Home / Suncorp Group / Determination 780600

Determination 780600

Declined strata building water inundation claim relying on flood exclusion

FirmSuncorp Group
Decided2021-09-07
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The strata insurer declined a claim for storm and flood inundation of a unit complex in Townsville, relying on the flood exclusion. The Panel found rainwater mixed with river floodwater was flood, and AFCA made no order.

Rainwater that mixes with floodwater is treated as flood, which the policy excludes where flood cover was not purchased.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 780600 Financial firm AAI Limited Determination | Case number: 780600 Page 1 of 6 Case number: 780600 7 Serptember 2021 1 Determination overview 1.1 Complaint The complainant is the strata manager for a body corporate (the property). The body corporate has a Residential Strata Insurance policy with the financial firm (the insurer) covering the property, which consists of block of units in Townsville, Queensland. A claim was lodged with the insurer after the insured property was inundated with water on or about 3 February 2019. There is no dispute the property was inundated by water during the storm event. The complainant says the initial inundation was storm water runoff (which is covered within the terms of the policy) prior to the inundation of flood water from the Ross River. The insurer has declined the claim. It says the inundation of the units above ground level was by flood. Flood is excluded from cover under the terms of the policy. The complainant is also represented by DK. For clarity, the strata manager DK as well as the individual residents of the property will collectively be referred to as ‘ the complainant ’ in this determination. 1.2 Issues and key findings Is the insurer entitled to refuse payment of the claim? Yes. The information exchanged establishes that the inundation of the units was caused by flood waters. The local catchment area was not sufficient to cause stormwater to inundate the properties. The insurer can rely on the terms and conditions of the policy which exclude flood to refuse payment of the claim. Why is the outcome fair? The outcome is fair because the insurer has established that it is entitled to rely on the policy exclusion of flood to decline the claim. 1.3 Determination The determination is in favour of the insurer. The insurer is entitled to refuse payment of the claim in accordance with the terms and conditions of the policy. Determination | Case number: 780600 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer entitled to refuse payment of the claim? The complainant’s residential strata policy provides cover for physical loss or destruction or damage to insured property caused by an event in the period of insurance. An event is defined as: Occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property Cover is subject to several exclusions and conditions. Unless the complainant selects the optional flood cover, flood is specifically excluded. Flood is defined in the product disclosure statement as: Flood the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following:  a lake (whether or not it has been altered or modified):  a river (whether or not it has been altered or modified):  a creek (whether or not it has been altered or modified):  another natural watercourse (whether or not it has been altered or modified):  a reservoir:  a canal:  a dam. The certificate of insurance clearly states that flood is not insured. The exchanged material confirms the complainant was aware they did not have flood cover under the policy. Circumstances of the loss In late January and early February 2019, the city of Townsville and surrounding areas of north Queensland experienced a significant weather event. Heavy rainfall occurred over the Townsville catchment over several days including the complainant’s property on B street in Rosslea. AHD (Australian Height Datum), is used to relate recorded water levels to ground levels respect ively. The property is a double storey residential unit complex located on the South West side of B Road. The ground level adjacent to the buildings is 5.8 m AHD and the floor levels of the units are about 0.15 m (or approximately 5.95 m AHD) above the gr ound level of the property. The crown level of B Road in front of the subject property is about 5.1 m AHD. On 2 February 2019, photographs provided by one of the residents shows there were no problems at the site other than water appeared on B Road due to the drains backing up. At approximately 6:00pm on 3 February 2019, the resident of unit five noticed water was beginning to inundate the property via the rear. Further, the resident of unit six provided a Determination | Case number: 780600 Page 3 of 6 similar account that water pushed the back fence over and entered the units. Within 10 minutes the water was about 0.20 m above floor level. Complainant says initial inundation above ground level was by storm water Essentially, the complainant says that the units were initially inundated by stormwater backing up in the early evening before 6:00 pm on 3 February 2019, approximately 2-3 hours prior to the arrival of floodwaters following the main dam release. The complainant says the stormwater drainage system was essentially not functioning by Sunday morning, 3 February 2019. The complainant says the stormwater was ponding on B Road which is adjacent to the subject property on the morning of 3 February 2019, indicating that stormwater from the subject property was unable to drain. The complainant says the heavy rains which occurred from between 2:00pm and 5:00pm on 3 February 2019, were unable to drain due to the backed-up stormwater on S street and B road. As a result, the storm water continued to back up before inundating the properties in the evening. The complainant says that neighbouring property owners (94 and 100 B Road) escalated complaints to AFCA after their insurers relied on reports from Hydrologist W. After these complaints were lodged with AFCA, the insurer in those matters accepted an initial inundation up to 100mm being caused by storm water inundation. The complainant says that because W was proven wrong with respect to the neighbouring properties, it has no confidence that W has not made similar mistakes in the findings contained in its report (which is addressed below). In addition, the complainant has provided a non-site-specific hydrology report for 86 B Road, which is effectively opposite the subject property. The insurer of that property accepted the hydrology confirmed the inundation at 86 B Road was caused by storm water. However, it should be noted that according to hydrologist evidence in this matter, 86 B Road has a height of 5.628 m AHD which is approximately 0.30 m AHD below that of the property relevant to this complaint. Expert reports disagree with the complainant’s position The insurer has provided two reports from its hydrologist W dated 7 March 2019 and M 2 July 2019, which were prepared following site inspections on 20 February 2019 and 21 June 2019. M has also provided a supplementary report to the insurer via email dated 24 July 2019. Both the insurer’s hydrologists state the height of the property was 5.8 m AHD and with W stating the floor levels of the ground floor units as 5.95 m AHD, and while M states the level is 6.00 m ADH. M says the level of B Road in the front of the insured property is 5.1 m AHD. The floor level of the insured property is elevated about 0.15 above the ground level of the property to 5.95 to 6.00 m AHD as noted above. W and M says the units at the subject property would not have been inundated above the ground floor level by local stormwater runoff. This is due to the height of the ground floor level above the property level, the height of the property above B Road, and the small local catchment reporting to the subject property. Determination | Case number: 780600 Page 4 of 6 W says the initial inundation above the floor level at all units would have occurred around 6:00 pm on 3 February 2019. At this time W says the Ross River would have overflowed approximately 200 m south west of the property and flowed towards it via Snelham Street. W further say that the peak depth of inundation at the property occurred shortly after 11.30pm on Sunday 3 February 2019 as the water level in the Ross River upstream of the Bowen Road Bridge reached its peak. While M initially stated that it was unclear whether there was an intermediate point at which inundation of the property occurred from local stormwater runoff prior to the occurrence of river overflow, it has subsequently clarified these comments and states: There was stormwater ponding in the streets but I do not believe it was high enough to result in over floor inundation at the property. For example, Image 20 in my report, taken on 3 February (presumably in the morning, show islands in the median strip along B Road, indicating a water level of 5.5m – 5.6 m AHD, compared to the property’s floor level of about 6.0m AHD. Breakout flow from the river along B Road commenced on Sunday morning (see Image 21) at 5.9m AHD, so it does not seem possible that stormwater alone could have risen from about 5.6m to above 6m AHD prior to the river overflow occurring. W concluded the initial and maximum inundation above the ground floor level at the subject address for the ground floor units, was caused by floodwater overflowing from the northern bank of the Ross River at various locations between Sherriff Park and the Bowen Road Bridge and then draining to the subject property. Initial Inundation was by flood There is no dispute stormwater was ponding in front of the property on B Road, however, the Panel is not persuaded that the cause of the initial inundation of the units was stormwater. Further, despite being requested, the complainant has not provided any alternative site- specific hydrology opinions for the Panel to consider and instead relies on a report prepared for 86 B Road. The issues with relying on this report have been discussed above. The information shows that during the day, prior to the initial inundation, the Ross River overflowed at various points surrounding the subject property which then made its way to the subject property. This is supported by the images provided by the complainant during the day of 3 February 2019. An image that was captured by a resident at 6:06pm (looking towards the Ross River, Snelham Street and Sherriff park) shows the water had changed in appearance from those taken prior, indicating that the flood water had started to mix with the storm water at the subject address. The Panel has also considered the information from the residents of units five and six who provided a time of approximately 6.00 pm on 3 February 2019 for the inundation. This accords with WRM’s time of flood inundation. The Panel has also taken note of the high rainfall between 2.00 and 5.00pm. However, this alone does not establish that the 6.00pm water inundation was runoff. Determination | Case number: 780600 Page 5 of 6 If floodwater is mixed with water from other sources (such as stormwater run-off) then it is established law that this is considered floodwater. The Panel is satisfied the inundation was a combination of the stormwater runoff and flood which had mixed prior to the inundation. Accordingly, the Panel is satisfied that the cause of initial inundation was flood, which is excluded under the policy. The insurer is entitled to decline the claim and is not required to take any further action. Determination | Case number: 780600 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A Panel determined this matter Due to the nature of this complaint, we referred it to a Panel for determination. The Panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive insurance experience. 3.2 Rainwater that mixes with flood water is flood The Courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding complaints, consideration has been given to whether there was any rainwater runoff damage before the flood water arrived at the insured property.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.