Home / Westpac / Determination 780159
Determination 780159
Flood damage claim settlement amount for investment property
Summary
The landlord complainant claimed flood damage to her investment property and disputed the insurer's $56,565.17 cash settlement offer. AFCA found the scope should be updated to include the kitchen and sewage remediation with a 15% contingency uplift, extended loss of rent to six weeks, and awarded $1,000 non-financial loss.
Policy cover for flood damage is limited to the claimed event, so pre-existing slab cracking and non-covered yard, trees and lawn costs were excluded, while sewage and kitchen damage were accepted.
Issues
- Claim amount dispute primary · upheld
“The insurer's current quotation ($56,565.17) does not include the remediation of sewage contamination or the kitchen; the parties should settle the claim in the manner set out.”
- Claim denial secondary · not upheld
“The insurer is not liable for these costs; the policy does not cover trees or lawn for yard cleaning.”
- Inadequate claim investigation secondary · not upheld
“The panel does not accept the main cause of damage to the slab is the claimed event; cracks existed since 2016.”
- Delay secondary · not upheld
“The insurer arranged the make safe and a building assessment in a timely manner.”
- Repairs or contractors secondary · upheld
“AG's scope of works does not include remediation of sewage contamination; the insurer accepts this should have been included.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay non financial loss
Text of the determination
Determination
Case number 780159
Financial firm Westpac General Insurance Limited
Determination | Case number: 780159 Page 2 of 7
Case number: 780159 23 September 2021
1 Determination overview
1.1 Complaint
The complainant holds a landlord insurance policy with the financial firm (insurer) for her
investment property. She lodged a claim with the insurer for damage to the property. This was
after the lower level of the property was flooded during a heavy rainfall event.
The insurer accepted the claim and offered a cash settlement of $56,565.17 as per its
builder’s (AG) scope of work. The insurer also offered to pay four weeks loss of rent and
$3,971 for report fees incurred by the complainant.
The complainant dispu tes the insurer’s settlement offer and is seeking the insurer to pay for
the following:
building repairs - $176,000
yard clean-up costs - $9,000
report fees – $5,401
three months loss of rent
1.2 Issues and key findings
Is the insurer’s settlement offer fair a nd reasonable?
The insurer’s current quotation ($56,565.17) does not include the remediation of sewage
contamination or the kitchen. Given this, the parties should settle the claim in the manner set
out in section 2.1.
What is the insurer’s liability towar ds loss of rent?
The insurer has offered loss of rent for four weeks. Given the quotation does not include
remediation of sewage contamination and the kitchen, it is fair for the insurer to increase the
loss of rent to six weeks.
Is the insurer required to reimburse the report fees?
The insurer’s offer of reimbursing $3,971 is fair in all the circumstances. The insurer is not
required to pay the second report fees ($1,430).
Is the insurer required to pay non-financial loss?
Yes. The insurer is required to pay $1,000 in non-financial loss compensation.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to settle the building claim and loss of rent as set out in sections 2.1 and 2.2.
The insurer is required to pay $1,000 in non-financial loss.
Determination | Case number: 780159 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer’s offer fair and reasonable ?
Circumstances surrounding the claim
In May 2019, the complainant lodged a claim after the lower level of her investment property
was flooded in February 2019 during a heavy rainfall event in Townsville. The insurer
appointed its builder (AG) to undertake the make safe and inspect the damage.
Following AG’s assessment, the insurer accepted the claim. On 5 June 2019, the complainant
disagreed with AG’s assessment report and its scope of work. The complainant notified the
insurer she will obtain her own assessment report and submit it for the insurer to review.
The complainant provided a report from a building consultant (AB). AB reported the flood had
caused cracks to the concrete slab in the lower level and movement of the stumps. AB also
reported the flood had caused mould in the lower level and the kitchen area.
AB recommends mould affected materials to be removed and replaced
On 30 March 2020, AB inspected the insured property and assessed the sewage
contamination, mould exposure and storm damage. AB took surface swabs from multiple
locations. Sewage bacteria was found at each of the sample locations.
AB also took air mould spore samples from the lower level and upstairs kitchen area. AB
noticed mould growth on the kitchen ceiling and to a variety of locations. AB concluded the
mould contamination within the property was high.
AB says even after remediating the mould affected materials, mould spores are still present in
the internal substrate material. It reports mould spores in building materials can never be
removed successfully by painting the surfaces. Accordingly, AB recommended the removal of
the mould affected material and undertake replacement of those materials.
AB reported flood has caused settlement in the lower level
AB reported settlement has occurred to a few supporting concrete stumps due to the flood. It
recommended a surveyor to be engaged to determine the extent of settlement.
AB reported flood has also caused settlement to the concrete slab resulting in significant
cracking in the concrete slab in the lower area. AB recommended replacement of the
concrete slab at the lower level.
AB says sewage bacteria contamination was detected at various locations adjacent to the
concrete slab in the lower level. It recommended replacement of all fixtures and fittings.
Engineer says cracking in the slab has occurred over a long period of time
The insurer appointed an engineer (NC) to attend the property and assess the damage. On 4
June 2020, NC attended the property and reported the property is a two-storey dwelling. It
reported the lower level is a non-habitable area used as a storage space and a laundry room.
The tenant notified NC around 300mm of water entered the lower level of the property.
NC noticed the concrete slab in the lower level had both vertical and horizontal cracks. It did
not notice any reinforcement in the slab or any dowel between the slab panels. NC reported
all the concrete posts were within the expected tolerances for this type of property.
Determination | Case number: 780159 Page 4 of 7
NC noticed the soil conditions in the area are typically of reactive clay which expands and
contracts due to changes in moisture content.
NC accepts some additional movement of the slab would have resulted from the flooding
event. However, it says the cracking in the slab has been occurring over a long period of time.
This is supported in a photograph on a real estate website from 2016 that shows the cracking
existed back then.
NC says movement in the masonry walls has occurred as it is only supported by a thin
unreinforced slab section. NC says this wall is not load bearing and does not form part of the
support structure. NC says there is no structural damage to the masonry infill wall due to the
flooding event as the masonry infill is still restrained at the top level. NC stated the separation
of the masonry infill walls is only aesthetic in nature and will not affect the lifespan of the
residence structure.
NC did not notice any damage to the concrete posts.
Parties have provided different quotes
The insurer engaged AG to provide a quotation and scope of works. AG did so. The amount
quoted was $56,565.17 and includes the following:
> removal and replacement of the hot water system
> mould remediation of the lower level and kitchen area
> removal of asbestos sheeting from the lower level
> installation of the new fibre cement sheeting
> disconnection and reconnection of the plumbing and power fittings
> removal of debris after repairs completion.
The complainant disputed the insurer’s scope of work. Sh e believes the entire concrete area
needs to be replaced. She also engaged AB to review AG’s scope of work.
AB says the ceiling in the kitchen should also be removed and replaced because mould
returned after it was cleaned. AB says the property should be re-levelled and the concrete
slab should be replaced.
The complainant provided a quotation from an independent builder (KL). KL provided a
quotation of $176,000 inclusive of GST which included the following:
> installation of 100 m2 of 100mm concrete
> installation of wall frame and sheeting
> removal and replacement of hot water system
> removal and replacement of the kitchen and bathroom
> removal and replacement of the carpets and vinyl
> removal and disposal of all affected wall and ceiling linings in kitchen area
> painting to all the walls and ceilings in the upper level
> installation of new insulation in ceiling.
Claim should be settled in this way
The panel is not satisfied KL’s quotation is reasonable. It includes replacement of items such
as concrete slab and the bathroom which were not damaged due to the flood.
The information shows the concrete slab had cracks since 2016. This supports NC’s view that
the main cause of damage are pre- existing factors, not the claimed event. NC’s report is also
more detailed about the concrete slab and its construction. In contrast, AB’s report is not as
Determination | Case number: 780159 Page 5 of 7
detailed. Therefore, the panel does not accept the main cause of damage to the slab is the
claimed event.
Further, AB did not say the bathroom was due to the claimed event. Instead, AB specifically
said the bathroom was not included in the report due to ‘consistent ablution activities and
poor ventilation to the room’.
There are also gaps in the insurer’s scope of works.
AB said the kitchen ceiling could have been damaged during the claimed event when the
gutters overflowed in this area and entered the ceiling space. The insurer has not provided
any evidence to refute this. These works have not been included in AG’s scope of works. The
panel accepts the damage to the kitchen should be included.
However, the panel does not accept this requires the kitchen to be fully replaced as
suggested by KL. AB’s report only identified mould to the kitchen ceiling after the claimed
event. Therefore, these works should be limited to repairing the ceiling in the kitchen.
Further, AG’s scope of works does not include remediation of sewage contamination. The
insurer accepts this should have been included and is willing to obtain a quotation from AG to
remediate that damage.
The complainant says she does not trust AG and would like a local builder to undertake the
repairs. Given this, it is fair in all the circumstances the claim should be resolved in this way:
AG to update its quote to include the kitchen and sewage contamination
the insurer to provide a cash settlement to the complainant based on this updated quote,
along with an uplift of 15% on the quotation to cover for contingencies (such as possible
variances).
Insurer is not required to pay yard cleaning fees
The complainant says she incurred $9,000 in completely removing the trees and topsoil in the
yard as there was an ongoing smell and sludge remaining in the yard after the flood.
The complainant has provided an invoice for these works. The invoice states the ground was
contaminated with septic waste after 2019 floods.
The policy does not cover trees or lawn. Under the additional benefit of ‘Demolition and
removal of debris’, it only includes removing trees if they have caused damage to the building.
The trees removed did not cause any damage to the building.
Therefore, even if the panel accepts sewerage contaminated the lawn and trees, this is not
covered by the policy. The insurer is not liable for these costs.
2.2 What is the insurer’s liability towards loss of rent ?
Insurer is required to pay six weeks of loss of rent
The policy provides cover for loss of rent if the property becomes uninhabitable. The insurer
accepts the property will be uninhabitable during the time the repairs are being undertaken.
AG estimated four weeks for the completion of the claim related repairs. Accordingly, the
insurer has offered four weeks of loss of rent to the complainant.
The complainant says it will take three months to complete the repairs. However, KL or AB
have not provided any time period for the repair durat ion. Given the panel concluded KL’s
Determination | Case number: 780159 Page 6 of 7
scope of work is excessive and AG’s scope of work does not include remediation for the
sewage contamination at the lower level or the kitchen, it is fair the insurer pays an additional
two weeks of loss of rent. This should be sufficient time for the sewage remediation and
kitchen works.
Hence, the insurer is required to pay a total of six weeks loss of rent.
2.3 Is the insurer required to reimburse the report fees?
Insurer’s offer for AB’s fees is fair
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs
incurred by a complainant in the course of a complaint. These costs can be awarded if the
complainant needed an expert to understand or establish their claim. These costs are
normally capped at $5,000 unless exceptional circumstances apply.
The complainant says she had to obtain AB’s report because the insurer’s builder did not
identify sewage contamination at the lower level of the property. The insurer accepts AB’s first
report assisted the complainant’s position and has agreed to pay these costs ($3,971).
The complainant says she had to re- engage AB because AG’s scope of work was
inadequate.
The panel does not agree. AB’s second report did not provide any new information which
advanced the complainant’s position. Accordingly, the insurer is not required to pay $1,430 to
the complainant for the second report fees.
2.4 Is the insurer required to pay non-financial loss?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Fair the insurer pays $1,000 compensation
The claim was made in May 2019. The insurer arranged the make safe and a building
assessment in a timely manner. The claim was temporarily closed due to the complainant’s
lack of response.
AG’s initial scope of work was inadequate. This resulted in the complainant obtaining a report
from AB. After reviewi ng AB’s report, the insurer acted in a timely manner and amended the
scope of work.
The panel accepts this aspect of the complainant’s claim’s experience would have caused
some physical inconvenience and stress to the complainant. Given this, and considering
AFCA’s conservative approach, the panel accepts it is fair the insurer pays the complainant
$1,000 non-financial loss compensation.
Determination | Case number: 780159 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.