costs
The insurer has agreed to pay this.
Refund of premiums
Part of the reason the complainant wanted this to be reimbursed is because she says the
premises need to be demolished and rebuilt. The panel has not accepted this. The panel also
notes the insurer was on risk for any additional damage that occurred to the property.
The insurer is not liable to refund any premiums.
Interest
The panel does not accept interest is required. This is because the insurer’s offer is more
than fair given the available information.
Legal costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The panel accepts the complainant required continued assistance with this complaint. The
information shows that she has been affected by her claims experience and has continuing
health issues. Her solicitors have continued to provide assistance in this complaint.
Whilst legal costs were awarded in the previous panel determination, the panel is satisfied
there was a continued need for the complainant to engage her solicitors to support her in this
process.
Therefore, it is fair for the insurer to contribute to the complaina nt’s legal costs up to $5,000,
subject to the complainant providing invoices in support.
Determination | Case number: 789693 Page 6 of 8
2.3 Should the insurer pay non-financial loss?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,000) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Insurer is not required to pay non-financial loss
The panel notes the insurer has offered a fair outcome given BE’s report. For temporary
accom modation, the panel is persuaded the insurer’s position is fair. Whilst there were issues
about the clarity of BE’s report, the available information does not show this is the insurer’s
fault.
Given all this, the panel is not persuaded the insurer is required to pay non-financial loss.
Determination | Case number: 789693 Page 7 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 789693 Page 8 of 8
3.2 Main points of AFCA Determination Case number 710534
Property Damage
The parties are to engage an independent structural engineer to inspect the property and
provide a full scope of works for all the required repairs. This should include the shed and
the septic tank.
The engineer should be one agreed to by the parties. This can be done by the insurer
providing a list of three engineers that the complainant can choose one from. Alternatively,
the complainant can provide three choices for the insurer to choose one. The engineer’s
costs are to be borne by the insurer.
Once this engineer has been engaged and has completed the scope of works, each party
can obtain at least one, and no more than two, actionable quotes based on that scope of
works. To clarify, an actionable quote is one where the builder is prepared to do the works
for the complainant.
If only one actionable quote is obtained, then the insurer is to cash settle the claim based
on that quote plus a 20% contingency. If more than one actionable quote is obtained, then
the insurer is to cash settle based on the average of those quotations with a 20%
contingency.
The contingency is to address the likely variances that may arise in a complicated job like
this and the fact the risks of the works are passing to the complainant.
Any amount payable by the insurer is limited by the relevant sum insured. No interest is
payable given payment should be based on current rates.
If the parties are unable to agree on the final quantum, they can return to AFCA for a
decision on this point.
Temporary accommodation
The relevant benefit is based on a time limit of 12 months. However, it is not fair for this time
to include any period where:
the insurer has yet to fairly cash settle the claim
the complainant cannot reasonably be expected to repair the damage
she has been unable to live in the property during the whole time.
Therefore, the panel considers it is fair for the 12-month period to begin from the time the
insurer has fairly cash settled the claim. This means that up to the point the claim is cash
settled, the insurer should be paying temporary accommodation. This is subject to the
complainant providing reasonable co-operation with the insurer regarding the implementation
of this determination (for example, allowing reasonable access to the property for the
engineer and the builders who are providing actionable quotes).
Once the claim is cash settled, then the insurer should pay for temporary accommodation for
the estimated time it will take for the builders to complete the engineer’s scope of works. For
instance, if the builders estimate the works will take six months to complete from the time they
are engaged, then the insurer should pay up to six months of temporary accommodation and
subject to the $50,000 limit.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.