Hail storm home claim settlement: contingency, project management, bathroom tiles, decking, flooring margin, contents and temporary accommodation costs
Text of the determination
Determination
Case number 789494
Financial firm AAI Limited
Determination | Case number: 789494 Page 1 of 11
Case number: 789494 22 November 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
A claim was lodged for damage to her home because of a significant hail event. The insurer
accepted the claim. The complainant is disputing the following:
Contingency paid for repairs
Project management costs
Building costs
Replacement of the outdoor decking
Replacement of the tiling in the bathroom
Builder’s margin on the flooring
Removal and storage of contents.
The complainant is dissatisfied with the claim handling and is seeking compensation.
1.2 Issues and key findings
Is the complainant entitled to a further contingency?
Yes. The Panel is satisfied the complainant is entitled to a further 10% contingency due to the
complex nature of the repairs required.
Is the complainant entitled to additional project costs?
Yes. The Panel is satisfied the complainant is entitled to project management costs of
$50,000 due to the complex nature of the repairs required.
Is the complainant entitled to additional building costs?
No. The Panel is satisfied with the additional contingency provided, the complainant is not
entitled to additional building costs.
Whether the outdoor decking requires replacement?
No. The Panel is satisfied the insurer’s offer to clean and replace some of the decking is fair
and reasonable.
Whether the bathroom tiles required replacement?
Yes. The Panel is satisfied the bathroom tiles need replacing to the pre-event condition. The
Panel accepts that parts of the bathroom were already stained and considers a fair sum is
$65,000.
Is the complainant entitled to builder’s margin for the flooring ?
No. The quote provided by the complainant was a complete quote.
Determination | Case number: 789494 Page 2 of 11
Is the complainant entitled to further costs?
No. The insurer has paid the full amount under the temporary accommodation costs which
includes removal. Once the complainant provides information showing she has incurred
storage costs, the insurer is required to pay the amount.
Is the complainant entitled to compensation?
No. The information provided shows the insurer acknowledged the concerns raised by the
complainant regarding delays. The insurer paid the complainant $1,500 compensation for the
claim handling. The Panel is satisfied the complainant is not entitled to any further
compensation.
Why is the outcome fair?
The Panel recognises the repairs required to the complainant are extensive and complex. In
this regard, the Panel accepts the complainant is entitled to additional amount for contingency
and project management costs.
However, the Panel considers it is fair in the circumstances, no additional amounts are
payable as the insurer has fulfilled its obligations under the policy.
1.3 Determination
This determination is partially in favour of the complainant.
Upon acceptance of this determination by the complainant, the insurer is required to pay the
following:
$28,712.03 representing the additional contingency
$50,000 representing additional project management costs.
$65,000 representing a fair sum for the bathroom tiles
the insurer is to pay $2,933 for the decking (if it has not already done so).
Once the complainant provides the information showing the costs of storage has been
incurred, the insurer is required to pay the amount (up to the policy limit of $15,000).
The insurer is not required to take any further action.
Determination | Case number: 789494 Page 3 of 11
2 Reasons for determination
2.1 Is the complainant entitled to a further contingency?
Insurer’s settlement provided a 10% contingency
The claim was accepted. The insurer obtained a quote from its panel builder (J). It is noted J
was willing to complete the work, however the complainant requested a cash settlement.
J provided a quote for the works which total $289,542.80. The complainant was dissatisfied
some works were not included in the scope of works. The complainant advised the damage in
the bathroom could not be restored and repaired. The complainant stated replacement was
required.
The insurer reviewed this information, it was determined J would attend the property to attend
to repairs in the bathroom. The quote from J was revised and the amount allowed for the
restoration of the bathroom was removed from the settlement totalling $7,716.50.
The insurer provided settlement to the complainant which included a 10% contingency. The
settlement amount of $310,008.83 was paid to the complainant.
Complainant is seeking an additional 15% contingency
The complainant submits for major building projects, a contingency amount is added to the
quotes to cover for unforeseen costs. The complainant states the contingency amount reflects
the complexity and scope of works. Repairs required to the property include:
roof replacement
tiling
flooring replacement
painting
wallpaper.
The complainant also states scaffolding and traffic control are required while repairs are being
completed. The complainant submits these are major works which will be undertaken by
different contractors.
In support of her submissions, the complainant relies of a call recording between herself and
the insurer. During this call, the insurer recommended a contingency of 20%.
In addition, the complainant raised concerns with the insurer regarding the original quote
provided by J. The original quote from J was for $294,836.83.
Insurer is required to pay an addition 10% contingency
In response to the complainant’s concerns regarding the original quote, the insurer submits it
is standard practice that a high quantum quote is reviewed by an assessor or building
coordinator prior to approval. Unfortunately, in this instance, the insurer forwarded the original
quote to the complainant prior to the approval. In recognition of this, the insurer made a
further payment of $5,294.03.
The insurer is of the view, it has fulfilled its policy obligations and not required to pay an
additional contingency.
The Panel does not share the same view. The complainant has provided compelling
information which shows the insurer had indicated a contingency of 20%. It is not disputed by
Determination | Case number: 789494 Page 4 of 11
the parties; extensive repairs are required to the property. The Panel notes the insurer has
recognised a contingency is required for unforeseen costs. The Panel is of the view, given the
nature of the repairs, and the indication provided by the insurer, the complainant is entitled to
an additional 10% contingency. Upon acceptance of this determination, the insurer is required
to pay the complainant $28,712.03 which represents the further 10% contingency.
2.2 Is the complainant entitled to additional project costs?
Complainant submits the payment of costs is unreasonable
The complainant states building quotes include costs to project manage the building site and
oversee contractors. The scope of works indicate there are 19 areas of work which are
required to be carried out over a six-month period. These works included scaffolding and
traffic control. The complainant submits the works required are major and require different
contractors. In addition, the site requires to be compliant with Worksafe and local government
rules.
The insurer as part of the cash settlement, provided payment of $22,840 for staff costs and
project management. The complainant notes t he insurer’s builder quoted 260 hours. The
complainant believes this is unreasonable due to the amount of work required. The
complainant submits a more realist project management costs is 1786 hours at $145,465.
The complainant provided a break-down of the hours and costs for the hours required for
project management.
The complainant recognises the insurer payment of $22,840 and therefore is seeking the sum
of $122,625 for project management costs.
Insurer is required to provide payment for an additional amount for costs
In the absence of the information to contrary, the Panel is satisfied the complainant has
established an entitlement for additional costs. It is accepted by the parties the works required
are complex. It’s also noted the insurer settled based on its builder’s quote. However, the
information provided by the complainant in support of the claim for project management fees
does not provide any information as to why such a large sum is quoted. Therefore, the Panel
believes it is fair in the circumstances the insurer pays an additional $50,000, for project
management costs.
2.3 Is the complainant entitled to additional building costs?
Complainant submits the payment of the building costs is unreasonable
The complainant states the insurer cash settled the claim based on its own builder. The
complainant submits the quote was undervalued. The complainant submits she obtained her
own quote for the same quote and there is a difference of $31,532, The complainant believes
her quote is a more accurate assessment of costs.
No further payment is required
It is accepted any cash settlement provided to a complainant must be fair and actionable.
AFCA tends to award contingency to ensure there is no shortfall for the complainant.
In consideration of the available information, and taking into consideration the award of
additional contingency, the Panel is satisfied no further payment is required.
Determination | Case number: 789494 Page 5 of 11
2.4 Whether the outdoor decking requires replacement?
Complainant’s submissions as to why the decking needs replacement
As part of the damage, the complainant submits the outdoor decking is beyond repair and
needs to be replace. The complainant submits the outdoor decking was impacted by the
storm event. The complainant advises due to the delays in claims process, the exposed wood
has mould. The complainant has provided information from her treating medical professional
regarding a medical condition impacted by the mould. The complainant maintains the
management of the claim from the insurer has resulted in the mould in the decking.
The complainant is seeking $19,458 for the replacement of the outdoor decking.
Information does not show the decking did not require replacement
The insurer accepts some damage to outdoor decking. However, relies on the findings of its
building consultant (BC) which advised of mildew on the deck, and it could be easily clean.
The insurer also submits the information from its builder (K) which states there was wear on
the decking which was unrelated to the storm event. The insurer further advises that no
trades including the complainant’s trade raised concerns regarding mould.
In review of the available information, the Panel is satisfied the decking does not require
replacement.
Insurer’s offer is fair and reasonable
As previously mentioned, the complainant has requested a cash settlement for repairs. The
insurer maintains its position to repair the damage with the outdoor decking. The scope of
works provided, allows for some parts being replaced and other parts being cleaned, sanded,
treated and painted.
The insurer has offered to pay the complainant $2,933. The Panel is satisfied this offer is fair
and reasonable for the works accepted by the insurer. If the insurer has not paid this amount
it is to do so.
2.5 Whether bathroom tiles required replacement?
Bathroom tiles suffered damaged from the storm event
There is not dispute the storm event caused water ingress into the bathroom. This resulted in
rust marks staining the marble vanity and the bathroom tiles. The insurer arranged for the
cleaning and restoration of the bathroom tiles.
Complainant is dissatisfied with the restoration of the bathroom tiles
The complainant submits the restoration and cleaning resulted in a variation to the floor tiles.
She submits it was confirmed by the assessor and the restoration company (S) the acid-clean
treatment would not cover the comers of the floor and would result in variation to the floor
tiles. The acid-clean was completed which resulted in variations of the floor tiles in the comer
of the floor. On this basis, the complaint is seeking replacement of the bathroom tiles. In
addition to the replacement, the complainant submits the replacement of the tiles requires
jackhammering, which leads to damage to the shower screens, toilet, vanity and
waterproofing. The complainant has provided a quote totally $72,179 for the works.
Determination | Case number: 789494 Page 6 of 11
Storm related damage in the bathroom is restored
In review of the information provided, the Panel is not satisfied the storm related damage in
the bathroom is restored. The Panel however notes that the report, by the insurer’s assessor
dated 1 June 2021 noted that some of the damage was as the result of pre-existing stains as
follows:
at the shower screen door
shower floor tiles
tiles at waste outlet
around the toilet pan
tiles at the bathroom entry door.
The Panel is not satisfied the complainant has established the entire bathroom staining is all
as result of the storm. The insurer is only liable for the damage caused by the storm. In this
instance, the damage was to the tiles. The complainant was aware prior to the cleaning of a
possible variation of the floor tiles. The complainant agreed to the acid-cleaning of the tiles.
However, the Panel is satisfied that once the acid cleaning failed the insurer has not been
able to bring the bathroom back to its pre-existing condition Therefore, the insurer is liable for
the restoration of the bathroom tiles but considering the pre-existing condition the Panel
believes a fair and reasonable figure is $65,000.
2.6 Is the complainant entitled to bu ilder’s margin for flooring ?
Complainant is requesting the builder’s margin for the flooring
As part of the damage caused by the storm event, the sisal flooring was damaged in the
complainant’s home. The insurer agreed to pay the cost of the replacement o f the sisal
flooring. The flooring required replacement in the dining room, lounge room, sun-room,
master bedroom, second bedroom, stairs and hallway. The complainant obtained a quote
from a flooring specialist (N). N is one of a limited number of suppliers for this type of flooring.
The complainant provided the quote of $35,645 to the insurer and the insurer paid this
amount to the complainant.
The complainant submits it is standard practice for builders to add a ‘builder’s margin’ of 15%
to invoices. The complainant submits the insurer has settled the flooring without allowing for a
builder’s margin. The complainant states the floor replacement is major works which needs to
be completed by a builder.
Insurer is not required to pay the builder’s margin in this instance
The insurer submits the quote provided by the complainant was complete. The quote included
supply, installation of the flooring coverings and take up and removal of the existing covering.
The insurer submits on that basis, its obligation under the policy have been met.
The Panel has reviewed the quote provided N. The Panel agrees with the insurer the quote
was complete, as it detailed the required works. The Panel acknowledges the complainant’s
submissions regarding the standard practice for builders to add a margin. However, in this
instance, N did not include a builder’s margin . The quotes the complainant relies includes the
builder’s margin. In the event, the complainant was seeking payment of the builder’s margin
for the flooring, this would be expected to be included in the quote provided.
As N’s quote is conclusive, the Panel is satisfied the insurer is not required to pay the
builder’s margin in this instance.
Determination | Case number: 789494 Page 7 of 11
2.7 Is the complainant entitled to further costs?
Complainant has requested additional costs as part of the claim
The complainant has requested the following payments:
furniture removal
temporary accommodation in a furnished residence during the repairs
redirection of mail
storage costs.
The complainant is seeking payment of $15,000 to store the furniture for seven months. The
complainant is of view she will incur these costs as part of the remediation process. The
complainant is seeking $79,176 for the removal of the contents.
The complainant advised the insurer the temporary accommodation provided was not like her
home. The complainant submits this is her entitlement under the policy.
No further payment for these costs are required at this stage
The insurer submits the complainant elected to cover her property for the sum insured of
$1,700,000. The insurer issued payment to the complainant of $175,000 which is the policy
limit under the temporary accommodation benefit. Therefore, the insurer submits the policy
limit is set by the complainant at the time of insuring the property.
The insurer submits the payment of $175,000 for temporary accommodation includes costs
associated with the relocation of contents to and from the temporary accommodation. Further,
the insurer states redirection of mail is covered under this payment.
Regarding the payment of the storage costs, the insurer agrees the complainant is entitled to
10% of the sum insured for her contents being $15,000, However, the insurer maintains it is
not required to issue payment until the complainant demonstrates the costs have been
incurred. To date, the complainant has not done so.
Until such time the complainant provides the insurer information showing she has incurred the
costs for storage, the Panel is of the view, no payment is required to be made. In regard to
the costs, the Panel is satisfied the complainant is not entitled to any further payments.
2.8 Is the complainant entitled to compensation?
AFCA awards compensation is some circumstances
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We
will only award this type of compensation if the complainant suffers an unusual degree of
stress, inconvenience, or delay because of the insurer’s handling of the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer
handles the claim correctly. We will not award compensation for the ordinary degree of
inconvenience which comes with handling a claim.
The complainant is dissatisfied with the insurer’s handling of the claim
The complainant says her experience with the insurer involved a significant amount of stress
and effort required to manage the claim and to resolve issues when they arose. The
complainant says:
Determination | Case number: 789494 Page 8 of 11
the claim process has required to her to persistently fight over two and half years to be
given a fair assessment.
over 100 hours of documented calls with the insurer
multiple re-visits of contractors.
The insurer handled the claim reasonably overall in the circumstances
The insurer acknowledged the difficulty the complainant experienced during the claims
handling. The insurer submits some delays were outside of its control. The insurer also
acknowledges some of the delays could have been avoided by more efficient management of
the claim. The insurer does note the damage occurred to the property during a major storm
event at the time, and the claims team, assessors and repairers were working to capacity.
In recognition of the compla inant’s experience handling the claim, the insurer paid the
complainant $1,500. In addition, the insurer apologised for the complainant’s frustration or
inconvenience of handling the claim.
The Panel accepts at the time of the event, it was a major storm event. The Panel also notes
the works the complainant was seeking were that of a complex nature. Specialist contractors
were required to provide scope of works due to the nature of the complainant’s home.
Having reviewed the exchanged information, the Panel is satisfied some of the delays were
outside of its control. The Panel further acknowledges the insurer’s apology and payment of
$1,500 for the claim’s experience. However, overall, the Panel is satisfied the insurer handled
the complaint reasonably overall in the circumstances.
2.9 Why is the outcome fair?
The outcome is fair because insurer did indicate the complainant was entitled to a 20%
contingency for the works. Therefore, it is fair in the circumstances, the insurer pays an
addition 10% contingency for the works. It is fair in the circumstances the insurer pays an
additional amount for project management fees. However, as the complainant is getting
further contingency, there is no further entitlement for building costs.
The works required were extremely complex and required specialist contractors. The
information provided shows the insurer has fulfilled its obligations regarding flooring, and
bathroom and the outdoor decking. The insurer has also acknowledged the claim’s
experience and awarding compensation. The Panel is satisfied the complainant is not entitled
to any additional payments.
Determination | Case number: 789494 Page 9 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A Panel determined this matter
Due to the nature of this complaint, we referred it to a Panel for determination. The Panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 789494 Page 10 of 11
3.2 Policy wording
Other repair/rebuilding costs – page 31
When we are rebuilding or repairing damaged parts of your home, we will pay the reasonable
and necessary costs:
of any temporary work required to make the damaged or destroyed home and insured
address safe
….
Temporary accommodation when you have home cover – page 32
When an insured event damages your home to the extent you cannot live there, and we
agree we will pay for your reasonable temporary accommodation costs for the time it will take
to repair or rebuild your home to a liveable condition.
…..
The most we will pay for is:
up to 4 weeks in short term accommodation agreed to by us (e.g. standard rates for a hotel,
motel or serviced apartment), then if necessary up to another:
48 weeks in residential accommodation of a similar standard to your home if you have Classic
or Classic Extras cover;
…..
We will also pay the reasonable and necessary costs for:
redirection of mail from the insured address for up to 12 months if you have Classic or Classic
Extras cover or for up to 24 months if you have Platinum cover;
utility connect costs at the temporary accommodation residence;
relocation of your contents to and from the temporary accommodation residence if you also
have contents cover under this policy;
…..
Limits
Classic
The most we will pay under this feature is 10% of the home sum insured and the longest
period you can claim for is 12 months
Storage of undamaged contents – page 36
If you make a claim for loss or damage to your contents due to an insured event and we
agree that the undamaged contents cannot be kept at the insured address, we will also pay
the reasonable cost to store the undamaged contents until the contents can be kept at the
insured address.
Determination | Case number: 789494 Page 11 of 11
Limits
Classic
The most we will pay for the storage of undamaged contents is 10% of the general contents
sum insured
…..
General exclusions – page 75
You are not covered under any section of this policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
…..
Consequential losses or extra costs following an incident covered by your policy
consequential loss (financial and non-financial loss) or extra costs following an incident
covered by your policy, such as:
…..
loss or costs, including the cost of your time (e.g. inconvenience), to prove your loss or to
help us with your claim (e.g. telephone calls, postage);
How we settle you claim – page 87
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:
repair damage to our home;
…..
pay you what it would cost us to repair or rebuild your home;
…..
If we choose to pay you what it would cost us to rebuild or repair your damaged home, you
are not eligible for cover under additional feature ‘Other repair/rebuilding costs’, see page 31.