Home / Strata Unit Underwriters / Determination 779659

Determination 779659

Insurer declined building damage claim relying on gradual deterioration, settling/shrinkage and structural defect exclusions

FirmStrata Unit Underwriters
Decided2022-04-14
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under a commercial strata policy for cracking and movement damage to two units, which they attributed to a leaking sewer pipe. AFCA found the insurer entitled to decline the claim because the proximate cause was long-term foundation movement, which is excluded.

The proximate cause of the damage, being settling, shrinkage and heave, was an excluded cause under the policy, and the insurer's engineering evidence was more persuasive.

Issues

Subjects and remedies

motor vehicle collisionno remedy

Related

All Strata Unit Underwriters determinations · Find similar determinations

Text of the determination

Determination Case number 779659 Financial firm Strata Unit Underwriters Determination | Case number: 779659 Page 1 of 10 Case number: 779659 14 April 2022 1 Determination overview 1.1 Complaint The complainaint is the owner and occupier of two units insured under a commercial strata insurance policy held with the financial firm (the insurer). A claim was lodged in May 2020 after noticing cracking and movement-related damage to the property in January 2020 believed to have been caused by a leaking sewer pipe. The insurer while acknowledging the damage was accidental damage, declined the claim and says the damage was aused by gradual deterioration which is excluded from cover under the terms of the policy. The insurer says it is entitled to deny payment of the claim because:  the damage has occurred over a period of time, not as a result of a single event  the damage has not occurred immediately following an insured peril  the damage has been caused by or contributed to by a structural defect and faulty design. The complainaint relies on the findings of his own experts and maintains he has demonstrated a valid claim under his policy for damage caused by the leak. The complainant says the cracking damage developed within four to six weeks and therefore should be considered damage that has occurred immediately following the leak, in the context of how a building moves. 1.2 Issues and key findings Has the complainant established the claim falls within the terms of the policy? Yes. The panel accepts the damage was accidental damage first identified during the period of insurance. Is the insurer entitled to decline the claim? Yes. The panel is satisfied based on the available information that most likely the proximate cause of the damage was gradual deterioration, settling/shrinkage that occurred over an extended period. The insurer is entitled to rely on policy exclusions to decline the claim. Why is the outcome fair? The outcome is fair because the insurer has assessed the claim in accordance with the terms and conditions of the policy. Further, it has established that the proximate cause of the damage was due to factors excluded from cover. 1.3 Determination The determination is in favour of the insurer. The insurer is entitled to rely on the terms and conditions of the policy to deny liability for the claim. The insurer is not required to undertake any further action. Determination | Case number: 779659 Page 2 of 10 2 Reasons for determination 2.1 Has the complainant established the claim falls within the terms of the policy? Yes. The panel accepts the damage was accidental damage first identified during the period of insurance. The complainant bears the onus to establish a valid claim It is established insurance law an insured has the onus to establish, on the balance of probabilities (that is more likely than not), the loss claimed falls within the terms of the policy. This is commonly called a prima facie claim. Once established, the onus shifts to the insurer to establish, on balance, that it is not required to cover the claimed loss in line with a provision or exclusion present in the terms of the policy. The complainant ’s policy is a commercial Strata Insurance policy and provides cover for the accidental physical loss or damage to the building during the period of insurance. Accidental is defined as: ‘ something that is not intended or expected by You and In addition to the definition of damage, would not be expected from the standpoint of a reasonable person in Your position. ” Damage is defined as: ‘ any physical loss of, destruction of, or Damage to property from any sudden and Accidental cause not otherwise excluded by this Policy. Damaged has a corresponding meaning ’ The complainant lodged a claim in May 2020 after noticing cracking and movement-related damage to the property in January 2020. During lodgement the complainant stated the damage occurred because of an unknown leak. In an email of 10 September 2020 sent to the insurer, the complainant says a toilet at the building had a leaking seating washer which allowed water to continuously flow from the cistern and through the system. This was first noticed in November 2019 but not repaired until May 2020. According to the exchanged information a sewer pipe leading from the complainant’s units to the sewer main at the front of the property had a break and was repaired in May 2020. There is no dispute that the damage to the property was unintended or expected. While a pre- purchase inspection report from BP dated 29 May 2018 identified some issues with settlement and cracking, the panel understands that the damage was repaired. The panel accepts that the damage claimed was accidental damage first identified during the period of insurance. The onus therefore shifts to the insurer to establish a relevant exclusion applies if it is to refuse payment of the claim. Determination | Case number: 779659 Page 3 of 10 2.2 Is the insurer entitled to decline the claim? Yes. The panel is satisfied based on the available information that most likely the proximate cause of the damage was gradual deterioration, settling/shrinkage that occurred over an extended period. The insurer is entitled to rely on policy exclusions to decline the claim. Insurer denied the claim based on several policy exclusions The insurer has relied on following policy exclusions to decline the claim, which include: c. wear and tear, fading, marring, gradual deterioration, developing flaws, normal up-keeping or making good, rust, gradual corrosion, oxidization, concrete or brick cancer, wet or dry rot. However this exclusion does not apply to subsequent Damage to Insured Property not otherwise excluded by the Policy j. normal settling, seepage, shrinkage, expansion, creeping, heaving in Buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders, retaining walls and other structural improvements; m. defect in any item, structural defect, faulty design, faulty workmanship, error or omission that You were aware of or should have reasonably been aware of. Insurer’s experts indicate damage most likely due to long term foundation movement The insurer has relied upon loss adjuster NLA and engineer MBC. NLA attended the property on 2 June 2020 together with the complainant and reported:  a break in a bend in the sewer pipe that leads from units 1 and 2  the break is most probably from the time of construction  the break appears to have caused disturbance to the soil which has resulted in subsidence of the tilt panel and floor slab  misalignment of internal aspect of the property, internal heaving, creaking and breaking of the wall linings and gaps between the ceiling. NLA recommended that a further assessment be undertaken by an engineer. MBC has provided five reports. The panel does not propose to summarise each report and commentary is limited to key findings of the reports. Further summary of MBC’s report s is contained within section three of this determination. MBC has noted that the pre-purchase inspection report had identified pre-existing building movement and settlement. MBC considered that while the leak may have exacerbated foundation movement locally, it would not have caused the damage observed throughout the property. MBC concluded that the long-term foundation movement, was unrelated to the sewer pipe break and likely due to inadequacies in the p roperty’s foundation system. Complainant’s expert report relate damage to break in sewer pipe In response to the initial report from MBC the complainant has provided reports from engineers KCE and SRB. Determination | Case number: 779659 Page 4 of 10 Essentially, KCE disagrees with MBC’s findings and concludes that: ‘ only minor movements were encountered up until November 2019. These were repaired and remained stable for a further 16 months, which indicates the footing system is adequate. Once the cracked sewer pipe had enough time to fully saturate the surrounding soils the building has seen excessive movements and issues local to this area. The cracked sewer pipe has caused detrimental damage to the building. ’ SRB’s report dated 9 September 2021 supports the findings made by KCE. However, SRB explains that the property experienced normal differential subsidence issues between 2013 to approximately 2018. SRB concludes that from circa 2018 until the time the leak was identified, the leak is the likely cause of the damage to the property. While SRB reported that a pipe break was directly under the ground floor toilet, it has since provided clarification that it was not directly below the toilet but was in the sewer pipe outside the front of the property. Insurers reports more persuasive Having reviewed the exchanged evidence, the panel finds the reports from MBC to be more persuasive. In response to the reports from KBE and SRD, MBC has provided four reports dated 5 September 2020 (report two), 23 September 2020 (report three), 1 November 2021 (report four) and 15 November 2021 (report five). These reports largely repeat MBC ’s initial findings. In its report dated 5 September 2020 MBC notes that the location of the leaking sewer pipe is not near the observed damage. MBC notes the water escaping the break in the pipe would have drained to the lower point away from the property in the drain channel which runs along the front of the property. In the report dated 23 September 2020, MBC responded to the complainant’s claim that the leaking toilet cistern led to sufficient amount of water escaping from the pipe to saturate the soil and cause the damage. MBC maintained that any leaking water from the sewer pipe break is expected to make its way to a lower elevation away from the building footing due to the slope of the embankment. Any escaping water would flow away from the building and any influence from saturation would be miniscule. MBC noted that even if one assumes a degree of influence from soil saturation, the front edge footing is supported by bored piers that are anchored into the footing beam. The bored piers are expected to resist any minor movement at this section. In the panel’s view, MBC’s evidence is persuasive. The issues indemnified by MBC are long- standing and are consistent with the damage identified during the pre-purchase inspection report of BP in May 2018. Insurer can deny the claim The insurer has relied on numerous policy exclusions it says entitles it to decline the claim. The panel notes the policy excludes cover for: normal settling, seepage, shrinkage, expansion, creeping, heaving in Buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders, retaining walls and other structural improvements Determination | Case number: 779659 Page 5 of 10 The panel accepts that the proximate cause of the damage, that is the dominant or effective cause of the damage is most likely due to long term foundation movement. The panel is satisfied the available information shows the proximate cause of damage claimed was settling, shrinkage and heave, which are causes of damage excluded from cover. Therefore, the panel is satisfied the insurer has established, on the balance of probabilities, that the exclusion applies. On this basis, the insurer can refuse payment of the claim. 2.3 Why is the outcome fair? The outcome is fair because the insurer has assessed the claim in accordance with the terms and conditions of the policy. While there was a leaking pipe near the property, the proximate cause of the damage was most likely long-term foundation movement. Such damage is excluded from cover under the terms of the policy. It is fair in the circumstances that that the insurer can rely on the terms of the policy to refuse payment of the claim. Determination | Case number: 779659 Page 6 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive insurance experience We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. 3.2 Product Disclosure Statement Page 12 WHAT YOU ARE COVERED FOR This section is an Accidental, physical Loss or destruction contract of insurance bet ween You and Us. We will cover Your Insured Property for any Damage occurring during the Period of Insurance not excluded by this section. The most We will pay is the Sum Insured shown on Your Schedule for this section. Determination | Case number: 779659 Page 7 of 10 If We have agreed to pay a claim and the Sum Insured on Your Buildings and Common Contents is not totally used for that claim, We will also pay for… 19 - 20 EXCLUSIONS We will not pay any claims for Damage to Ins ured Property arising directly or indirectly from or in connection with: … c. wear and tear, fading, marring, gradual det erioration, developing flaws, normal up - keeping or making good, rust, gradual corrosion, oxidization, concrete or brick cancer, wet or dry rot. However this exclusion does not apply to subsequent Damage to Insured Property not otherwise excluded by the Policy; … j. normal settling, seepage, shrinkage, expansion, creeping, heaving in Buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders, retaining walls and other structural improvements; … m. defect in any item, structural defect, faulty design, faulty workmanship, error or omission that You were aware of or should have reas onably been aware of. 3.3 Expert Reports Record Key points Complainant’s Pre - Purcha se Pest (BP) Report 29 May 2018 > the building has had some settlement resulting in cracking to walls and some door openings being out of square > the long - term consequences of this movement are not known and if you require a better understanding of the risk of further movement I recommend you consult with a consulting Structural Engineer > the building has had some settlement resulting in cracking to walls and some door openings being out of square (such as the ground floor d isabled toilet door out bid square. approx.10mm) Insurer’s Loss Adjuster ( NL A) Report 4 June 2020 > a bend in the sewer pipe that leads from Units 1 & 2 to the sewer main at the front of property has a fracture/break > t his is most probably from the time of construction noting that there is no evidence of any other intervening cause of damage to the pipe after installation/constructio n Insurer’s Engineer (MBC) Report > pre - existing movements have been report ed in the pre - purchase inspection report Determination | Case number: 779659 Page 8 of 10 Record Key points 17 July 2020 > the report identifies cracking to walls and some door openings being out of square > it appears that the piles do not meet the geotec hnical strength requirements > the pipe breakage at the SE section of the building frontage is likely to have exacerbate d the foundation movement locally but not to the extent observed throughout the building > the sewer pipe breakage is not believed to have influenced the movement cracks/deformation at the Northern half of the office > the building movement is pre - existing and believe d to have been ongoing since construction of the building due to foundation settlement / movement. > The long - term foundation movement is unrelated to the s e wer pipe breakage but us [sic] likely due to inadequacies in the design of the foundation sy stem Complainant’s Engineer (KCE) Report 17 August 2020 > all pipe work for this site should have been installed to accommodate any possible settlement of the fill and possible seasonable movements of the fill/soil > we have not been informed if articulation joints were installed to cater for these movements or not. > As the pipework has cracked, it would be fair to assume no articulation joints were installed > All plumbing on this site should be inspected and confirmed to be installed adequately > Once the cracked sewer pipe had enough time to fully saturate the surrounding soils the building has seen excessive movements and issues local to this area > The cracked sewer pipe has caused detrimental damage to the building Insurer’s Engineer (MBC) Report # 2 5 September 2020 > The pipe break/repair was identified as being at the front L.H.S. of Unit 1. It is pertinent to note the presence of a drainage channel/soak - away ditch along the length of the building frontage bet ween Unit 1 and the street. > Water tends to flow by gravity towards a lower elevation such as the channel bed away from the building and tends to collect along the channel bed. > The location of the pipe break next to the drainage channel is a fair distance away from the general location of the observed/reported cracking and deformations internally. > Therefore, the influence of the saturated soil due to pipe leak next to the soak - away pit on the int ernal footing is considered to be localised to the front edge of t he building at worst. It does not extent internally under the office area. > K CE have inferred that no articulation joints were installed in the piping to accommodate possible movements caused by settlement or seasonal changes. Highly reactive soils swell w hen Determination | Case number: 779659 Page 9 of 10 Record Key points wet and shrink during the drying out phase and therefore, if no flexible joints have been provided, cracking of pipes is expected Insurer’s Engineer (MBC) Report # 3 23 September 2020 > Insured’s claim that the leaking toilet cistern led to sufficient amount of water escaping from the pipe, causing the extent of damage now apparent: > any leaking water from the sewer pipe break is expected to make its way to a lower elevation away from the building footing due to the slope of the embankment and make - up of a standard pipe trench if built to approved standards. > Secondly, even if the one assumes a degree of influence from soil saturation, the front edge footing is supported by bored piers tha t are anchored into the footing beam. > Note the pres ence of 2 closely spaced bored piers in the vicinity of the pipe break. Refer circled section in part drawing shown in Appendix B. The bored piers are expected to resist any minor movement at this section . > Thirdly, it is evident that there has been ongoing footing movement internally within Unit 1 where footing beams are not supported by bored piers and rest directly on filled soil Class P (nominally Class H) to AS 2870 > Any escaping water would flow away from the building and not influence the areas where damage is apparent Complainant’s Engineer (SRB) Report 9 September 2021 > We have reviewed the limited construction doc ument ation supplied and would generally concur with the KCE assertion that the (substructure) foundation arrangement has been a generally adequate response to the ambient site conditions. > we have reviewed the initial MBC calculations regarding the foundations contained within the 17 July 2020 report and do not concur with same. Indee d, it would appear they have inadvertently applied Ultimate Limit State factors to soil parameters reported in Permissible State format, returning unnecessarily ‘amplified’ and hence incorrect loading / performance res ults in the process > We are of the con sidered opinion that the conjoined U1 / U2 building footprint present ed in a generally structurally adequat e / competent condition, experiencing only nominal differential subsidence issues between 2013 and circa 2018, this being generally within acceptable performance parameters for a building of this construction type, geometry and the ambient site conditions (highly reactive fill materials up to 3.5m in dept h, as cited by both KCE and MBC , in their respective reports > We are of the considered opinion that the conjoined U1 / U2 building footprint has experienced an isolated differential subsidence event – identified as Point A. on plate HL - 04 on Determination | Case number: 779659 Page 10 of 10 Record Key points page 4 of this report – post circa 2018 which, on the information to hand and on the balance of probability, is a ssignable to the fractured subsurface graywater (sewerage) line in the ground level toilet, Southern aspect of U1. We therefore concur with the KCE report that this is the likely damage mechanism for this isolated and apparently post - 2018 event. We convers ely do not concur with the MBC report that the fractured graywater line was essentially ‘inconsequential’ and therefore the matter is related solely to as - existing foundation performance 3.4 Other Documents Considered  Complainant’s submissions .  Certificate of Insurance.  Product Disclosure Statement.  Insurer’s Notice of Response.  MBC reports dated 1 November 2021 and 15 November 2021.  SRB email dated 9 November 2021.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.