Home / Westpac / Determination 788534
Determination 788534
Claim denial for water escape damage to embankment and garage
Summary
The complainant claimed under home and contents insurance for damage when an embankment collapsed after a water leak. The insurer denied the claim, and AFCA found the proximate cause was defective design and construction, which is excluded.
Under a defined events policy the proximate cause was the non-compliant embankment design, not the escape of water, and defective design and soil movement are excluded.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim; proximate cause was defective design, not an insured escape of water event.”
- Product terms interpretation secondary · not upheld“The policy expressly excludes loss caused by defects in design, structure, materials, workmanship or construction, and earth or soil movement.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
Case number 788534
Financial firm Westpac General Insurance Limited
Determination | Case number: 788534 Page 1 of 11
Case number: 788534 22 February 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
In February 2020, a section of the embankment adjacent to the complainant’s property
collapsed and fell against the garage, causing damage. The complainant lodged a claim
for damage due to escape of liquid (water). The insurer denied the claim. This was on the
basis of its expert ’s opinion that the cause of the loss was not the escape of water , but
the defective design of the embankment.
The complainant disagrees. He believes the claim should be covered.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. The insurer is entitled to deny the claim.
This is because the complainant has not established, on balance, the proximate cause of the
loss was an insured event under the policy. Instead, it is more likely than not, the
embankment failed due to defects in design and construction. In other words, the proximate
cause of the loss was a factor excluded under the policy.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim and is not required to take any further action.
Determination | Case number: 788534 Page 2 of 11
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Complainant has not established a valid claim for escape of water
The complainant is required to show, on the balance of probabilities, he has suffered a loss
caused by an event insured against under the policy. This is known as a valid (or prima facie )
claim.
If the complainant is able to establish a valid claim, then the onus shifts to the insurer to
show, on balance, an exclusion applies or that it is otherwise entitled to decline the claim.
The complainants’ policy covers listed defined events, including ‘ escape of liquid’, which
occur during the period of insurance. Cover is subject to the terms, conditions and exclusions
of the policy. The policy schedule shows the complainant had not elected to take out the
optional extra ‘ accidental loss or damage ’ cover available under the policy.
In February 2020 the complainant noticed water leaking near his property. The complainant
attempted to have the leak rectified, however his efforts were unsuccessful.
In August 2020 a section of the embankment adjacent to the complainant’s property
collapsed and fell against the garage, causing damage. Rectifying the damage will require,
amongst other things, reconfiguring the electrical, gas, water and internet services to the
property.
The insurer’s liability depends on the proximate cause
In order to determine whether the complainant’ s claim falls within the scope of cover under
the policy, it is necessary to determine the proximate cause of the loss. That is a question of
fact depending upon the circumstances of each case.
It is well established law that a proximate cause is not necessarily the first or last or the sole
cause of the loss. It is the effective or dominant or operative cause. If there are several
causes operating contemporaneously, then each must be examined for the qualities of
predominance and efficiency as the active efficient cause that sets a relevant train of events
in motion. The courts have said that if one cause would have resulted in the harm in any
case, and the other would not have done so in the absence of the first, then the first is the
proximate cause.
The insurer’s experts state defective design is the proximate cause
Following the loss, the insurer engaged specialists to report on it: forensic engineer (F),
engineering geologist (S) and structural/forensic engineer (L). L in turn engaged a
geotechnical engineer (CT).
In his September 2020 report, engineering geologist S says:
inspection of the property revealed a wedge-type failure of the rock embankment
the embankment is situated at an angle of approximately 45 degrees
erosion of the batter has been occurring continually, most likely since it was cut
no effective upslope drainage at crest of batter
the trigger for the failure was likely build-up of hydrostatic pressures in the hill side
the rest of the embankment is unstable, likely to fail and should be rectified immediately.
Determination | Case number: 788534 Page 3 of 11
In addressing the cause of the loss, S says the embankment was unstable and the escape of
water event triggered a failure of a section of rock.
In his October 2020 report, the forensic engineer (F) says:
having regard to the findings of S, F is of the opinion the proximate cause of the loss is the
inadequate design/construction of the embankment
the water ingress into the hillside was a secondary contributing factor to the loss
it is F’s opinion that the embankment was originally created too steeply (more than 45
degrees from horizontal) with some unfavourable bedding zones left in a potentially
unstable condition
over the long term, weathering to the embankment will have caused it to become potentially
more unstable, until the 2020 water ingress contributed to the sudden local failure adjacent
to the carport.
The geotechnical engineer CT says:
a failure of this type would occur under certain conditions, one of which is inundation with
moisture
the embankment should be rectified with retaining walls designed by an engineer.
In his January 2021 report, the structural/forensic engineer L says:
the embankment was non-compliant with the relevant Building Code at the date of
construction (and also with current Codes)
slope stability analysis shows the embankment to be unstable in both the short-term
(undrained) and long-term (drained) states. That means the slope is unstable even without
ground water present
the escape of water event was a contributing factor
the embankment would have failed even without the escape of water event
but for the inadequate and non-compliant design of the slope, failure would not have
occurred.
As summarised above, after reviewing the findings of S, F and CT and conducting their own
analysis, L determined that had the embankment been properly designed and constructed,
the water escape event would not have caused it to fail. L also concluded the embankment
would have eventually failed even if the water event had not occurred.
The complainant’s experts say the water escape caused the damage
The complainant disagreed with L’s findings and had reports prepared by an engineering
geologist (D) and a civil engineer (LR). The complainant also asserted that a pre-sale
inspection of his property had pronounced it free of defects and further that the building plans
for the property deem it to be defect-free (given that the plans themselves must comply with
all relevant regulations of the relevant building code).
The geologist D prepared a July 2021 report, stating:
the embankment most likely would not have failed without the escape of water event
if the design of the slope was the cause of the failure, the failure would have been more
widespread and not confined to the area of the water escape
an engineer-designed retaining wall should be installed to the lower portion of the
embankment
the risk of instability in the embankment could not be entirely mitigated.
The complainant’s civil engineer LR reports in July 2021:
the water ingress incident saturated the clay seams in the rock mass, and thus caused the
sliding failure of the rock on the slope
Determination | Case number: 788534 Page 4 of 11
however, more investigation is required to support their findings
the ‘current embankment face is vertical, and hence, unstable ’ and requires rectification
works.
While the insurer’s experts also acknowledge the influence of the escape of water on the
failure of the embankment, I am not persuaded their observations, or the complainant’s
experts’ reports, establish that was sufficient in itself to have caused the dam age. LR
specifically refers to the need for further investigation, and makes the statement which
indicates that the vertical profile of the embankment alone makes it unstable.
The embankment did not comply with the Building Code at construction
On the available evidence, the panel accepts the Building Code of Australia 1996 (BCA) was
the applicable code at the time of the property ’s construction (about 20 years ago), and it
deals with issues including earthworks and slope stability. A slope is deemed stable and
complies with the BCA if it meets certain stated requirements.
L says the subject slope is non-compliant with these requirements, and the battering of the
slope required a geo-technical engineering input at the time of construction. L says the BCA
allows for a batter of 80 degrees for stable rock for a maximum height of two metres. L notes
that the slope is greater than the two metres height maximum (and D noted the height of the
batter was three to four metres height), and the rock is not considered ‘ stable ’ for the
purposes of the Code due to the severe fracturing of the rock and its low strength.
Having regard to all the available evidence, the panel accepts the embankment has not been
constructed to the applicable Building Code at the time of its original construction.
The panel acknowledges the complainant’s submission regarding the approval of the original
design/building plans for the house. However, the panel also accepts L ’s comments in
response, which show the plans make no mention of the design of the embankment and are
not in themselves proof the design (or construction) is defect-free.
Even in the absence of any water leak, the batter was/is unstable
L concluded the slope is unstable in both the drained and undrained state. In his opinion,
regardless of the reported leak, the slope is considered non-complaint and unstable and
would have failed.
In his report L suggested different causes or a combination of factors contributing to the failed
slope:
seasonal rainfall
torrential rain or storms
increased ground water from a leak.
Whilst L notes the leak is 100 metres away from the subject site, the natural site topography
suggests the flow of the leak could be directed to the site. However, L further says any
adverse effects from an escape of water would be expected to be widespread.
The panel accepts the leak is likely to have exacerbated the pre-existing weaknesses in the
slope, leading up to the acute collapse event. L concludes the slope was susceptible to
collapse irrespective of the escape of water; and but for the noncompliance of the slope, the
failure would not have occurred from a leak or wet weather.
The findings of the complainant’s expert, LR, on the other hand, were not based on testing or
slope stability analysis.
Determination | Case number: 788534 Page 5 of 11
The panel is satisfied the evidence shows the slope and the embankment were inadequate
for the intended purpose, and non-compliant with the applicable Building Code.
The panel f inds L’s findings comprehensive, logical and persuasive, based on rigorous
investigations:
L’s findings are based on the slope stability analysis and soil tests done by a geotechnical
engineer, while D’s and LR’s are not
D’s recommendation for engineered r etaining walls to be built appears inconsistent with
their declaration that the rest of the embankment is stable, and strongly suggests the
section that failed was already unstable at the time of the loss
LR’s report states further testing is required to support their findings, and that testing
(slope stability analysis) was then undertaken by CT and considered by L.
The insurer is entitled to rely on the policy terms and conditions
The panel has carefully considered the arguments, exchanged information and expert
reports. As outlined above, the panel is satisfied the proximate cause of the embankment
failure is the defective design, and not the escape of water incident. While the leak might
have highlighted and exacerbated an existing issue, it did not cause that issue or the resulting
loss and damage.
The complainant’s policy is a defined events policy and defectiv e design is not a defined
event. That means there is no cover for the loss.
Even if the panel were to accept that a valid claim had been established, the policy has two
specific exclusions which the insurer could rely on to deny the claim. The policy expressly and
excludes loss of damage caused by or arising from defects in design, structure, materials,
workmanship or construction.
As well, the policy excludes ‘ earth or soil movement (other than earthquake) including
landslide, subsidence, erosion or heave, settling, expansion, shrinkage or vibration ’ .
The panel is satisfied the insurer is not liable for the damage to the embankment itself, or
any other dam age following the collapse. It is entitled to deny the claim. It is not required
to take any further action.
2.2 Why is the outcome fair?
This outcome is fair because the insurer is entitled to rely on the terms and conditions of the
policy. The policy outlines those specific events which are covered. The claim does not fall
within the scope of cover under the policy.
Determination | Case number: 788534 Page 6 of 11
3 Supporting information
3.1 The AFCA process
AFCA’ s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Policy Wording
Your policy does not cover any loss or damage that is caused by or arises from:
Maintenance and building
- defects in design, structure, materials, workmanship or construction,
Wear and tear, and environmental conditions
Determination | Case number: 788534 Page 7 of 11
- wear and tear, gradual deterioration, or fading,
- earth or soil movement (other than earthquake) including landslide, subsidence, erosion or
heave,
- settling, expansion, shrinkage or vibration
3.3 Expert Reports
Record Key points
Financial firm’s
Engineer F
6 October 2020
based on [S] ’s soil report, the proximate cause of the damage to
the embankment is inadequate c onstruction (of the embankment)
and that water ingress was a secondary contributing factor
It is [ F ] 's opinion that the embankment was originally created too
steeply (more than 45 degrees from horizontal) with some
unfavourable bedding zones being left in a potentially unstable
condition.
The water ingress into the hillside was a secondary contributing
factor to the loss .
Financial firm’s
Engineering Geologist S
30 October 2020
Steeply dipping bedding and highly jointed siltstones and minor
sandstone s. Approx. 45 degrees dip at point of failure.
Unfavourable bedding and jointing planes onsite that have been
"released" by undercutting.
Trigger of movement likely build - up of hydrostatic pressures in soil
mass above and throughout weathered seams leading to reduced
friction/cohesion and failure.
Section of batter to the east of carport area also overserved to be
"released" also. Failure likely to occur this this section also.
Due to the unstable nature of the batter and likelihood for further
failures to occur we recommend that rectification works are
undertaken as a priority.
Determination | Case number: 788534 Page 8 of 11
Record Key points
Financial firm’s
Structural / Forensic
Engineer L
14 January 2021
Review of the relevant Building Codes at the date of construction
confirms that the slope on the subjec t site f alls outside the deemed -
to - comply provisions of the Building Code. Compliant excavation
and construction of the slope required the slope to be designed by
an engineer .
Slope stability analysis confirms that the slope is unstable in both
the short - term (undrained) and long - term (drained) states. This
means that the slope is unstable even without ground water present.
The presence of ground water will further weaken the sl ope
increasing the risk of collapse.
It is the opinion of [L] that failure of the slope was imminent
irrespective of the reported l eak event. It is advised that increased
ground water will weaken the slope contributing to failure.
Slope stability modelling indicates that but - for the inadequate and
non - compliant design of the slope, failure would not have occurred.
It is therefore advised that the proximate cause of failure of the
slope is inadequate and non - compliant design.
Financial Firm’s
Geotechnical Engineer
CT
29 December 2020
The observed slope failure is wit hin the Silurian aged weathered
ROCK (Mudstone) formation. The failure mass is very similar to a
wedge failure and it is the opinion of the author that a failure of this
ty pe , and particularly in the encountered weathered rock, would
take place under the following conditions or a combination of:
Prolonged wet weather
High ground water level or inundation of the weathered rock
Moisture softening from the subsurface seepa ge along specific
pathway(s) over a period of time
Severe earthquake
Complainant’s
engineering geologist D
01 July 2021
This cut batter tapers to zero at either end but extends to a
maximum height in the vicinity of the carport of around 3.0 to 4.0
metres.
While it is acknowledged that the main bedding plane is parallel to
the batter face, it is considered that failure alo ng this plane would
be highly unlikely without the reported water ingress issue.
The evidence in this case confirms that the failure of the cut batter
above the carport has been caused predominantly by water ingress
due to the previously leaking water mai n in F … Road. This
evidence includes:
The timing of the failure which occurred some 6 to 7 months after
the leak was observed, notified and reported.
The fact that the only section of the relatively long cut batter that
has failed is located in the immedi ate area where water from the
leaking water main is reported to have flowed into the back
of the embankment. The remaining well drained sections of the cut
batter have remained relatively stable since original excavation
over the two decades ago.
Determination | Case number: 788534 Page 9 of 11
Record Key points
If the h eight and angle of the cut batter was the main cause of the
failure, it would be reasonable to assume that the failure would
have occurred more pervasively across the entire batter face, which
is not the case.
An engineer designed retaining wall should be installed to retain the
lower section of the cut batter. This design must be undertaken by
a suitably qualified and experienced engineer. It is critical that
appropriate drainage measures are installed and maintained
around the retaining wall and embankmen t at all times.
Due to the number of possible unforeseeable factors that can
influence slope instability, the findings and recommendations
contained in this report are intended to provide advice to address
the batter failure that has occurred at this site. This is not intended
to be an exhaustive investigation and report. It is also stressed that
this report must not be interpreted to infer that the risk of instability
in the earth works will be able to be mitigated entirely.
Complainant’s civil
engineer L R
2 July 2021
Based on these findings, it is considered that the leaking water pipe
prompted saturation of clay seams within the insitu rock mass, and
thus the sliding failure of rock on the slope.
In order to further support t his assertion, more evidence is required.
This can be completed through a geotechnical investigation …
The current embankment face is vertical, and hence, unstable. It
will need to be supported to prevent further instability and cannot
be considered safe a s it currently stands. Stabilisation works need
are required to remediate the slope.
Financial firm’s
Structural / Forensic
Engineer L
6 August 2021
I advise that this report ( Building inspection report by Building
Property Inspections Melbourne) provides no relevant information
to the investigation. The report provides no information on the
writer’s qualifications. It is advised that buildin g inspectors are not
qualified to comment on structural issues. It is further advised that
the scope of the report does not include assessment of the site cut
or batter of the slope, nor is the writer qualified to comment on this
area.
It is important to note in section 1(b) of the ( [D] 1 July 2021 report)
report , the writer provides a disclaimer that the repor t in no way
guarantees the stability of the slope, and the report should not be
inferred as guaranteeing the stability of the slope.
I suggest that there is a degree of co ntradiction in the report by [D] .
[ D ] suggests for the purposes of his argument that the slope was
stable and the leak was the cause of the collapse, but at the same
time provides a disclaimer that they do not guarantee the stability of
the slope. I advise that [D] provides this disclaimer because the
writer is aware that the construction and angle of the slope is non -
compliant and unsafe and can be prone to sudden and unexpected
collapse due to the inadequate construction.
I further advise that if the writer were asked to provide an
Determination | Case number: 788534 Page 10 of 11
Record Key points
engineering design for an embankment, he would not reco mmend
the embankment be battered at the slope occurring at the subject
site as it is not adequate. This is confirmed in section 4 of the report
where the writer recommends the construction of retaining walls to
support the slope and recommends a batter of approximately 30°
(some 50° less than the existing batter). I suggest that this is an
indirect admission by [ D ] that the existing batter and embankment
is not adequate or compliant.
Instead [D] supports his conclusion that the slope failure is due to
the leak by advising that the rest of the slope has not failed. I
disagree with this line of reasoning. Utilising this line of argument, it
could be alternatively suggested that the leak event which occurred
100 meters from the subject site and area of collaps e, would just
have readily affected other areas of the slope. Therefore, the
absence of any widespread failure of the slope closer to the leak is
evidence that the leak is not the cause of the collapse some 100
meter away. Such a line of reasoning can be a rgued both ways and
is not very conclusive in either instance.
The objective engineering analysis of the embankment is that the
slope is not compliant and inadequately battered making it
susceptible to failure and collapse due to multiple reasons
discuss ed in our report, being (a) seasonal rainfall, (b) torrential
rainfall or storms, (c) increased ground water from a leak. However,
but - for the non - compliance and inadequacy of the embankment,
the failure would not occur. Hence, the inadequate and non -
compl iant construction of the embankment is considered the
proximate cause of failure.
I also advise that [D] has not undertaken any slope stability analysis
or computations. I advise that this is the case because [ D ] is aware
that the computations will confir m that the slope of the embankment
is inadequate irrespective of the leak. It appears the [D] is avoiding
objective engineering analysis in favour of a more subjective
analysis. I disagree with this approach.
I utterly dismiss the report by [ LP ] . LP has u ndertaken no testing or
slope stability analysis. The findings and conclusion by LP seem to
be based on generic theory and are not supported by any analysis
or tests. I therefore dismiss these findings and conclusions as
unsupported and irrelevant.
I advi se as an independent engineer that the geotechnical
investigation undertaken by (CT) is the most comprehensive by far.
CT have undertaken soil bore samples to 3 m depth, soil testing
and slope stability analysis. Whilst I acknowledge the opinion and
analy sis by [D] , I r espectfully disagree and suggest that [ D ] has
ignored the crux of the issue relating to the compliance and
adequacy of the embankment. I suggest that [ D ] has ignored this
matter as he cannot objectively justify the construction of the
embank ment.
Determination | Case number: 788534 Page 11 of 11
Record Key points
Review of the building plans confirms that no site excavation plans
have been provided. However, in the general notes of the plans, it
is documented that all works must comply with the Building Code of
Australia (BCA). As noted in our report, the ba tter of the failed
embankment did not comply with the BCA provisions and is
therefore non - compliant at the date of construction.
Our investigation and reference to BCA Part 3.1.1 confirms the
slope construction was not compliant and was inadequate and
def ective and exceeds the allowable batter slope for a 2 meter high
embankment (1 meter lower than the actual embankment).