Text of the determination
Determination
Case number 785343
Financial firm AAI Limited
Determination | Case number: 785343 Page 1 of 10
Case number: 785343 7 March 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
In February 2020, she lodged a claim for water ingress-related damage following a severe
weather (storm) event.
The insurer accepted liability for two out of four leaks identified in the property, and has paid
the complainant for work to the roof tiles above the master bedroom, the pergola/gym roof
and ceiling and other carpentry work under the pergola/gym; including for rectification of
repairs from an earlier claim.
The insurer has also accepted liability for internal damage caused by the water ingress.
However, it denies liability for repairs to the balcony and sliding door through which water had
entered, on the basis these were maintenance issues and the responsibility of the
complainant.
The complainant says her experts found the balcony was damaged by heavy wind and
torrential rain, and so it should be covered by the policy.
To resolve the complaint, the complainant wants the insurer to cover the balcony/sliding door
repairs, additional internal repairs, damage to contents and mould remediation.
1.2 Issues and key findings
Is the insurer liable for the balcony and sliding door?
The insurer is not liable under the policy for repairs to the balcony and sliding door. That is
because the evidence does not establish, on balance, the balcony and sliding door water-
proofing failed due to a one-off storm event, which is required for the policy to respond.
Instead, the damage was from gradual deterioration, and represented a maintenance issue
for which the complainant is responsible.
What is the extent of the insurer’s liability for other damage ?
The insurer has accepted liability for internal damage arising from water ingress, which is fair
in the circumstances. That includes mould remediation, but that has not yet been completed.
The insurer is required to promptly arrange a comprehensive mould analysis by a suitably
qualified expert, and is liable for the cost of a full mould remediation in accordance with that
report and best industry practice.
In addition to the cost of the mould assessment and remediation, the insurer is also required
to cash settle the complainant $126,500 based on the complainant’s most recent quote for
building repairs. To be clear, that is for a scope of works set out in the quote. The insurer is
also required to actively engage with the complainant to investigate, assess and (as
appropriate) cover any further building damage which she says has happened, because of
the compromised state of the building, since her proposal to accept settlement based on that
quote.
Determination | Case number: 785343 Page 2 of 10
While the $126,500 includes an unspecified amount for the balcony and sliding door (for
which the insurer is not liable), it does not include cover for damaged contents. However, it is
fair to treat that amount as including an offset of the cost of damaged contents against the
amount for the balcony/sliding door.
The insurer is also liable for a contribution to the cost of professional reports obtained by the
complainant, as detailed in section 2.2 below.
As well, the insurer remains liable for suitable temporary accommodation for the complainant
and her family for a further period of 20 weeks from the date she accepts this determination.
That is to allow a reasonable time for the mould assessment and remediation to be
completed, for the complainant to source and arrange builders for the work, and then for the
building repairs to be completed.
Since this matter has been ongoing for over 2 years, it is also fair that the insurer pay
compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair because the quotes on which the insurer based the proposed cash
settlement have not been shown to be actionable by the complainant, nor to reflect all the
necessary repair work. As well, the claim-related damage cannot be repaired in isolation,
without the significant issue of mould first being thoroughly addressed and remediated.
Having regard to all the claim-related damage, and the need for this matter to be resolved as
soon as possible, it is fair and appropriate that the cash settlement be based broadly on the
complainant’s most recent available quote, but offsetting contents to be covered against a
deduction for the balcony and sliding door.
It is also fair that the insurer investigate and assess any further damage the complainant says
has since occurred because of the unrepaired state of the building.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to:
make a cash settlement of $126,500 to cover claim-related repairs and damaged
contents, within 7 days of the complainant accepting this determination. To be clear,
that takes account of an off-set for balcony/sliding door costs for which the insurer is
not responsible. It does not included any further building damage which must now be
investigated and assessed
promptly engage an appropriately qualified independent mould specialist to complete
a detailed mould analysis and quote (actionable by the complainant) for a full mould
remediation. The insurer is liable for the cost of that remediation and is required to
cash settle the complainant the cost of that quote. That is in addition to her builder
SLA’s quote of $126,500, to the extent the remediation quote includes matters not
already covered in SLA’s building repair work
pay $4,000 compensation for non-financial loss for its handling of the claim, including
for upset and inconvenience caused by delays, inadequate repairs, inappropriate
temporary accommodation and health concerns from mould
contribute $2,000 towards the cost of the complainant’s expert reports
Determination | Case number: 785343 Page 3 of 10
continue to cover suitable temporary accommodation for the complainant and her
family (that is, ‘home’ style, not hotel) for a period of 20 weeks from the date the
complainant accepts this determination.
Determination | Case number: 785343 Page 4 of 10
2 Reasons for determination
2.1 Is the insurer liable for the balcony and sliding door?
Policy covers listed events
The complainant holds a Platinum Home & Contents Insurance policy which covers loss or
damage caused by any of the insured events outlined in the product disclosure statement
(PDS).
The policy makes it clear that an ‘insured event’ is always ‘ a single event, accident or
occurrence which you did not intend or expect to happen ’ .
‘S torm ’ is one of the insured events, and means:
a storm, cyclone or severe atmospheric disturbance. It can be accompanied by
strong winds, rain, lightning, hail, snow or dust.
The policy also covers accidental damage that is not otherwise excluded under the policy.
However, certain conditions and exclusions apply, including general exclusions for damage
arising from a failure to keep the home and contents well-maintained and in good condition;
and from wear, tear and gradual deterioration.
There is no dispute there was a severe storm event and there was water ingress to the
property.
Expert reports do not establish one-off storm event caused waterproofing to fail
The complainant lodged a claim on 16 February 2020 following the discovery of several
leaks. Both parties provided expert reports.
The insurer initially denied the claim in full saying the water ingress was caused by
maintenance-related issues. However, the insurer subsequently accepted liability for damage
caused by two of the four identified leaks. The insurer provided a leak detection report and a
quote for internal repairs by SH in the amount of $10,347.70.
SH conducted dye/saturation tests on the top balcony above the lounge room, and a
saturation test on the lower balcony above the entry foyer. With regard to the top balcony, SH
concluded that during heavy rainfall water makes its way through the cracked tiles, under the
door frame and into the wall cavity, then making its way onto the hallway ceiling below; the
top balcony had a failed waterproofing membrane.
SH discovered the same waterproofing issues with the lower balcony and found water was
leaking through the sliding door frame and making its way onto the bulkhead of the foyer
entry ceiling below. SH noted there was evidence of previous attempts to seal the door frame
sill. Colour photographs were provided to support S’s findings.
The insurer says the failure of the waterproofing mechanisms at the balcony and sliding door
constitute a maintenance issue, which is not one of the events covered by the policy, but is
excluded.
The complainant, however, maintains that high winds during a storm compromised and broke
the membrane under the sliding door and fixed bay window panels. She says that up until the
Determination | Case number: 785343 Page 5 of 10
storm, there was no leaking or damage since the membrane was replaced and the balcony
retiled in 2015; but now all leaks were coming from the sliding door and bay window panels.
She has provided a report from building consultants MPI who inspected and concluded the
damp ingress was caused by significant damaging winds. MPI stated the leaks are not a
result of a failed or inadequate waterproofing membrane or any associated contractor.
However, the panel is not satisfied MPI has established a causal link between a single
storm event and the claimed balcony/sliding door issues.
Insurer had dealt with previous water ingress claims
The evidence shows there had been previous water ingress issues in the property, some of
which had been considered/dealt with by the insurer under previous claims. As set out below,
the insurer has accepted liability for certain residual related issues, and they are being
covered under the current claim as follows:
1. water damage and mould was found in the front bay window area of the master
bedroom. The complainant had been cash settled for resulting damage under a
previous claim, but (while the insurer had conducted interim make-safe works) the
insurer had not advised her she needed to carry out thorough repairs of the
maintenance issues that gave rise to the damage in the first place. The insurer has
therefore appropriately accepted liability for the additional internal water damage
identified, under this current claim.
2. roof of the pergola had previously been replaced by the insurer under an earlier
claim. However that work was found to have been inadequate, and so the insurer has
appropriately agreed to cover the cost of rectifying the pergola roof and covering the
resulting internal damage, under the current claim. The panel understands that
rectification work has now been completed.
The complainant had also previously lodged a claim for the upstairs balcony, but that had
been withdrawn after it was found the failed waterproofing was the responsibility of a previous
builder. The complainant has said she completed the necessary repairs herself, and she has
provided evidence from June 2015 for that work. The panel is satisfied, on the available
evidence, she did take steps to attend to those issues. That does not necessarily mean,
however, the more recent water ingress was because the storm damaged the repaired area.
Insurer not liable under the policy for balcony and sliding door
On the basis of SH’s report, the insurer agreed to cover resulting damage from the water
ingress, but not to repair any waterproofing issues with the balconies themselves because the
available evidence did not show the damage was caused in a single storm event. Rather, the
evidence indicated the waterproofing systems had failed over time due to deterioration and
wear and tear. That meant the damage was a maintenance issue for which the complainant is
responsible.
On the available evidence, the panel is not satisfied the complainant has shown the balcony
and sliding door waterproofing failed due to a single insured storm event, which is required for
the policy to respond. Instead, it is clear there were previous issues with the waterproofing
and water ingress, and even if work was carried out since then to address those issues, that
in itself does not establish a single storm event was the cause of the later damage in that
area. Even if the high winds from a storm event caused tiles above the complainant’s
bedroom to move, as the complainant has submitted, that also does not establish a storm
was the proximate cause of the water ingress at the balcony and sliding doors.
Determination | Case number: 785343 Page 6 of 10
That means the insurer is not liable for repair of the balcony and sliding door issues under the
terms of the policy, although it is fair and appropriate in the circumstances that the insurer
cover the cost of repairs for the resulting internal water damage, as it offered to do.
2.2 What is the extent of insurer’s liability for other damage ?
The complainant has provided quotes and reports (now over a year old) from building
consultant MPI and builder AB, ranging from $125,000 to $148,000. However, those quotes
included the balcony waterproofing and sliding door, and did not separately itemise the
different components of the work. Nor did they persuasively address causation or justify the
inclusion of the balcony and sliding door in the proposed scope of works.
The insurer has indicated it considered the complainant’s quotes excessive. However, the
panel notes, by contrast, that the substantially lower quotes on which the insurer has offered
to cash settle have not been shown to be actionable by the complainant as a retail customer,
nor to include all internal repairs likely to be necessary. The panel is not satisfied that the
insurer’s cash settlement offer is fair in the circumstances, either as to the scope or works or
the applicable amounts.
The complainant has more recently provided a scope of works and (now expired) quote dated
1 November 2021 from builder SLA, together with an explanatory letter from him. The quote
(for $126,500) still includes work to repair the balcony waterproofing and sliding door, but is
also not itemised sufficiently clearly to identify the amount(s) attributable to that work for
which the insurer is not liable under the policy.
The complainant has said she would be prepared to cash settle the claim based on SLA’s
quote. However, while it includes work for which the insurer is not responsible, that amount
does not include other costs for which the panel considers the insurer should be liable.
It also does not included potential further building damage which the complainant says has
occurred since that quote was prepared.
Full mould assessment and remediation required
Importantly, SLA’s quote does not include specialist mould assessment or remediation
(beyond certain physical building elements).
When the insurer’s restorer S inspected in June and July 2021, their report noted ‘visible
microbial growth’ in the main bedroom and lounge room ; and water stains and a ‘strong
musty smell’ in the hallway and other areas. Much of that is likely to have occurred because
of ongoing water ingress from the balcony/sliding door issues, which remained unrepaired
because the insurer had not told the complainant its initial make-safe needed to be followed
up with more substantial maintenance work. Although the insurer did conduct some mould
remediation works, the complainant says mould has reappeared since.
Given the extent of the water ingress and the extended period over which mould will have
been able to further develop, the panel is not persuaded the water damage and mould can be
thoroughly remediated without a full ceiling replacement (as confirmed by the complainant’s
builder SLA and included in his quote).
More recently, the insurer has said they have attempted to attend the property to undertake
further mould remediation, but the complainant has not agreed to that until the internal repairs
are completed.
Determination | Case number: 785343 Page 7 of 10
The panel acknowledges the insurer ’s attempt to address the mould. However, it considers a
premature and possibly incomplete mould remediation (when there is likely continuing water
ingress and the further spread of existing mould until other repairs are completed), would be
ineffective in fully dealing with the issue.
In the circumstances, the panel considers it fair and appropriate that the insurer be liable for a
new specialist mould assessment, and the necessary remediation (which may extend beyond
the costs and issues set out in SLA’s quote) .
Insurer liable for some contents items
The complainant has also claimed for several significant contents items which she says were
damaged by the water ingress, developing mould and actions by the insurer’s contractors:
lighting, motorised blinds, pure silk curtains, lounge suite, and a rug. She has provided
invoices and other evidence of value, which totals about $31,000.
On the available evidence, the panel is satisfied the insurer should be liable for damaged
contents (notwithstanding some were already showing signs of wear). However, as set out
below, the panel considers it fair that be offset against a deduction for the balcony/ sliding
door work included in SLA’s quote .
Compensation for non-financial loss is warranted
The claim was first made in February 2020. Since then there have been a number of issues
with the quality and completeness of the repair work, and the need for further rectification.
The complainant has also said that the insurer has made various payments into her account
for work undertaken so far. From that she then paid contractors she had to find and from
whom she had to source quotes (to be provided to the insurer) in the first place. During that
period, she says, there was no specific cash settlement offer made by the insurer. It appears
that the complainant herself has had to undertake a considerable amount of time and effort in
dealing with the practicalities of arranging work for which the insurer was responsible.
In the meantime, she and her family have had regular moves between temporary
accommodation, most of which has been quite unsatisfactory for her family circumstances.
She has also had the continuing inconvenience and stress of being unsure when that benefit
might end.
The issue of mould in the home also raised the real concern about health impacts (while the
family was still there). The insurer’s restorer S noted (in their attendance in September 2020)
that the complainant was coughing, and they observed ‘[it] may be due to the level of
contaminants in the main bedroom. The level of contami nants may pose a health risk’.
AFCA may award compensation for non-financial loss where there has been a significant
degree of upset and inconvenience caused to a complainant by the insurer’s handling of a
claim. The panel is satisfied compensation of $4,000 is fair in this case.
Temporary accommodation cost to continue
One of the complainant’s builders indicated a repair time of up to 2 months should be
allowed. There is nothing to suggest that is unreasonable.
However, time also needs to be factored in for a mould assessment first, and any additional
remediation for that (not already included in the general repair quote). It is unclear how long
that might take, however, the panel considers it reasonable to allow 3 weeks for that.
Determination | Case number: 785343 Page 8 of 10
In the current climate, it is likely the complainant may not be able to immediately source a
suitable builder to commence the repair work once the mould has been addressed. The panel
considers 6 weeks should be allowed for that.
In the circumstances, the panel is satisfied the insurer should continue to cover 20 weeks of
temporary accommodation for the complainant an her family, from the date she accepts this
determination.
To be clear, the accommodation needs to be a home (and not hotel rooms) suitable for the
complainant’ s family circumstances.
Fair that insurer contribute to complainant’s expert reports
The complainant says she has paid a total of $5,500 for her own expert reports from MPI and
AB. She has provided evidence in support.
The panel notes the reports supported elements of the complainant’s position (for example,
with regard to mould and the extent of related repairs required). They did not, however, assist
her in relation to establishing the balcony/sliding door should be covered by the insurer.
In the particular circumstances, the panel considers it fair that the insurer contribute $2,000
toward those costs.
2.3 Why is the outcome fair?
With regard to remaining repairs, the outcome is fair in the circumstances because the
ins urer’s quotes have not been shown to be actionable by the complainant (sufficient to allow
all the work for which the insurer is liable to be carried out fully); while the complainant’s
quotes do not provide enough detail to substantiate/separately itemise the extent of all costs
being claimed. The position of using the complainant’s most recent quote as a basis for cash
settlement, but making relevant offsets to allow for that uncertainty (and cover contents), is a
fair compromise in the particular circumstances.
The outcome also requires investigation and assessment of further damage the complainant
says has occurred since her builder’s quote. It is fair that a cash settlement be made in the
meantime, as set out in this determination, but also that the insurer consider (and cover) any
further related damage which is identified.
Given the time taken to resolve the claim and the manner in which it has been handled by the
insurer, it is also fair that compensation and reimbursement of some of the complainant ’s
costs be paid, and that temporary accommodation continue to be covered, as set out above.
Determination | Case number: 785343 Page 9 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Policy extracts
General exclusions
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric
or climatic conditions or gradual deterioration such as but not limited to :
Determination | Case number: 785343 Page 10 of 10
tiles and their adhesive or grouting breaking down;
weathering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.