Cyclone damage claim - faulty flooring repairs by insurer's contractor

FirmWestpac
Decided2021-11-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home flooring, repaired by the insurer's contractor after a cyclone claim, failed within two months. AFCA found faulty workmanship, ordered the insurer to cash settle the flooring based on averaged quotes plus 15% contingency and pay temporary accommodation, and awarded $1,000 non-financial loss.

Expert evidence showed the flooring works were not done properly, so the insurer must rectify the flooring via cash settlement, and non-financial loss was awarded for prolonged outstanding repairs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 781652 Financial firm Westpac General Insurance Limited Determination | Case number: 781652 Page 1 of 5 Case number: 781652 15 November 2021 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). He lodged a claim on 4 April 2017 for damage following a cyclone. The insurer accepted the claim. The insurer authorised repairs and cash settled various items. The repairs included the flooring, plasterboard and painting. The complainant contacted the insurer on 30 July 2019 to advise the flooring was lifting and raising concerns about the painting. The insurer engaged and authorised A to rectify the flooring, plasterboard and painting. About a couple of months after A stopped work, the complainant contacted the insurer to advise the floor had begun to blister. The insurer engaged experts to assess the damage. The insurer denied it was liable for any further work. The insurer says the issue is unrelated to the quality of repairs or the original claim. The complainant disputes this. 1.2 Issues and key findings Is the insurer required to undertake rectification? Yes. The available information shows the floorboards were not properly installed. Should the insurer pay non-financial loss? Yes. After two attempts, there are still substantive rectification works required. Therefore, the insurer should pay $1,000 in non-financial loss. 1.3 Determination This determination is substantially in favour of the complainant. The insurer should settle the flooring as set out in section 2.1. The insurer should pay $1,000 in non-financial loss. Determination | Case number: 781652 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer required to undertake rectification? Both parties have provided expert reports The insurer has relied upon reports by A and M. As these reports have been exchanged, I do not propose to summarise them in detail. A says the damage appears to be due to a water source within the house flooding the area. This has caused the breakdown of the floorboard’s glue. M’s opinion was different. Whilst M accepted the concrete slab had a high level of moisture, M concluded this was due to rising damp under the floor penetrating a deteriorated damp proof membrane. The complainant engaged builder C. C lifted floorboards in the worst affected areas. C observed a strong acid odour was present as well as a breakdown of the adhesive, sealer/binder and self-levelling compound. C concluded the cleaning of the slab was the most likely cause as it left an acid residue which reacted with the sealer/binder and adhesives. Information shows there was faulty workmanship with the flooring After careful consideration of all the expert evidence, I note the following. A’s opinion is not compelling. It is not independe nt. The opinion that a water event top side has caused all the damage is not consistent with either M or C. Further, it is difficult to accept such a leak has resulted in widespread damage to the flooring but left little other obvious damage. If I accept e ither M or C, then there is an issue with A’s workmanship. M says the cause was rising damp through the subfloor. A was aware of this risk and had installed a cement based waterproofing membrane to mitigate this. If this has failed within two months, then it is reasonable to conclude this was not installed correctly. C raised concerns with the way the concrete slab was cleaned and how it reacted with the adhesive and sealer . C’s opinion is plausible given the evidence of residue throughout the floorboards. Whilst A says this residue is efflorescence, it is not clear how this developed in such a short timeframe or became so widespread. Regardless, if I accept either C or M, then A has conducted faulty workmanship. The floorboards have failed within two months of installation. Both C or M attribute this to issues with either the waterproofing or how the concrete slab was cleaned and prepared. On either opinion, it is clear the works were not done properly. No evidence painting on door was done improperly Regarding the painting, no evidence has been provided by either party. A said the painter would not attend due to previous issues with the complainant’s behaviour. C’s report makes no mention of this. For the door, A said this was working when they left. A did not find any evidence of poor workmanship when attending. Neither C nor M mention the door. Determination | Case number: 781652 Page 3 of 5 Given the limited information, I am not persuaded there is sufficient basis to conclude the insurer is liable for these issues. Insurer should settle the flooring in this way The insurer is liable to rectify the flooring. The insurer has raised concern about having its contractors do the works due to previous issues with the complainant’s behaviour. The insurer provided contemporaneous notes and emails demonstratin g several contractor’s concerns with the complainant’s behaviour. The complainant has not disputed this. Given this history , I agree with the insurer’s position that a cash settlement is fair. Therefore, the insurer is to cash settle the complainant’s claim based on an actionable quote to rectify the flooring. One quote can be obtained by each party in this regard. If each party obtains a quote, then the insurer is to cash settle based on the average of the two. The insurer should also include a 15% contingency on any amount payable. This is to account for the loss of the lifetime guarantee and the possibility of any variations in the works (noting A’s previous works included substantive variatio ns). The insurer should also pay for any temporary accommodation costs incurred by the complainant and/or his mother (who is residing at the property) whilst the flooring works are undertaken. Any temporary accommodation is subject to the complainant establishing these costs will, or have been, incurred. 2.2 Should the insurer pay non-financial loss? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where the insurer has caused the complainant to suffer an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $1,000 in non-financial loss The available information shows that more than four years after the claim was lodged, the claim related repairs remain outstanding. Further, after two repairs attempts, substantive rectifications works are still required. Whilst I accept that some of the delays may have been attributed to the complainant, part of it was also caused by the insurer’s works. I also note that the complainant says his vulnerable mother, who resides at the property, has been adversely affected. There is no evidence disputing this. I acknowledge the insurer has reimbursed the complainant his $2,000 excess as a gesture of goodwill. This does mitigate its conduct. I also note this claim has been complicated by the complainant’s behaviour. Determination | Case number: 781652 Page 4 of 5 However, given the claim related repairs remain outstanding after two attempts and more than four years after the event, I consider it fair in all the circumstances the insurer pays an additional $1,000 in non-financial loss. Determination | Case number: 781652 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.