Home / Suncorp Group / Determination 786100

Determination 786100

Claim denial for stormwater ingress damage alleged to result from defective repairs under a previous hail claim

FirmSuncorp Group
Decided2021-10-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$18,678
SourceAFCA PDF

Summary

The complainant claimed that internal stormwater damage discovered in 2020 resulted from defective repairs under a 2007 hail claim and sought roof repair costs under the lifetime guarantee. AFCA found the damage was not shown to result from the insurer's defective repairs and decided in favour of the insurer.

The complainant bears the onus to show on the balance of probabilities that the loss falls within the policy, and the evidence did not link the recent damage to the 2007 hailstorm or to defective repairs by the insurer.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authorityno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 786100 Financial firm AAI Limited Determination | Case number: 786100 Page 1 of 6 Case number: 786100 28 October 2021 1 Determination overview 1.1 Complaint The complainant held a home insurance policy (policy) with the financial form (insurer). On 10 December 2007, a claim was lodged for hail damage to the insured building. The insurer accepted the claim and repairs were authorised. On or about 1 December 2020, the complainant has contacted the insurer regarding int ernal stormwater ingress damage which she is believes is a result of poor/defective repairs completed under the claim. The complainant is seeking cover for the internal water ingress damage as well as rectification of external repairs to the main roof unde r the policy’s lifetime repair warranty. The insures says the damage claimed is not because of defective repairs and is the result of a lack of maintenance to the main roof, which is excluded under the policy. The complainant is represented in this matte r by her daughter ‘PC’. For simplicity, reference to the complainant includes PC. 1.2 Issues and key findings Is the insurer required to cover the claimed cost of repairs? No. The available information does not establish that the current damage claimed is because of defective and/or inadequate repairs completed under the claim. Accordingly, the insurer is not required to cover the cost of repairs for damage identified in 2020 under the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline cover for the damage identified in 2020 and is not required to take any further action. Determination | Case number: 786100 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer required to cover the claimed cost of repairs? No. The available information does not establish that the current damage claimed is because of defective and/or inadequate repairs completed under the claim. Accordingly, the insurer is not required to cover the cost of repairs for damage identified in 2020 under the claim. The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events, including ‘Storm’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The policy also includes a lifetime guarantee on home repairs the insurer arranges, authorises and pays for under a claim. We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your home as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. However, the lifetime guarantee is subject to exclusions and does not apply: • t o repairs you authorise or make yourself; • to loss, damage or failure of any electrical or mechanical appliances or machines; • to wear and tear consistent with normal gradual deterioration of your home (e.g. paint peeling off after its expected life cycle, wood rotting from moisture in the air or ground, roofs weathering or a hot water tank leaking after its guaranteed life); • where we agree with a repair quote and we give you, or the builder or repairer, payment for the cost of the repairs and you arrange the repairs. The complaint bears the onus to establish entitlement to cover It is established law that the insured has the onus to establish, on the balance of probabilities (that is, more likely than not) that the loss falls within the terms of the policy. Given the complainant is seeking cover for damage to the insured building she maintains is the result of poor or defective repairs. She bears the onus to show on balance this damage is because of the original hailstorm event and/or repairs completed by the insurer. There is no dispute the insured building suffered damage to the main roof in 2007 because of a hailstorm or that this subsequently resulted in internal stormwater ingress damage to the dwelling. The insurer accepted the claim and autho rised repairs to consultants ‘P’. P was, also tasked with completing further repairs and rectification works in 2012/2013. Determination | Case number: 786100 Page 3 of 6 Complainant says the recent damage is covered under the claim The complainant says before the claim lodged in 2007, she had not lodged any previous claims relating to the insured building roof for 47 years. The hailstorm event in 2007 caused significant damage to the main roof and associated internal water damage. Despite the insurer authorising repairs to the roof, it continued to leak for which it had to arrange rectification works twice, the last instance in 2012 in line with a determination by the Financial Ombudsman Service (FOS). The complainant has provided a repair quote from ‘ZN’ dated 1 December 2020 in the amount $18,678. This includes the supply and installation of new battens, removal and replacement of all broken and chipped tiles, bedding and flexy pointing all ridges and gables as well as fixing broken and cracked lead flashing. The complainant has provided report fr om consultant ‘MS’ dated 16 July 2021 which says the roof had new tiles put on it seven to eight years prior as part of repairs. New tiles were fitted, and old tiles were then used to replace broken tiles around the rest of roof. The old tiles have not matched up with the other tiles and the pointed top ridge had no weep holes. The gables had been patched up and the sarking had fallen in at gable ends. The complainant has provided an email from consultants ‘HC’ dated 1 June 2021. HC is said to be the consultant that undertakes routine maintenance of the insured buildings gutters and the email sets out the process HC says it follows when attending the insured property. T he complainant has submitted a second quote for repairs from consultants ‘SP’ dated 21 May 2021 in the amount $3,905. SP advised whilst the roof does need some work, it is not as extensive as that quoted by ZN. SP’s quote includes rebed and repoint of the top ridge, repointing gables with red flex terracotta, drilling weep holes to release condensation and remove or replace wrong fitted tiles. Insurer says the damage is due to a lack of maintenance to the roof The insurer appointed consultants ‘P’ to attend the insured property and complete an assessment of the cause and extent of the damage. P attended the property on 8 December 2020 and provided a report the following day. P noted the below damage:  Damaged Roof Tiles  Damaged ceilings and cornices throughout upstairs hallway and 3 bedrooms  Damaged wall and ceiling linings in the laundry at rear of property on ground floor However, P formed the view the damage is because of poor maintenance of the property. It says had the damage been the result of poor repairs, water ingress damage would have become evident within 12 months of repairs finalised in 2012/2013 and/or during the first heavy rainfall event, of which the insurer notes there have been several over the relevant period. P says the damage noted to internal plasterboards appeared new and had this been an ongoing issue over previous years, the damage would be expected to more deteriorated to the extent of holes being present as well as mould infestation, which is not the case. P found the roof to be in a poor condition with large amounts of moss which had been there for several years based on photographic evidence obtained from Google maps from as early as 2014. P formed the view there was evidence of overflowing of gutters due to a lack of maintenance and the presence of a large tree in the area of the roof. Determination | Case number: 786100 Page 4 of 6 An internal assessor for the insurer has reviewed all the reports and repair quotes and invoices relating to the claim since 2017 to the most current evidence. He notes the quote from ZN and says the replacement of battens to upper and lower levels is maintenance work with no evidence linking this to the hailstorm nor defective repairs. The assessor found that the roof has been assessed several times over the life of the claim and no poor workmanship issues have been identified. The complainant has the option to lodge a new claim for the recent damage however that it is not related to nor because of the 2007 hailstorm event and related repairs. The evidence does not support the damage is due to defective repairs I have reviewed all the available information from the parties. I accept the main roof sustained hail damage in 2007 which was accepted and repaired under the claim. I am satisfied the available information shows although internal stormwater ingress was not evident at the first assessment, once this did become evident the insurer was provided with and accepted a variation scope of repairs. The available information shows a few years later in 2012 further water ingress damage was noted and investigations by the insurer identified issues with the lead flashing which was not identified previously. The insurer accepted to cover this under the claim as storm damage and subject to a FOS determination internal damage repairs and some works to the roof were also completed. The complainant arranged for her o wn builder ‘A’ to undertake repairs to the lead flashing with the insurer completing other repairs in line with the FOS determination by January 2013. I accept the insured property was noted to have stormwater ingress damage in December 2020 prompting the complainant to contact the insurer. However, I am not satisfied the available information shows that this is the result of poor or defective repairs completed by the insurer. I am of the view the quote from ZN is includes works that have not been shown to be consistent with the storm in 2007 nor repairs completed by the insurer. This opinion is supported by the second builder SP appointed by the complainant as well. I am not satisfied the deterioration to the main roof sarking has been shown to be the result of the original hailstorm event not repairs completed under the claim. Rather, on balance, this deterioration of the sarking seems consistent with gradual deterioration over the life of the roof (over 50 years old). I note the complainant says the roof is routinely maintained and has provided evidence from HC. However, this evidence establishes the consultants ’ process but is not evidence of when and how often maintenance works may have been completed over the years. On balance, repairs to the leading flashings were completed b y the complainant’s appointed consultants A in or around 2012 as part of recommended maintenance works. I am not satisfied the insurer can reasonably be liable for these works, if indeed they can be shown to be defective. Although there is no dispute the insured property has suffered more recent stormwater ingress damage, I am not satisfied that this has been shown to be the result of defective or poor repairs authorised by the insurer. The insurer is not required to cover the damage claimed in December 2020, as this has not been shown to be the result of poor or defective repairs completed by the insurer under the claim. Determination | Case number: 786100 Page 5 of 6 Why is the outcome fair? Given the available information, it has not been shown that the more recent stormwater ingress damage is because of poor or defective repairs completed by the insurer several years prior. Therefore, it is fair in all the circumstances to permit the insurer to decline indemnity for the cost to repair the claimed damage in line with the policy. Determination | Case number: 786100 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.