Home / Allianz Australia / Determination 788734
Determination 788734
Defective storm repairs and delayed handling of claim
Summary
The complainant disputed the quality of storm repairs carried out by the insurer's builder and sought further settlement and compensation for business interruption and stress. AFCA accepted the insurer's $30,000 further cash settlement as fair, rejected the business interruption claim as outside the home and contents policy, and ordered $5,400 for non-financial loss due to delays.
The home and contents policy does not cover business interruption, and the insurer's delays and communication failures after the June 2021 conference justified non-financial loss compensation under AFCA rule D3.3.
Issues
- Repairs or contractors primary · upheld
“The insurer conceded that there were issues with the work undertaken by AN and agreed repairs and a cash settlement in May 2019.”
- Claim amount dispute secondary · not upheld
“The panel is satisfied the report from MC has identified the additional damage. The insurers offer of $30,000 to complete the repairs is fair in the circumstances.”
- Delay secondary · upheld
“The insurer has caused further delays following the agreement reached at the joint case conference in June 2021.”
- Poor communication secondary · upheld
“The panel considers the insurer has not acted in a timely in its communications with the complainant having regard to the General Insurance Code of Practice.”
Subjects and remedies
business interruptionhome or building damagenatural disasterpay non financial loss
Text of the determination
Determination
Case number 788734
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 788734 Page 1 of 6
Case number: 788734 28 March 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the
insurer) and lodged a claim on 3 November 2018 after a storm damaged the property.
The insurer accepted the claim and completed repairs. The complainant subsequently
contacted the insurer to report additional items not included in the original scope of works or
have not been repaired satisfactorily. The insurer reviewed the list of defects and in March
2021 issued a cash settlement of $11,592.24.
After the complaint was referred to AFCA, the insurer arranged a structural engineer ‘MC’ to
review the matter. Based on MC’s assessment, the insurer made a further cash settlement
offer of $30,000 on 22 December 2022.
The complainant disputes the insurers settlement and is also seeking compensation for
business interruption and stress associated with the claims handling
1.2 Issues and key findings
Is the insurer liable for any additional loss or damage?
No. The panel is satisfied the report from MC has identified the additional damage. The
insurers offer of $30,000 to complete the repairs is fair in the circumstances
Is the complainant entitled to financial loss for business interruption?
No. The complaints policy is a home and contents policy and does not cover business
insurance / business interruption.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurers handling of the claim has resulted in undue delays causing the complainant
an unusual degree of physical inconvenience and stress. The panel considers compensation
of $5400 under AFCA rule D3.3 for non-financial loss fair in the circumstances.
Why is the outcome fair?
The outcome is fair as the insurer has assessed the claim in accordance with the terms and
conditions of the policy. It is fair however that the insurer pays compensation for the stress
and inconvenience caused to the complainant.
1.3 Determination
The determination is partially in favour of the complainant.
Within 21 days of the complainant’s acceptance of this determination the insurer is to pay the
complainant compensation of $5,400 for non-financial loss. Otherwise, the insurer is not
required to undertake any further action in relation to the claim.
Determination | Case number: 788734 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer liable for any additional loss or damage?
No. The panel is satisfied the report from MC has identified the additional damage. The
insurers offer of $30,000 to complete the repairs is fair in the circumstances
Complainant accepts AFCA jurisdictional limits
The complainant lodged the complaint with AFCA seeking approximately $1 million dollars to
resolve the matter. This figure included a claim for liquidated damage as well as other
miscellaneous items, many of which were not relevant to the October 2018 claim.
AFCA’s jurisdictional limits fo r these type of claims is set at $1,085,000 with a compensation
cap of $542,500. The complainant has since lodging her claim, agreed to AFCA’s
jurisdictional and compensation limits.
The complainant had also commenced proceedings in QCAT against the insurer ’ s builder AN.
Those proceedings have since been withdrawn.
Initial repairs defective and required remediation
There is no dispute the complainant’s property sustained storm related damage in October
2018. The insurer appointed loss adjuster CC to assess the damage and appointed AN to
undertake the required repairs.
In March 2019 the complainant contacted the insurer advising that there was additional
damage to the property which included water leaking into her loungeroom. These repairs
were completed by mid-May 2019.
On 27 May 2019 the complainant contacted the insurer stating that the repairs were
defective. The complainant and builder AN were unable to resolve the outstanding issues
regarding the repairs. CC noted that AN had completed the repairs to a satisfactory standard
however, the complainant disagreed. Due to this a building consultant CRD was appointed.
Following CRD’s attendance the complainant and AN reached an agreement where AN paid
a $3,000 settlement for the remaining works. The complainant accepted this settlement.
In November 2020 the complainant contacted the insurer with new concerns regarding the
repairs. Further attendance by CC and CDR was arranged by the insurer. Following their
reports, the insurer made a cash settlement of $11,592.24. This was paid to the complainant
on 30 March 2021.
Following a joint case conference conducted by the AFCA case manager in June 2021 the
complainant provided a list of approximately 35 outstanding items and the insurer agreed to
arrange a further assessment. The insurer arranged for a structural engineer MC to attend the
property in October 2021. MC identified there were issues with respect to quality of the
repairs completed by AN. MC also identified several issues raised by the complainant were
either not caused by the storm in October 2018 or were otherwise excluded from cover.
MC recommended a further cash settlement of $27,380.24. In December 2021 the insurer
offered a further cash settlement to the complainant of $30,000. While the complainant
rejected this offer, the insurer considered that it was liable for the further issues identified by
MC and paid this further cash settlement on 22 December 2021.
Determination | Case number: 788734 Page 3 of 6
Complainant’s submissions do not substantially advance her position
The complainant has not submitted any evidence to rebut the findings of MC nor alternative
quotes. In her email to AFCA dated 4 February 2022, the complainant sets out her
submissions regarding those defects not accepted by MC and asks that AFCA account for
these in its decision.
The complainant has provided emails to support her position that the works undertaken by
AN were not completed to a satisfactory standard. The information assists the panel in
understanding the condition of the property post AN’s repairs . It does not provide evidence
from a suitably qualified individual (despite requests) about the defective repairs.
There is no evidence to challenge the accuracy of the report and finding by MC.
Insurer has met is liability under the terms of the policy
The policy includes a lifetime guarantee on building repairs which the insurer authorises and it
requires the insurer to rectify any defects resulting from poor quality workmanship on any
authorised repairs.
The panel accepts the insurer on accepting liability was entitled to appoint AN to complete the
repairs. The insurer was entitled under the terms of the policy to ask AN to rectify defective
repairs when notified of the defects by the complainant.
The panel accepts the insurer was entitled to cash settle the complainant for the balance of
the damage and defective repairs as the relationship between the complainant and insurer
had failed.
As noted the panel has not been provided with any alternative expert evidence from the
complainant to challenge MC’s assessed dam age. In the absence of any further evidence,
the panel considers the insurer’s additional cash settlement of $30,000 (based on the further
assessment of MC) is fair in the circumstances. The settlement fulfils the insurers policy
obligations and is made in the interest of bringing finality to the claim.
2.2 Is the complainant entitled to financial loss for business
interruption?
No. The complaint ’ s policy is a home and contents policy and does not cover business
insurance / business interruption.
Policy does not cover business interruption/business losses
The complainant is also seeking losses from the insurer because of interruption to her
business.
The complainant operates a clinic from her home and says she has been unable to operate
the clinic due to the defective works / leaking roof. The complainant has not provided any
information to prove the loss claimed.
The complainants policy is a home and contents policy. It is not business insurance and does
not cover business interruption or business losses. The panel is satisfied the insurer has no
liability under the terms of the policy for any business interruption/ losses claimed.
Determination | Case number: 788734 Page 4 of 6
2.3 Is the complainant entitled to compensation for non-
financial loss?
Yes. The insurer ’ s handling of the claim has resulted in undue delays causing the
complainant an unusual degree of physical inconvenience and stress. The panel considers
compensation of $5,400 under AFCA rule D3.3 for non-financial loss fair in the
circumstances.
Compensation paid in some circumstances
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer has caused the complainant to suffer an unusual degree or
extent of inconvenience, delay or interference. AFCA takes a conservative approach when
considering any award of compensation.
There is no dispute the scope of the complaint evolved while on foot with AFCA. The
complainant says the insurer has shown a total disregard for her wellbeing which has caused
additional stress and trauma throughout the clai m’s process. The complainant says she was
twice hospitalised due to the stress associated with the claim.
The panel has carefully reviewed the information exchanged and the insurer’s actions since
being notified of the claim and subsequent notification of the complaint being lodged with
AFCA. The information before the panel shows the insurer has significantly contributed to the
unreasonably long period it has taken to finalise this claim.
The complainant lodged the claim in November 2018. Following repairs, the complainant
raised the defective repairs in 2019,2020 and 2021. The insurer conceded that there were
issues with the work undertaken by AN and agreed repairs and a cash settlement in May
2019. A further cash settlement was made in March 2021.
Additionally, the insurer has caused further delays following the agreement reached at the
joint case conference in June 2021. At the conference it was agreed the insurer would
arrange for an additional consultant to review the complainant’s concerns regarding the
quality of the repairs. This review did not take place until later October 2021 and the report
(together with its recommendations) were not provided to the complainant until December
2021.
The panel considers the insurer has not acted in a timely in its communications with the
complainant having regard to the General Insurance Code of Practice. Its handling of the
claim has caused the complainant to suffer an unusual degree of physical inconvenience and
time taken to resolve the situation.
In the circ umstances the panel determines that within 21 days of the complainant’s
acceptance of this determination, the insurer is to pay the complainant compensation of
$5,400 for non-financial loss.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances as:
the complainant has been settled her entitlements under the policy
due to the breakdown of the relationship between the insurer and complainant, cash
settlement is appropriate
Determination | Case number: 788734 Page 5 of 6
due to delays caused by the insurer following the conference, it is fair in all the
circumstances to require the insurer to pay the complainant $5,400 non-financial loss
compensation
the policy does not provide cover for business losses.
Determination | Case number: 788734 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive insurance experience
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.