Home / Chubb / Determination 784852
Determination 784852
Loss of rent claim declined under strata policy
Summary
The complainant, an owner of a strata unit, claimed loss of rent after water damage insured under the strata policy. AFCA found the insured works made the unit unfit to be occupied for two weeks and ordered payment of $1,900 plus interest, rejecting the remaining loss of rent and finding no undue delay.
Loss of rent under the policy is payable only where covered damage made the unit unfit to be occupied for its intended purpose, limited to the period of the covered works.
Issues
- Claim denial primary · upheld“The insurer must indemnify the complainant for two weeks of loss of rent.”
- Delay secondary · not upheld“There was no undue delay in the claims process.”
Subjects and remedies
third party authoritypay claimpay interest
Related
Text of the determination
Determination
Case number 784852
Financial firm Chubb Insurance Australia Limited
Determination | Case number: 784852 Page 1 of 10
Case number: 784852 12 November 2021
1 Determination overview
1.1 Complaint
The complainant owns a unit in a building insured under a residential strata insurance policy
issued by the insurer (the financial firm). The insurance policy was held by the strata
corporation and as a unit owner the complainant was a third-party beneficiary under the
policy.
The complainant’s long-term tenants gave notice to terminate their lease. When the
complainant visited the unit after they moved out he found water damage in the hallway,
dining room ceiling and bedroom. A claim was lodged with the insurer by the strata
corporation.
The insurer settled the claim with the strata corporation for the damage to several units in the
building. The complainant sought to recover loss of rent from the insurer. The insurer said
that any loss of rent was not due to the damage covered by the policy, but was due to other
matters outside the policy coverage.
1.2 Is the insurer entitled to deny the claim for loss of rent?
The insurer must indemnify the complainant for two weeks of loss of rent.
1.3 Was there any undue delay in the claims process?
There was no undue delay in the claims process.
1.4 Why is the outcome fair?
I consider that the outcome is fair as the complainant will receive a payment for two weeks of
loss of rent. This takes into account the works covered by the policy when he was unable to
rent the unit and the property was unfit to be occupied. It would not be fair for the insurer to
pay for more than two weeks of loss of rent as the other works that the complainant
undertook to the unit were not covered by the policy. The complainant has otherwise received
a cash settlement for all other damage to the units covered by the policy. The insurer is not
liable for the mould as there is no evidence that the mould was caused by the insured event.
The insurer has not unduly delayed finalisation of the claim.
1.5 Determination
This determination is substantially in favour of the insurer. The insurer is not required to pay
the complainant for the full amount of loss of rent claimed. The insurer is required to pay the
complainant for two weeks of loss of rent, which relates to the time during which the insured
works were being undertaken, this is a total of $1,900. Interest in accordance with section 57
of the Insurance Contracts Act 1984 (Cth) is payable on the cash settlement from 1
December 2020 (being the date that the claim for loss of rent was declined) until payment of
the claim.
Determination | Case number: 784852 Page 2 of 10
Determination | Case number: 784852 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim for loss of rent?
The complainant seeks cover for loss of rent
The complainant says that the insurer should cover his loss of rent for the period while repairs
were being undertaken to the unit. The insurer says that the damage that was covered by the
policy was minor and did not mean that the unit could not be rented while the works were
undertaken.
The complainant accepts that the extent of the damage may not have caused an ongoing
tenancy to be frustrated. But he says that he should be paid under the policy for loss of rent.
This is because the damage occurred at a time when the unit was to be leased out and there
was a high likelihood that a prospective tenant would not want to rent a unit with water
damage present. He says that the unit was unfit to be occupied for its intended purpose.
The complainant argues that the ‘intended purpose’ is for the u nit to be leased out at a
reasonable market rate.
The cover provided under the policy
The product disclosure statement (PDS) sets out the terms and conditions of the policy.
The policy provides cover for
Physical loss or destruction of or damage to Insured Property caused by an Event
occurring during the Period of Insurance and not otherwise excluded.
‘Event’ is defined as
Occurrence or accident causing or resulting in sudden and unforeseen, physical
loss or destruction of or damage to Insured Property.
The insurer engaged third party loss adjusters to undertake a series of inspections of the
complainant’s unit and other units in the building . The insurer later accepted liability and paid
a cash settlement for part of the water damage caused by a burst water pipe. The insurer
says that part of the damage to the complainant’s unit was caused by an event not covered
by the policy. That is, it was not caused by a sudden and unforeseen occurrence or accident.
The policy also excludes
loss, destruction or damage caused by or arising directly or indirectly from:
[…]
wear and tear, fading, scratching or marring, gradual deterioration or developing
flaws, rust or oxidisation, mildew, mould, wet or dry rot, corrosion, concrete or
brick cancer, normal upkeep or making good.
Determination | Case number: 784852 Page 4 of 10
The insurer says that part of the damage to the complainant’s unit was as a result of wear
and tear and so was excluded from cover.
The policy owner (the strata corporation) was cash settled for damage to several units in the
building which was covered under the policy.
Cover for loss of rent under the policy
The policy provides cover for loss of rent in these circumstances:
Following loss, destruction or damage covered under this [section] of the Policy,
[the insurer] will also pay, in addition to the Sum Insured, the following amounts,
costs and expenses incurred in consequence of the loss, destruction or damage.
Where the [unit] is leased out or would have been leased out, the Loss of Rent
incurred by the [unit] Owner if the [unit]… is made unfit to be occupied for its
intended purpose.
[the insurer] will pay from the time of the loss, destruction or damage until the time
the [unit] is re-let following completion of reinstatement or replacement of your
insured property, provided the [unit] owner takes all reasonable action to obtain a
new tenant.
‘Loss of Rent’ is defined as:
As regards any [unit]… leased to a tenant, an amount of money for lost ren t
calculated on the basis of the Annual Rentable Value that applied immediately
prior to the event causing loss or damage.
The loss of rent benefit is only payable if the loss of rent was incurred because of damage
otherwise covered by the policy, and where that damage meant that the property was unfit to
be occupied for its intended purpose.
There was some loss of rent due to the damage covered under the policy
I accept that the complainant decided to undertake structural maintenance works to the unit.
This was aimed at fixing underlying water leak problems which were not covered by the
policy. Once those works were completed, the insured works could be undertaken. The
insured works were not structural, and the insurer has estimated that the insured works would
take two weeks. Nevertheless, it should be considered whether the unit could be leased while
the insured works were being undertaken.
I find that at least two weeks’ loss of rent is due to the insured works taking place.
Was the unit unfit to be occupied while the insured works were taking place?
The insurer says that the unit was not unfit to be occupied while the insured works were
taking place, as they were minor and non-structural. The insurer says that the complainant’s
previous tenants did not end the lease due to the insured damage, but gave notice and ended
the lease before the insurance claim was made.
Determination | Case number: 784852 Page 5 of 10
The insured works were to the following areas in the unit:
- The entry/lounge/dining – application of sheeting to floor and furniture for dust
protection, removal and replacement of bulk head plaster ceiling (12 square
metres) involving plastering, sanding, sealing and repainting of ceiling and
bulkhead
- First floor main bedroom - application of sheeting to floor for dust protection,
removal of timber architraves and 16 metres of skirting boards, replacement of
same, sealing and repainting of walls, skirting, architraves, door and door jamb
- Hallway - application of sheeting to floor for dust protection, remove 4 metres of
skirting and architraves, sealing and repainting of walls, skirting and architraves.
While these works were relatively minor in nature, I find that they would render the unit unfit to
be occupied while they were being carried out. The presence of sheeting and the removal of
plaster bulkheads, sanding and painting would interfere with the occupation of the unit. For
the unit to be fit to be occupied, at a minimum it would need to comply with the standards in
the Residential Tenancies Act NSW . That legislation includes an obligation to provide
residential premises in a reasonable state of cleanliness and fit for habitation by a tenant.
This includes being structurally sound. Being structurally sound includes being in a
reasonable state of repair, and with respect to floors, ceilings, walls and supporting
structures, not subject to significant dampness.
I do not consider it relevant that the unit was not leased at the time that the works were being
undertaken. Once the complainant had carried out the structural (non-insured) works, there
was an ongoing need for the insured works to be undertaken. The insured works were
required whether or not the complainant undertook other works. I consider that the need for
these works means that the unit would not have been attractive to a prospective renter. The
carrying out of the insured works would likely have made it impossible for the complainant to
rent out the unit before, or while, they were undertaken. The report of the insurer’s loss
adjuster confirms this: ‘any repairs completed wi thin a rented unit is going to cause
inconvenience to a tenant and it is harder to secure a tenant when there are repairs to be
completed ’. The insurer’s underwriting agent which issued the policy agreed that ‘it would be
more difficult to secure tenants w hilst repairs are pending’, and that ‘the repairs are minor
however, any repairs would create an inconvenience for a tenant who would have to allow
access for trades and have areas restricted during the course of repairs.’
I consider that the complainant was proposing to lease out the unit, but for the need for the
uninsured and insured works. The complainant had appointed a real estate agent with
exclusive rights to lease and manage the unit.
I consider that the complainant is not entitled to loss of rent for the period during which he
was undertaking structural repairs to the property that were not covered by the policy.
However, once those works were complete, the insured works which were estimated to take
two weeks. This would have meant that the property was not fit to be occupied until those
works were carried out.
The amount of loss of rent payable by the insurer
Under the policy the amount of loss of rent is calculated on the basis of the ‘annual rentable
value’ that applied immediately prior to the e vent causing loss or damage. The fortnightly
rental set out in the lease agreement that applied up until the previous tenant terminated the
lease was $1,900. I consider that the insurer should pay this amount to the complainant.
Interest in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) is payable
Determination | Case number: 784852 Page 6 of 10
on the cash settlement from 1 December 2020 (being the date that the claim for loss of rent
was declined) until payment of the claim.
Whether the insurer is liable for any mould damage in the unit
The complainant says that the unit was affected by mould caused by the water damage. He
says this has not been assessed or addressed by the insurer.
It is not clear that the complainant raised the issue of mould damage directly with the insurer
whe n the insurer was assessing the claim. The insurer’s loss adjuster should have identified
any mould present at the time of the inspections if it was evident. The third report provided by
the loss adjuster identified that drying of the walls may be required before the repairs started.
The insurer has not confirmed whether there was any mould in the unit and, if so, if it was
caused by the insured event.
As there is no information that supports a case that there was mould in the unit which
occurred as a result of the insured event, I consider that the insurer is not liable for any mould
damage.
2.2 Was there any undue delay in the claims process?
No undue delays in claims process
The complainant says that the claims process was unnecessarily long and gave examples in
support. The complainant says the delay caused him distress, significant inconvenience and
productivity loss.
The date of loss occurred around 11 August 2020, the claim was lodged on 3 September
2020 and recommendations were provided by the insurer’s loss adjuster on 29 October 2020.
Upon notification of the claim the insurer arranged an assessment of the extent of damage to
the unit. The insurer’s loss adjuster produced five reports which examine d the complainant’s
unit and other units in the building. This was because the units were insured under the same
policy, and water damage issues were evident in several of the units.
The insurer made a decision on the claim and arranged for a cash settlement within two
months of the claim being lodged. There was some delay due to difficulties accessing one of
the units in the building, I do not consider the overall timeframe in the context of a claim of
this nature to be unreasonable in the circumstances.
The complainant raises a concern that the insurer overly delayed the claim and caused him to
suffer additional loss of rent. I do not find that this is made out.
The property required inspection by several parties, as well as investigations being
undertaken to the units above and next door to the complainant ’s . These matters necessarily
added a layer of complexity to the claim and the time taken to bring it to conclusion.
I consider that the insurer’s management of the claim was reasonable in the circumstanc es
and that the insurer is not liable for any losses outside the policy terms.
2.2 Why is the outcome fair?
I consider that the outcome is fair as the complainant will receive a payment for two weeks of
loss of rent. This takes into account the works covered by the policy when he was unable to
rent the unit and the property was unfit to be occupied. It would not be fair for the insurer to
Determination | Case number: 784852 Page 7 of 10
pay for more than two weeks of loss of rent as the other works that the complainant
undertook to the unit were not covered by the policy. The complainant has otherwise received
a cash settlement for all other damage to the units covered by the policy. The insurer is not
liable for the mould as there is no evidence that any mould was caused by the insured event.
The insurer has not unduly delayed finalisation of the claim.
Determination | Case number: 784852 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 784852 Page 9 of 10
3.2 Definitions in the insurance policy
The calculation of loss of rent is set out in the PDS as follows:
Annual Rentable Value
The amount specified in a lease agreement or the annual rentable value of similar
or like [units], including any outgoings payable by the tenant or lessee. The
Annual Rentable Value is adjustable:
a) in accordance with any existing increases or decreases in Rent specified in the
lease agreement; or
b) in the absence of a rental agreement or where no such decreases or increases
in Rent are specified, upon the (12) month anniversary of the Event, an increase
in accordance with the change in the Housing Group for the weighted average of
the eight capital cities within the Consumer Price Index (CPI) costs for the
proceeding four (4) CPI quarters prior to the anniversary date.
3.3 Chronology
.
The relevant dates are relating to this dispute are as follows:
Date Action
25 February 2020 Residential strata insurance policy commenced
14 July 2020 Tenant gave notice to terminat e lease
10 August 2020 Tenant vacat ed property, complainant inspected the property and
identified water damage in unit
3 September 2020 Claim lodged with insurer
7 September 2020 First building inspection by i nsurer’s loss adjuster
9 September 2020 First loss adjuster’s report
22 September 2020 Inspection by insurer’s wat er damage expert
23 September 2020 Report by insurer’s water damage expert
30 September 2020 Second building inspection by insurer’s loss adjuster
8 October 2020 Second loss adjuster’s report
12 October 2020 Third loss adjuster’s report – opinion on covered loss and
recommends cash settlement to strata corporation for repairs after
all maintenance issues addressed
Determination | Case number: 784852 Page 10 of
10
20 October 2020 Fourt h loss adjuster’s report – opines on loss of rent claim
23 October 2020 Policy owner advised of claim outcome
29 October 2020 Fifth loss adjuster’s report – rec ommends final cash settlement
amount
1 December 2020 Loss of rent claim declined by insurer
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.