Text of the determination
Determination
Case number 778262
Financial firm AAI Limited
Determination | Case number: 778262 Page 1 of 7
Case number: 778262 8 June 2022
1 Determination overview
1.1 Complaint
The complainant and JH hold home building insurance with the financial firm (the insurer).
On 9 April 2020, the complainant lodged a claim following water damage to the insured
property. The complainant initially thought the damage was due to a recent storm. However,
the insurer correctly noted the claim event as escape of liquid (EOL) from a stormwater pipe.
The insurer agreed to cover replace ment of the property’s upper and lower deck s. It said that
the rest of the claimed damage was due to long term earth movement so was excluded. The
insurer paid the complainant $28,897.99 based on quotes from its builder (BB).
The complainant says the EOL event was the proximate cause of all the claimed damage. He
says the required repairs include debris removal, drainage works, soil stabilisation and
underpinning of the house. The complainant seeks a $237,120 cash settlement, non-financial
loss compensation for stress the insurer has caused and payment of his costs.
1.2 Issues and key findings
Is the insurer required to cover more of the claim?
No. It has not been established that the proximate cause of the additional damage claimed
was EOL. Rather, that damage was due to excluded causes. Further, BB ’s quotes set out the
works reasonably required to return the decks to their pre-loss condition.
Is the complainant entitled to any additional payments?
Yes. The cash settlement should have included a 15% uplift for transfer of risk and
contingencies. The insurer is to pay the complainant $4,484.70 plus interest. However, the
insurer’ s claim handling has overall been reasonable, and it has already fairly contributed to
the complainan t’s professional costs. The complainant is not entitled to non-financial loss
compensation or more than the insurer has paid and offered for costs.
Why is the outcome fair?
The outcome is fair because the insurer reasonably assessed the EOL related damage and
the claim overall. However, in keeping with reasonable expectations, the insurer should have
included a 15% uplift when it paid the cash settlement amount on 31 July 2020.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 21 days of receiving notice the complainant accepts this determination, the insurer is
to pay the complainant $4,484.70 plus interest on that amount pursuant to section 57 of the
Insurance Contracts Act,1984 (Cth) from 31 July 2020 to the date payment is made.
The insurer is to the extent it previously offered, to reimburse the complainant for professional
costs upon receipt of supporting invoices.
Determination | Case number: 778262 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer required to cover more of the claim?
No. It has not been established that the proximate cause of the additional damage claimed
was EOL. Rather, that damage was due to excluded causes. Further, BB ’s quotes set out the
works reasonably required to return the decks to their pre-loss condition.
Complainant has established a valid claim under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not) that he suffered a loss caused by an insured event covered by the policy. This is known
as a valid claim.
The complainant and his wife, JH, hold a home building and contents policy. Subject to its
terms and conditions, the policy provides cover for loss or damage caused by the insured
events listed in the product disclosure statement (PDS), which include ‘Escape of Liquid’.
The available information shows that on or about 6 April 2020, an EOL event occurred
involving a disconnected inground stormwater pipe below the property’s upper deck. It is not
in dispute that there was resultant damage to the property.
The insurer accepted the claim and says it has covered the damage caused by the EOL,
being deflection of the upper and lower decking as a result of localised soil washout.
In the circumstances, the panel is satisfied that the complainant has established a valid claim.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proof in
establishing that an exclusion applies. The standard of proof is the balance of probabilities .
The proximate cause of the damage must be determined
The primary issue in dispute between the parties is whether the EOL was the proximate
cause of damage to the property in addition to the two decks.
Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be
last in time or the sole cause. It is a question of fact that depends on the circumstances of
each case. It requires a common sense evaluation of the evidence.
The complainant says the EOL led to earth movement and caused damage to footings,
retaining walls and fencing, as well as to the decks.
The insurer disagrees. It says the proximate cause of the additional damage is long term
gradual ground movement. It relies on a general exclusion in the PDS which excludes cover
for damage, loss, cost or legal liability that is caused by, arises from or involves:
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
• ‘Storm’;
Determination | Case number: 778262 Page 3 of 7
• ‘Flood’;
• ‘Earthquake and Tsunami’;
• ‘Explosion’.
The insurer also refers to the provision in the PDS that the EOL insured event does not cover
‘loss or damage to retaining walls’.
In addition, the insurer notes that the PDS does not cover as part of the insured home ‘loose
or compacted soil, lawn, artificial grass, gravel, pebbles, rocks or granular rubber’.
Experts disagree on the extent of EOL related damage
While there is no dispute that the complainant has a valid claim for damage sustained to the
insured property, the expert opinions differ as to the extent of damage caused by the EOL
damage.
The parties have exchanged numerous expert reports, including multiple reports from some
of their respective experts. The panel has considered all of the reports. What follows is a
summary of the reports the panel has found particularly noteworthy.
The insurer appointed HC, engineers . HC’s report dated 15 April 2020 says:
the failure of the lower and upper retaining walls was primarily due to inadequate
construction, likely inadequate founding depth of steel uprights
long term creep and failure of the retaining walls has progressed over an extended period
as shown by previous attempts to stabilise the walls with timber uprights
the stormwater pipe leak and resultant soil washout has accentuated the damage but is
not its primary cause
the leak and localised soil washout led to deflection and translation of the decks.
In June 2020, t he complainant’s geotechnical engineers, TT, reported:
the bow shaped moving of the retaining w alls was due to the lower wall’s footings moving
downslope rather than inadequate design or construction flaws
the key contributing factor of reactivation of landslides in the area is the introduction of
water into the slopes
by reference to the size of the erosion hole at the leaking pipe, it is likely to have introduced
a significant amount of water into the ground over a long period
given the history of the area and the existence of some retained soil on the slope, the site
slopes were likely of marginal stability prior to the pipe leaking
the introduction of the additional water from the leak significantly contributed to the
instability movement of the soil beneath the retaining walls and the wall footings.
The insurer engaged a second engineer, MS. In its report dated 12 July 2020, MS concluded:
The proximate cause of the movement and subsidence to the sloped soils and
terraced retaining walls is due to long term soil creep and slumping that is
docume nted and detailed to have been occurring to the…Road Area since 1854.
MS noted that the movement issues were not isolated to the complainant ’s property; rather,
they affected the entire street – there were at least 31 landslides/incidences recorded on the
local council’s landslide susceptibility study report.
Determination | Case number: 778262 Page 4 of 7
In addition, MS investigated the status of the stormwater pipe. It noted that a redundant lead
off branch had dislodged from the main pipe. The branch pipe sloped upwards and waterflow
testing confirmed that discharge from it would have been at a very low volume/negligible. MS
also said the extent of soil erosion around the branch pipe was minor and not consistent with
a major flow of water.
MS concluded that water discharge from the pipe was not the proximate cause of the ground
movement.
The complainant obtained a series of reports from JP, engineers. In its final report dated 30
August 2021, JP says:
‘localised accelerated movement…coincided with the locations of the downslope plume
below the water leak…’
it may be the case the slope grade of the rear yard required alteration to protect the house
from damage caused by slope instability in the absence of the leaking pipe
it is not possible to quantify the degree to which the leak has contributed to the movement
the evidence indicates the water weakened the soil and caused movement
‘the leaking pipe has worsened the condition and now requires remedial treatment’.
Insurer is entitled to limit its liability for the claim
Having carefully reviewed all of the available information, the panel is satisfied the insurer is
entitled to limit its liability under the policy to the damage to the two decks.
The reasons for the panel’s finding include:
it is clearly the case that the area where the complainant resides has been the subject of
significant earth movement issues for over 150 years
the insurer has provided aerial photos that show progressive bowing of the insured
property’s lower retaining wall and fence from 2011 onwards
MS has provided detailed analysis on the proximate cause of the ground movement and
explained why the leaking pipe would not have introduced high water volumes into the soil
the complainant’s experts have acknowledged that there has been an ongoing gradual
process of movement, with the EOL described as a contributing rather than a primary
factor.
In the circumstances, the panel is satisfied that the proximate cause of the additional damage
claimed is not EOL; it is ground movement. Accordingly, the insurer is entitled to limit its
liability for the claim to the damage to the upper and lower decks.
BB’s quotes reasonably assessed covered repair costs
The insurer obtained quotes from BB dated 19 May 2020 and 16 June 2020 for the cost to
repair the covered damage to the two decks. On 31 July 2020, the insurer paid the
complainant a cash settlement of $28,897.99 based on the combined total of BB’s quotes,
less the $1,000 policy excess.
The complainant says the cash settlement was insufficient. In doing so, he relies on a quote
totalling $237,120 from OC, builder, dated 8 December 2020.
Th e panel is not satisfied that the complainant has demonstrated BB’s quotes were
unreasonable. OC’s quote includes repairs which the panel has found are not a result of the
EOL event such as underpinning the house and the introduction of a spoon drain on th e
property’s boundary. There are also aspects that are not only not due to the EOL event but
Determination | Case number: 778262 Page 5 of 7
are also otherwise not covered. These include soil stabilisation work and replacement of the
upper retaining wall.
Consideration has been given to the allowance OW made for underpinning below the decks.
However, a geotechnical engineering report dated 27 June 1985, obtained prior to the decks’
construction, concluded construction on pads was acceptable. BB had allowed for
reinstatement of the decks on that basis.
Accordingly, the panel is satisfied that BB’s quotes set out the works reasonably required to
return the decks to their pre-loss condition.
2.3 Is the complainant entitled to any additional payments?
Yes. The cash settlement should have included a 15% uplift for transfer of risk and
contingencies. The insurer is to pay the complainant $4,484.70 plus interest. However, the
insurer’ s claim handling has overall been reasonable, and it has already fairly contributed to
the complainant’s professional costs. The complainant is not entitled to non-financial loss
compensation or more than the insurer has paid and offered for costs.
Insurer should have added an uplift when it cash settled
When an insurer cash settles a claim, it transfers to the insured the risk that the cost of
repairs may unexpectedly increase and/or that additional works not quoted are required. The
insured also loses the insurer’s warranty that would apply to repairs arranged by the insurer.
In the circumstances, there is a reasonable expectation that when cash settling a claim an
insurer will:
base its offer on a reasonably recent quote that is actionable for a retail customer, and
increase (uplift) the quoted figure by applying a fair percentage, to allow for the transfer of
risk, contingencies and loss of access to a warranty from the insurer.
Based on the matters set out in section 2.1 of this determination, the panel is satisfied that
BB’s quotes dated 19 May 2020 and 16 June 2020 were at the time current and actionable.
This is particularly so in circumstances where the insurer says it mistakenly paid the
complainant the combined total of the two quotes despite the second quote being an updated
version of the first quote that incorporated all of the works set out in the first quote.
On 5 August 2021, the insurer offered to pay the complainant a 15% uplift on the $29,897.99
combined total of BB’s quotes, being $4,484.70. The panel accepts that a 15% uplift is
appropriate but considers that it should have been included in the cash settlement paid on 31
July 2020.
The panel has considered whether it is fair that the insurer be required to pay interest on the
cash settlement uplift given the insurer says it overpaid the complainant for the claim related
repair costs. The panel is satisfied it is fair because the apparent overpayment was solely due
to the insurer’s error, which it does not appear to have identified until a year after the payment
and six months after the AFCA complaint was lodged.
Therefore, the insurer is to pay the complainant $4,484.70 plus interest on that amount
pursuant to section 57 of the Insurance Contracts Act,1984 (Cth) from 31 July 2020 (the date
of the cash settlement) to the date payment is made.
Determination | Case number: 778262 Page 6 of 7
Compensation for non-financial loss is not payable
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the com plainant’s expectation of enjoyment or peace of mind.
Information on file shows that the insurer’s trades attended to make safe works on 15 April
2020. The insurer arranged six expert inspections within four months of the claim being
lodged. The available information indicates that the insurer was in regular contact with the
complainant.
The insurer settled the claim according to its assessment of its liability within four months of
claim lodgement. As outlined above, the panel is satisfied that the insurer correctly assessed
the damage caused by the EOL event.
In the circumstances, the panel is satisfied that the insurer has overall handled the claim
reasonably. Accordingly, an award of non-financial loss compensation to the complainant is
not justified.
Insurer is not required to contribute further to the complainant’s costs
The AFCA rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes
into account the complexity of the complaint and whether the particular complainant needed
to incur costs to understand or establish their claim.
The insurer has already contributed $20,843 towards the costs of the complainant’s expe rt
reports. In doing so, it acknowledged the assessment of the claim and cause of loss has been
complex.
In addition, the insurer has said that upon receipt of supporting invoices, it will cover the costs
the complainant incurred in obtaining the following reports:
TT addendum report dated 20 October 2020
JP report dated 2 November 2020
TT report dated November 2020
JP email response dated 25 June 2021.
The panel is satisfied that the insurer’s contribution (paid and offered) to the complain an t’s
professional costs is fair and reasonable. The insurer is not required to further contribute to
those costs. Upon provision of supporting receipts, the insurer is to reimburse the cost of the
abovementioned expert reports to the complainant. The panel notes that the documents
provided by the complainant on 8 June 2022 concerning JP’s fees do not include receipts for
the abovementioned reports.
2.3 Why is the outcome fair?
The outcome is fair because the insurer reasonably assessed the EOL related damage and
the claim overall. However, in keeping with reasonable expectations, the insurer should have
included a 15% uplift when it paid the cash settlement amount on 31 July 2020.
Determination | Case number: 778262 Page 7 of 7
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.