Text of the determination
Determination
Case number 782603
Financial firm AAI Limited
Determination | Case number: 782603 Page 1 of 6
Case number: 782603 13 May 2022
1 Determination overview
1.1 Complaint
The complainants have a listed events home and contents insurance policy with the financial
firm (the insurer).
On 23 January 2020, the complainants lodged a claim with the insurer after storm water
caused damage to their property. Ultimately, the insurer accepted the claim and assessed its
liability for the damage at $122,469.60.
The insurer has also included a 10% (or $12,246.96) contingence payment and $15,000 for
temporary accommodation which brings its total cash settlement to $149,716.56.
The complainants seek an additional $260,000, to resolve the claim and the complaint.
1.2 Issues and key findings
Is the insurer’s offer adequate?
Subject, to the insurer increasing its offer in accordance with the provisions of this
determination , the insurer’s offer adequately addresses the required repairs.
Are the complainants entitled to compensation?
Yes, the complainants are entitled to non-financial loss compensation due to the insurer ’s
management of the claim.
Why is the outcome fair?
The outcome is fair because the insurer’s scope of works and quote adequately address the
storm related repairs. However , the insurer’s initial handling of the claim has caused the
complainants to suffer an unusual degree of stress and inconvenience, therefore
compensation for non-financial loss is fair in the circumstances.
1.3 Determination
The determination is substantially in favour of the insurer.
The insurer is required to increase its offer to cash settle the claim in accordance with the
provisions of this determination. The insurer is required to facilitate payment within 21 days of
the date of this determination.
In addition, and subject to the complainants’ acceptance of this determination, the insurer is
required to pay $3,500, non-financial loss with in 21 days of the complainants’ acceptance.
Determination | Case number: 782603 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer’s offer fair in all the circumstances?
Circumstances of the complaint
There is no dispute the complainants ’ property sustained damage during an insured event
which occurred prior to the lodgement of the claim in January 2020.
In February 2021, following a protracted assessment, the insurer offered to cash settle the
complainants for the internal damage, in the amount of $6,399.48.
The complainants have raised concerns as to whether the insurer adequately identified the
required repairs and the cost of those repairs.
Following lodgement of the complaint with AFCA, the insurer’s internal assessor contacted
the complainants to express concerns regarding the assessment of the damage and arranged
to work with the complainants to develop an itemised and agreed scope of works.
After several attendances at the complainants’ property, the insurer created a scope of works
and quote with the assistance of builder JWBS. Initially, JWBS was prepared to undertake the
required repairs and the insurer was willing to authorise the same.
However, due to a break down in the relationship between the parties, the insurer cash
settled the complainants in the sum of $149,743.56. This included $122,469.60, plus a 10%
contingency of $12,246.96, what its assessor identified as being storm related damage, as
well as an additional $15,000, for temporary accommodation.
The complainant initially sought $709,500 to resolve the claim. This was based on an
assessment and scope of works provided by JH.
However, following conciliation, arranged by AFCA, the complainants have revised their
position and now seek a total of $400,270.34 which comprises of:
$324,120.00 based on a quote provided by PPS
$48,618.00 (or a 15% allowance for contingencies) based on PPS’ quote
$25,882.34 for temporary accommodation
$1,650.00 for a report fee
In a submission to AFCA, the complainants acknowledge the insurer has previously cash
settled them for $157,000 and therefore they only seek a further $260,000.
Complainants ’ quotes outside the scope of the storm related repairs
The complainants have provided several quotes and scope of works in response to that
provided by JWBS.
Initially the complainants provided a scope of works and quote from JH dated 28 May 2021.
The scope of works was substantially the same as that provided by JWBS. Therefore, it was
acknowledged that the issue in dispute appeared to be the cost to complete the repairs.
When provided with the scope of works from JH, the insurer acknowledged the similarities
however, raised concerns with JH’s costings. In addition, it was also concern ed that JH was
not suitably qualified to undertake the extent of the repairs it was quoting for.
Determination | Case number: 782603 Page 3 of 6
The insurer was of the view that the scope of works and quote provided by JWBS was
actionable and it was prepared to authorise JWBS to complete the repairs.
Following the conciliation, the complainants have confirmed that they rely on the quote
provided by PPS, which was provided to both AFCA and the insurer on 20 July 2021.
When comparing the quote from JWBS with that of PPS, it is evident that PPS has included
items in its quote which are above and beyond that of the agreed scope of works to repair the
damage.
PPS includes a contingency of almost $55,000, for damage which may not be identified once
the works commence, replacement of the entire kitchen cabinets and appliances and an
estimate almost three times that of the insurer’s estimate to replac e insulation.
PPS has provided an estimate of $21,750, to create an entry in the house to commence
works (via scaffolding) and then $28,745, for the works taking longer because it is required to
enter and exit the property via the scaffold. PPS has quoted $22,450 to return to the property
and repair damage in the future to newly repaired areas of the house. Finally, PPS’ quote
includes other significant increases such as the cost to remove furniture and the cost of a skip
bin hire.
Insurer’s assessment suff iciently addresses storm related repairs
When comparing PPS’ quote and scope of works against JWBS, the panel is not persuaded
that PPS has provided a like for like comparison.
As noted, the insurer’s assessor worked with the complainant to develop the sco pe of works
from which JWBS has provided a quote.
JWBS ’ scope of works and quote is itemised and addresses the aspect of the required repairs
in each room of the property. It includes items quoting for mould remediation, asbestos
removal, electrical, plumbing and other trades which is required to complete repairs in the
affected rooms.
The panel does not propose to address the line by line items in the scope of works and quote
provided by JWBS, other than to say it is itemised and sufficiently addresses the insurer ’s
liability.
On balance, the insurer’s assessment fulfils its policy obligations
Having reviewed the exchanged evidence, the panel accepts the storm has caused damage
to the property for which the insurer has agreed to cash settle the complainants. However, the
complainants’ quotes include items which are more than what the insurer is required to cover,
as a result of the storm related damage.
The scope of works provided by JWBS is persuasive and provides sufficiently more detail for
consideration than that of PPS.
JWBS’ scope of works is itemis ed and sufficiently detailed to address the damage that was
caused by the storm. The quote provide by PPS includes items which were not damaged or
caused by the storm.
These items include a significant allowance of contingency for damage which may not even
eventuate, total appliance replacement, a significant increase on the cost to replace insulation
and the creation of an entry to the house to start works.
Determination | Case number: 782603 Page 4 of 6
In contrast, the insurer’s quote is itemised and addresses the sections of damage throughout
the house. The panel accepts that while damage has occurred to the property, the
complainants’ quotes are excessive.
Fair the insurer cash settles the complainants for the required repairs
The insurer has confirmed it has issued the cash settlement to the complainants for the
repairs it says it is liable for. However, the complainants remain unsatisfied with the insurer’s
offer. Additionally, the complainants’ preference is for the insurer to undertake the repairs.
The panel is concerned that due to the breakdown of trust and relationships between the
complainants and insurer, if it were to find that the insurer is required to undertake the repairs,
this would cause further issues between the parties. It will also not bring finality to the
complaint.
Therefore, the panel considers it fair in the circumstances for the insurer to cash settle the
complainants for the cost of repair works as quoted by JWBS
However, given the age of this quote and the complexity of the dispute, the insurer is required
to increase its allowance for contingency from 10% to 20% on the original quote provided by
JWBS, due to the transfer of risk to the complainants. The panel notes the insurer has
already included and paid the complainants a 10% contingency (or $12,246.96).
Therefore, the insurer is only required to pay an additional 10% (or $12,246.96) on top of the
cash settlement already paid to the complainants.
Regarding the question of temporary accommodation, the panel notes that the insurer has
offered to pay an additional amount of $1,573.96, which is substantially less than the amount
sought by the complainants.
Based upon the exchanged material the panel is satisfied that the submission regarding
temporary accommodation, presented by the insurer, is supported by evidence and is
persuasive.
To finalise the question of temporary accommodation the panel is of the view that the insurer
should pay the complainants, the additional rounded up figure of $2,000.00.
Finally, the panel is not satisfied it should reimburse the cost of the report the complainants
obtained from JB, as the panel did not rely upon this report in reaching its determination.
2.2 Are the complainants entitled to compensation?
Yes. The insurer’s handling of th e claim has resulted in undue delays causing the
complainant an unusual degree of physical inconvenience and stress. The panel considers
compensation of $3,500 under AFCA rule D3.3 for non-financial loss is fair in the
circumstances.
Compensation paid in some circumstances
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer has caused the complainant to suffer an unusual degree or
extent of inconvenience, delay or interference. AFCA takes a conservative approach when
considering any award of compensation.
It is clear that the scope of the complaint evolved while on foot with AFCA. The complainants
say the insurer has shown a total disregard for their wellbeing which has caused additional
Determination | Case number: 782603 Page 5 of 6
stress and trauma throughout the claim’s process. The complainants say their children were
hospitalised and suffered health issues due to the stress associated with the claim as well as
the living conditions within the property.
The panel has carefully reviewed the information exchanged and the insurer’s actions since
being notified of the claim and subsequent notification of the complaint being lodged with
AFCA. The information before the panel shows that the insurer has contributed to the
unreasonably long period it has taken to finalise this claim.
The complainants lodged the claim in January 2020 and it took it almost 13 months for the
insurer to make its initial cash settlement offer of $6,399.48. Following referral to AFCA, the
insurer then increased its offer to cash settle the complainants for the repairs by over one-
hundred thousand dollars. The panel is satisfied that this shows that during the period leading
up t o the first cash settlement, the insurer’s management of the claim and understanding of
the required repairs was grossly underappreciated or considered.
The panel considers the insurer has not acted in a timely manner in its communications with
the complainant having regard to the General Insurance Code of Practice. Its handling of the
claim has caused the complainants to suffer an unusual degree of physical inconvenience
and time taken to resolve the situation.
In the circumstances the panel determines that within 21 days of the complainants ’
acceptance of this determination, the insurer is to pay the complainants ’ compensation of
$3,500 for non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair because the insurer has established and identified the repairs required
following the above-mentioned incident. While the complainants have raised concerns
regarding the level of repairs they consider is required, the insurer’s evidence does not
indicate this work is required.
Determination | Case number: 782603 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.