Home / Commonwealth Insurance Limited / Determination 780194

Determination 780194

Malicious damage claim assessment and scope of repairs

FirmCommonwealth Insurance Limited
Decided2022-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$8,105
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for malicious damage to her home; the insurer accepted the claim but disputed part of the scope and refused further alternative accommodation. AFCA largely accepted the insurer's assessment, ordered cash settlement of the scope plus contingency, payment for sliding doors and gate with interest if already paid, two weeks' alternative accommodation, and $750 for non-financial loss.

Damage must be caused by the insured malicious act; maintenance, poor workmanship and wear and tear are excluded, and alternative accommodation is limited to the period the property is uninhabitable for repairs.

Issues

Subjects and remedies

family violencefinancial hardshiphome or building damagetheft or burglarypay claimpay compensationpay interestpay non financial loss

Related

All Commonwealth Insurance Limited determinations · Find similar determinations

Text of the determination

Determination Case number 780194 Financial firm Commonwealth Insurance Limited Determination | Case number: 780194 Page 1 of 9 Case number: 780194 25 November 2021 1 Determination overview 1.1 Complaint The complainant has a home building and contents policy with the financial firm (insurer). She made a claim for damage to her property caused by malicious damage and vandalism to the property. The insurer accepted the claim however the is a dispute about what damage has been caused. The insurer says work that is required to the property has not been caused by malicious damage and vandalism. The insurer says a lot of work needed is either due to maintenance or poor workmanship. The insurer has denied those parts of the claim. The complainant disagrees with the insurers decision. She has attended to some items within the property including termite review. The insurer has also paid some money for alternative accommodation costs. The insurer won’t pay further amounts because it says the property is liveable. The complainant does not agree. She says make safe repairs have not been completed and it is not safe to live at the property. The complainant wants her claim met including the costs of alternative accommodation. 1.2 Issues considered Has the insurer adequately assessed the claim? Yes. Generally, the insurer has adequately assessed the claim. There are some items that should be added to the repair costs. SW is to provide a further scope of work as set out in their report of 4 December 2020. Should the insurer be liable for further alternative accommodation? No. The insurer provided a period of alternative accommodation given the circumstances of the claim. It is not liable for any further alternative accommodation other than the allowance made. Has the insurer handled the claim adequately? The insurer has generally handled the claim adequately. There has been some miscommunications and misunderstanding. The insurer is to pay $750 for non-financial loss 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to:  if not already paid, cash settle the complaint based on the statement of works (SOW) by QT dated 10 December 2020 and any further amounts required as the result of SW’s report dated 4 December 2020  add an amount of 20% to SOW for the transfer of risk Determination | Case number: 780194 Page 2 of 9  pay the complainant for the sliding doors based on the quote from Stegbar for the amount of $8,105.28 and the front gate per the quote of Queensland Gate Automation for the amount of $716.10.If the complainant has already paid these amounts the insurer is to pay interest from the date of payment by the complainant, under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act), until date of payment.  pay the complainant $1,400 for alternative accommodation for the period of two weeks required to repair the property.  pay the complainant $750 for non-financial loss Determination | Case number: 780194 Page 3 of 9 2. Reasons for determination 2.1 Has the insurer adequately assessed the claim? The insurer has adequately assessed the claim. There are some amounts to be paid if not already. The claim was accepted The complainant insured her home building and contents with the insurer. The policy provided cover for several things including malicious damage and vandalism. The complainant’s property was damaged whilst she was a way from the property, said at first to be from persons unknown, and made a claim under the policy for the malicious damage and vandalism which happened to her property. The matter was reported to the police. The insurer accepted the claim although there has been a disagreement about what was damaged. The insurer had builders attend After the claim was made the insurer organised a builder (JL) to attend. JL provided a statement of works for the damage as they assessed it. The complainant was not satisfied with the proposed works and asked the insurer for someone else to assess the damage. The insurer appointed another builder, QT, who found more damage than initially assessed, but did say a lot of the areas that appeared damaged were not as a result of malicious damage, but rather due to maintenance and unfinished renovations. QT said it could not warrant the works. The complainant obtained a quote for repairs from RI. This quote appeared to cover items said by the insurer, not be malicious damage. The complainant also provided photographs which were said to show before and after shots of the property. She has provided quotes for sliding glass doors and repairs to the front gate. The insurer arranged for another assessor /builder (SW) to review the damage again including the statement of work prepared by the QT and information provided by RI. SW reviewed all the damage to the property and found that the quote from QT essentially covered the damage to the property said to be from malicious damage. SW further said the quote from RI made allowances for damage that SW says is not from malicious damage, but rather from maintenance or previous defective works by someone. It also found that the property needed a significant clean-up and two weeks would be needed to carry out the repairs. SW was to provide a further statement of work for things not included in the QT assessment – this does not appear to have been provided. SW also noted the damage to the front gate and sliding doors. Maintenance, faulty workmanship and wear and tear is not covered by the policy The complainant had a safety report conducted by PG after the malicious damage. PG also noted the gate needed to be replaced. Determination | Case number: 780194 Page 4 of 9 The insurer should cash settle As said above, the insurer has had three builders attend the property. The report from SW is the most persuasive, noting the QT report and statement of work was generally adequate. The insurer has adequately assessed the claim, but it seems repairs have not been completed. The insurer should cash settle the claim on the following basis:  pay the complainant the amount of QT statement of works (SOW) dated 10 December 2020 together with the final SOW by SW as was to be prepared as per their report dated 4 December 2020. If this has not been prepared, SW are to provide it within 10 days of acceptance of this determination  an amount of 20% should be added to the total amount of the scope of works to cover contingencies and transfer of risk.  pay for the sliding doors based on the quote from Stegbar for the amount of $8,105.28 and the front gate per the quote of Queensland Gate Automation for the amount of $716.10. If the complainant has already paid these amounts the insurer is to pay interest from the date of payment by the complainant, under section 57 of the Act, until date of payment. The complainant is to provide proof and date of payment 2.3 Should the insurer be liable for further alternative accommodation? No. The insurer paid for alternative accommodation for a period of time after the claim. That period was reasonable given the circumstances. Other than an allowance to be made, the insurer is not liable for further alternative accommodation. The insurer made an allowance for alternative accommodation The complainant’s policy provides for alternative accommodation costs if the building or contents if a claim is accepted by the insurer and it determines that the property is so extensive, the complainant cannot live in the property. The allowance is made until the property is repaired and a maximum period of 52 weeks applies. The complainant has sought the maximum amount of 52 week be paid to her. Initially the insurer did not allow alternative accommodation because the assessor builder said the property was still able to be lived in. The complainant says the property was not safe The complainant said the property was not safe for her and her family given the circumstances of the claim. There is domestic violence in her current circumstances. A person was also reportedly found at the premises when Police attended. It is unclear if the complainant knew this person. Given these circumstances the insurer provided a period of alternative accommodation. This ceased because it was determined the property was liveable and that complainant could return to the property. However, the complaint about the damage to the property continued. Determination | Case number: 780194 Page 5 of 9 The complainant obtained assistance The complainant has not provided any information to justify the provision of alternative accommodation. It is noted she has continuing concerns including the lack of repair to the front gate. The information provided does show that the complainant has had periods of not being in suitable accommodation and seeking the assistance of a local body to assist find such accommodation. I understand the complainant has at times been in some form of continuing temporary accommodation and may have returned to her property. The property was rented The information provided shows that the property was rented out for a period of time. From that information provided it shows the property was rented out for an amount of $500 per week for at least a few months. This appears to have been done in the early to middle part of 2021. The complainant says that a clean-up of the property had been undertaken however there was still damages to be repaired; which included the glass doors and front gate The insurer is not liable for further alternative accommodation After considering all the information provided and the circumstances of this matter, whilst I am sympathetic for the complainant, I am not persuaded the insurer should pay for any further alternative accommodation, except for a two-week period to allow for completion of the repairs. 2.4 Has the insurer handled the claim adequately? Yes. Generally, the insurer has handled the claim adequately although there were some communication issues between the parties. AFCA will only award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve a situation  interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation for non-financial loss, AFCA expects complainants to be:  moderately robust  bear the normal degree of inconvenience experienced when a problem occurs and  take reasonable steps to minimise the inconvenience suffered. AFCA takes a conservative approach to the award of non-financial loss, which is limited to a maximum of $5,000. Whilst I am sympathetic to the complainant and note that she has been forced to seek alternative accommodation, not all of this is related to matters which are the responsibility of the insurer under the policy. In the circumstances of this complainant, in my view it, is appropriate to make an allowance for non-financial loss of $750. Determination | Case number: 780194 Page 6 of 9 2.5 Why is the outcome fair? The outcome is fair in all the circumstances because the insurer has considered the claim in an appropriate manner. It has attempted to consider the claim when there were other concerns with the property. Given that the house was rented out to other parti es, in the circumstances the claim for alternative accommodation already paid is reasonable. Determination | Case number: 780194 Page 7 of 9 3. Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Expert Reports Record Key points Determination | Case number: 780194 Page 8 of 9 Record Key points Financial firm’s expert JL Report 29 - 04 - 2020  Upon inspection of the residence there was found to be damages sustained to the plaster wall sheeting in several areas has been damaged, kitchen cupboards door and gable end have been displaced, plaster ceiling in Walk in Robe has been spray pai nted, window in bedroom 1 has been broken, screen doors have been broken and/or removed and front entry gate has been compromised.  The building …has had little or no maintenance, termite infestation was evident, I don’t think active now, [complainant] did say it was treated. There has been “DIY” works carried out in several areas of the property and poorly executed, and I mean poorly, obviously not by Licensed trades, as building faults, the renovations to the en - suite and bathroom are certainly not up to s tandard, but related to damage. Financial firm’s expe rt QT Report 10 - 07 - 2020  Please be advised that during our inspection the ensuite was being renovated and only partially complete. During our inspection,we also noted that there appeared to be on going maintenance issues on the roof. There was evidence that suggests there has been previous attempts to prevent water ingress by sealing up around the apron flas hings and fixing penetrations. Financial firm’s expert SW Report 04 - 12 - 202 0  The scope of works dated 16th July 2020 prepared by Queensland All Trades (QAT) generally reflects damaged items that are considered to be consistent with malicious damage. It is noted that some additional damage that was not present at the time of their inspections has present ed, other items have been repaired whilst some have been omitted.  The additional costs that the Insured is claiming for (as per the private quotation) are not consistent with the “Malicious act including vandalism event”.  There are a considerab le amount of maintenance issues that require the immediate attention of the Insured such as roof replacement, eradication of termite activity including repair/replac ement of affected timber wall & roof frames, installation of guttering and downpipes to two verandahs including connection to a legal point of discharge, replac ement of deteriorated timber trims around the triangular high light window (above the kitchen). These issues will need to be completed by the Insured prior to the commencement of any insu rable repairs.  Scope of works(SOW) to be provided for any additional matters not covered by the QT sow. Determination | Case number: 780194 Page 9 of 9 Financial firm’s expe rt QT Scope of Works(SOW) 10 - 07 - 2020  SOW provide for the sum of $19,821.78