Storm damage claim partially declined on wear and tear grounds; cash settlement offer disputed
Text of the determination
Determination
Case number 779247
Financial firm Insurance Australia Limited
Determination | Case number: 779247 Page 2 of 9
Case number: 779247 27 January 2022
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy covering her rental property with the financial
firm (insurer) and lodged a claim on the 26 October 2020 for storm related damage.
The insurer accepted liability for storm damage but limited its liability for the roof damage
which it says was caused by wear, tear and gradual deterioration which is excluded from
cover under the terms of the policy. The insurer offered to settle the complainant’s claim
based on Scope of Works (SOW) provided by RC for $28,678.07.
The case manager issued a recommendation substantially in favour of the complainant in this
matter. A copy of the recommendation is attached. The complainant has rejected the
recommendation and submits that the recommendation does not allow for assessment of the
damage to the pool roof or replacement of the oven.
1.2 Issues and key findings
Is the insurer’s offer of settlement fair in all the circumstances?
No. The insurer did not adequately assess the storm related damage. In addition to its offer of
$28,678.07, the insurer is to obtain a quotation for additional repairs based on the SOW
provided by its engineer CE and pay the complainant the assessed quotation on the SOW
plus a 25% contingency.
Is the insurer liable for the damage to the pool roof and oven?
It is fair in the circumstances that the insurer appoints a roofing contractor to assess the
damage to the pool roof. If assessed as storm related, then the insurer is to settle the claim
based on the quoted cost of repairs to the pool roof.
It is also fair in the circumstances that if the insurer has not already done so that the insurer
arranges for an electrician to assess the damage to the oven. If assessed as related to the
storm damage the insurer must pay the complainant, the cost of replacing the oven.
Is the complainant entitled to compensation for non-financial loss?
Yes, the complainant has suffered an unusual degree of psychical inconvenience and time
taken to resolve the situation.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 21 days of the complainant accepting this determination the insurer is to:
Pay the complainant $28,678.07 based on SOW from RC including a 15% contingency
and less an excess of $750
Determination | Case number: 779247 Page 3 of 9
arrange a quotation based on CE ’s SOW and on receipt of the quotation pay the
complainant the amount quoted plus an additional 25% contingency to cover the transfer
of risk
arrange for an assessment of the damage to the pool roof and oven. If assessed as storm
related settled the complaint for the cost to repair the pool roof and oven as quoted
pay the complainant $1,500 compensation for non-financial loss.
Determination | Case number: 779247 Page 4 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has had the
opportunity of addressing the issues that arise from the information exchanged.
This matter has been subject of a case manager’s recommendation. A copy of the
recommendation is attached to this determination. It is the case manager’s recommendation
that the insurer pay the complainant:
$28,678.07
arrange a quotation on (CE) scope of works and settle this with a 25% contingency
pay the complainant $1,500 compensation for non-financial loss.
Having reviewed the material exchanged and the case manager’s recommendation I am
satisfied its contains an accurate summary of the complaint and the issues to be determined.
I am satisfied that the findings in the recommendation were correct and they are largely
adopted in this determination.
I have considered the further submissions made after recommendation and note that in
rejecting the recommendation the complainant has raised the following substantial issues:
the recommendation does not provide for assessment of the damage to the pool roof
which was substantially damage in the storm event
the recommendation does not include in the scope of works replacement of the oven which
had previously been accepted by the insurer but not replaced
the insurer has failed to repair the front veranda light which had been damaged.
While I accept the findings in the recommendation were correct and adopted in this
determination I will address the further issues raised by the complainant in the body of this
determination.
2.1 Is the insurer’s offer fair in all the circumstances?
No. The insurer did not adequately assess the storm related damage. In addition to its offer of
$28,678.07, the insurer is to obtain a quotation for additional repairs based on the SOW
provided by its engineer CE. In addition to its offer of $28,678.07 the insurer is to the amount
assessed quotation on the SOW provided by CE plus a 25% contingency.
Policy provides cover for storm related damage.
There is no dispute between the parties that the complainant had been provided with the
relevant policy documentation including the Product Disclosure Statement (PDS) and the
Certificate of Insurance (COI).
The policy is an insured event policy that provides cover for series of events including storm
damage. Such cover is subject to various condition limitations and exclusions.
The insurer does not dispute the property had suffered storm damage on or about 26 October
2020 but maintains not all the damage claimed was storm related. On this basis it offered to
cash settle the claim as it could not warrant the repairs due to the pre-existing condition of the
roof.
Determination | Case number: 779247 Page 5 of 9
The insurer is entitled to cash settle the claim.
The policy provides the insurer with an option whether to repair, replace or cash settle a
claim. Whilst the insurer has this discretion it must exercise the discretion fairly, reasonably
and consistent with the upmost good faith.
As set out in the recommendation, the available information from the experts provided by both
the insurer and the complainant indicates the roof to be in a generally worn condition with a
lack of sarking and subject to large amounts of leaf litter debris from the large tree
surrounding the property.
The reports indicate it is highly likely water would re-enter the property if the relevant
maintenance was not completed. It is fair in these circumstances that the insurer cash settles
the claim.
The insurer ’s builder RC provided a SOW for various repairs to the roof. Particulars of the
SOW are set out in the recommendation attached. Based on the SOW and assessed storm
related damage the insurer offered to settle the claim for $28,678.07 allowing for the quoted
amount ($25,937.84) plus a 15% contingency (total $29,428.09) less the relevant $750
excess.
As there are no alternative quotations for these repairs it is fair in the circumstances that the
insurer be allowed to rely upon the quote including the contingency fee for settlement of that
aspect of the complainant’s claim .
Insurer to increase its offer based on scope of works from CE.
After the matter was referred to AFCA the insurer obtained a report from an engineer CE.
As the report has been exchanged I do not propose to repeat the findings in the report in
detail. In summary CE determined water entered the dwelling through the lounge room
window due to the overflow from the valley gutter caused by a combination of hail build up
and poorly maintained gutters (leaf debris). This caused damming of the hail stones,
preventing correct removal of the hail and rain.
CE considered the ceiling lining mould damage unrelated to water ingress, although a section
of the ceiling in bedroom 2 of the property required replacement due to a possibly incorrect
replacement of a roof tile during the make safe.
A SOW was provided for water entry damage only. The SOW provided by CE is detailed and
provides for the following:
removal and replacement soffit offer outside entry door, for 4m2
allowed paint – 2 coats to match existing replacement section of soffit
removed and replace 1m2 (or dimension as necessary based on ceiling joist spacing) of
damage ceiling in bedroom 2
Allow to paint, 2 coats to match existing, ceiling in bedroom 2,10m2
Patch section of the flooring where holes have been drilled.
Allow for varnish coat finish to the lounge room flooring.
Prepare and paint, 2 coats to match existing, south-western wall of lounge room (wall with
window penetration)
Remove and replace 1 kickboard under the oven in the kitchen
Remove a 1m2 section of the plasterboard linings on the separating wall between the
lounge and kitchen and inspect for water damage to the frame. Refer damage to CE.
Patch and paint walls, 2 coats to match existing if no moisture damage found.
Determination | Case number: 779247 Page 6 of 9
Remove a 1m2 section of the plasterboard linings on the separating wall between the
lounge and the hallway and inspect for water damage to the frame. Refer damage to CE.
Patch and paint wall, 2 coats to match existing if no moisture damage found.
The complainant has not provided any evidence to dispute CE ’s findings or to suggest that
there was additional damage not included in the scope of works other than the damage to the
pool roof.
The insurer has not disputed the damage as assessed by CE. It is fair in the circumstances
that the insurer accepts the scope of works as CE has assessed the damage as storm related
and not due to any of the exclusions contained within the terms of the policy.
Insurer to obtain quotation based on the CE scope of works.
In the circumstances it is fair the insurer obtains a quotation for the repairs based on the
SOW provided by CE.
As the insurer wants to cash settle any claim then it is fair the insurer allows a further 25%
contingency on the assessed quotation to take into account the transfer of risk. I consider a
25% contingency fair as the SOW notes the risk of moisture damage being found in the
plasterboard lining separating the wall between the lounge and kitchen and the lounge and
hallway.
On receipt of the quotation based on the CE SOW the insurer is to pay the complainant the
amount quoted plus an additional 25% contingency to cover the transfer of risk. To avoid any
doubt this payment is in addition to the offer of $28,678.07 based on the SOW from RC.
The insurer is not liable for mould damage or roof replacement.
In so far that there is damage to the roof associated with wear, tear and lack of maintenance
then the insurer is not liable for such damage as this is not covered under the terms of the
policy.
The available information indicates that there were issues with leaf debris to the roof with leaf
debris being found under the tiles and in the guttering. Whilst some of this leaf matter have
been the result of the storm it is clear from the photographs that a lot of the leaf debris had
settled under the roof overtime.
It is also apparent from the photographs supplied that there was some pre-existing damage to
the roof although it is unclear whether such damage had allowed water entry into the property
during the storm.
In so far as the damage is due to wear, tear or gradual deterioration the insurer is not liable
for such damage.
In relation to the moisture or mould damage there is no evidence to show the storm was
either the proximate cause of the smoke damage or mould. On balance I agree with the
findin gs in the recommendation that CE’S opinion was persuasive that the damage was
caused by humidity-based mould growth which occurred gradually overtime. This is
supported by CE’s findings that there was a lack of water damage on the top sides of the
ceiling.
Determination | Case number: 779247 Page 7 of 9
2.2 Is the insurer liable for the damage to the pool roof and
oven?
In rejecting the recommendation, the complainant has referred to damage to the pool roof
which was separate to the damage to the main house roof.
I have reviewed all the material and I cannot find reference to damage to the pool roof other
than in the complainant’s rejection of the recommendation. This does not mean that the
complainant did not raise this issue with either the assessor or the insurer’s engineer . It has
simply not been raised as part of the complaint process until after the recommendation.
In view of this and given the nature of the storm I consider it fair that the insurer has the
opportunity to assess the damage to the pool roof. If the damage is considered to be storm
related, then the insurer would be able to obtain a quote for the cost of the repair of the pool
roof area and would be in a position to cash settle the complainant for such a claim.
In the circumstances I consider it fair that within 21 days of the complainant’s acceptance of
this determination, the insurer arranges for the assessment of the pool roof. If the damage is
assessed as storm related, then the insurer should obtain a quotation based on an assessed
SOW to repair the pool roof.
The insurer is entitled to either complete the repairs or should it choose to do so cash settle
the claim based on the quoted scope of works.
Insurer to assess damage to oven.
The complainant has also claimed that the insurer offered to settle the claim for the damage
to the kitchen oven but has not done so.
I note from the information exchanged that the insurer offered to have an electrician attend to
assess the damage to the oven. It is unclear from the information before me whether the
insurer had then accepted t he complainant’s claim for damage to the oven and either offered
to cash settle the complainant for the replacement of the oven or agreed to replace the oven.
In the circumstances given this has been raised following the recommendation I consider it
fair that the insurer, if it has not already done so, appoint an electrician to assess the damage
to the oven. The insurer then is to notify the complainant its decision. Should the insurer
accept the complainant’s claim for damage to the oven then the insurer is entitled to either
replace the oven or cash settle the complainant for the cost to replace the oven in accordance
with the terms and conditions of the policy.
Is the complainant entitled to compensation for non-financial loss?
Yes. The complainant is entitled to compensation for $1,500 for non-financial loss.
Determination | Case number: 779247 Page 8 of 9
2.3 AFCA can award compensation for non-financial loss.
AFCA can award compensation to a complainant for non-financial loss where a complainant
experiences an unusual degree of physical inconvenience or time taken to resolve a situation
or interference with a complainant’s expectation of enjoyment or peace of mind.
The complainant says that insurer’s handling of this complaint has caused her significant
stress and taken a toll on her health. The complainant has highlighted the time taken to
assess the review and make a decision on the claim and the inconvenience that has been
caused to her.
I note the claim was lodged on 26 October 2021. The insurer whilst initially accepting internal
damage declined damage to the roof area. It was not until further roofing report was obtained
and further assessment obtained from RC and CE that the insurer offered to settle the
complainant’s claim based on the SOW from RC.
I accept that the insurer had incorrectly denied the claim in its entirety. But for the
complainant’s persistence the insurer would likely have maintained that denial. I also accept
that the insurer failed to cover the damage identified by CE despite CE indicating such storm
related.
In the circumstances I accept that the complainant suffered an unusual degree of physical
inconvenience and interreference with her expectation of enjoyment and peace of mind. It is
fair that the insurer pays the complainant $1,500 compensation for non-financial loss.
Determination | Case number: 779247 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted our
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Recommendation
Case number 779247
Financial firm Insurance Australia Limited
Recommendation| Case number: 779247 Page 1 of 5
Case number: 779247 3 November 2021
4 Recommendation overview
4.1 Complaint
On 26 October 2020 the complainant lodged a claim with the financial firm (insurer) after a
storm caused damage to the complainant’s rental property.
The insurer reviewed and initially denied the claim, however later accepted storm damage to
the property. The insurer denies damage to the roof on the basis it says this was caused by
excluded factors of its policy as wear, tear and gradual deterioration.
The insurer says due to the condition of the roof it cannot warrant the work and therefore
opted to cash settle the claim based on its builder’s scope of works and allowed a
contingency.
The complainant is seeking coverage to the roof and disputes the extent of items being
covered under the scope of works.
The complainant says the insurers settlement offer is not reasonable and seeks the insurer to
complete the repairs or increase its settlement offer.
4.2 Issues and key findings
Is the insurers assessment of its liability reasonable?
No, the insurer is to in addition to its previous offer settle the complainant based on the scope
of works provided by its engineer (CE) plus a 25% contingency strictly on (CE)’s quotation.
Is the complainant entitled to compensation for non-financial loss?
Yes, the complainant is entitled to compensation for non-financial loss for $1,500.
4.3 Preliminary assessment
This preliminary assessment is in substantially favour of the complainant.
Subject to both parties accepting this preliminary assessment: The insurer is to pay the
complainant:
$28,678,07
Arrange a quotation on (CE)’s scope of works and settle this with a 25% contingency.
Pay the complainant $1,500 compensation for non-financial loss.
Recommendation| Case number: 779247 Page 2 of 5
5 Reasons for preliminary view
5.1 Is the insurers settlement offer reasonable?
Complainant must establish a valid claim and policy coverage
When lodging an insurance claim, the complainant bears the initial onus to establish, on the
balance of probabilities (that is, more likely than not), that the claim falls within the scope of
cover under the policy. Once that is established, the onus shifts to the insurer to show, on the
balance of probabilities, that an exclusion applies, or it is otherwise entitled to deny the claim.
The re’s no dispute the insurer provided the complainant with the relevant policy
documentation, including the product disclosure statement (PDS) and certificate of insurance
(COI). Therefore, the insurer is entitled to rely on the policy provisions to assess its liability
under the claim.
The policy covers the insured property against ‘storm’ damage. Cover under this benefit is
subject to the conditions, limitations and exclusions specified in the product disclosure
statement (PDS).
The complainant lodged a claim for storm damage to her rental property on 26 October 2020
after a server wind and hail storm caused damage to the property.
The insurer partially accepts the damage at the property, however certain portions of the
claim it does not accept were caused by the storm, rather it says it was caused by excluded
factors of the policy such as wear, tear and gradual deterioration.
The insurer chooses to cash settle the claim, on the basis it cannot warrant the repairs due to
the pre-existing condition of the roof and the large trees in the vicinity of the roof.
The complainant is disputing the extent of damage and seeks the insurer to complete the
repairs or increase it settlement offer. Below I will consider whether the insurer is required to
complete repairs and/or increase its settlement offer.
Insurer entitled to cash settle, however settlement offer to be increased
The insurer relies on it builder (RC) who included a scope of works from builder (RC), who
included the following in the scope of works:
Disconnect and reconnect all pool matting system to complete repairs
Remove and dispose of all concrete roof tiles
Supply and install lead flashing for vent pipe
Supply and install new concrete roof tiles including all bedding and repointing required for
ridge capping tiles
Supply and install sarking blanket
Supply temporary tarps to ensure the main dwelling is watertight during repairs
Disconnect and reconnect all pool matting system to complete repairs
Remove and dispose of all concrete roof tiles
Supply and install lead flashing for vent pipe
The insurer accepts these items were damage by the storm and proposed to settle based on
this quotation for a sum of $25,937.84 with a 15% contingency ($29,428.09 less the excess of
Recommendation| Case number: 779247 Page 3 of 5
$750= $28,678.07). In the absence of an alternate quotation I am not persuaded the insurer
is required to increase this portion of the claim.
However, I do not accept this finalises the claim.
The insurer following the referral to AFCA provided a report from engineer (CE) who also
noted the following were directly damaged by a storm.
Remove and replace soffit outsider entry door 4m2
Allow to paint, 2 coats to match existing, replacement section of soffit
Remove and replace 1m2 (or dimension as necessary based on ceiling joist spacing) of
damage ceiling in bedroom 2
Allow to paint, 2 coats to match existing, ceiling bedroom 2, 10m2
Patch sections of the flooring where holes have been drilled.
Allow for a varnish coat finish to the lounge room flooring.
Prepare and paint, 2 coats to match existing, south-western wall of lounge room (wall with
window penetration).
Remove and replace 1 kickboard under kickboard under the over in the kitchen.
Remove a 1m2 section of the plasterboard linings on the separating wall between lounge
and kitchen and inspect for water damage to the frame. Refer damage to (CE). Patch and
paint wall, 2 coats to match existing if no moisture damage found.
Remove a 1m2 section of plasterboard linings on the separating wall between the lounge
and hallway and inspect for water damage to the frame. Refer to (CE). Patch and paint
wall, 2 coats to match existing if no moisture damage is found.
The insurer is to accept this scope of works as (CE) clearly explained the damage was
caused by the storm and not by any of the relied upon exclusions of the policy.
Therefore, the insurer is to provide a quotation on these items and to allow a contingency of
25% for any unforeseen damage.
The complainant appears to be claiming for the roof replacement, however there is no
evidence of storm damage to the roof beyond the damage already quoted and therefore it is
not covered. I note the mention of damage caused by the failed make safe or removed tile by
the insurers builder, this is included in (CE)’s scope of works above.
In relation to the moisture or mould damage to the other ceilings in the property, I am
persuaded by (CE)’s opinion that the damage was caused by humidity -based mould growth
which occurred gradually over time and the insurer is entitled to exclude this damage. This is
further supported by the lack of evidenced water damage on the top side of the ceilings.
Whilst the complainant queried the engineer’s findings, saying the dryer was not used and
that the it has not been confirmed the tenants were in fact smokers. There is no evidence to
show the storm was the proximate cause, therefore a valid claim for this damage has not
been established.
In relation to whether the insurer is liable to complete repairs. The available reporting
provided by all parties shows the roof to generally be worn, with a lack of sarking and it is
constantly subjected to large amounts of leaf litter debris from the large trees surrounding the
property. For these reason, I accept it is likely high risk that water would re-enter the property
and partial repair of the roof cannot be fairly completed, and the insurer is entitled to cash
settle the claim.
The insurer is to pay the complainant $28,678,07 and arrange a quotation for the above noted
scope of works provided by (CE) with a 25% contingency on (CE)’s quotation as full and final
Recommendation| Case number: 779247 Page 4 of 5
settlement of the claim and complaint subject to the parties accepting this preliminary
assessment.
I note the complainant provide a roofing report, however it does not clarify any further
damages caused by the storm and does not alter the outcome.
5.2 Is the complainant entitled to compensation?
AFCA can award compensation in certain circumstances
AFCA’s Rules enable it to award compensation to complainants for non -financial loss outside
of the policy terms (capped at $5,000). Compensation for non-financial loss is limited. AFCA
may decide an insurer should compensate complainants for such a loss only where there has
been:
an unusual amount of physical inconvenience;
time taken to resolve a situation; or
interference with the complainants’ expectati on of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss and expects
complainants to be moderately robust and bear the usual degree of inconvenience when
managing an insurance claim.
Complainants seeks compensation for claims handling experience
The complainant has mentioned the stress and toll on her health the claim has taken. The
complainant has highlighted the time taken to assess, review and make decision on the claim
and the inconvenience this has caused her tenants.
I accept, the available information shows the insurer incorrectly initially denied the claim in its
entirety. The insurer also failed to cover the damage identified by (CE) which is clearly storm
damage. These issues caused delays and I accept effected the complainant’s peace of mind.
The insurer is to pay the complainant $1,500 compensation for non-financial loss.
Recommendation| Case number: 779247 Page 5 of 5
6 Supporting information
6.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has assessed this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
recommendation to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.