Insurer declined building damage claim relying on gradual deterioration, settling/shrinkage and structural defect exclusions
Text of the determination
Determination
Case number 779659
Financial firm Strata Unit Underwriters
Determination | Case number: 779659 Page 1 of 10
Case number: 779659 14 April 2022
1 Determination overview
1.1 Complaint
The complainaint is the owner and occupier of two units insured under a commercial strata
insurance policy held with the financial firm (the insurer). A claim was lodged in May 2020
after noticing cracking and movement-related damage to the property in January 2020
believed to have been caused by a leaking sewer pipe.
The insurer while acknowledging the damage was accidental damage, declined the claim and
says the damage was aused by gradual deterioration which is excluded from cover under the
terms of the policy. The insurer says it is entitled to deny payment of the claim because:
the damage has occurred over a period of time, not as a result of a single event
the damage has not occurred immediately following an insured peril
the damage has been caused by or contributed to by a structural defect and faulty design.
The complainaint relies on the findings of his own experts and maintains he has
demonstrated a valid claim under his policy for damage caused by the leak. The complainant
says the cracking damage developed within four to six weeks and therefore should be
considered damage that has occurred immediately following the leak, in the context of how a
building moves.
1.2 Issues and key findings
Has the complainant established the claim falls within the terms of the policy?
Yes. The panel accepts the damage was accidental damage first identified during the period
of insurance.
Is the insurer entitled to decline the claim?
Yes. The panel is satisfied based on the available information that most likely the proximate
cause of the damage was gradual deterioration, settling/shrinkage that occurred over an
extended period. The insurer is entitled to rely on policy exclusions to decline the claim.
Why is the outcome fair?
The outcome is fair because the insurer has assessed the claim in accordance with the terms
and conditions of the policy. Further, it has established that the proximate cause of the
damage was due to factors excluded from cover.
1.3 Determination
The determination is in favour of the insurer.
The insurer is entitled to rely on the terms and conditions of the policy to deny liability for the
claim. The insurer is not required to undertake any further action.
Determination | Case number: 779659 Page 2 of 10
2 Reasons for determination
2.1 Has the complainant established the claim falls within the
terms of the policy?
Yes. The panel accepts the damage was accidental damage first identified during the period
of insurance.
The complainant bears the onus to establish a valid claim
It is established insurance law an insured has the onus to establish, on the balance of
probabilities (that is more likely than not), the loss claimed falls within the terms of the policy.
This is commonly called a prima facie claim. Once established, the onus shifts to the insurer
to establish, on balance, that it is not required to cover the claimed loss in line with a provision
or exclusion present in the terms of the policy.
The complainant ’s policy is a commercial Strata Insurance policy and provides cover for the
accidental physical loss or damage to the building during the period of insurance.
Accidental is defined as:
‘ something that is not intended or expected by You and In addition to the
definition of damage, would not be expected from the standpoint of a reasonable
person in Your position. ”
Damage is defined as:
‘ any physical loss of, destruction of, or Damage to property from any sudden and
Accidental cause not otherwise excluded by this Policy. Damaged has a
corresponding meaning ’
The complainant lodged a claim in May 2020 after noticing cracking and movement-related
damage to the property in January 2020. During lodgement the complainant stated the
damage occurred because of an unknown leak.
In an email of 10 September 2020 sent to the insurer, the complainant says a toilet at the
building had a leaking seating washer which allowed water to continuously flow from the
cistern and through the system. This was first noticed in November 2019 but not repaired until
May 2020.
According to the exchanged information a sewer pipe leading from the complainant’s units to
the sewer main at the front of the property had a break and was repaired in May 2020.
There is no dispute that the damage to the property was unintended or expected. While a pre-
purchase inspection report from BP dated 29 May 2018 identified some issues with
settlement and cracking, the panel understands that the damage was repaired.
The panel accepts that the damage claimed was accidental damage first identified during the
period of insurance. The onus therefore shifts to the insurer to establish a relevant exclusion
applies if it is to refuse payment of the claim.
Determination | Case number: 779659 Page 3 of 10
2.2 Is the insurer entitled to decline the claim?
Yes. The panel is satisfied based on the available information that most likely the proximate
cause of the damage was gradual deterioration, settling/shrinkage that occurred over an
extended period. The insurer is entitled to rely on policy exclusions to decline the claim.
Insurer denied the claim based on several policy exclusions
The insurer has relied on following policy exclusions to decline the claim, which include:
c. wear and tear, fading, marring, gradual deterioration, developing flaws, normal
up-keeping or making good, rust, gradual corrosion, oxidization, concrete or brick
cancer, wet or dry rot. However this exclusion does not apply to subsequent
Damage to Insured Property not otherwise excluded by the Policy
j. normal settling, seepage, shrinkage, expansion, creeping, heaving in Buildings,
foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden
borders, retaining walls and other structural improvements;
m. defect in any item, structural defect, faulty design, faulty workmanship, error or
omission that You were aware of or should have reasonably been aware of.
Insurer’s experts indicate damage most likely due to long term foundation
movement
The insurer has relied upon loss adjuster NLA and engineer MBC.
NLA attended the property on 2 June 2020 together with the complainant and reported:
a break in a bend in the sewer pipe that leads from units 1 and 2
the break is most probably from the time of construction
the break appears to have caused disturbance to the soil which has resulted in subsidence
of the tilt panel and floor slab
misalignment of internal aspect of the property, internal heaving, creaking and breaking of
the wall linings and gaps between the ceiling.
NLA recommended that a further assessment be undertaken by an engineer.
MBC has provided five reports. The panel does not propose to summarise each report and
commentary is limited to key findings of the reports. Further summary of MBC’s report s is
contained within section three of this determination.
MBC has noted that the pre-purchase inspection report had identified pre-existing building
movement and settlement. MBC considered that while the leak may have exacerbated
foundation movement locally, it would not have caused the damage observed throughout the
property. MBC concluded that the long-term foundation movement, was unrelated to the
sewer pipe break and likely due to inadequacies in the p roperty’s foundation system.
Complainant’s expert report relate damage to break in sewer pipe
In response to the initial report from MBC the complainant has provided reports from
engineers KCE and SRB.
Determination | Case number: 779659 Page 4 of 10
Essentially, KCE disagrees with MBC’s findings and concludes that:
‘ only minor movements were encountered up until November 2019. These were repaired and
remained stable for a further 16 months, which indicates the footing system is adequate.
Once the cracked sewer pipe had enough time to fully saturate the surrounding soils the
building has seen excessive movements and issues local to this area. The cracked sewer
pipe has caused detrimental damage to the building. ’
SRB’s report dated 9 September 2021 supports the findings made by KCE. However, SRB
explains that the property experienced normal differential subsidence issues between 2013 to
approximately 2018. SRB concludes that from circa 2018 until the time the leak was
identified, the leak is the likely cause of the damage to the property.
While SRB reported that a pipe break was directly under the ground floor toilet, it has since
provided clarification that it was not directly below the toilet but was in the sewer pipe outside
the front of the property.
Insurers reports more persuasive
Having reviewed the exchanged evidence, the panel finds the reports from MBC to be more
persuasive.
In response to the reports from KBE and SRD, MBC has provided four reports dated 5
September 2020 (report two), 23 September 2020 (report three), 1 November 2021 (report
four) and 15 November 2021 (report five).
These reports largely repeat MBC ’s initial findings. In its report dated 5 September 2020 MBC
notes that the location of the leaking sewer pipe is not near the observed damage. MBC
notes the water escaping the break in the pipe would have drained to the lower point away
from the property in the drain channel which runs along the front of the property.
In the report dated 23 September 2020, MBC responded to the complainant’s claim that the
leaking toilet cistern led to sufficient amount of water escaping from the pipe to saturate the
soil and cause the damage. MBC maintained that any leaking water from the sewer pipe
break is expected to make its way to a lower elevation away from the building footing due to
the slope of the embankment. Any escaping water would flow away from the building and any
influence from saturation would be miniscule.
MBC noted that even if one assumes a degree of influence from soil saturation, the front edge
footing is supported by bored piers that are anchored into the footing beam. The bored piers
are expected to resist any minor movement at this section.
In the panel’s view, MBC’s evidence is persuasive. The issues indemnified by MBC are long-
standing and are consistent with the damage identified during the pre-purchase inspection
report of BP in May 2018.
Insurer can deny the claim
The insurer has relied on numerous policy exclusions it says entitles it to decline the claim.
The panel notes the policy excludes cover for:
normal settling, seepage, shrinkage, expansion, creeping, heaving in Buildings,
foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden
borders, retaining walls and other structural improvements
Determination | Case number: 779659 Page 5 of 10
The panel accepts that the proximate cause of the damage, that is the dominant or effective
cause of the damage is most likely due to long term foundation movement. The panel is
satisfied the available information shows the proximate cause of damage claimed was
settling, shrinkage and heave, which are causes of damage excluded from cover.
Therefore, the panel is satisfied the insurer has established, on the balance of probabilities,
that the exclusion applies. On this basis, the insurer can refuse payment of the claim.
2.3 Why is the outcome fair?
The outcome is fair because the insurer has assessed the claim in accordance with the terms
and conditions of the policy.
While there was a leaking pipe near the property, the proximate cause of the damage was
most likely long-term foundation movement. Such damage is excluded from cover under the
terms of the policy.
It is fair in the circumstances that that the insurer can rely on the terms of the policy to refuse
payment of the claim.
Determination | Case number: 779659 Page 6 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive insurance experience
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
3.2 Product Disclosure Statement
Page
12 WHAT YOU ARE COVERED FOR
This section is an Accidental, physical Loss or destruction
contract of insurance bet ween You and Us.
We will cover Your Insured Property for any Damage occurring
during the Period of Insurance not excluded by this section.
The most We will pay is the Sum Insured shown on Your
Schedule for this section.
Determination | Case number: 779659 Page 7 of 10
If We have agreed to pay a claim and the Sum Insured on Your
Buildings and Common Contents is not totally used for that
claim, We will also pay for…
19 - 20 EXCLUSIONS
We will not pay any claims for Damage to Ins ured Property
arising directly or indirectly from or in connection with:
…
c. wear and tear, fading, marring, gradual det erioration,
developing flaws, normal up - keeping or making good,
rust, gradual corrosion, oxidization, concrete or brick
cancer, wet or dry rot. However this exclusion does not
apply to subsequent Damage to Insured Property not
otherwise excluded by the Policy;
…
j. normal settling, seepage, shrinkage, expansion, creeping,
heaving in Buildings, foundations/footings, walls, bridges,
roadways, kerbing, driveways, paths, garden borders,
retaining walls and other structural improvements;
…
m. defect in any item, structural defect, faulty design, faulty
workmanship, error or omission that You were aware of
or should have reas onably been aware of.
3.3 Expert Reports
Record Key points
Complainant’s Pre - Purcha se
Pest (BP)
Report
29 May 2018
> the building has had some settlement resulting in cracking to
walls and some door openings being out of square
> the long - term consequences of this movement are not known
and if you require a better understanding of the risk of further
movement I recommend you consult with a consulting Structural
Engineer
> the building has had some settlement resulting in cracking to
walls and some door openings being out of square (such as the
ground floor d isabled toilet door out bid square. approx.10mm)
Insurer’s Loss Adjuster
( NL A)
Report
4 June 2020
> a bend in the sewer pipe that leads from Units 1 & 2 to the sewer
main at the front of property has a fracture/break
> t his is most probably from the time of construction noting that
there is no evidence of any other intervening cause of damage
to the pipe after installation/constructio n
Insurer’s Engineer (MBC)
Report
> pre - existing movements have been report ed in the pre - purchase
inspection report
Determination | Case number: 779659 Page 8 of 10
Record Key points
17 July 2020 > the report identifies cracking to walls and some door openings
being out of square
> it appears that the piles do not meet the geotec hnical strength
requirements
> the pipe breakage at the SE section of the building frontage is
likely to have exacerbate d the foundation movement locally but
not to the extent observed throughout the building
> the sewer pipe breakage is not believed to have influenced the
movement cracks/deformation at the Northern half of the office
> the building movement is pre - existing and believe d to have been
ongoing since construction of the building due to foundation
settlement / movement.
> The long - term foundation movement is unrelated to the s e wer
pipe breakage but us [sic] likely due to inadequacies in the
design of the foundation sy stem
Complainant’s Engineer
(KCE)
Report
17 August 2020
> all pipe work for this site should have been installed to
accommodate any possible settlement of the fill and possible
seasonable movements of the fill/soil
> we have not been informed if articulation joints were installed to
cater for these movements or not.
> As the pipework has cracked, it would be fair to assume no
articulation joints were installed
> All plumbing on this site should be inspected and confirmed to
be installed adequately
> Once the cracked sewer pipe had enough time to fully saturate
the surrounding soils the building has seen excessive
movements and issues local to this area
> The cracked sewer pipe has caused detrimental damage to the
building
Insurer’s Engineer (MBC)
Report # 2
5 September 2020
> The pipe break/repair was identified as being at the front L.H.S.
of Unit 1. It is pertinent to note the presence of a drainage
channel/soak - away ditch along the length of the building
frontage bet ween Unit 1 and the street.
> Water tends to flow by gravity towards a lower elevation such as
the channel bed away from the building and tends to collect
along the channel bed.
> The location of the pipe break next to the drainage channel is a
fair distance away from the general location of the
observed/reported cracking and deformations internally.
> Therefore, the influence of the saturated soil due to pipe leak
next to the soak - away pit on the int ernal footing is considered to
be localised to the front edge of t he building at worst. It does not
extent internally under the office area.
> K CE have inferred that no articulation joints were installed in the
piping to accommodate possible movements caused by
settlement or seasonal changes. Highly reactive soils swell w hen
Determination | Case number: 779659 Page 9 of 10
Record Key points
wet and shrink during the drying out phase and therefore, if no
flexible joints have been provided, cracking of pipes is expected
Insurer’s Engineer (MBC)
Report # 3
23 September 2020
> Insured’s claim that the leaking toilet cistern led to sufficient
amount of water escaping from the pipe, causing the extent of
damage now apparent:
> any leaking water from the sewer pipe break is expected to
make its way to a lower elevation away from the building footing
due to the slope of the embankment and make - up of a standard
pipe trench if built to approved standards.
> Secondly, even if the one assumes a degree of influence from
soil saturation, the front edge footing is supported by bored piers
tha t are anchored into the footing beam.
> Note the pres ence of 2 closely spaced bored piers in the vicinity
of the pipe break. Refer circled section in part drawing shown in
Appendix B. The bored piers are expected to resist any minor
movement at this section .
> Thirdly, it is evident that there has been ongoing footing
movement internally within Unit 1 where footing beams are not
supported by bored piers and rest directly on filled soil Class P
(nominally Class H) to AS 2870
> Any escaping water would flow away from the building and not
influence the areas where damage is apparent
Complainant’s Engineer
(SRB)
Report
9 September 2021
> We have reviewed the limited construction doc ument ation
supplied and would generally concur with the KCE assertion that
the (substructure) foundation arrangement has been a generally
adequate response to the ambient site conditions.
> we have reviewed the initial MBC calculations regarding the
foundations contained within the 17 July 2020 report and do not
concur with same. Indee d, it would appear they have
inadvertently applied Ultimate Limit State factors to soil
parameters reported in Permissible State format, returning
unnecessarily ‘amplified’ and hence incorrect loading /
performance res ults in the process
> We are of the con sidered opinion that the conjoined U1 / U2
building footprint present ed in a generally structurally adequat e /
competent condition, experiencing only nominal differential
subsidence issues between 2013 and circa 2018, this being
generally within acceptable performance parameters for a
building of this construction type, geometry and the ambient site
conditions (highly reactive fill materials up to 3.5m in dept h, as
cited by both KCE and MBC , in their respective reports
> We are of the considered opinion that the conjoined U1 / U2
building footprint has experienced an isolated differential
subsidence event – identified as Point A. on plate HL - 04 on
Determination | Case number: 779659 Page 10 of 10
Record Key points
page 4 of this report – post circa 2018 which, on the information
to hand and on the balance of probability, is a ssignable to the
fractured subsurface graywater (sewerage) line in the ground
level toilet, Southern aspect of U1. We therefore concur with the
KCE report that this is the likely damage mechanism for this
isolated and apparently post - 2018 event. We convers ely do not
concur with the MBC report that the fractured graywater line was
essentially ‘inconsequential’ and therefore the matter is related
solely to as - existing foundation performance
3.4 Other Documents Considered
Complainant’s submissions .
Certificate of Insurance.
Product Disclosure Statement.
Insurer’s Notice of Response.
MBC reports dated 1 November 2021 and 15 November 2021.
SRB email dated 9 November 2021.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.