Insurer declined cover for propeller shaft coupling and steering damage and further repairs; hardstand fees and claim handling disputed
Summary
The complainant's pleasure craft was damaged after grounding and later failed at sea; the insurer declined cover for propeller shaft coupling and steering damage, hardstand fees beyond January 2020 and further repairs. AFCA found in favour of the insurer and ordered no further action.
Proximate cause of the disputed damage was gradual deterioration and faulty workmanship from incorrect materials, which are excluded under the policy.
Issues
- Claim denial primary · not upheld“The proximate cause of the propeller shaft coupling and steering damage was excluded factors; the insurer is not liable under the policy for those items.”
- Poor claim handling secondary · not upheld“The insurer acted reasonably and appropriately in handling the claim; much of the delay was caused by the complainant.”
- Incorrect fees or charges secondary · not upheld“The insurer is not liable for hardstand fees beyond 16 January 2020 after clear advice and the complainant not moving the vessel.”
- Repairs or contractors secondary · not upheld“The insurer did not authorise PM to repair the propeller shaft coupling and steering and is not responsible for shortcomings in that work or for any further repair work.”
Subjects and remedies
business interruptionmotor vehicle collisionno remedy
Related
Text of the determination
Determination
Case number 786389
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 786389 Page 1 of 7
Case number: 786389 14 April 2022
1 Determination overview
1.1 Complaint
The complainant holds a pleasure craft insurance policy with the financial firm (insurer). In
September 2019 the insured vessel ran aground on a reef.
The insurer partially accepted the claim and repairs were carried out to the claim-related
damage before the vessel was returned to the complainant. However, it suffered two further
failures at sea after those repairs (after gearbox issues and loss of oil, and connecting the
jack shaft from the gearbox to the V-drive failed).
The insurer had already declined cover for damage to the propeller shaft coupling, on the
basis that was not related to the grounding event, but was from excluded factors. The
complainant believes that should also be covered as it arose when trying to get the vessel off
the reef.
The complainant says the vessel still requires further repair arising from the initial incident (as
the full extent of the damage was not identified at the time), as well as from the later actions
of the insurer’s repairers/agents, who, he says, did not ensure the vessel was seaworthy
before it was returned to him.
The complainant wants the vessel to either be fully repaired and certified seaworthy, or for the
insurer to cash settle for a total loss. He also claims the repair costs already incurred
($2,420.55), together with hardstand fees.
1.2 Issues and key findings
What is the extent of the insurer’s liability for the claimed damage/losses?
The available evidence shows, on balance, the grounding event was not the proximate cause
of the propeller shaft coupling or steering damage. Instead, the damage was the result of pre-
existing issues: the use of defective/incorrect materials, and progressive deterioration. The
insurer is not liable for repairs to the propeller shaft coupling or steering.
The evidence shows the initial investigation/repair work was undertaken for and at the
request of the complainant (through repairer B, by PM). The insurer did not authorise that. It
is not responsible for shortcomings (if any) in that work. It has, in any case, accepted and
paid for subsequent claim-related issues which arose.
The insurer is not liable for further hardstand fees, since it clearly advised the complainant it
would not pay beyond January 2020, and the complainant took no steps to move the vessel.
The insurer is not responsible for any further repair work, nor for additional damage which
may have been occurring over time while the vessel has remained on the hardstand.
The insurer has not unreasonably delayed repairs or mismanaged its handling of the claim
overall. Instead, the evidence indicates the complainant has failed to take steps which would
have helped mitigate his loss.
Determination | Case number: 786389 Page 2 of 7
Why is the outcome fair?
It would not be fair to require the insurer to cover more than its liability under the claim and
the policy. It has not been shown that the insurer acted unreasonably or inappropriately in all
the circumstances, nor that it should be held responsible for any additional losses.
1.3 Determination
This determination is in favour of the insurer.
It is not required to take any further action.
Determination | Case number: 786389 Page 3 of 7
2 Reasons for determination
2.1 What is the insurer’s liability for claimed damage/losses?
Onus on complainant to establish claimed damage caused by insured event
The onus is on the complainant to show, on balance, the claimed loss/damage falls within the
scope of cover under the policy, or that the insurer should otherwise be held responsible. This
is known as establishing a ‘ valid ’ , or prima facie claim.
Once the complainant has established a prima facie claim, the onus shifts to the insurer to
establish, on balance, a policy exclusion applies or that it is otherwise entitled to decline the
claim.
Policy covers accidental damage, subject to exclusions and limitations
The policy covers accidental loss or damage to the insured pleasure craft (or part of it)
caused by ‘ an accident during use or while stored ashore, or moored …’.
‘Accident’ is defined in the policy as:
an incident that is unforeseen and unintended and that causes loss or damage.
This includes a series of accidents arising out of the one (1) event.
Relevant to this claim, the policy expressly provides that it does not cover any loss or damage
from:
normal wear and tear including gradual deterioration
mechanical failure … caused by or resulting from gradual deterioration.
Nor does the policy cover:
the cost of repairing or replacing any part of the pleasure craft which is defective and
the defect caused by fault, error in design or construction or faulty workmanship.
Damage, on balance, was caused by faulty workmanship and materials
The insurer engaged the services of a maritime engineer (MES) to assess the disputed
damage (to the propeller shaft coupling and the steering) and report on its cause.
MES inspected the vessel on 18 November 2019, and reported the use of incorrect
materials/fittings: the adaptor fitted between the V-drive and the propeller shaft coupling was
aluminium, when it should only be steel; the stainless coupling bolts should not have been
used for that purpose, and the only bolts which should have been used should be of a
minimum high tensile class 8.8 grade steel.
MES concluded by stating that ‘ with the obvious damage to the aluminium coupling adaptor it
indicates there has been gradually failing over a prolonged period [sic]’ .
Marine engineer MJ then inspected and confirmed incorrect bolts had been used, explaining
that would cause issues with the connection between the gearbox and shaft coupling. On that
basis, MJ concluded ‘it was inevitable the coupling, aluminium spacer and stainless steel
bolts would eventually become loose, accident or no accident’.
Determination | Case number: 786389 Page 4 of 7
Neither expert attributed the damage specifically to the grounding incident itself. Instead, their
conclusions were that it was the use of incorrect materials/fittings which was the proximate
cause of the damage.
Repairer PM, who undertook work on the vessel after the incident, acknowledged the
grounding event may have sped up the coupling coming loose, but (consistent with MJ’s
conclusion) says the use of the wrong bolts and adaptor meant it would have eventually failed
in any case.
With regard to the steering, PM identified the problem was that it had blown a line on the auto
pilot pump. PM concluded the issue had ‘nothing to do with the claim as the impact on the
rudder and propeller nut was not even enough to damage the propeller speed’. Instead, PM
said the auto pilot pump was installed incorrectly.
Proximate cause of the damage was not the grounding incident
Having regard to all the available evidence, I am satisfied the proximate cause of the damage
to the propeller shaft coupling and the steering was a combination of gradual deterioration
and faulty workmanship (through the use of incorrect materials).
To be clear, the proximate cause of a loss is not necessarily the first (or the last) or the sole
cause of the loss. It is the effective or dominant or operative cause. The courts have said that
if one cause would have resulted in the harm in any case, and the other would not have done
so in the absence of the first, then the first is the proximate cause. The proximate cause of
the loss is a question of fact to be determined based on the surrounding circumstances.
While the grounding incident may have highlighted the issues with the vessel, the expert
evidence shows, on balance, that event would not have caused the disputed damage if it
were not for the pre-existing defective materials and progressive deterioration. That means
the proximate cause of the damage was factors which are excluded from cover under the
policy.
I am satisfied, on the available evidence, the insurer is not liable under the policy for the
propeller shaft coupling and steering.
Insurer did not authorise PM to repair propeller shaft coupling and steering
The complainant, however, maintains that the insurer engaged PM to perform the uninsured
repair work to the propeller shaft coupling, and so should be liable for those costs.
The insurer was provided with a copy of PM’s December 2019 quote (addressed to the
complainant) for $1,984.95 to repair the propeller shaft coupling. In February 2020, the
complainant sent an email to PM accepting the damage to the steering, and asking them to
also repair that.
There is nothing to show the insurer accepted responsibility for or authorised that work, either
under the policy or otherwise.
That means that any outstanding costs incurred for those repairs are a matter for the
complainant.
Insurer not liable for further hardstand fees
The insurer says it had completed the claim-related repair work on 15 January 2020 and paid
the hardstand fees until 16 January 2020. It sent the complainant an email on 22 January
Determination | Case number: 786389 Page 5 of 7
2020 advising of its position and that he would be liable for any hardstand fees from 16
January 2020.
It appears, however, the vessel was not returned or collected by the complainant because of
the outstanding issue of PM’s unpaid repair costs, and also because of the ongoing disput e
about the insurer’s liability under the claim. In the meantime, hardstand fees grew
significantly.
The complainant was on notice about the insurer’s clear position regarding the hardstand
fees. He could have paid the relatively minor outstanding repair costs, removed the vessel (so
avoiding further hardstand fees) and still continued with his complaint, but did not do so.
The insurer is not liable for any hardstand fees beyond 16 January 2020.
Insurer is not liable for any additional repairs
The complainant says the engine has now corroded and seized, and that, along with the
gearbox and all electrical components, should have been removed after being submerged in
seawater during the retrieval of the vessel after the grounding event. The complainant
(th rough his representative) says ‘this alone’ has led to the vessel presenting in its current
deteriorated condition. I am not satisfied that has been shown to be the case.
The vessel was initially assessed by three apparently qualified and experienced parties and
none of these identified the need to remove those components for further assessment at the
time. Before the insurer became involved, the complainant had engaged repairer B, who in
turn engaged PM. The insurer’s surveyor subsequently became invo lved, along with the
insurer’s repairer F. It was not unreasonable, in the circumstances, for the insurer to have
relied on advice given and work undertaken by the complainant’s repairer (s) in the meantime
(as the complainant himself had done).
I appreciate the complainant feels there were issues missed in the various transfers of
instructions between repairers/experts. However, PM’s initial advice (based on their
contemporaneous assessment of the vessel after the event) did not include reference to any
iss ues with the gearbox. While the complainant’s expert, GS, later indicated that should have
been investigated further, that is with the benefit of hindsight and it does not mean it was
unreasonable for the parties to rely on PM at the relevant time.
In any case, the insurer has since covered the further issues with the starter motor and
gearbox under the claim.
The complainant more recently (in early 2022) obtained statements from three further marine
assessors/repairers (whose qualifications are not specified), who have provided opinions
about what work and investigations could have been carried out soon after the grounding
event, and particularly with regard to the engine, electricals and gearbox.
I acknowledge they suggest removal of certain components should have occurred following
the grounding; as well as other shortcomings in the initial investigation and assessment.
However, they did not inspect the vessel at the time of the incident.
Given the time that has now passed since the grounding incident, and the handling of the
matter in the meantime (with the vessel having already passed through the hands of several
different repairers/assessors), I am not persuaded these additional statements are sufficient
to establish any failing by the insurer.
On the available evidence, I am not satisfied the complainant has established the insurer
should be liable for any further repair work on the vessel.
Determination | Case number: 786389 Page 6 of 7
Evidence does not show insurer unreasonably delayed claim
The complainant believes the insurer has failed to handle the claim appropriately or meet its
obligations under the relevant industry code.
The insurer points out that significant delays occurred in progressing and finalising the claim
and complaint were because of th e complainant’s ongoing refusal to accept its decision as to
liability.
I have considered the extensive communications between the various parties over the course
of the claim and complaint, and a detailed chronology of how/when the matter has been
progressed. It is not necessary to repeat that here.
However, based on the evidence, I am satisfied much of the delay has been caused by the
complainant. That includes his failing to provide expert evidence to support his position
regarding the initial damage and then the further issues around the adequacy of repairs.
There were also some delays in finalising the claim when, for example, the later incidents
occurred after initial repairs. However, it is not unreasonable to expect additional time would
be needed to consider and deal with that.
I am satisfied overall that the insurer acted reasonably and appropriately in the way it handled
the claim, including keeping the complainant updated on progress.
While the complainant points out this matter has caused him significant stress, upset and
inconvenience, I am not persuaded the insurer can reasonably be held responsible for that.
2.2 Why is the outcome fair?
The available evidence does not establish the insurer should be held liable for more than the
repairs it has accepted and dealt with under the terms of the policy.
In the circumstances, it would not be fair to require it to do more.
Determination | Case number: 786389 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.