Home / RAA / Determination 789073

Determination 789073

Cash settlement of building damage claim after repairs

FirmRAA
Decided2022-09-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed further building damage after repairs to a leaking pipe and sought full rectification. AFCA found the insurer need only cover 50% of the additional damage, ordered an updated quote and TA cost assessment, reimbursement of expert costs and $3,000 non-financial loss compensation.

The additional damage was partly due to longstanding reactive soil and tree drying effects not covered by the policy, so the insurer's 50% cash settlement is fair, but it must be based on a current actionable quote with a contingencies uplift.

Issues

Subjects and remedies

elderly or capacityhome or building damagethird party authoritypay claimpay compensationpay non financial lossreassess claimreinstate policy or contract

Related

All RAA determinations · Find similar determinations

Text of the determination

Determination Case number 789073 Financial firm RAA Insurance Limited Determination | Case number: 789073 Page 1 of 10 Case number: 789073 16 August 2022 1 Determination overview 1.1 Complaint The complainants hold home and contents insurance with the financial firm (the insurer). They are represented by their son, ER. On 20 May 2015, the complainants lodged a claim for cracking dam age to their hom e caused by a leaking pipe under their property. The insurer accepted the claim and repairs were completed in October 2017. However, in August 2018, the complainants reported further cracking and movement damage which they attribute d to the insurer’s inadequate repairs . The insurer agreed that the repairs partially caused the additional damage. However, it said that the damage was also due to long term ground movement related to the highly reactive soil and the drying effect of tree roots. The policy does not cover damage from that cause. The insurer offered a cash settlement of 50% of what it said were the reasonable repair costs. The complainants say the inadequate repairs are the sole cause of the further damage. They want the insurer to rectify all of it and to be reimbursed the cost of their expert reports. 1.2 Issues and key findings Is the insurer required to cover more than 50% of the damage? No. The insu rer’s offer to cover 50% of the damage is reasonable. The complainants have not established the insurer is liable for the other 50%. Are further investigations required to enable settlement of the claim? Yes. The insurer is entitled to cash settle but the scope of works (SOW) and quotes it relies on are over 18 months old. The insurer is to ask BE (its builder who provided SOWs/quotes for both the building and the roof repairs) to provide a current SOW and fully costed quote for the building and roof repairs. The insurer is to pay the complainants 50% of the new quote plus a 15% contingencies uplift. BE is also to be asked to estimate how long (if at all) the property will be unfit to be lived in due to the works. The insurer is to cash settle 50% of the reasonable temporary accommodation (TA) costs for that period, in line with the policy. Is the insurer to reimburse the complainants’ professional costs? Yes. The claim has involved complex issues and it was reasonable for the complainants to obtain reports from IE, engineers. The insurer is to reimburse to the complainants so much of the $3,820.30 IE charged that is proven to have been paid . Is the insurer required to pay non-financial loss compensation? Yes. The insurer has contributed to the delay experienced and its continuing reliance on increasingly aged quotes in making cash settlement offers was not reasonable. These matters have caused the complainants considerable stress. The insurer is to pay them $3,000 in non-financial loss compensation. Determination | Case number: 789073 Page 2 of 10 Why is the outcome fair? 50% of the damage is not covered, so it would not be fair to require the insurer to cash settle for more than 50% of current repair quotes plus a contingencies uplift, plus 50% of the reasonable TA costs (if any). Given the claim’s complexity and how it has been handled, it is fair that insurer pays the proven cost of IE ’s reports plus $3,000 in non -financial loss compensation. 1.3 Determination This determination is partially in favour of the complainants. Upon receiving written confirmation that the complainants accept this determination (the notice), the insurer is to take the following steps:  within seven days of receiving the notice, request BE to provide an updated fully costed SOW/quote for the building and roof repairs. The SOW is to include an estimate of the period in which the home will be unliveable due to the work  w ithin 14 days of receiving BE’s updat ed SOW/quote, pay the complainants: > 50% of the quoted amount > 15% of that 50% as a contingencies uplift > 50% of the reasonable TA costs for the complainants over the unliveable period (if any), in line with the policy  within 14 days of receiving proof of payment, reimburse the complainants the $3,820.30 paid to IE (or so much of that amount that is proven to have been paid)  within 14 days of receiving the notice, pay the complainants $3,000 in non-financial loss compensation. Determination | Case number: 789073 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer required to cover more than 50% of the damage? No. The insu rer’s offer to cover 50% of the damage is reasonable. The complainants have not established that the insurer is liable for the other 50%. The insurer accepted the original claim and undertook repairs The complainants hold a home and contents policy issued by the insurer. Subject to its terms and conditions, the policy provides cover for loss or damage caused by an insured event listed in the product disclosure statement (PDS). One of those insured events is ‘Bursting, leaking, discharging or o verflowing of water or liquid’. On 20 May 2015, the complainants lodged a claim with the insurer. They said their house had developed cracking damage due to a leaking pipe. The insurer’s investigations confirmed that a sewer pipe on the southern side of the property was leaking. The insurer’s appointed builder, AT, attended to repairs. The repairs included replacement of a section of the pipe, which required excavation and subsequent refilling of a trench close to the house. Due to cracks reappearing, the insurer appointed GP, engineer. GP inspected the property on 23 October 2015 and noted that the pipe replacement had been completed and the trench refilled but the disrupted paving was yet to be replaced. GP provided a report dated 6 November 2015, which stated:  the soil in the area was likely to be highly to extremely reactive clay, which may experience high to extreme ground movement from moisture changes  a moisture increase above equilibrium levels leads soil volume to increase (heave) and a decrease below equilibrium levels leads to decreased soil volume (shrinkage)  the property had a long history of cracking, involving settling from the drying effect of trees to the south. However, the leaking pipe would have also caused some localised heave  the leaks likely assisted in balancing moisture conditions and prevented further settling. Once the leaks stopped, some initial rapid movement was to be expected from tree drying effects. This has been exacerbated by the paving removal and recent high temperatures  it is possible the trenching work caused some minor footing undermining which would affect the southern side of the house  GP recommended the paving be replaced and a drying out and monitoring period. At the end of the period, any distress to the south side of the house could be attributed to the leak/trenching work. GP ‘ categorically states that once repairs have been made any further distress or reoccurrence of the repaired cracking shall NOT be attributed to the water event and rather to environmental conditions.’ Following the drying out/monitoring period, further repair work was performed pursuant to GP’s SOW dated 26 October 2016. O n 4 October 2017, the insurer concluded the claim had been finalised. The parties disagree on the cause of the additional damage On 27 August 2018, the complainants notified the insurer that their house had sustained further cracking and movement damage. They say that all of that damage is due to AT’s inadequate repair work. Determination | Case number: 789073 Page 4 of 10 The insurer disagrees. It accepts that AT’s repairs have been a contributing factor but says the damage is also due to long term ground movement related to the highly reactive soil and tree drying effects. The policy does not cover damage from that cause. The insurer has offered to cover 50% of the reasonable costs to repair the additional damage. It says that represents the outer limit of its liability. Both parties rely on expert reports The parties have exchanged multiple expert reports, dating back to July 2015. As the parties are familiar with them, it is not necessary to comment on each report in this determination. The panel has, however, carefully reviewed all of the expert evidence provided. The complainants’ main expert is IE, engineers. IE’s report dated 12 December 2019, say s:  the property was built on reactive clay and has a long term history of cracking  the cracking damage since the repairs were completed in late 2016 is primarily due to drying shrinkage following rectification of the leak  undermining from the trench excavation may have induced some subsidence and cracking, but this is not the dominant cause of movement  repair of the damage to t he house’s southern portion was undertaken far too early in the recovery phase after the pipe replacement and before the house had stabilised  further movement meant it was inevitable the repairs would fail and that there would be further cracking damage  there i s evidence of continuing movement, meaning ‘ the home cannot be considered to have fully recovered from the influence of the former leaking pipes ’. On 28 September 2021, IE resurveyed the property and said the results demonstrated significant ongoing settlement beneath the middle of the home’s southern elevation, centred on the bathroom. The northern side of the house had not moved much at all. IE said: In my opinion, this indicates that the area formerly affected by long-term sewer leakage is still continuing to settle down, even five years after the sewer was replaced! This isn’t unprecedented – I’ve monitored homes in the past that have taken several years to fully recover from long-term leakage issues or environmental changes. The insurer primarily relies on reports from engineers GP and FE. GP has provided a total of seven reports, including the report dated 6 November 2015 outlined above. GP’s comments include :  the complainants confirmed the property had a history of cracking spanning decades, but that cracking was minor compared to what had been experienced from 2015 onwards  the additional damage involves reopening of the same cracks that had been present prior to the repairs. This shows the cracks could not have been caused by the trenching work  by reference to plumbing tests in 2015, the leaks were very minor, so contrary to what IE says, the effect of the leaks on the house had stabilised by the time repairs occurred  if IE was correct that the repairs were done too early, you would expect the cracks to reduce over time as the soil dried out, not worsen (as has happened)  the surveys undertaken by GP and IE showed continuing settlement in the south west corner, consistent with GP’s prediction that trees would continue to influence the home . Determination | Case number: 789073 Page 5 of 10 In a report dated 6 June 2020, FE said the cause of the initial damage was a combination of excessive soil wetting from the pipe leak and the desiccating effect of trees in conjunction with inadequate footings incapable of resisting both seasonal and abnormal soil movement. The cause of the additional damage was lack of proper detailing of the remedial works, resulting in wall and ceiling construction unable to accommodate continuing soil movement. FE found no evidence that the additional damage was caused or contributed to by AT’s repairs. Rather, the damage was contributed to by repairs not carried out but that should have been. FE noted that GP had provided a SOW requiring provision of retrospective control joints in accordance with a specification it failed to include. AT did not ask for the specification and did not install the control joints. In response, GP has said it is not aware of the reason for the control joints not being provided by AT, but this can be done retrospectively if required. FE provided a second report dated 7 September 2020, along with an SOW for recommended repairs. FE included the following caveats in the report: 2.3. It must be noted, that even if our final recommendations are carried out that future movements may occur due to the reactive nature of the soil and the inadequate footing system, and which are not attributable to the water leak. 2.4. I recommend that the owners should seek further advice for any recommendation relating to future site management which is their responsibility. 2.5. Complete stabilisation of the soil moisture content cannot be achieved without very high capital cost. The purpose of our recommendations would be to attempt to limit movement to a more acceptable level in the future. The insurer is not required to cover more than 50% of the damage There is no dispute between the engineering experts that:  the property is built on reactive soil  the soil has been (and will continue to be) influenced by the drying effect of trees  there is a long term history of cracking  the cracking reappeared after the repairs and has continued to worsen (expand). In the circumstances, the panel is satisfied that not all of the damage is due to the water leak and/or inadequate repairs. It is apparent that the cracking is a longstanding problem. Further, on balance, the panel prefers GP’s view that if it was the case that the repair work was undertaken before the effect of the water leak had ceased, one would expect the cracks to shrink as soil moisture content decreased. Instead, the cracks have widened considerably. The panel also notes that there is no proof that the trenching work undermined foundations, leading to major movement. The highpoint of the expert evidence on that point is IE ’s view that undermining from the trench excavation may have induced some subsidence and cracking, but this is not the dominant cause of movement. Nevertheless, it does appear that the repairs were not properly undertaken. The panel particularly notes GP does not reject or otherwise substantively comment on the concerns FE raises in its report dated 6 June 2020. Determination | Case number: 789073 Page 6 of 10 The available information does not enable a precise apportionment of responsibility for the further damage. However, on balance, the panel considers that the issues with the repair work have not made a significant contribution. In the circumstances, the panel considers the insurer’s offer to cover 50% of the additional repair costs to be fair and reasonable. 2.2 Are further investigations required? Yes. The insurer is entitled to cash settle but the scope of works (SOW) and quotes it relies on are over 18 months old. The insurer is to ask BE (its builder who provided SOWs/quotes for both the building and the roof repairs) to provide a current SOW and fully costed quote for the building and roof repairs. The insurer is to pay the complainants 50% of the new quote plus a 15% contingencies uplift. BE is also to be asked to estimate how long (if at all) the property will be unfit to be lived in due to the works. The insurer is cash settle 50% of the reasonable temporary accommodation (TA) costs for that period, in line with the policy. The insurer is entitled to cash settle The complainants want the insurer to attend to repairs rather than pay a cash settlement. However, the PDS gives the insurer the option to pay (cash settle) an insured the cost of covered repairs rather than attend to the repair work. Nevertheless, the insurer must act reasonably in choosing whether to exercise that option and in determining the cash settlement amount. Given the determination that the insurer is only liable for 50% of the required repairs, the panel is satisfied that it is fair and reasonable for the insurer to proceed by way of a cash settlement. Cash settlement should be based on an actionable quote and include an uplift When an insurer cash settles a claim, it transfers to the insured the risk that the cost of repairs may unexpectedly increase and/or that additional works not quoted are required. The insured also loses the insurer’s warranty that would apply to repairs arranged by the insurer. In the circumstances, there is a reasonable expectation that when cash settling a claim an insurer will base its offer on a recent quote that is actionable for a retail customer. Further, it should increase (uplift) the quoted figure by applying a fair percentage, to allow for the transfer of risk, conti ngencies and loss of access to the insurer’s repair warranty. Based on FE’s SOW dated 7 September 2020, the insurer obtained the following builders’ combined SOWs/quotes:  HP dated 7 January 2021 for building repairs - $64,831.25  M&S dated 4 December 2020 for building and roof repairs - $64,721.66  BE dated 4 January 2021 for roof repairs - $15,213.00  BE dated 23 October 2020 for building repairs - $74,265.40. On 5 February 2021, the insurer offered to pay the complainants a cash settlement representing 50% of HP’s building repair quote and 50% of BE’s roofing repair quote. It has consistently maintained since then that the offer represents the outer limit of its liability to the complainants. Determination | Case number: 789073 Page 7 of 10 The quotes from HP, M&S and BE are all now more than 18 months old so will not reflect current pricing, particularly given the rapid increase in the cost of building materials and labour over the last year or so. This means none of the quotes are actionable. BE has quoted for both the building and the roof repairs, while HP has only quoted on the building repairs. The pane l does not consider it reasonable for the insurer to combine HP’s building quote with BE’s roofing quote to obtain a combined figure lower than the total of the two BE quotes. This is particularly so given that if the insurer was attending to repairs it would likely use a single builder. Accordingly, the insurer is to obtain from BE an updated SOW and fully costed quote for the building and roof repairs, using current prices. The insurer is to pay the complainants 50% of the quoted amount plus a further 15% of the 50% figure to allow for contingencies, transfer of risk and loss of warranty. The panel acknowledges that the complainants have provided a quote dated 19 August 2021 from their builder, CB, totalling $151,055.02. However, the PDS does not require the insurer to use an insured’s preferred builder or adopt their quote. Further, CB’s quote is now 12 months old. The panel is satisfied that once BE updates its earlier quotes, the new quote will reflect the current reasonable cost of repairs. TA costs may be payable As set out on page 17 of the PDS, the policy includes as an automatic additional benefit cover for TA costs. If the insurer agrees that the home is unfit for the insured to live in as a result of covered damage, it will cover the insured for TA costs during the time it takes to repair the home or for the period it remains unfit to live in (for a maximum period of 12 months). The TA cost payable will be based on the rentable value of the home immediately prior to the damage and the maximum sum payable is 10% of the sum insured. The quotes provided previously by BE outline extensive work that may have rendered the complainants’ home unfit to be lived in for a period. Accordingly, when the insurer asks BE to provide an updated SOW/quote it is to specify that the SOW is to include an estimate of the period (if any) in which the home will be unfit to be lived in due to the work. The insurer is then to pay the complainants 50% of the reasonable TA costs for the complainants over the unliveable period (if any), in line with the policy terms. To assist in that regard, the panel notes that the date of the relevant damage was the completion of the initial repairs in October 2017. That is the date at which the rentable value of the home is to be assessed. The maximum amount payable is 10% of the building sum insured in place at that time. 2.3 Is the insurer required to reimburse professional costs? Yes. The claim has involved complex issues and it was reasonable for the complainants to obtain reports from IE, engineers. The insurer is to reimburse to the complainants so much of the $3,820.30 IE charged that is proven to have been paid . Determination | Case number: 789073 Page 8 of 10 AFCA may require insurer to contribute to complainant’s professional costs The AFCA rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. The insurer is to reimburse the complainants the costs charged by IE It is clear that this matter has involved complex engineering concepts, technical reports and progressive dam age to the complainants’ home over time. As noted in section 2.1, there have been a number of factors that have contributed to that damage. Noting none of the complainants are specialist engineers, the panel accepts that they needed to incur costs in obtaining reports from IE to enable them to properly understand their case and to respond to the insurer’s position. In the circumstances, the panel is satisfied that it is fair and reasonable for the insurer to reimburse to the complainants so much of the $3,820.30 IE charged that is proven to have been paid . 2.4 Is insurer required to pay non-financial loss compensation? Yes. The insurer has contributed to the delay experienced and its continuing reliance on increasingly aged quotes in making cash settlement offers was not reasonable. These matters have caused the complainants considerable stress. The insurer is to pay them $3,000 in non-financial loss compensation. AFCA may award non-financial loss compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Where a complainant has contributed to their loss arising from the insurer’s conduct, their level of compensation may be reduced accordingly. Insurer has unreasonably caused stress and inconvenience The complainants have complained of delays in communication, delays in provision of expert reports and inappropriate conduct and commentary from the insurer’s experts when visiting the property. The issues the subject of the claim have been on foot for seven years. Even accepting that some of the delay was outside the insurer’s control, that is too long, particularly taking into account the fact that the complainants are elderly and have continued to live in their det eriorating home. Further, by reference to the insurer’s cl aim notes, were occasions where communications should have been more prompt. Determination | Case number: 789073 Page 9 of 10 The panel also considers that the insurer’s continuing cash settlement offer based on increasingly old quotes and without consideration of a contingencies uplift or potential TA costs entitlement has not been reasonable. The panel is unable to make a finding the insurer’s experts acted inappropriately on the available information. The panel accepts that these matters have caused the complainants considerable stress and inconvenience. In all the circumstances, it is reasonable that the insurer pays them $3,000 in non-financial loss compensation. 2.5 Why is the outcome fair? 50% of the damage is not covered, so it would not be fair to require the insurer to cash settle for more than 50% of current repair quotes plus a contingencies uplift, plus 50% of the reasonable TA costs (if any). Given the claim’s complexity and how it has been handled, it is fair that insurer pays the proven c ost of IE’s reports plus $3,000 in non -financial loss compensation. Determination | Case number: 789073 Page 10 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.