Determination 778668

Water damage from leaking shower declined as gradual escape of liquid

FirmWestpac
Decided2021-09-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$14,632
Non-financial loss—
Amount claimed$18,290
SourceAFCA PDF

Summary

The insurer declined a water damage claim for a leaking shower, relying on the gradual escape exclusion and a policy-period argument. AFCA found the damage fell within the earlier policy and ordered payment of 80 percent of repair costs plus interest.

The insurer could not establish a decline under the policy, but the complainant's delay in lodging the claim justified reducing the insurer's contribution to 80 percent of repairs.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 778668 Financial firm Westpac General Insurance Limited Determination | Case number: 778668 Page 1 of 8 Case number: 778668 6 September 2021 1 Determination overview 1.1 Complaint The complainant with his wife ‘L’, arranged a quality care insurance policy (policy 1) with the financial firm (insurer) to cover their home and contents for the period 3 May 2019 to 3 May 2020. On expiry of policy 1, a new premier care insurance policy (policy 2) was arranged with the insurer for the period 11 May 2020 to 11 May 2021. On 8 December 2020, a claim was lodged for water damage to the insured building which the insurer has declined. It says the complainant has not shown the damage is covered under the policy. Alternatively, the insurer says if it is accepted that a valid claim exists, the damage is excluded because it is due to a gradual escape of liquid, which was evident, and the complainant failed to rectify. 1.2 Issue and key findings Is the insurer entitled to decline the claim? No. The insurer is not entitled to decline the claim in its entirety. Although, the damage claimed may have been occurring prior to inception of policy 2, it is reasonable to accept the damage falls within period of insurance for policy 1. Given the delay in the lodgement of the claim, the ongoing damage and considering what is fair in all the circumstances, the insurer can limit its liability to 80% of the cost of repairs. The insurer is to pay the complainant $14,631.84 under the claim. 1.3 Determination This determination is significantly in favour of the complainant. Within 14 days of the complainant accepting this determination, the insurer is to pay the complainant $14,631.84 in settlement of the claim. The insurer is to pay interest on this payment in line with section 57 of the Insurance Contracts Act 1984 from 23 December 2020 to the date on which payment is issued under the claim. Determination | Case number: 778668 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? The policy provisions slightly differ for the two policy periods Policy 1 covers the insured property against loss or damage caused by one or more of the listed insured events, including loss or damage due to an accidental escape of liquid. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). Policy 2 covers the insured property against loss or damage caused by one or more of the listed insured events, including a sudden and accidental escape of liquid. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the PDS. The policy provisions relating to cover under the escape of liquid benefit for policy 2 were amended by way of a supplementary PDS effective 30 June 2018. This amendment adds the term ‘sudden’ to requirement of cover. Unlike essential care cover, quality and premier cover policies do not exclude loss or damage resulting from liquid escaping from a shower recess. Complainant bears the onus to establish a valid claim under the policy It is established law that the insured has the onus to establish, on the balance of probabilities (that is, more likely than not) that the loss falls within the terms of the policy. There is no dispute the damage claimed is the result of an escape of water from the shower breecher as well as water escaping the shower recess whilst in use. The parties accept the water damage in the laundry, bathroom and hallway areas of the insured property is because of the leaking shower breecher and water escaping the shower recess whilst in use. The insurer says the damage has been occurring for an extended period of time. It says the damage will have been occurring prior to inception of policy 2 and so falls outside the period of cover (no valid claim). Also, given the damage is because of a gradual escape of liquid which will have been evident, and the complainant failed to rectify, the resultant damage excluded under the policy. The complainant di sputes the insurer’s position and says they were not aware of the escape of liquid and associated damage until the damage became evident, at which point the claim was lodged in December 2020. Also, that the insurer is ignoring the fact there was a policy (policy 1) in place covering the insured building before inception policy 2. I note AFCA put the complainant’s concerns to the insurer including reference to policy 1 allowing the insurer the opportunity to respond to the concerns. The insurer confirms policy 1 did exist, however, the insurer has chosen not to provide any comment on why cover under policy 1 has not been considered. Further, the insurer has not provided any information as to why policy 2 was incepted as opposed to renewal of policy 1. For reasons discussed in greater detail below, I accept:  it is more likely than not the escape of liquid from the shower breecher and alcove will have been occurring for some time and possibly from before inception of policy 2  there is no evidence which shows the damage had been occurring from before inception of policy 1 Determination | Case number: 778668 Page 3 of 8  it is fair in all the circumstances to accept the accidental escape of liquid and resultant damage has occurred at a time the complainant held cover with the insurer. Therefore, I determine the complainant has established a valid claim. The onus shifts to the insurer to show an entitlement to decline indemnity for the claimed damage line with the policy provisions or otherwise. The insurer cannot decline but is entitled to reduce its liability under the claim The insurer has provided a report from consultants ‘T’ dated 8 December 2020 and a report from plumbers ‘PP’ dated 17 December 2020. I accept given the information from T and PP, including photographic evidence, that it more likely than not that the water damage to the insured building has been occurring for some time and became evident at least several months before the claim was lodged. PP in its report dated 17 December 2020 confirms having completed several tests. These include a shower breecher test, shower alcove test and a water spray test to the shower alcove, all of which failed. The consultants are consistent in their position that the damage is consistent with water escaping because of the leaking breaching pipework and alcove and TT has quoted to the cost of repairs at $18,289.81. There is no evidence the complainant had made any attempts to repair and or investigate the cause for the damage other than remove some of the wallpaper to the hallway wall. The evidence shows the complainant’s wife had told TT that the damage to the wall had been evident for a few months. I am satisfied the evidence supports the view that the damage to the insured building will have been evident for at least a couple months before the claim was lodged. Also, that the complainant failed to rectify and/or contact the insurer in a timely fashion, which will have resulted in an increase in the extent of damage now present. However, it is also reasonable to accept that a significant portion of the water damage will have occurred before the escape of water issue and resultant damage became evident. As discussed above, I am satisfied this most likely will have been during period of insurance relevant to policy 1. I am satisfied it is fair to accept the escape of water and associated damage will not have been evident the whole time. It is reasonable to accept that a significant part of the damage to the wall, floor, timber doorframe and hallway wallpaper will have occurred before the damage reached the surface and before it could have become evident to the complainant. Therefore, I am not satisfied it would be fair in all the circumstances to allow the insurer to decline total indemnity under the claim on the basis the damage was evidence for a few months before claim lodgement. The insurer is to cover 80% of the cost of repairs under the claim I am satisfied the complainant’s delay in lodging the claim will have contributed to the extent of damage now present and associated cost of repairs. Given this, it would not be fair to require the insurer to cover all of the cost of repairs as these are likely higher than what they will have been had the complainant not delayed claim lodgement. Determination | Case number: 778668 Page 4 of 8 I determine, the insurer is to cover the complainant for 80% of the cost of repairs which comes to a total of $14,631.85. The complainant is to bear/contribute 20% of the cost to repair the claimed damage subject to payment of the relevant policy excess. The insurer is to arrange payment of the above noted amount to the complainant within 14 days of his accepting this determination. Why is the outcome fair? The outcome is fair because the evidence shows the damage to the insured building will have occurred whilst the building was covered under an insurance policy held with the insurer. Given the insurer has not shown an entitlement to decline cover, it is fair to require it to contribute to the cost of repairs representative of what it would have had to pay, if the claim was lodged in a timely manner. Determination | Case number: 778668 Page 5 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy provisions 2019 – 2020 policy period Escape of liquid: Covered Loss or damage caused by accidental escape of liquid from any fixed pipe, fixed tank, waterbed, fish tank, or fixed item used to hold liquid. We will also pay reasonable exploratory costs in locating the source of the damage, provided we have agreed to pay for the loss or damage caused by the escape of liquid. Not covered.  loss or damage to the item from which the liquid escaped, and if the liquid escaped from a shower recess, the cost of re-tiling the walls or floor of the shower recess,  repair or replacement of undamaged parts of your building and/or contents to match property that has been repaired or replaced, or  loss or damage caused by gradual escape of liquid which is evident and which you fail to rectify. … Determination | Case number: 778668 Page 6 of 8 2020 – 2021 policy period Escape of liquid: Covered Loss or damage caused by the sudden and accidental escape of liquid from any fixed pipe, fixed tank, waterbed, fish tank, or fixed item used to hold liquid. We will also pay reasonable exploratory costs in locating the source of the damage, provided we have agreed to pay for the loss or damage caused by the escape of liquid. Not Covered.  loss, damage or repairs to the item from which the liquid escaped, and if the liquid escaped from a shower recess, the cost of re -tiling the walls or floor of the shower recess,  repair or replacement of undamaged parts of your building and/or contents to match property that has been repaired or replaced, or  loss or damage caused by gradual escape of liquid which is evident and which you fail to rectify. … Accidental damage Covered. Accidental loss or damage to:  your building and/or contents at the site, or  your contents while temporarily removed elsewhere in Australia. If loss or damage is caused by any other insured event, you must claim under that section of your policy. For every claim we agree to pay, your excess will be the greater of your basic excess or $300. Not covered. Determination | Case number: 778668 Page 7 of 8 Any loss or damage excluded under any insured events, unless otherwise stated. Loss or damage caused by:  …  … … General Exclusions Your policy does not cover any loss or damage that is caused by or arises from: Maintenance and building failure to keep the property insured watertight, well maintained, structurally sound and secure. For example:  damage due to lack of maintenance or which happens gradually is not covered  Wear and tear, and environmental conditions.  wear and tear, gradual deterioration, or fading  rust, corrosion, oxidisation, mould, mildew or atmospheric conditions, … accident an event that happens by chance and is not expected in the normal course of events. accidental loss or damage loss or damage caused by an accident. Determination | Case number: 778668 Page 8 of 8 3.3 Consultants evidence Record Key points T Report 8 December 2020  Date of inspection 8 December 2020  Inspected the insured property with ‘L’ (complainant’s wife)  L advised the damage to the wall had been evident for a few months  Complainant attempt ed to remove the wallpaper in the hallway as it was showing signs of water damage  Appointed plumber who found damage to leaking breaching pipework to shower alcove and leaking shower alcove  In T’s opinio n, damage is consistent with water damage. The leak has been occurring for some time and has caused damage to the surrounding areas including the shower tiles, laundry tiles, timber doorframe and hallway wall/wallpaper  Cost of repairs: - For hallway wall/wal lpaper: $2,177.81 - Remain in g water damage: $16,112.0 1 PP Leak Detection Report 17 December 2020  Complainant advised his wife had a long shower recently, he noticed a wet spot appearing on the adjacent hallway brick wall around the height of the taps  Noticed wall look ed damp and noticed tiles in the laundry started to lift near the shower  Shower breecher test, shower alcove flood test and water spray test in shower walls failed  PP says the present damage has been caused by a leaking shower breecher as well as contributing leaking shower alcove  The shower breecher will need to be removed and replaced. A secondary pressure test is recommended upon completion to rule out any further leaks  Full shower renovation will be needed in order to waterproof the ar ea in accordance with AS3740.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.