Determination 777886
storm damage claim settlement amount
Summary
The complainant claimed storm damage to a landlord property and disputed the insurer's cash settlement of $10,806.35 against her quote of $70,210.08. AFCA found the insurer's assessment largely fair but required a 20% increase to the offer, being $2,161.27, for transfer of risk.
The insurer's expert reports were more persuasive than the complainant's quote, and non-storm damage was excluded, though a 20% uplift was considered fair for transfer of risk.
Issues
- Claim amount dispute primary · not upheld“Subject to the insurer increasing its offer by 20% (or $2,161.27)... the insurer's offer adequately addresses its liability and the required storm repairs.”
- Inadequate claim investigation secondary · not upheld“The insurer's evidence does not indicate the cracking damage and damage to the carport was caused by the storm.”
Subjects and remedies
pay compensation
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 777886
Financial firm AAI Limited
Determination | Case number: 777886 Page 1 of 5
Case number: 777886 2 February 2022
1 Determination overview
1.1 Complaint
The complainant has a landlord building insurance policy with the financial firm (the insurer).
On 2 August 2020, the complainant lodged a claim with the insurer for storm damage to the
property. After assessing the reported damage, the insurer calculated its liability for the
damage at $10,806.35.
The complainant disputed the insurer’s assessment and provided her own quote to repair the
storm damage at $70,210.08. The insurer arranged for further assessment to be undertaken
by an engineer who reaffirmed the insurer’s liability assessm ent.
Therefore, the parties remain in disagreement with respect to the cost of the storm related
repairs.
1.2 Issues and key findings
Is the insurer’s offer fair in all the circumstances ?
Subject to the insurer increasing its offer by 20% (or $2,161.27) of the original scope of works
provided by RPF and RCC, the insurer’s offer adequately addresses its liability and the
required storm repairs.
Why is the outcome fair?
The outcome is fair because the insurer has established and identified the repairs required
following the storm. While the complainant has raised concerns regarding the insurer’s offer,
the insurer’s evidence does not indicate the cracking damage and damage to the c arport was
caused by the storm. It is fair the insurer increases its offer by 20% (or $2,161.27).
1.3 Determination
The determination is substantially in the insurer’s favour.
The insurer is required to increase its offer to cash settle the claim by 20% (or $2,161.27) and
it is required to facilitate this payment within 14 days of the date of this determination.
Otherwise, the insurer is not required to undertake any further action.
Determination | Case number: 777886 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer’s offer fair in all the circumstance s?
Circumstances of the complaint
There is no dispute the complainant ’ s property sustained damage because of an insured
event which occurred prior to the lodgement of the claim in August 2020. Further damage
was reported after police forced entry to the property.
The complainant has raised concerns regarding the insurer’s assessment of its liability and
whether it has adequately identified the required repairs during its assessments of the
property.
The insurer is willing to cash settle the complainant in the sum of $10,806.35, for the damage
its assessor identified as being storm related damage.
The complainant is seeking for the insurer to accept her quote in the sum of $70,210.08,
which she says is a more accurate reflection of the cost to repair the storm related damage.
Insurer’s assessment sufficiently addresses storm related rep airs
The insurer appointed builder RPF to undertake an initial assessment.
During its attendance RPF reported that the property was in a neglected state. RPF noted:
roof sheets were dented from foot traffic
sagging carport due to ground movement
sagging gutters around the entire house as well as rotten barge boards
deteriorated roof pointing
internal cracking damage as well as missing skirting boards
RPF reported that no damage to the carport and gutters could be observed due to tree impact
and there were no broken tiles. There was also movement damage throughout the kitchen,
dining and loungeroom. RPF was of the view that these items were not storm related.
RPF observed water staining to the walls and ceiling in the kitchen, dining room, loungeroom
which it said could be linked to the recent storm.
RPF provided a scope of works for preparing and painting the water affected internal aspects
of the property, allowance for one gutter and removal of tree debris.
RCC was engaged to provide a report on the condition of the roof. RCC noted in its report
numerous issues with the roof including:
damage sections of guttering
downpipes poorly constructed and fitted
rusting roof valleys and poorly installed flashing
skillion roofs have inadequate pitches
previous repair attempts to ridge capping and pointing
flashing in poor condition around the chimney.
RCC also noted that while the roof tiles were recorded as being in a fair condition some were
fretted allowing water to ingress the property during heavy rain.
Determination | Case number: 777886 Page 3 of 5
RCC observed a damaged section of guttering which had been impacted by the fallen tree in
the storm event. This section would need replacing as well as the hip caps re-bedded and
pointed.
Engineer DWK was engaged to comment on the movement and cracking related damage
observed to the concrete slab in the laundry and store room, cracking in the masonry walls
and damage to the carport.
DWK provided a report dated 15 February 2021, following his attendance on 3 February
2021.
DWK concluded the cracking damage to the floors in the laundry and store room were likely
caused by long term deterioration of the subfloor structure. This damage can be attributed to
poor ventilation and build-up of moisture or settlement of the internal subfloor piers from
drying out or saturation of the foundation soils.
DKW also reported that the damage observed to the carport was not caused because of the
storm but was due to long term deterioration and poor construction methods.
Based on the above assessments the insurer determined its liability was limited to the
damage identified by RPF and RCC and offered a cash settlement of $10,806.35.
Complainant ’ s quotes outside the scope of the storm related repairs
In response to the insurer’s reports and offer, the complainant provided a report and quote
from HTB.
HTB submits a price for repairs which he attributes to being caused following the storm.
HTB estimate, while itemised, lacks sufficient details such as unit amounts. In addition, HTB
provides no rationale as to how he concluded that the items he identifies were damaged by
the storm. HTB also seeks to replace items which are not damaged as a result of the storm
such as the carport and internal cracking.
I consider HTB’s quote details work which is well outside the scope of work covered under the
policy.
Due to the significant lack of detail in HTB’s quote and the inclusion of items that do not form
part of the insurer’s liability, I am not persuaded that HTB’s quote should be preferred to that
of the insurer’s material.
On balance, the insurer’s assessment fulfils its policy obligations
Having reviewed the exchanged evidence, I accept the storm has caused minimal damage to
property for which the insurer has agreed to cash settle the complainant. However, the storm
is not the proximate or dominate cause of the cracking damage, damage to the carport and
condition of the roof.
The reports of DWK, RCC and RPF are persuasive and provide sufficiently more detail for
consideration than that of HTB.
HTB states that the damage was caused by the storm however, does not consider other
factors such as wear and tear and the overall poor condition of the property.
Therefore, I accept that minimal sections of the roof have been damaged by the storm as well
as resultant water staining to internal aspects identified by RPF.
Determination | Case number: 777886 Page 4 of 5
However, the storm is not the proximate or dominate cause of any damage to the carport or
cracking damage. Rather, based on the information to hand, the proximate or dominate cause
of this damage is due to the findings contained in the report of DWK, being long term ground
movement of foundation settlement.
Fair the insurer cash settles the complainant for the required repairs
The insurer has confirmed it has issued the cash settlement to the complainant for the repairs
it says it is liable for. However, the complainant remains unsatisfied with the insurer’s offer.
It is unclear if the insurer’s cash settlement included any cont ingency for the transfer of risk
from the insurer to the complainant.
Therefore, the I consider it fair in the circumstances for the insurer to increase the offer of
$10,806.35 by 20% (or $2,161.27).
Insurer not liable for damage caused by police
HTB’s quo te also included damage to doors and windows which are reported to have been
caused by police.
I note the insurer has already discharged its liability with respect to this claim and it is not
required to undertake any further action with respect to this matter.
2.2 Why is the outcome fair?
The outcome is fair because the insurer has established and identified the repairs required
following the storm. While the complainant has raised concerns regarding the amount offered
and has sought an increased settlement offer from the insurer , the insurer’s evidence is
persuasive and does not indicate this damage was caused as a result of the storm. It is fair
the insurer increases its offer by 20% (or $2,161.27) due to the transfer of risk.
Determination | Case number: 777886 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.