Determination 777819

Delay in finalising water damage claim repairs and claim handling

FirmSuncorp Group
Decided2021-12-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,000
Amount claimed$45,000
SourceAFCA PDF

Summary

The complainants claimed water damage to their home and sought compensation for delays in finalising repairs and additional costs. AFCA found the insurer caused undue delay and ordered $4,000 non-financial loss compensation and a written apology, but rejected the additional costs claimed.

Under AFCA Rule D.3.3, non-financial loss compensation is available for an unusual degree of time taken to resolve the situation, and the insurer's delays, including faulty kitchen works, were unusual.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossprovide documents

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 777819 Financial firm AAI Limited Determination | Case number: 777819 Page 1 of 6 Case number: 777819 7 December 2021 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (the insurer). On 30 June 2020, a claim was lodged for significant water damage to the insured property because of a burst water pipe, which occurred whilst the complainants were away from the property. The insurer has accepted the claim and provided temporary accommodation to the complainants at a location of their preference (Regional Victoria), given concerns relating to the COVID-19 pandemic. The complainants are seeking compensation for the significant delays in finalising the repairs to the insured property by the insurer. The available information shows the keys being returned to the complainants in around September 2021. In addition to compensation, the complainants are also seeking additional costs for further works they believe should be covered as part of finalising the claim., these are discussed in section 2 of this determination. 1.2 Issues and key findings Are the complainants entitled to compensation? Yes. The insurer is to arrange payment of $4,000 in non-financial loss compensation to the complainants in line with the AFCA Rules (Rules) with 14 days of the complainants’ acceptance of this determination. This is because of the undue delays caused by the insurer in fulfilling its policy obligations under the claim. In addition to the above, the insurer is also required to issue a written apology which addresses the complainants’ poor claim ’ s experience and delays. 1.3 Determination The determination is substantially in favour of the complainant. Within 14 days of accepting this determination, the insurer is required to pay the complainants $4,000 for non-financial loss and issue a written apology for the general claim ’ s experience and delays. Determination | Case number: 777819 Page 2 of 6 2 Reasons for determination 2.1 Are the complainants entitled to compensation? Compensation paid in some circumstances The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. Circumstances of the loss and complaint The complainants lodged a claim with the insurer on 30 June 2020 after discovering a burst hot water pipe that was connected to the dishwasher in the kitchen. The complainants had been away from the property for several weeks and the duration of the leak is unknown. However, it was evident due to the widespread nature of the damage and affected contents, that it had been occurring for some time. The insurer accepted the claim and proceeded to engage the relevant trades. Due to the presence of mould, the remediation works appear to have been substantial and were not completed until around October 2020. In October 2020 the insurer appointed builder, ‘ J ’ , to complete the required repairs. At the time of their appointment, J noted that the repairs would take until approximately April 2021. Due to frustrations with the repair process and perceived delays, the complainants lodged a complaint with AFCA on 12 January 2021. With respect to the completion date for the repairs, this was revised from April 2021 until mid- May 2021. On 31 May 2021, during a site inspection the insurer confirmed its builder had installed the incorrect kitchen design and cabinetry. As such, the insurer was of the view that this error would cause a further delay of approximately four weeks. The insurer says on or around 4 August 2021, the rectifications to the kitchen had been completed, and the complainants were happy with these alterations. Finally, on 10 September 2021, the insurer confirmed that all repairs and cleaning had been completed and the keys were in the process of being returned to the complainants. Initially, the insurer offered $1,000 to resolve the complaint (as well as refunding the excess of $400) in recognition of the claims delay. It subsequently increased this to $2,000 on 10 May 2021, which the complainants’ have declined. Complainants seek compensation and cover for additional items under the claim When the complaint was lodged with AFCA, the complainants sought an award of $20,000 for non-financial loss which is a bove AFCA’s jurisdictional limit. As noted above, AFCA can award a maximum of $5,400 where it is satisfied there has been an unusual degree or extent of delay, stress and inconvenience caused by the insurer in its management of the claim. I will address the compensation issues below. In addition to the compensation for non-financial loss sought, the complainants are seeking:  $8,000 for replacement of the upstairs carpet Determination | Case number: 777819 Page 3 of 6  $10,000 for new paving tiles in the courtyard and front  $5,000 for assisting moving boxes and landscaping  $2,000 for medical treatment, procedures and travel costs  cleaning of your heating and cooling systems The insurer has considered the complainants’ expectations and whilst some have been accepted, it says some of these fall outside the terms and conditions of the policy. Also, the insurer says the complainants have not shown the claimed paving tiles, exterior of the building and upstairs carpets were damaged by the insurer’s trades or because of the insured event giving rise to the claim. I acknowledge that the property has not been permanently occupied since approximately June 2020, however the policy does not require the insurer to undertake extensive maintenance and upkeep. The insurer has confirmed it will undertake a final clean of the property and this includes attending to cleaning heating and cooling systems. The insurer has also confirmed it will cover the reasonable costs associated with the complainants relocating back to the property from the temporary accommodation (this includes moving boxes and return of plants etc that had to be moved to the temporary accommodation (for care). I am satisfied the insurer’s a ssessment of its liability and associated offer to cover the expenses noted above is reasonable. I note the policy generally excludes consequential loss from cover (relevant policy wording has been provided in section 3 of this determination). Without persuasive evidence to the contrary and given the below expectation of cover does not arise from the insured event giving rise to the claim, I determine the insurer is not obliged to cover/pay:  $8,000 for replacement of the upstairs carpet  $10,000 for new paving tiles in the courtyard and front  $2,000 for medical treatment, procedures and travel costs Insurer is to pay $4,000 in non-financial loss compensation to the complainants There is no dispute the scope of the complaint evolved while on foot with AFCA. In the numerous submissions provided by the complainants, they say the insurer has shown a total disregard for their wellbeing which has caused additional stress and trauma throughout the claim ’ s process. I have carefully reviewed the information exchanged and the insurer ’ s actions since being notified of the claim. I acknowledge that COVID- 19 restrictions may have had some impact on the insurer’s ability to complete the works and comply with its original completion date of April 2021. However, the information before me shows the insurer and its appointed consultants have significantly contributed to the unreasonably long period it has taken to finalise this claim. I accept claimants are expected to endure a certain degree of inconvenience and stress as part of a claim of this nature and that the complainants were aware that the repairs needed due to the significant escape of water event would take time to complete. However, there is evidence of substantial delays caused by the insurer including the repairs to and fit out of the kitchen, which of itself delayed repairs by a further three months. This was eventually rectified in August 2021. Determination | Case number: 777819 Page 4 of 6 I note the insurer does not dispute the level of service provided to the complainant under the claim was poor and has substantially delayed finalisation of the claim. In an effort to resolve this aspect of the complainants’ dispute, the insurer offered to pay them $2,000 in non - financial loss compensation, which was declined. I accept the complainants’ opinion that th is amount does not represent a fair offer of compensation, given their experience of the life of the claim and the time they have been left out of their home. I consider it fair in the circumstances for the insurer pay the complainants $4,000 in non-financial loss compensation within 14 days of their acceptance of this determination. Further, the compensation payment is to be accompanied by an apology in writing from the insurer acknowledging its part in the undue delays experienced and the impact its poor management of the claim has had on the complainants. 2.2 Why is the outcome fair? Given the above, it is fair in all the circumstances to require the insurer to pay the complainants non-financial loss compensation as well as provide a written apology to the complainants. Determination | Case number: 777819 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is base d on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred. Determination | Case number: 777819 Page 6 of 6 3.3 Relevant policy provision General exclusions (cont.) Consequential losses or extra costs following an incident covered by your policy  consequential loss (financial and non-financial loss) or extra costs following an incident covered by your policy, such as: - loss of income or wages; - medical expenses; - loss or costs, including the cost of your time (e.g. inconvenience) to prove your loss or to help us with your claim (e.g. telephone calls, postage); - travel costs; …