Home / Suncorp Group / Determination 780600
Determination 780600
Declined strata building water inundation claim relying on flood exclusion
Summary
The strata insurer declined a claim for storm and flood inundation of a unit complex in Townsville, relying on the flood exclusion. The Panel found rainwater mixed with river floodwater was flood, and AFCA made no order.
Rainwater that mixes with floodwater is treated as flood, which the policy excludes where flood cover was not purchased.
Issues
- Claim denial primary · not upheld“The insurer is entitled to refuse payment of the claim in accordance with the terms and conditions of the policy.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 780600
Financial firm AAI Limited
Determination | Case number: 780600 Page 1 of 6
Case number: 780600 7 Serptember 2021
1 Determination overview
1.1 Complaint
The complainant is the strata manager for a body corporate (the property). The body
corporate has a Residential Strata Insurance policy with the financial firm (the insurer)
covering the property, which consists of block of units in Townsville, Queensland.
A claim was lodged with the insurer after the insured property was inundated with water on or
about 3 February 2019. There is no dispute the property was inundated by water during the
storm event.
The complainant says the initial inundation was storm water runoff (which is covered within
the terms of the policy) prior to the inundation of flood water from the Ross River.
The insurer has declined the claim. It says the inundation of the units above ground level was
by flood. Flood is excluded from cover under the terms of the policy.
The complainant is also represented by DK. For clarity, the strata manager DK as well as the
individual residents of the property will collectively be referred to as ‘ the complainant ’ in this
determination.
1.2 Issues and key findings
Is the insurer entitled to refuse payment of the claim?
Yes. The information exchanged establishes that the inundation of the units was caused by
flood waters. The local catchment area was not sufficient to cause stormwater to inundate the
properties. The insurer can rely on the terms and conditions of the policy which exclude flood
to refuse payment of the claim.
Why is the outcome fair?
The outcome is fair because the insurer has established that it is entitled to rely on the policy
exclusion of flood to decline the claim.
1.3 Determination
The determination is in favour of the insurer.
The insurer is entitled to refuse payment of the claim in accordance with the terms and
conditions of the policy.
Determination | Case number: 780600 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to refuse payment of the claim?
The complainant’s residential strata policy provides cover for physical loss or destruction or
damage to insured property caused by an event in the period of insurance. An event is
defined as:
Occurrence or accident causing or resulting in sudden and unforeseen, physical
loss or destruction of or damage to Insured Property
Cover is subject to several exclusions and conditions. Unless the complainant selects the
optional flood cover, flood is specifically excluded. Flood is defined in the product disclosure
statement as:
Flood
the covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a lake (whether or not it has been altered or modified):
a river (whether or not it has been altered or modified):
a creek (whether or not it has been altered or modified):
another natural watercourse (whether or not it has been altered or modified):
a reservoir:
a canal:
a dam.
The certificate of insurance clearly states that flood is not insured. The exchanged material
confirms the complainant was aware they did not have flood cover under the policy.
Circumstances of the loss
In late January and early February 2019, the city of Townsville and surrounding areas of north
Queensland experienced a significant weather event. Heavy rainfall occurred over the
Townsville catchment over several days including the complainant’s property on B street in
Rosslea.
AHD (Australian Height Datum), is used to relate recorded water levels to ground levels
respect ively. The property is a double storey residential unit complex located on the South
West side of B Road. The ground level adjacent to the buildings is 5.8 m AHD and the floor
levels of the units are about 0.15 m (or approximately 5.95 m AHD) above the gr ound level of
the property.
The crown level of B Road in front of the subject property is about 5.1 m AHD.
On 2 February 2019, photographs provided by one of the residents shows there were no
problems at the site other than water appeared on B Road due to the drains backing up.
At approximately 6:00pm on 3 February 2019, the resident of unit five noticed water was
beginning to inundate the property via the rear. Further, the resident of unit six provided a
Determination | Case number: 780600 Page 3 of 6
similar account that water pushed the back fence over and entered the units. Within 10
minutes the water was about 0.20 m above floor level.
Complainant says initial inundation above ground level was by storm water
Essentially, the complainant says that the units were initially inundated by stormwater backing
up in the early evening before 6:00 pm on 3 February 2019, approximately 2-3 hours prior to
the arrival of floodwaters following the main dam release. The complainant says the
stormwater drainage system was essentially not functioning by Sunday morning, 3 February
2019.
The complainant says the stormwater was ponding on B Road which is adjacent to the
subject property on the morning of 3 February 2019, indicating that stormwater from the
subject property was unable to drain.
The complainant says the heavy rains which occurred from between 2:00pm and 5:00pm on
3 February 2019, were unable to drain due to the backed-up stormwater on S street and B
road. As a result, the storm water continued to back up before inundating the properties in the
evening.
The complainant says that neighbouring property owners (94 and 100 B Road) escalated
complaints to AFCA after their insurers relied on reports from Hydrologist W. After these
complaints were lodged with AFCA, the insurer in those matters accepted an initial inundation
up to 100mm being caused by storm water inundation. The complainant says that because W
was proven wrong with respect to the neighbouring properties, it has no confidence that W
has not made similar mistakes in the findings contained in its report (which is addressed
below).
In addition, the complainant has provided a non-site-specific hydrology report for 86 B Road,
which is effectively opposite the subject property. The insurer of that property accepted the
hydrology confirmed the inundation at 86 B Road was caused by storm water. However, it
should be noted that according to hydrologist evidence in this matter, 86 B Road has a height
of 5.628 m AHD which is approximately 0.30 m AHD below that of the property relevant to
this complaint.
Expert reports disagree with the complainant’s position
The insurer has provided two reports from its hydrologist W dated 7 March 2019 and M 2 July
2019, which were prepared following site inspections on 20 February 2019 and 21 June 2019.
M has also provided a supplementary report to the insurer via email dated 24 July 2019.
Both the insurer’s hydrologists state the height of the property was 5.8 m AHD and with W
stating the floor levels of the ground floor units as 5.95 m AHD, and while M states the level is
6.00 m ADH.
M says the level of B Road in the front of the insured property is 5.1 m AHD. The floor level of
the insured property is elevated about 0.15 above the ground level of the property to 5.95 to
6.00 m AHD as noted above.
W and M says the units at the subject property would not have been inundated above the
ground floor level by local stormwater runoff. This is due to the height of the ground floor level
above the property level, the height of the property above B Road, and the small local
catchment reporting to the subject property.
Determination | Case number: 780600 Page 4 of 6
W says the initial inundation above the floor level at all units would have occurred around
6:00 pm on 3 February 2019. At this time W says the Ross River would have overflowed
approximately 200 m south west of the property and flowed towards it via Snelham Street.
W further say that the peak depth of inundation at the property occurred shortly after 11.30pm
on Sunday 3 February 2019 as the water level in the Ross River upstream of the Bowen
Road Bridge reached its peak.
While M initially stated that it was unclear whether there was an intermediate point at which
inundation of the property occurred from local stormwater runoff prior to the occurrence of
river overflow, it has subsequently clarified these comments and states:
There was stormwater ponding in the streets but I do not believe it was high
enough to result in over floor inundation at the property. For example, Image 20
in my report, taken on 3 February (presumably in the morning, show islands in the
median strip along B Road, indicating a water level of 5.5m – 5.6 m AHD,
compared to the property’s floor level of about 6.0m AHD.
Breakout flow from the river along B Road commenced on Sunday morning (see
Image 21) at 5.9m AHD, so it does not seem possible that stormwater alone could
have risen from about 5.6m to above 6m AHD prior to the river overflow occurring.
W concluded the initial and maximum inundation above the ground floor level at the subject
address for the ground floor units, was caused by floodwater overflowing from the northern
bank of the Ross River at various locations between Sherriff Park and the Bowen Road
Bridge and then draining to the subject property.
Initial Inundation was by flood
There is no dispute stormwater was ponding in front of the property on B Road, however, the
Panel is not persuaded that the cause of the initial inundation of the units was stormwater.
Further, despite being requested, the complainant has not provided any alternative site-
specific hydrology opinions for the Panel to consider and instead relies on a report prepared
for 86 B Road. The issues with relying on this report have been discussed above.
The information shows that during the day, prior to the initial inundation, the Ross River
overflowed at various points surrounding the subject property which then made its way to the
subject property.
This is supported by the images provided by the complainant during the day of 3 February
2019. An image that was captured by a resident at 6:06pm (looking towards the Ross River,
Snelham Street and Sherriff park) shows the water had changed in appearance from those
taken prior, indicating that the flood water had started to mix with the storm water at the
subject address.
The Panel has also considered the information from the residents of units five and six who
provided a time of approximately 6.00 pm on 3 February 2019 for the inundation. This
accords with WRM’s time of flood inundation.
The Panel has also taken note of the high rainfall between 2.00 and 5.00pm. However, this
alone does not establish that the 6.00pm water inundation was runoff.
Determination | Case number: 780600 Page 5 of 6
If floodwater is mixed with water from other sources (such as stormwater run-off) then it is
established law that this is considered floodwater. The Panel is satisfied the inundation was a
combination of the stormwater runoff and flood which had mixed prior to the inundation.
Accordingly, the Panel is satisfied that the cause of initial inundation was flood, which is
excluded under the policy. The insurer is entitled to decline the claim and is not required to
take any further action.
Determination | Case number: 780600 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A Panel determined this matter
Due to the nature of this complaint, we referred it to a Panel for determination. The Panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive insurance experience.
3.2 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all considered
flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion
will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether there was
any rainwater runoff damage before the flood water arrived at the insured property.