Text of the determination
Determination
Case number 782879
Financial firm AAI Limited
Determination | Case number: 782879 Page 1 of 7
Case number: 782879 15 September 2021
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (the insurer). He lodged
a claim after a bathroom and ensuite were damaged by a leaking pipe. He asked the insurer
to cash-settle the claim because he wanted to install upgrades, rather than restoring the
rooms to their original condition.
The insurer has offered to pay $48,826.33 for repairs, based on a quote from its builder. The
complainant says the insurer should pay $80,107.72, the amount quoted by his builder.
The insurer has offered to pay for 12 weeks’ accomm odation. The complainant says the
insurer should pay for 43 weeks’ accommodation.
1.2 Issues and key findings
Is the insurer required to pay more for repairs?
Yes. The policy entitles the insurer to pay a cash settlement based on its builder’s quote.
However, the insurer’s builder’s quote omitted some work that would have been necessary to
repair claim-related damage. The cost of this omitted work is $5,675.40.
The insurer must pay $5,675.40 for repairs, in addition to the previously offered amount of
$48,826.33. These amounts total $54,501.73.
Is the insurer required to pay more for accommodation?
No. The best available estimate of the repair time is 12 weeks. The policy does not cover the
cost of accommodation for longer than it will take to complete repairs. The insurer is not
required to pay for more than 12 weeks’ accommodation.
Is the complainant entitled to other compensation?
No. The insurer did not cause the complainant to suffer additional losses by mishandling the
claim. Therefore, the complainant is not entitled to compensation outside the policy terms.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer must settle the claim by paying the complainant:
$54,501.73 (less any amounts already paid) for damage to the bathroom and ensuite
$16,800 (less any amounts already paid) for accommodation.
The insurer may deduct the excess of $1,000, if it has not already been paid.
Determination | Case number: 782879 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer required to pay more for repairs?
Insurer agreed to pay cost of repairs
In or about September 2019, the complainant lodged a claim for damage in and around his
kitchen caused by water leaking from a pipe. The insurer settled the claim by paying for
repairs and temporary accommodation. The complainant has not lodged an AFCA complaint
about the insurer’s handling of this claim.
In or about March 2020, before the claim was resolved, the home’s bathroom and ensuite
were damaged by water leaking from another pipe. The complainant asked the insurer to
cover this damage as part of the first claim. The insurer said the second leak was unrelated to
the first leak, and required the complainant to lodge a second claim.
The complainant asked the insurer to settle the second claim by paying the cost of repairs,
rather than repairing the damage. This was because he did not want the bathroom and
ensuite restored to their original condition. He wanted to convert the two rooms into a single
room and install upgrades.
The insurer agreed to settle the claim by paying the cost of repairs. However, the parties
disagree on the cost of repairs.
Complainant obtained repair quote
For the first claim, the complainant says he obtained repair quotes from three builders. One
builder (DPD) quoted a much lower price than the others. The insurer settled the first claim
based on DPD’s quote. The complainant says he asked DPD to produce a quote for the
second claim because the insurer accepted DPD’s quote for the first claim.
DPD produced a scope of works and quote dated 8 May 2020 in the sum of $80,107.72. The
complainant says this quote was for the work required to restore the bathroom and ensuite to
their previous condition, and did not include the costs of converting the two rooms into one or
installing upgrades.
The complainant says he appointed another builder, who converted the two rooms into one.
He says this cost more than the amount quoted by DPD because he paid for some upgrades.
He says he does not know the exact cost of the work because he paid in cash, and the
builder did not provide a written quote or invoice.
The complainant says the claim settlement should be based on DPD’s quote.
Insurer obtained lower quotes
The insurer appointed a builder (JL), who produced a scope of works and quote dated 24 July
2020 in the sum of $27,596.61. The insurer offered to settle the claim based on this quote.
The complainant did not accept this offer.
The insurer appointed another builder (PP), who produced a quote (based on JL’s scope of
works) dated 16 September 2020 in the sum of $32,992.74. The insurer’s building coordinator
reviewed the quote, and said further items (such as demolition and replacing timber window
frames) should be added to it. PP produced an amended quote dated 16 October 2020 in the
sum of $41,237.79.
Determination | Case number: 782879 Page 3 of 7
The insurer has offered to pay $41,237.79 for the cost of repairs, plus $7,588.54 for the risk of
unexpected additional costs, a total of $48,826.33. The complainant did not accept this offer.
Insurer entitled to settle based on insurer’s quote
The policy says the insurer can settle a claim for building damage by repairing the damage, or
by paying what it would cost the insurer to repair the damage.
The insurer has provided a quote from PP showing it would cost the insurer $41,237.79 to
repair the damage. The complainant has provided a much higher quote for substantially the
same work. However, the complainant has not provided information showing the insurer could
not have had the work done for $41,237.79.
The panel is satisfied that the insurer c ould have had the work in PP’s quote done for the
quoted amount. Therefore, the insurer is entitled to settle the claim based on PP’s quote.
Insurer’s quote omits necessary work
PP’s amended quote omits the following work:
new shower screens in bathroom an d ensuite. This work was included in JL’s scope of
works
retiling hallway outside bathroom. The insurer’s assessor’s report of 1 April 2020 said the
insured event damaged floor tiles in the bathroom. The assessor’s photographs show the
tile damage extended to the bathroom entrance and into the hallway
screed floor in hallway outside bathroom. The insurer’s building coordinator said this work
should be included in PP’s quote.
The insurer said this work was unnecessary. However, for the above reasons, the panel
believes the work would have been necessary to repair claim-related damage.
DPD quoted the following amounts (including builder’s margin and GST) for this work:
$2,772 for new shower screens
$2,250 for retiling the hallway
$653.40 to screed the hallway floor.
These amounts total $5,675.40. The panel considers this amount should be added to PP’s
amended quote of $41,237.79, yielding a total of $46,913.19.
Insurer offered to pay contingency for transfer of risk
When the insurer settles a claim by repairing damage, it guarantees the quality of the repairs.
If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the
cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers
this risk to the customer. Furthermore, the customer may find it more difficult and expensive
to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining
power.
AFCA considers that where an insurer settles a claim by paying the cost of repairs, it should
consider paying an allowance for the transfer of risk. Generally, AFCA considers that a
reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
The insurer has offered to pay $7,588.54 for the transfer of risk. This is slightly more than
15% of $46,913.19 (the amount of PP’s amended quote, plus the items discussed above).
The panel is satisfied that this is fair in the circumstances. Adding $7,588.54 to $46,913.19
yields a total of $54,501.73.
Determination | Case number: 782879 Page 4 of 7
2.2 Is the insurer required to pay more for accommodation?
Policy does not cover further accommodation costs
The insurer has offered to pay for accommodation for the complainant for 12 weeks. The
complainant says the insurer should pay for accommodation for 43 weeks. The parties agree
that the accommodation costs should be paid at a rate of $200 per day.
The complainant says the policy covers the cost of accommodation from the time the claim is
lodged to the time it is settled. This is incorrect. The policy only covers the cost of
accommodation ‘for the time it will take to repair or rebuild your home to a liveable condition’.
DPD and PP estimated the repairs would take 12 weeks. The complainant has not provided
information showing the repairs would have taken longer than 12 weeks.
The insurer has offered to pay the complainant $16,800, being 12 weeks’ accommodation at
$200 per day. The policy does not require the insurer to pay more for accommodation.
Insurer not required to pay accommodation costs outside policy terms
The policy entitles the complainant to the cost of accommodation for 12 weeks. If the
complainant incurred additional accommodation costs because the insurer mishandled the
claim, it would be fair for the insurer to pay these costs, even if they are not covered under
the policy.
The complainant asked the insurer to settle the claim by paying the cost of repairs, not by
repairing the damage. He was responsible for arranging repairs. He has not provided
information showing the insurer prevented him from arranging repairs.
The available information does not indicate the insurer made an error that caused the
complainant to incur additional accommodation costs. Therefore, the insurer is not required to
pay accommodation costs, other than the costs covered under the policy.
2.3 Is the complainant entitled to other compensation?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a
complainant suffered an unusual degree of stress, inconvenience, or delay because an
insurer mishandled a claim.
We will only award this type of compensation if there has been an unusual degree of stress,
inconvenience, or delay. We will not award compensation for the usual amount of
inconvenience involved in making a claim. We will not award compensation for delays caused
by the complainant, or other factors outside the insurer’s control.
Complainant not entitled to compensation for non-financial loss
The insurer obtained quotes to repair the complainant’s h ome. Its building consultant
reviewed the quotes and asked for more work to be added. The insurer’s last offer still
omitted some necessary work, but this was a relatively small portion of the claim. Overall, the
panel considers that the insurer acted reasonably in handling the claim.
The complainant says he has suffered ‘severe depression and sleepless nights’ as a result of
his claims experience. The panel accepts that the complainant suffered stress and
Determination | Case number: 782879 Page 5 of 7
inconvenience in making this claim. However, the stress and inconvenience was mostly
because of the loss that led to the claim, not the insurer mishandling the claim.
The damage occurred while the complainant was still dealing with a previous claim. This may
have exacerbated the stress felt by the complain ant, but it was not the insurer’s fault.
The panel is not satisfied that complainant suffered an unusual degree of stress,
inconvenience, or delay because the insurer mishandled the claim. Therefore, the insurer is
not required to pay compensation for non-financial loss.
Outcome is fair in the circumstances
The policy entitles the insurer to settle the claim by repairing the damage, or by paying what it
would cost the insurer to repair the damage. The complainant asked the insurer to cash-settle
the claim rather than repair the damage.
The panel is satisfied that the insurer could have repaired the damage for the amount quoted
by PP, plus the cost of the disputed work items.
The panel is satisfied that this determination provides the fairest possible outcome, based on
the available information.
Determination | Case number: 782879 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with experience in consumer and small business advocacy
a member with experience in insurance.
3.2 Relevant policy terms
WHAT YOU ARE COVERED FOR – INSURED EVENTS (pages 23 – 37)
If you have a home insurance policy, we cover your home for loss or damage at the insured address
caused by an ins ured event during the period of insurance.
Escape of liquid
What is covered
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage
systems ( not forming part of a shower cubicle wall, floor or base);
…
Determination | Case number: 782879 Page 7 of 7
ADDITIONAL FEATURES (pages 38 – 47)
Temporary accommodation when you have home cover
What is covered
When you have home cover and you are living i n the home and an insured event damages your
home to the extent you cannot live there, and we agree, we will pay for your reasonable temporary
accommodation costs for the time it will take to repair or rebuild your home to a liveable condition.
…
HOW WE SETTLE YOUR CLAIM (pages 92 – 94)
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:
repair damage to your home;
rebuild your home;
pay you what it would cost us to repair or rebuild your home;
…
HOME CLAIM S (pages 94 – 94)
This section relates specific ally to a claim made on your home policy and is in addition to the
information in ‘How we settle your claim’ on pages 92 to 94.
Changes to your home
If you want to change the design of your home
When repairing or rebuilding your home, if we agree, you can choose to change the design of your
home or upgrade parts of it, providing you pay the extra c osts of doing this. If you want to downsize
your home for less cost than you are entitled to c laim, we will not pay mor e than it costs us to rebuild
the downsized home.