Text of the determination
Determination
Case number 778361
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 778361 Page 1 of 7
Case number: 778361 6 October 2021
1 Determination overview
1.1 Complaint
The complainant is a lot owner in a development insured under a commercial strata
insurance policy held with the financial firm (insurer). The insured property suffered
damage from a storm event in early February 2020. During the storm, water caused a
rock retaining wall to collapse directly behind the lower office. The complainant says this
blocked drains and buried a drainage pump; that in turn caused the drainage system to
be overrun, which caused the water to enter his lot, damaging carpets.
Claims were lodged for the damage to the collapsed rock wall itself and the resulting
damage to the storm water drainage system; for damage to the carpets in the complainant’s
lot, as well as for his loss of rent after the tenant terminated the lease because of the water
ingress and carpet damage. The insurer accepted the damage to the rock wall and
drainage. However, it declined the complainant’s claim for damage to the carpet, since the
policy does not cover contents. The complainant has accepted that.
The insurer also declined his claim for loss of rent, on the basis the property was not made
unfit for its intended us due to the claimed event. It did, however, make an initial ex-gratia
offer of $2,000 for loss of rent. In an effort to resolve the complaint, that was later increased to
$4,400, representing the 20 weeks remaining on the lease in place at the time of the loss
The complainant does not accept the insurer’s decision or offer. He is seeking $13,530 in loss
of rent (for 61.5 weeks at $220 per week) an d $2,000 for lot owner’s fees incurred while the
lot was not able to be rented out.
1.2 Issues and key findings
What is the insurer’s liability for the claim?
The insurer has correctly dealt with the repairs of the damaged property. While it is not strictly
liable for loss of rent for the period claimed, it is fair and appropriate in the circumstances that
it pay $4,400, as it has offered. That is for the period up to the end of the tenancy that was in
place at the time of the loss, but was prematurely ended because of the damage. It is also fair
that it pays for 8 weeks of lot owner’s fees, representing the period the lot needed to dry
out/be remediated following the water event.
1.3 Determination
This determination is substantially in favour of the insurer. It is required to pay the
complainant $4,400 towards his loss of rent, and the relevant proportion (plus statutory
interest) of lot owner’s fees applicable to the eight week period immediately following the
claimed event. It is not required to take any further action.
Determination | Case number: 778361 Page 2 of 7
2 Reasons for determination
2.1 What is the insurer ’s liability for the claim?
No dispute there was physical damage to the property
The February 2020 storm event caused the rock wall to collapse, and the debris from that
collapse buried one of the storm water drainage pumps near the external wall of the
complainant’s lot. The insurer accepted the claim for the physical damage to the insured
property.
In their fourth report (14 August 2020) and after having spoken with the OC representative,
t he insurer’s loss adjuster, AS, reported there were two pumps installed in the subfloor to
assist in extracting water that entered the basement during heavy rainfall. They said that
during the storm event, the pump servicing the area where the bedrock collapsed had failed,
which caused flooding in the basement; and the second pump (although not actually
damaged) was then unable to cope with the volume of water that poured through the
basement. Water then flowed into the complainant’s ground floor lot. The latter pump returned
to ‘normal functionality’ after the event, but the complainant said the other one which had
been buried/blocked in the wall collapse was reporte d by the owners’ corporation
representative (OC) as being ‘ unserviceable ’ .
Structural engineers, SWP, had inspected in March 2020. They ‘ observed delamination
and collap se of the rock wall foundation’. They recommended that reinstatement of the
damage be undertaken as soon as possible to mitigate further damage to the rock foundation
which might subsequently compromise the structural integrity of the building itself. SWP
provided a detailed scope of works for the damage it identified at the time as needing to be
repaired. They did not identify any issues and made no recommendations to do with the
drainage system or pumps.
Policy provides cover for loss of rent in certain circumstances
Having accepted the claim for the physical damage to the external area, the insurer declined
cover for the complainant’s loss of rent on the basis the collapsed wall did not prevent
reasonable access to or occupation of the lot. It said the sub-floor pump was back in
operation, and the storm was, in any case, a one-off extreme and unavoidable event.
The complainant’s position is that he is entitled to loss of rent from 9 February 2020, when his
tenant vacated because of the water ingress; and he was unable to rent the lot out since then
(until repairs were eventually completed over 14 months later) because of the continued risk
of water ingress from the damaged and unrepaired drainage system. The rent payable was
$220 per week (excluding GST).
He has acknowledged the pump closest to his lot did become operational after maintenance
work in the days following the February 2020 event, however he maintains that the drainage
system overall was not functioning properly until the remediation work finished in April 2021.
The complainant has made the point he did not need the collapsed rock wall to have been
repaired before he could let out his lot (and the evidence does not show that prevented
access to his lot); but instead he only needed the damaged storm water pump and drainage
system to have been fixed. He says the pump/drainage could have been separately fixed
much sooner, regardless of the wall repairs, and the delay caused him additional loss.
Determination | Case number: 778361 Page 3 of 7
The policy provides cover for loss of rent in certain circumstances. The relevant policy
provision is set out in section 3.2 below. In summary, it provides that loss of rent can be
covered if the lot is ‘made unfit to be occupied for its intended purpose’ by physical loss or
damage that has been accepted as a claim under the policy. ‘Loss or damage’ is defined in
the policy as ‘ direct physical loss of, destruction of, or damage to property from any sudden
and accidental cause not otherwise excluded by this Policy ’ .
The complainant therefore needs to show that the accepted damage made the lot unfit to be
occupied for its intended purpose (which was as commercial premises).
Complainant had difficulty finding new tenant
The complainant has provided three letters from his managing real estate agent (covering the
period from September 2020 through to April 2021), which outline the attempts to obtain new
tenants for the lot. The letters suggest it was the ongoing incomplete repairs to the drainage
system (and the risk of further water ingress) which was deterring prospective tenants. I
accept that uncertainty would likely have been a factor in the complainant being unable to re-
let the premises.
The complainant also submits he should not have had to accept the risk of replacing the
carpet before the external repairs were completed, since the insurer would not cover the
carpet if it was damaged again. However, I consider the complainant had the option of
investigating and taking out landlord’s insurance cover for his contents including the carpet
(whether with the insurer or another provider). I am not persuaded that concern reasonably
prevented the complainant making the lot ready for occupation by a new tenant.
I can appreciate the complainant’s (and prospective tenants’) reservations, however I do not
accept the uncertainty about possible future water ingress events was sufficient, in itself, to
render the lot ‘ unfit to be occupied for its intended purpose ’ as required under the policy .
A second water ingress event occurred in March 2021
Unfortunately, there was a second water ingress event in March 2021. The complainant has
provided photographs which show the build- up of storm water on the lot’s external wall, as
well as water inside the lot.
He says he has owned the lot for about 12 years and the only water ingress events have
been in February 2020 (the claimed loss) and this second event in March 2021. He believes
the second event was a consequence of the unrepaired drainage damage caused the
previous year, and was not from a separate ‘unprecedented rain event’ , as has been
suggested by the insurer. He is also unhappy the insurer did not respond to that second
incident promptly.
He says that since the repairs were eventually finalised, there has been no further water
ingress. He does not accept the insurer’s suggestion that there were de sign issues or other
problems with the insured building or an incorrect drainage system which were responsible
for the further water ingress event (and I also do not consider the insurer has established that
was the case).
There were delays by both the insured OC and the insurer
The complainant submits the insurer’s delays in its handling of the claim have contributed to
the loss of rent, including allowing the March 2021 water ingress event to happen. That is
because, he says, the cause of the storm water ingress (the damaged/non-operational
drainage pump) was not fixed until over 14 months after the storm event.
Determination | Case number: 778361 Page 4 of 7
He says, in particular, the insurer could and should have dealt concurrently but separately
with the issues of the collapsed rock wall itself, and the damaged storm water drainage
system; instead, the insurer focussed on the former, and that meant the part of the claim that
affected his lot (the damaged drainage) was unnecessarily delayed; that in turn, prevented
him being able to rent the lot out, although that would have been possible even without the
rock wall itself having been fixed.
The complainant said he understands the removal of the rock wall debris and getting the
damaged drainage system and pump back in operation only took several days in the weeks
of 12 and 19 April 2021. He believes that could have been done in the second half of 2020,
once the site was deemed safe.
He refers to the reports of SWP (supplementary report of 15 March 2021) and AS (seventh
report of 16 March 2021) in which both experts say they had not previously been made aware
by the insurer of the need to repair/replace the second pump or to include that in their scope
of works. It appears that it was only after the builder completed all approved repairs, that they
then realised the pump needed repair as well. AS, in their final report dated 23 April 2021,
then confirmed the pump underneath the rubble was found to be inoperable, although the
pump nearest the complainant was operational since soon after the event. I do note,
however, that AS had previously reported (in March 2020) that the OC had put them on notice
of issues with the second pump. It would appear that information was not then referred back
or cross-checked by AS with the engineer or builder.
It is not entirely clear, although (with the benefit of hindsight) it may have been the case that
repair of the second drainage pump could have been progressed independently of the
broader wall repair, if the insurer’s service providers/experts had been made aware of that
issue and included it in the earlier scope for repairs. However, I also accept it was reasonable
for the insurer to take the time to arrange for the various assessments into the construction of
the rock wall, and to rely on its experts, before finalising a scope of works and authorising any
work in the area.
At the same time, the evidence shows the insured OC was also responsible for delays from
when an initial scope of works was provided on 23 June 2020. AS reported in August 2020
that th e OC’s broker had been given the opportunity of having their chosen repairer quote on
the repairs, but after some time and unsuccessfully following up, that repairer was not
prepared to quote as he had concerns about potential logistical and access issues. I note the
OC does not appear to have queried the scope of works, and specifically the lack of mention
of the damaged pump which they had previously raised with AS.
AS had then obtained confirmation from builder KBG that they could proceed on SWP’s
scope of works.
I understand that the wall repairs were then able to be scheduled in early September 2020
but were only completed in April 2021, having commenced on 15 January 2021.
In the meantime, the available evidence indicates there was a further delay of several months
from November 2020 to the January 2021 commencement. That is said to have occurred at
the request of the OC, acting on the request of another lot owner who was concerned that
repairs over the Christmas holiday period would have meant they had to close down and that
would have affected their business.
I am satisfied the available evidence shows that the OC , rather than the insurer, was
responsible for delays totalling about four months, from when the first scope of works was
provided in June 2020.
Determination | Case number: 778361 Page 5 of 7
I accept the damage to the pump immediately impacted by the wall collapse was not included
in the insurer’s initial SOW. However I consider, on balance, that if the insurer had been able
to commence repairs sooner (but for the delays by the OC), the pump issues would also have
been fully identified and able to be repaired sooner as well.
Fai r that insurer contribute to complainant’s loss of rent in the circumstances
On the available evidence, I consider it more likely than not that the fact the second drainage
pump was unrepaired at the time, did contribute to the water ingress in the March 2021 event.
That is particularly so if that was an extreme or unusual rain event, as the insurer has
suggested. The evidence does not establish that rain event was so extreme that it would have
overwhelmed even a fully operational drainage system.
I accept that disclosure of the as-yet unrepaired wall/drainage to prospective tenants by the
complainant’s property agent was reasonable and appropriate, and that may well have
deterred them , and ‘adversely affected’ the use of the lot (as the complainant has sai d). I am
not persuaded, however, that meant the lot was strictly ‘ unfit to be occupied for its intended
use ’ in accordance with the terms of the policy, pending completion of those repairs (despite
the March 2021 ingress). In the meantime, there had been other periods of rainfall since the
original damage in February 2020 which have not been shown to have affected the lot
(although I do acknowledge the complainant had not been able to conduct regular inspections
over that period himself).
The insurer initially offered to pay the complainant $2,000 for loss of rent. That was to
address AS’ recommendation to allow 8 weeks for drying out and repair work to the lot. I
consider it is appropriate to recognise and cover that period from the initial event.
In the course of the complaint, the insurer then offered to settle the matter by paying $4,400
for loss of rent, which represented the rent for the remaining 20 weeks of the lease after the
tenants had vacated. That period (up to the end of June 2020) coincides with the point at
which the insurer’s initial scope of works was available. In other words, it is then that the
insurer had broadly identified the necessary work (and the insured OC had the chance to
review that) and was in a position to arrange for repairs, pending only the confirmation as to
which builder was prepared to undertake the work.
In the particular circumstances, I consider it fair and appropriate that the insurer pay the
complainant $4,400 towards his loss of rent.
Entitlement to a proportion of lot owner’s fees
The complainant is also seeking lot fees he has had to pay while the lot was untenanted.
Under the terms of the policy, payment of up to $2,000 can be made for lot owners’ fee in the
event the property is unfit to be occupied for its intended purpose.
In this case, as explained above, I am not persuaded the lot was strictly unfit for occupation,
beyond any initial drying out and restoration period. On this basis, I consider it fair that the
insurer pays the proportion of the lo t owner’s fees paid by the complainant in respect of that 8
week period as recommended by AS (up to the policy limit).
The complainant is required to provide the insurer with reasonable evidence of the relevant
amount paid for that period. The insurer is required to add statutory interest to the applicable
amount, calculated from the date the complainant paid the fees to the date of settlement.
Determination | Case number: 778361 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy extracts
Section 1 – Part B
(a) Rent
When the Common Area or a Lot has been leased out, or can be substantiated by means of a
signed agreement that the Common Area or Lot would have been leased out, We will pay
You and/or the Lot Owner for the Rent that is lost or would have been lost if the Common
Area or Lot is made unfit to be occupied for its intended purpose by:
(i) Loss or Damage that is admitted as a claim under Section 1; or
Determination | Case number: 778361 Page 7 of 7
(ii) reasonable access to your occupancy of the Common Area or Lot is prevented by
damage from an Event claimable under Section 1 happening to other property in
the immediate vicinity.
Section 1 – Part C
3. Lot Owners’ contributions and fees
We will pay, up to $2,000 a Lot, for contributions, levies, maintenance and other fees the Lot
Owner is required to pay during the period their Lot is unfit to be occupied for its intended
purpose by Loss or Damage to Your Insured Property that is admitted as a claim under
Section 1.