Home / Stewart Title Limited / Determination 787494

Determination 787494

claim denial for collapsed retaining wall and pool damage after storm

FirmStewart Title Limited
Decided2021-10-29
ProductGeneral Insurance · Other general
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant lodged a claim for a collapsed retaining wall and pool damage after an October 2018 storm, which the insurer denied as storm damage not covered by the title policy. AFCA found the wall's unapproved, non-compliant construction was the proximate cause and that council required its reinstatement, so AFCA ordered the insurer to indemnify the complainant for the loss.

The title policy covers loss where the complainant is forced by a public authority to rectify or remove a structure built without required approvals, and the unapproved construction was the proximate cause of the collapse.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Stewart Title Limited determinations · Find similar determinations

Text of the determination

Determination Case number 787494 Financial firm Stewart Title Limited Case number: 787494 21 October 2021 Determination | Case number: 787494 Page 2 of 6 1 Determination overview 1.1 Complaint The complainant holds a residential purchaser title insurance policy with the financial firm (insurer). He lodged a claim for a retaining wall which collapsed following a storm event. The insurer investigated the claim and ultimately denied indemnity, saying the policy does not cover storm damage to property. The insurer points out the policy would only respond if the complainant had been forced by the council to rectify or remove the wall because the structure was built without obtaining relevant approval. The complainant disputes the claim decision. To resolve the complaint, the complainant wants to be indemnified for the damage to the retaining wall and pool. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. The retaining wall was non-compliant when constructed. The inadequate condition of the wall, a title defect, was the proximate cause of its collapse and the associated damage. The practical effect of the council’s notices to the complainant (while not in the form of a formal ‘order’) is that he was ‘forced’ to obtain development approval and reinstate the retaining wall in accordance with that approval. Those factors satisfy the relevant terms of cover and so the insurer is not entitled to deny the claim. Why is the outcome fair? It is fair that the insurer indemnifies the complainant for his loss, since that outcome (given the particular circumstances of the claim) is consistent with the purpose and intention of the policy. 1.3 Determination This determination is in favour of the complainant. The insurer is required to indemnify the complainant for the claimed loss. Determination | Case number: 787494 Page 3 of 6 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Parties accept there was a storm event, but disagree as to policy cover The complainant took out the residential purchaser title insurance policy with the insurer in October 2007. The policy covers loss or damage to insured structures, subject to certain terms and conditions. The complainant lodged a claim for collapsed retaining walls and a damaged pool following a storm event on or around 14 October 2018. It is not in dispute the wall collapsed during the storm, but the insurer says the policy does not cover storm events. The insurer denied the claim, pointing out the policy is not a building insurance policy; it is a title insurance policy which covers specific risks in respect of the title to and use of the property; it does not cover loss from damage to structures resulting from weather or other events. The complainant believes the claim falls within the cover available under the policy because the local council deemed the retaining wall non-compliant and required it to be reinstated. The insurer ’s position is that the council did not order that the wall be reinstated, and if it did, it was not because of non-compliance. Policy cover subject to certain conditions The insurer says the only sections of the policy that would potentially provide cover for the retaining wall and pool require that the complainant is forced by the council to rectify or remove a structure because the structure was built without obtaining relevant approval (clause 2.1(p)(iii)). That clause says: 2.1 Ri sks occurring before the Policy Date and during the Registration Period We insure you for actual loss against all of the following Covered Title Risks, if the circumstances creating or giving rise to these risks existed or occurred before the Policy Date. … Ri sks affecting your use of the land (p) you are prevented by a public authority from using the Land as a residence, or another person has the right and refuses to complete a contract for the purposes of your interest in the Land, or you are forc ed to rectify or remove all or part of the existing structure(s) on the Land (other than boundary walls or fences) because: … (iii) any portion of the existing structure(s) does not comply with or was built or modified without building or development approvals required by law; … The initial onus is on the complainant to show damage was caused to his property due to an event covered by the policy. That means the complainant must establish, on balance:  the structure (retaining wall) failed because it did not have or did not comply with building or development approvals, and  the council forced (required) removal or replacement of the wall for that reason. Determination | Case number: 787494 Page 4 of 6 Proximate cause of damage was, on balance, unapproved condition of wall That means the complainant first needs to show, on balance, the lack of relevant approvals was the proximate cause of the loss/damage being claimed, rather than the October 2018 storm event. The proximate cause is not the first, or the last, or the sole cause of the loss. It is the effective, dominant or operative cause. The courts have said that if one cause would have resulted in the harm in any case, and the other would not have done so in the absence of the first, then the first is the proximate cause. In this instance, the insurer says the proximate cause of the damage was the rain event. Although the parties agree the wall failed during a rain storm, the expert report from engineer EC indicates that failure was likely due to it being non-compliant with industry codes, having been built without relevant approvals. EC noted it was significantly under-designed for the applied retaining pressure. There is no other expert evidence which compellingly contradicts EC’s conclusions. Based on the available expert evidence, the panel accepts the proximate cause of damage was, on balance, the insufficient, unapproved and non-compliant construction of the wall. If it were not for that pre-existing compromised condition, the storm event would not have triggered the collapse. Complainant ‘forced’ by council to rectify The following timeline broadly sets out the involvement of the council in the matter:  13 October 2018: The retaining wall above the swimming pool collapsed during a heavy rain storm; adjoining walls cracked and movement had occurred.  8 January 2019: after having inspected the property, the council issued a ‘ Notice of Intention to serve an Order ’ to the complainant confirming the building of the now damaged retaining wall was unauthorised, and it held concerns the condition of the wall presented a danger to persons using the adjacent public reserve, as well as the building’s occupants. In the annexed Proposed Order, the council required the complainant to arrange for an engineer to inspect and provide a report on the structural adequacy of the retaining wall.  10 January 2019: Claim lodged with the insurer.  15 January 2021: Complainant submitted an engineer ’s report which concluded the retaining wall failed during a storm. However, the cause of damage was attributed to the retaining wall being under-designed, which meant that collapse was inevitable regardless of the storm event.  25 January 2019: Council issued a ‘Development without Consent Warning L etter’ to the complainant, requiring that he submit a development application to remove and replace the retaining wall to make the area safe. The council explained it was not in a position to issue Orders to replace/repair unauthorised works, and so the Warning letter was issued instead. The insurer has acknowledged the retaining wall was built without the development aproval required by law (a title defect). However, it still denied the claim, saying the failure was not caused by the wall’s non -compliance, and the council was not requiring the wall be rebuilt because of a failure to obtain building or development approval. As previously stated, the panel disagrees, and accepts the proximate cause of the damage was the unapproved and non-compliant construction of the wall. The insurer also said the complainant was not being ‘ forced ’ to rectify the wall once the new development application was submitted. The panel disagrees for the following reasons: Determination | Case number: 787494 Page 5 of 6  the council deemed the site unsafe and said the wall presented a danger to pedestrians and the building occupants  the council issued a notice of intention to serve orders, and then a warning letter to the complainant, requiring him to engage a qualified engineer to report, and later to submit development plans for compliant reconstruction of the wall  on submission of these plans, the council would either approve them or notify the complainant of any amendments to be made  the complainant would likely be liable for any damage or injury caused by the wall not being reinstated. The panel is satisfied the council’s clear intention in its correspondence, even if that intention was not in the form of an ’order’ as such, was that the complainant must reinstate the wall in accordance with relevant development approval. The panel considers it reasonable to interpret the council’s correspondence as being a requirement for this work to be done, failing which there would likely be other enforcement action taken, such as penalties or sanctions imposed on the complainant, including potential liability for any further harm or damage. In other words, a reasonable interpretation is that the complainant was effectively ‘forced’ to comply with the council requirements. For the reasons outlined above, it is the panel’s conclusion the wall failed due to its unapproved construction, and the complainant was reasonably required to reinstate it to a safe condition. It would be inherently unfair for the policy not to respond in the circumstances. The insurer is not entitled to deny the claim. Insurer is required to indemnify complainant for his loss The insurer accepted that the complainant was not aware of the non-compliance of the retaining wall when he purchased the property. On that basis, it offered to pay $12,400 (plus GST) towards the reasonable costs of obtaining council approval for the rectification/rebuild. However, the panel is satisfied the claim falls entirely within the terms of cover under the title insurance policy. That means the insurer must indemnify the complainant in full for the loss arising from the unapproved construction of the retaining wall, and the council requirement that the wall be rectified. To be clear, the panel does not accept the insurer’s submission that this means it is being required to provide building insurance in breach of its APRA authorisation. The panel is satisfied the required outcome reflects the insurer’s obligations under the policy to cover a title defect. 2.2 Why is the outcome fair? The council did not issue formal ‘ orders ’ for the wall to be reinstated, as it was not in a position to do so. However, the practical effect and clear intent of the notice issued by the council was that it was requiring the complainant to undertake the relevant work in accordance with an approved development application. It is fair and appropriate, in the particular circumstances, to interpret the council notice as ‘forcing’ the complainant to rectify the wall. It was not reasonably the case that the complainant had a choice or discretion as to whether or not he should comply. The panel is satisfied it is also fair to interpret the intention of the policy as being consistent with such a situation. Determination | Case number: 787494 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.