Home / Suncorp Group / Determination 785343

Determination 785343

Water ingress storm damage claim: balcony and sliding door repairs declined; scope and quantum of cash settlement, mould remediation and compensation disputed

FirmSuncorp Group
Decided2022-03-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$126,500
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for storm-related water ingress damage to her home, including balcony and sliding door repairs, mould, contents and temporary accommodation. AFCA found the balcony and sliding door waterproofing was not covered, but ordered a cash settlement of $126,500, a full mould assessment and remediation, temporary accommodation for 20 weeks, $4,000 non-financial loss compensation and a $2,000 contribution to expert reports.

Cover requires a single insured storm event to be the cause of the damage; gradual deterioration and wear and tear are excluded, so the balcony and sliding door repairs are a maintenance issue, while resulting internal damage is covered.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay non financial lossprovide documentsrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 785343 Financial firm AAI Limited Determination | Case number: 785343 Page 1 of 10 Case number: 785343 7 March 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). In February 2020, she lodged a claim for water ingress-related damage following a severe weather (storm) event. The insurer accepted liability for two out of four leaks identified in the property, and has paid the complainant for work to the roof tiles above the master bedroom, the pergola/gym roof and ceiling and other carpentry work under the pergola/gym; including for rectification of repairs from an earlier claim. The insurer has also accepted liability for internal damage caused by the water ingress. However, it denies liability for repairs to the balcony and sliding door through which water had entered, on the basis these were maintenance issues and the responsibility of the complainant. The complainant says her experts found the balcony was damaged by heavy wind and torrential rain, and so it should be covered by the policy. To resolve the complaint, the complainant wants the insurer to cover the balcony/sliding door repairs, additional internal repairs, damage to contents and mould remediation. 1.2 Issues and key findings Is the insurer liable for the balcony and sliding door? The insurer is not liable under the policy for repairs to the balcony and sliding door. That is because the evidence does not establish, on balance, the balcony and sliding door water- proofing failed due to a one-off storm event, which is required for the policy to respond. Instead, the damage was from gradual deterioration, and represented a maintenance issue for which the complainant is responsible. What is the extent of the insurer’s liability for other damage ? The insurer has accepted liability for internal damage arising from water ingress, which is fair in the circumstances. That includes mould remediation, but that has not yet been completed. The insurer is required to promptly arrange a comprehensive mould analysis by a suitably qualified expert, and is liable for the cost of a full mould remediation in accordance with that report and best industry practice. In addition to the cost of the mould assessment and remediation, the insurer is also required to cash settle the complainant $126,500 based on the complainant’s most recent quote for building repairs. To be clear, that is for a scope of works set out in the quote. The insurer is also required to actively engage with the complainant to investigate, assess and (as appropriate) cover any further building damage which she says has happened, because of the compromised state of the building, since her proposal to accept settlement based on that quote. Determination | Case number: 785343 Page 2 of 10 While the $126,500 includes an unspecified amount for the balcony and sliding door (for which the insurer is not liable), it does not include cover for damaged contents. However, it is fair to treat that amount as including an offset of the cost of damaged contents against the amount for the balcony/sliding door. The insurer is also liable for a contribution to the cost of professional reports obtained by the complainant, as detailed in section 2.2 below. As well, the insurer remains liable for suitable temporary accommodation for the complainant and her family for a further period of 20 weeks from the date she accepts this determination. That is to allow a reasonable time for the mould assessment and remediation to be completed, for the complainant to source and arrange builders for the work, and then for the building repairs to be completed. Since this matter has been ongoing for over 2 years, it is also fair that the insurer pay compensation for non-financial loss. Why is the outcome fair? The outcome is fair because the quotes on which the insurer based the proposed cash settlement have not been shown to be actionable by the complainant, nor to reflect all the necessary repair work. As well, the claim-related damage cannot be repaired in isolation, without the significant issue of mould first being thoroughly addressed and remediated. Having regard to all the claim-related damage, and the need for this matter to be resolved as soon as possible, it is fair and appropriate that the cash settlement be based broadly on the complainant’s most recent available quote, but offsetting contents to be covered against a deduction for the balcony and sliding door. It is also fair that the insurer investigate and assess any further damage the complainant says has since occurred because of the unrepaired state of the building. 1.3 Determination This determination is partially in favour of the complainant. The insurer is required to:  make a cash settlement of $126,500 to cover claim-related repairs and damaged contents, within 7 days of the complainant accepting this determination. To be clear, that takes account of an off-set for balcony/sliding door costs for which the insurer is not responsible. It does not included any further building damage which must now be investigated and assessed  promptly engage an appropriately qualified independent mould specialist to complete a detailed mould analysis and quote (actionable by the complainant) for a full mould remediation. The insurer is liable for the cost of that remediation and is required to cash settle the complainant the cost of that quote. That is in addition to her builder SLA’s quote of $126,500, to the extent the remediation quote includes matters not already covered in SLA’s building repair work  pay $4,000 compensation for non-financial loss for its handling of the claim, including for upset and inconvenience caused by delays, inadequate repairs, inappropriate temporary accommodation and health concerns from mould  contribute $2,000 towards the cost of the complainant’s expert reports Determination | Case number: 785343 Page 3 of 10  continue to cover suitable temporary accommodation for the complainant and her family (that is, ‘home’ style, not hotel) for a period of 20 weeks from the date the complainant accepts this determination. Determination | Case number: 785343 Page 4 of 10 2 Reasons for determination 2.1 Is the insurer liable for the balcony and sliding door? Policy covers listed events The complainant holds a Platinum Home & Contents Insurance policy which covers loss or damage caused by any of the insured events outlined in the product disclosure statement (PDS). The policy makes it clear that an ‘insured event’ is always ‘ a single event, accident or occurrence which you did not intend or expect to happen ’ . ‘S torm ’ is one of the insured events, and means: a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. The policy also covers accidental damage that is not otherwise excluded under the policy. However, certain conditions and exclusions apply, including general exclusions for damage arising from a failure to keep the home and contents well-maintained and in good condition; and from wear, tear and gradual deterioration. There is no dispute there was a severe storm event and there was water ingress to the property. Expert reports do not establish one-off storm event caused waterproofing to fail The complainant lodged a claim on 16 February 2020 following the discovery of several leaks. Both parties provided expert reports. The insurer initially denied the claim in full saying the water ingress was caused by maintenance-related issues. However, the insurer subsequently accepted liability for damage caused by two of the four identified leaks. The insurer provided a leak detection report and a quote for internal repairs by SH in the amount of $10,347.70. SH conducted dye/saturation tests on the top balcony above the lounge room, and a saturation test on the lower balcony above the entry foyer. With regard to the top balcony, SH concluded that during heavy rainfall water makes its way through the cracked tiles, under the door frame and into the wall cavity, then making its way onto the hallway ceiling below; the top balcony had a failed waterproofing membrane. SH discovered the same waterproofing issues with the lower balcony and found water was leaking through the sliding door frame and making its way onto the bulkhead of the foyer entry ceiling below. SH noted there was evidence of previous attempts to seal the door frame sill. Colour photographs were provided to support S’s findings. The insurer says the failure of the waterproofing mechanisms at the balcony and sliding door constitute a maintenance issue, which is not one of the events covered by the policy, but is excluded. The complainant, however, maintains that high winds during a storm compromised and broke the membrane under the sliding door and fixed bay window panels. She says that up until the Determination | Case number: 785343 Page 5 of 10 storm, there was no leaking or damage since the membrane was replaced and the balcony retiled in 2015; but now all leaks were coming from the sliding door and bay window panels. She has provided a report from building consultants MPI who inspected and concluded the damp ingress was caused by significant damaging winds. MPI stated the leaks are not a result of a failed or inadequate waterproofing membrane or any associated contractor. However, the panel is not satisfied MPI has established a causal link between a single storm event and the claimed balcony/sliding door issues. Insurer had dealt with previous water ingress claims The evidence shows there had been previous water ingress issues in the property, some of which had been considered/dealt with by the insurer under previous claims. As set out below, the insurer has accepted liability for certain residual related issues, and they are being covered under the current claim as follows: 1. water damage and mould was found in the front bay window area of the master bedroom. The complainant had been cash settled for resulting damage under a previous claim, but (while the insurer had conducted interim make-safe works) the insurer had not advised her she needed to carry out thorough repairs of the maintenance issues that gave rise to the damage in the first place. The insurer has therefore appropriately accepted liability for the additional internal water damage identified, under this current claim. 2. roof of the pergola had previously been replaced by the insurer under an earlier claim. However that work was found to have been inadequate, and so the insurer has appropriately agreed to cover the cost of rectifying the pergola roof and covering the resulting internal damage, under the current claim. The panel understands that rectification work has now been completed. The complainant had also previously lodged a claim for the upstairs balcony, but that had been withdrawn after it was found the failed waterproofing was the responsibility of a previous builder. The complainant has said she completed the necessary repairs herself, and she has provided evidence from June 2015 for that work. The panel is satisfied, on the available evidence, she did take steps to attend to those issues. That does not necessarily mean, however, the more recent water ingress was because the storm damaged the repaired area. Insurer not liable under the policy for balcony and sliding door On the basis of SH’s report, the insurer agreed to cover resulting damage from the water ingress, but not to repair any waterproofing issues with the balconies themselves because the available evidence did not show the damage was caused in a single storm event. Rather, the evidence indicated the waterproofing systems had failed over time due to deterioration and wear and tear. That meant the damage was a maintenance issue for which the complainant is responsible. On the available evidence, the panel is not satisfied the complainant has shown the balcony and sliding door waterproofing failed due to a single insured storm event, which is required for the policy to respond. Instead, it is clear there were previous issues with the waterproofing and water ingress, and even if work was carried out since then to address those issues, that in itself does not establish a single storm event was the cause of the later damage in that area. Even if the high winds from a storm event caused tiles above the complainant’s bedroom to move, as the complainant has submitted, that also does not establish a storm was the proximate cause of the water ingress at the balcony and sliding doors. Determination | Case number: 785343 Page 6 of 10 That means the insurer is not liable for repair of the balcony and sliding door issues under the terms of the policy, although it is fair and appropriate in the circumstances that the insurer cover the cost of repairs for the resulting internal water damage, as it offered to do. 2.2 What is the extent of insurer’s liability for other damage ? The complainant has provided quotes and reports (now over a year old) from building consultant MPI and builder AB, ranging from $125,000 to $148,000. However, those quotes included the balcony waterproofing and sliding door, and did not separately itemise the different components of the work. Nor did they persuasively address causation or justify the inclusion of the balcony and sliding door in the proposed scope of works. The insurer has indicated it considered the complainant’s quotes excessive. However, the panel notes, by contrast, that the substantially lower quotes on which the insurer has offered to cash settle have not been shown to be actionable by the complainant as a retail customer, nor to include all internal repairs likely to be necessary. The panel is not satisfied that the insurer’s cash settlement offer is fair in the circumstances, either as to the scope or works or the applicable amounts. The complainant has more recently provided a scope of works and (now expired) quote dated 1 November 2021 from builder SLA, together with an explanatory letter from him. The quote (for $126,500) still includes work to repair the balcony waterproofing and sliding door, but is also not itemised sufficiently clearly to identify the amount(s) attributable to that work for which the insurer is not liable under the policy. The complainant has said she would be prepared to cash settle the claim based on SLA’s quote. However, while it includes work for which the insurer is not responsible, that amount does not include other costs for which the panel considers the insurer should be liable. It also does not included potential further building damage which the complainant says has occurred since that quote was prepared. Full mould assessment and remediation required Importantly, SLA’s quote does not include specialist mould assessment or remediation (beyond certain physical building elements). When the insurer’s restorer S inspected in June and July 2021, their report noted ‘visible microbial growth’ in the main bedroom and lounge room ; and water stains and a ‘strong musty smell’ in the hallway and other areas. Much of that is likely to have occurred because of ongoing water ingress from the balcony/sliding door issues, which remained unrepaired because the insurer had not told the complainant its initial make-safe needed to be followed up with more substantial maintenance work. Although the insurer did conduct some mould remediation works, the complainant says mould has reappeared since. Given the extent of the water ingress and the extended period over which mould will have been able to further develop, the panel is not persuaded the water damage and mould can be thoroughly remediated without a full ceiling replacement (as confirmed by the complainant’s builder SLA and included in his quote). More recently, the insurer has said they have attempted to attend the property to undertake further mould remediation, but the complainant has not agreed to that until the internal repairs are completed. Determination | Case number: 785343 Page 7 of 10 The panel acknowledges the insurer ’s attempt to address the mould. However, it considers a premature and possibly incomplete mould remediation (when there is likely continuing water ingress and the further spread of existing mould until other repairs are completed), would be ineffective in fully dealing with the issue. In the circumstances, the panel considers it fair and appropriate that the insurer be liable for a new specialist mould assessment, and the necessary remediation (which may extend beyond the costs and issues set out in SLA’s quote) . Insurer liable for some contents items The complainant has also claimed for several significant contents items which she says were damaged by the water ingress, developing mould and actions by the insurer’s contractors: lighting, motorised blinds, pure silk curtains, lounge suite, and a rug. She has provided invoices and other evidence of value, which totals about $31,000. On the available evidence, the panel is satisfied the insurer should be liable for damaged contents (notwithstanding some were already showing signs of wear). However, as set out below, the panel considers it fair that be offset against a deduction for the balcony/ sliding door work included in SLA’s quote . Compensation for non-financial loss is warranted The claim was first made in February 2020. Since then there have been a number of issues with the quality and completeness of the repair work, and the need for further rectification. The complainant has also said that the insurer has made various payments into her account for work undertaken so far. From that she then paid contractors she had to find and from whom she had to source quotes (to be provided to the insurer) in the first place. During that period, she says, there was no specific cash settlement offer made by the insurer. It appears that the complainant herself has had to undertake a considerable amount of time and effort in dealing with the practicalities of arranging work for which the insurer was responsible. In the meantime, she and her family have had regular moves between temporary accommodation, most of which has been quite unsatisfactory for her family circumstances. She has also had the continuing inconvenience and stress of being unsure when that benefit might end. The issue of mould in the home also raised the real concern about health impacts (while the family was still there). The insurer’s restorer S noted (in their attendance in September 2020) that the complainant was coughing, and they observed ‘[it] may be due to the level of contaminants in the main bedroom. The level of contami nants may pose a health risk’. AFCA may award compensation for non-financial loss where there has been a significant degree of upset and inconvenience caused to a complainant by the insurer’s handling of a claim. The panel is satisfied compensation of $4,000 is fair in this case. Temporary accommodation cost to continue One of the complainant’s builders indicated a repair time of up to 2 months should be allowed. There is nothing to suggest that is unreasonable. However, time also needs to be factored in for a mould assessment first, and any additional remediation for that (not already included in the general repair quote). It is unclear how long that might take, however, the panel considers it reasonable to allow 3 weeks for that. Determination | Case number: 785343 Page 8 of 10 In the current climate, it is likely the complainant may not be able to immediately source a suitable builder to commence the repair work once the mould has been addressed. The panel considers 6 weeks should be allowed for that. In the circumstances, the panel is satisfied the insurer should continue to cover 20 weeks of temporary accommodation for the complainant an her family, from the date she accepts this determination. To be clear, the accommodation needs to be a home (and not hotel rooms) suitable for the complainant’ s family circumstances. Fair that insurer contribute to complainant’s expert reports The complainant says she has paid a total of $5,500 for her own expert reports from MPI and AB. She has provided evidence in support. The panel notes the reports supported elements of the complainant’s position (for example, with regard to mould and the extent of related repairs required). They did not, however, assist her in relation to establishing the balcony/sliding door should be covered by the insurer. In the particular circumstances, the panel considers it fair that the insurer contribute $2,000 toward those costs. 2.3 Why is the outcome fair? With regard to remaining repairs, the outcome is fair in the circumstances because the ins urer’s quotes have not been shown to be actionable by the complainant (sufficient to allow all the work for which the insurer is liable to be carried out fully); while the complainant’s quotes do not provide enough detail to substantiate/separately itemise the extent of all costs being claimed. The position of using the complainant’s most recent quote as a basis for cash settlement, but making relevant offsets to allow for that uncertainty (and cover contents), is a fair compromise in the particular circumstances. The outcome also requires investigation and assessment of further damage the complainant says has occurred since her builder’s quote. It is fair that a cash settlement be made in the meantime, as set out in this determination, but also that the insurer consider (and cover) any further related damage which is identified. Given the time taken to resolve the claim and the manner in which it has been handled by the insurer, it is also fair that compensation and reimbursement of some of the complainant ’s costs be paid, and that temporary accommodation continue to be covered, as set out above. Determination | Case number: 785343 Page 9 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Policy extracts General exclusions Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to : Determination | Case number: 785343 Page 10 of 10  tiles and their adhesive or grouting breaking down;  weathering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.