Home / Westpac / Determination 776722

Determination 776722

Home insurance claim for tree branch damage: scope of repairs, mould, indirect damage and claim handling delay

FirmWestpac
Decided2022-03-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$300
Non-financial loss$2,000
Amount claimed$2,330
SourceAFCA PDF

Summary

The complainant claimed for tree-branch damage to his home, mould, structural movement, fence, pipe and vehicle costs. AFCA required the insurer to settle the storm damage claim and mould testing and remediation, reimburse a $300 gutter repair, and pay $2,000 non-financial loss, while rejecting most additional indirect damage claims.

Claims must be established on balance under the policy's insured event; the cause of mould and indirect damage was not shown to result from the tree event, but insurer delays and failure to act on make-safe recommendations caused unusual inconvenience warranting non-financial loss compensation.

Issues

Subjects and remedies

disabilityelderly or capacityhealth or medicalhome or building damagenatural disasterpay compensationpay non financial lossprovide documentsreassess claim

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 776722 Financial firm Westpac General Insurance Limited Determination | Case number: 776722 Page 1 of 14 Case number: 776722 4 January 2022 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer) and lodged a claim for damage to his home caused by a falling tree branch. The branch fell onto his electricity supply line, pulling off the point of attachment and damaging the fascia, gutter and soffit. The insurer accepted the claim and appointed a building assessor to inspect the damage. A dispute arose over the appropriate scope of required works and the insurer's claim handling. During this dispute, the complainant identified further damage to his property which he says the insurer caused due to its claim delays or the negligence of its contractors, being:  mould inside his bedroom (and resultant damage to home and contents)  movement damage to the foundations of the property  damage to the front fence  damage to a water pipe. Finally, the complainant seeks compensation for consequential and non-financial losses which he says the insurer caused by its claim handling errors. 1.2 Issues and key findings How should the claim be settled? The claim should be settled as set out in section 2.1 of this determination. Should the insurer pay professional costs? The insurer is not required to pay the complainant ’ s professional costs as they did not assist the complainant’s position. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer’s handling of the claim has caused an unusual degree of stress, inconvenience, or delay. The insurer should pay $2,000. Why is the outcome fair? This outcome is fair because the complainant has a valid claim under the policy which the parties could not agree on a method to resolve. Given the complainant’s particular circumstances, and the delays in managing the claim, it is also fair that compensation for non-financial loss be awarded. Determination | Case number: 776722 Page 2 of 14 1.3 Determination This determination is partially in favour of the complainant. Should the complainant accept this determination, then the insurer is required to do the following:  settle the claim for damage as set out in section 2.1  settle the claim for mould as set out in section 2.2  pay $2,000 non-financial loss. Determination | Case number: 776722 Page 3 of 14 2 Reasons for determination 2.1 How should the claim for damage be settled? The insurer accepted liability for the loss event The complainant’s home sustained loss and damage in September 2017, from a tree branch which fell onto his electric power supply line. The insurer accepted liability for this claim. The insurer engaged building assessor PIB to provide a quote on the scope of works and to conduct repairs. Issues raised by the complainant about the original scope of works The complainant reviewed the scope of works provided by PIB and raised the following issues:  should the gutter be replaced or repaired and who will warrant it  whether there is damage to roof timbers (rafters, joists) when the point of attachment (POA) was pulled off  cost of asbestos removal in the roof and the meter box  replacement of the meter box and its wiring. The gutter The complainant says the repair of the gutter involved PIB removing and replacing a section of the colorbond quad guttering to match the original as close as possible to the nearest architectural break. He disputes the method of repair; he says a silicone join would degrade, recommends his own method of repair and queries the warranty from PIB on repairs if the guttering is repaired and not entirely replaced. The policy contains a condition about matching materials, it says the insurer will pay to match materials with those that existed before the damage occurred, however, where that is not possible, it will match with the nearest similar materials. This condition is clear in stating that the insurer will only pay for costs that directly apply to the part of the property that has suffered damage. Considering the above and in the absence of any expert information which shows PIB ’s method of repair is unreasonable or inadequate, the panel is satisfied the insurer ’ s position is fair in relying on PIB ’s scope of works for the gutter and its policy conditions. The policy allows the insurer to decide how to settle a claim; it may choose to cash settle, or repair the building, or replace it to a condition substantially the same as when new; and similarly, for damaged contents. If the insurer chooses a cash settlement it is not required to provide a guarantee, therefore if it elects to have the repairs cash settled, consistent with the AFCA approach, the insurer is to add 15% to the quoted amounts to cover any contingencies and the transfer of risk associated with repairs. Further, if the insurer elects to cash settle this aspect of the claim, it must also include an allowance for temporary accommodation for the estimated time to complete repairs. Determination | Case number: 776722 Page 4 of 14 No information to show damage to roof timbers The complainant raised concerns that there may be damage to roof timbers (rafters, joists). PIB and the insurer ’ s appointed engineer (IL) did not identify any damage to the roof framing. IL says the collapsed tree branch did not make any direct contact with the property, and because of this, does not believe the branch collapse compromised the integrity of the roof framing. Given the available information, the panel is not persuaded the insurer is liable for this item. Asbestos flue pipe The complainant says PIB ’s scope of works provides for removal of the asbestos eave lining and raises concerns about an asbestos flue pipe damaged by possums in the roof space. He says it should be the insurer ’ s responsibility to remove it or indemnify him if workers are being exposed when the roof space is opened to conduct repairs. He also raises concerns about the possibility of asbestos in the wall cavity between the POA and the meter box. The complainant engaged an independent specialist and had the asbestos flue pipe removed. He did this on a precautionary basis. However, the panel notes that no expert information exists confirming that the flue pipe posed a risk to trades during repairs. The insurer says if the flue pipe is deemed a risk that a variation would have been raised by PIB for its removal. The panel is not satisfied that the flue pipe was damaged in the insured event and there is no evidence that it poses a risk for any trades people. The insurer is entitled to deny this aspect of the claim. On the other hand, if any asbestos is identified as posing a risk during repairs undertaken by the insurer, the associated costs are to be borne by the insurer. Meter box The exchanged material establishes that the 2017 loss event involved contact with the power lines and not the meter box itself. The panel is not satisfied that there is evidence of damage to the wiring or switchboard of the meter box. Further, the panel is satisfied that the insurer has established that repairs can be completed without the need to replace the meter box. The insurer is entitled to complete repairs in accordance with the scope of works provided by PIB. Extent of damage caused by the event For clarity, in the panel’s view, the only damage sustained directly by the event, is the damage to the gutter and surrounding area, and does not include any damage to the roof timbers, asbestos flue pipe or meter box. Repair or cash settlement to the gutter and surrounding area will satisfy the insurer’s liability for that damage. Determination | Case number: 776722 Page 5 of 14 2.2 How should the claim for mould be settled? Insurer made aware of mould in December 2020 In December 2020, the complainant raised with the insurer, issues with mould in his bedroom. The complainant told the insurer that he had been getting nose bleeds due to dampness in his property and did not feel safe because of this. Following the awareness of a possible mould issue in December 2020, the insurer re- engaged the services of PIB to conduct a further assessment. The information available shows PIB re-attended the property on 14 January 2021. This attendance could not be completed due to the complainant’s health at the time. An email from PIB to the insurer dated 14 January 2021 says, there was only a small patch of mould on the wall with no other visible signs or smell of mould. A second email was sent from PIB to the insurer dated 28 January 2021, advising it has not been successful in contacting the complainant since the incomplete site attendance of 14 January 2021. Insurer ’ s assessment of the mould On 11 February 2021, PIB arranged a specialist contractor (RIC) to attend the property and conduct further investigation regarding the reported mould contamination. RIC says:  visible mould growth was observed on the lower side of the bedroom external plasterboard wall with the heaviest growth beneath the window  some contents that were in contact with the mould affected wall also had visible mould growth  no elevated moisture levels were identified in the materials tested  a strong must odour was noted in the bedroom which is usually an indicator of dampness and microbial proliferation  continued occupancy of the bedroom is not advised, especially by someone that has reported health symptoms  whilst it is possible, a damaged eave sheet will not generally allow water into a wall cavity or the house  any rainwater that enters an eave will generally leave the eave by several means including the damaged cause to the sheet as well as cracks and joins  there has been significant rainfall over the weeks and months prior to the assessment, however, no excess moisture was identified in the affected materials. RIC concludes that further invasive assessment work is required. To determine the exact cause of the mould it is necessary to cut a hole into the wall for the purpose of inspecting the internal surfaces. RIC says, if no visible mould growth is identified on the internal surfaces of the wall cavity, then the mould growth is most likely from prolonged periods of high humidity within the room . The panel is satisfied that RIC’s initial assessment did not establish the cause of mould and is largely an opinion without supporting information. After RIC’s mould assessment, PIB issued a second report dated 17 February 2021. In this report PIB provides a list of minimum recommendations as a make safe. The report recommended that all contents and surfaces within the affected bedroom should be thoroughly cleaned with a temporary make safe to stop the gutter outside of the bedroom window leaking. Determination | Case number: 776722 Page 6 of 14 There is no information available to show the insurer acted on the information about the minimum recommendations. The complainant says he paid $300 to have the gutter temporarily repaired himself after it was recommended by the insurers engineer (IL). It is unclear exactly when the complainant had this completed. However, it is fair and reasonable that the complainant be reimbursed for this cost upon providing a copy of the invoice to the insurer. The invasive mould assessment The available information shows the complainant did not agree to the insurer ’ s invasive mould assessment, on the basis that he would need to remove his contents from the property if such testing were to take place and he would need to be relocated to temporary accommodation set up to cater for his special health requirements. The complainant asked for the mould assessment to be completed in two stages. This agreement was made in a shuttle conversation facilitated by the AFCA case manager on 18 March 2021. The agreement was for a non-invasive assessment of contents first, with the results shared between the parties, and if necessary, depending on the results, the second stage of invasive testing would occur with the complainant’s prior consent. It was agreed that a negative air space would be established in the bedroom, involving HEPA filters, which will capture any spores released from the wall should invasive testing take place. On 22 March 2021, RIC re-attended the property to conduct the non-invasive mould sampling. RIC says it conducted mould sampling of various contents and surfaces throughout the property and the results indicate the settled mould ecology was abnormal and indicate likely water damage and resultant mould growth. RIC’ s report confirms 19 of the 20 mould samples it assessed had the presence of elevated surface mould ecology as well as evidence of fungal hyphae which is an indicator of mould growth within the property. The report also acknowledges the health risk associated with mould. RIC concludes that a thorough assessment of the property should be undertaken to identify all water damaged and mould affected materials. The complainant says RIC’s report identified elevated levels of aspergillum, penicillium and fungi in bedroom one and lower levels elsewhere in the house. The panel is satisfied RIC’s report identified widespread mould throughout the property and notes that some samples taken from outside of the bedroom returned a higher mould spore count than samples taken from the bedroom which the complainant believes to be the source of the mould. Based on the available information, the panel is not satisfied that it has been established, on balance, that bedroom one is the source of the mould or that the mould is the result of the insured event. The panel accepts that the information about the cause of the mould is inconclusive, however, this does not mean the mould is not the result of the insured event either. RIC in its first attendance on 11 February 2021, did not discount the possibility of water entering the wall cavity. Determination | Case number: 776722 Page 7 of 14 A dispute arose between the parties over the process involved for the invasive mould assessment and because of this the insurer was not given the opportunity to conduct the invasive assessment as the complainant would not allow access to the property unless the assessment was completed according to his terms. It is not necessary to go into the details of this dispute. However, the panel accepts that this caused some delays not directly created by the insurer. Complainant ’ s assessment of the mould On 16 June 2021, the complainant engaged his own independent specialist (EA) to report on the mould and test the internal wall cavity of the west wall in the bedroom. EA says, the mould in the air sample collected from the master bedroom west wall, south end, wall cavity returned results within the “high” mould ecology range, indicating that active mould growth may have occurred in this area. EA says this is supported by the presence of a hyphal structure within this sample; hyphal structures indicate fragments of mycelia and fruiting bodies, and can be an indicator of historic mould growth, which suggests that while the mould was previously active it may currently be in dormant phase due to less favourable conditions (e.g. the building materials drying over time). The panel accepts that EA identified mould inside the bedroom wall cavity, however, EA does not establish the cause of mould. As stated, the presence of mould itself does not conclude it is a result of the insured event, considering RIC detected higher spore levels elsewhere in the property. Settlement of the mould remediation The insurer says the complainant’s actions in refusing to allow adequate investigation of the cause of the mould growth have prejudiced its ability to determine liability for the mould. In considering all the available information about the mould, the panel accepts that it is inconclusive. The cause may be related to the insured event and may also be unrelated and pre-existing. Given the serious health issues associated with mould, the passage of time since the insured event, the complainant being a vulnerable consumer, the possibility of the mould being related to the insured event and the property being the complai nant’s primary residence, it is important to ensure that the home is appropriately mould remediated. This would ensure the property can be lived in without the concerns of health issues. It is also possible that mould issues have exacerbated since previous assessments were completed. The panel is satisfied that the complainant has not provided the insurer an opportunity to properly assess the extent of the mould damage. He has made his own assessment of the claim for the mould remediation, specifically around his contents items. For the purposes of moving forward with the mould remediation, the panel is satisfied that the insurer is entitled to assess its liability in relation to the mould remediation for the home and contents. Within 30 days of the acceptance of this determination by the complainant, the insurer is to engage a suitably qualified expert to conduct testing, including but not limited to invasive testing, of the home and contents. The purpose of the testing is to determine the extent of any mould infiltration and the cause of that mould infiltration. Determination | Case number: 776722 Page 8 of 14 The complainant is to co-operate with the insurer and its appointed expert to allow the testing to proceed, including but not limited to, allowing access to the property and contents. Should the complainant not co- operate with the insurer or the insurer’s expert to prevent the testing from taking place, within 30 days of the acceptance of this determination by the complainant, the insurer is not required to take any further action regarding the mould or its remediation. Following testing, the insurer’s expert is to prepare a scope of works in relation to mould remediation, of the home and contents, if it is determined that the mould relates to the insured event. This should include an estimate of the time required for remediation. The insurer is to also obtain quotations for the cost of the remediation required. In the event the parties cannot agree upon the extent of liability, if any, for remediation of the mould, they may return to AFCA for further review. Temporary accommodation The insurer has already covered the cost of temporary accommodation during most of the time whilst the claim was being assessed and continues to do so during this complaint. The panel acknowledges that the complainant has special requirements in place for his health which have been impacted by being out of his primary residence. The information available shows the insurer was not able to secure temporary accommodation that met the complainant’s health needs and offered to cover costs up to $500 in having a third party assist him locate accommodation that would be suited. The panel is satisfied that in circumstances where the required accommodation is not available or cannot be located, that this is not either parties ’ fault and the insurer was reasonable in asking the complainant to propose alternate solutions for its consideration. In August 2021 the complainant put forward a proposal of alternate temporary accommodation, however, this was in the form of a lease through a real estate agent. The panel is satisfied that whilst the insurer agreed to cover the cost of temporary accommodation during this dispute, it was not required to apply for a fixed term lease on behalf of the complainant with a real estate agent. Whether the complainant chooses to be cash settled or have the insurer conduct repairs, the property will be unliveable during the mould remediation. The panel considers it fair in the circumstances that any payments already made not be included in the calculation of the temporary accommodation entitlement under the policy. That means the insurer is required to continue to pay the temporary accommodation benefit, commencing from the date of this determination if it is accepted by the complainant, until the matter is resolved, either by way of:  the completion of repairs within the time frame detailed above, or  cash settlement, with an allowance for the estimate of the time to complete repairs, or  the complainan t’s rejection of this determination, or  the complainant’s refusal to co -operate with the time frames detailed within this determination, whichever occurs first. Determination | Case number: 776722 Page 9 of 14 2.3 Claims for additional indirect damage Expert information does not establish compromised structural integrity caused by the insured event The complainant raised concerns that the water runoff from the damage caused by the tree branch compromised the structural integrity of the property and may have caused movement of footings in the sub floor area of the bedroom. The panel acknowledges that the complainant provided his own information showing that he detected some elevated moisture in the sub floor and outside of it. However, this itself does not conclude on the balance of probability that the structural integrity of the property has been compromised by water runoff from damage caused by the tree. The panel also acknowledges that the complainant provided his own assessment of the movement in relation to the west wall supported by photographs which show cracking, however, the presence of cracking also does not conclude that it was caused by water runoff from damage caused by a tree. The insurer engaged the services of an engi neer (IL). In IL’s opinion, the overflowing gutter caused by the tree branch collapsing onto the power supply line, has not resulted in any discernible foundation issues or movement. Whilst the complainant disputes the engineer’s opinion, the panel finds the opinion of the qualified engineer more persuasive as there is no expert information from a qualified engineer which associates the moisture or cracking to the insured event. Moisture content of the soil does not establish compromised structural integrity caused by the insured event The complainant engaged the services of geologist (DML) to dig four boreholes and report on the moisture content of the soil. DML says the results of the testing confirm the moisture content of the natural silty clay from borehole 1 (the area of water ponding under the torn gutter) is wetter than the same clay in the control borehole, borehole 4. He says, the clay from borehole 1 is also wetter than would normally be expected for a similar type of clay at this time of year. DML concludes that this elevated level of moisture in the clay is consistent with a local inadequacy in the plumbing services, the roof drainage system and/or poor site drainage. The panel acknowledges that DML established a higher moisture content in the soil around the area of water ponding. However, this does not establish on the balance of probability that there is compromised structural integrity caused by water runoff from tree damage. There is insufficient information to establish this claim. Given the limited information, the panel is not persuaded the insurer is liable for this item. Insurer not liable for damage to the front wall/fence The complainant says the insurer is liable to fix/replace damage to the front wall/fence of his property because a water seeking tree lifted the south fence plinth at the site of a long term stable crack. He believes this occurred due to the water runoff from damage caused by the tree. Determination | Case number: 776722 Page 10 of 14 The engineer IL also provided an opinion stating that there is no indication that the overflowing gutter has resulted in elevated moisture levels behind the boundary fence to have caused the recorded displacement. In support of his assessment regarding the front wall, IL provides an image from Google Street View dated September 2014 which shows what appears to be a crack and displacement in the front wall. The panel acknowledges that the complainant has asserted there was already a long term stable crack. He also asserts that IL’s findings which confirmed displacement of the wall had occurred years before the claimed event. The complainant says that this makes it possible that it is evidence of past earthquake damage which he is covered for under the policy. The onus is on the complainant to establish, on balance, he has a claim that falls within the cover offered under the policy. This claim is about damage caused by a tree impacting a power line and is restricted to matters related to that event. The panel is satisfied that there is no expert information to support the complainant’s conclusion about damage to the front wall being associated with tree damage. Should the complainant wish to have a claim for a different event causing damage to the front wall, he is entitled to lodge a new claim with the insurer. Insurer not liable for damage to the water pipe The complainant says the insurer ’ s contractors damaged a water pipe during assessments and seeks the costs he incurred in having the water pipe fixed. There is no information to support this claim. Given the limited information, the panel is not persuaded the insurer is liable for this item. Insurer not liable for a replacement vehicle The complainant says he detected a strong smell in the cabin of his vehicle and evidence of mould around a vent on the driver’s side door. He says mould contamination of his vehicle is a direct result of the insurer ’ s refusal to provide local accommodation which required him to use his vehicle twice a day when it would normally be unused. There is no expert information which identifies mould in the complainant’s vehicle, or that it originated from mould caused by the tree damage event at this property. Given the limited information about the complainant’s vehicle, the panel is not persuaded the insurer is liable for this item. Insurer not liable for vehicle running, repair or maintenance costs The complainant says he had to have repairs completed to his 20-year old vehicle due to a gasket leak. He says the additional travel and freeway driving due to being away from his property is what brought on the gasket leak and is a result of the insurer ’ s actions requiring him to live out of his local area. He seeks payment of $2,329.90 for the vehicle repairs. As noted above, in circumstances where the required accommodation is not available, this is not either parties fault. It is the complainant’s responsibility to maintain his own vehicle and pay for any required repairs. There is no information which support s the complainant’s allegation that the damage to his vehicle was a result of the insurer ’ s actions. It is also not uncommon for a 20-year old vehicle to require such repairs. Determination | Case number: 776722 Page 11 of 14 The panel is not persuaded the insurer is liable for this item. Insurer not liable for other claimed damage In the panel’s view there is no evidence to establish that the structural integrity has been compromised; further, there is no evidence to show that the cracking in the wall/fence has been caused by the insured event or subject of this complaint. Further, the complainant has not established an entitlement for the replacement water pipe or for repairs to the complainant’s motor vehicle, or any potential mould in the vehicle. For clarity, the insurer has no liability for these claimed items. 2.4 Should the insurer pay professional costs? Insurer not required to pay professional costs The complainant is seeking to be reimbursed for the expert report costs he has incurred. AFCA may require the insurer to contribute to the professional costs incurred by a party. Normally, this would be awarded if the professional costs were reasonably incurred and assisted the complainant’s position. The complainant engaged EA to support his position about mould inside the bedroom. However, the panel does not consider this report substantively assisted his position noting that he went ahead with his own mould assessment despite disagreeing with the insurer ’ s invasive assessment method and not allowing it to proceed. Therefore, the panel does not accept the insurer is required to reimburse these costs. The complainant had also engaged IF to inspect asbestos in the meter box and DML to provide a geology report. However, the panel does not consider these reports substantively assisted the complainant ’ s position. Therefore, the panel does not accept the insurer is required to reimburse these costs. The complainant also seeks reimbursement of costs he incurred during the process of communication throughout his complaint, specifically he seeks costs incurred for printer toners, Express Post and fax charges. The complaint is responsible for the communication costs he incurred throughout the course of this complaint and these are not costs covered under his policy. The panel does not accept the insurer is required to reimburse these costs. 2.5 Is the complainant entitled to compensation for non- financial loss? Compensation for non-financial loss is warranted in the circumstances AFCA may award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind caused by the insurer’s handling of a claim. When considering such an award, we take account of the severity and impact of the insurer’s conduct on the particular complainant. For example, a complainant in financial difficulty would be more impacted by unreasonable delays. Determination | Case number: 776722 Page 12 of 14 As mentioned above, PIB’s second report dated 17 February 2021 show ed a list of minimum recommendations as a make safe with no information to show the recommendations were acted upon by the insurer. The claim notes show the insurer was aware of the complainant being vulnerable in September 2020 and was first made aware of the mould in December 2020 when the complainant advised that he felt unhealthy, unsafe and reported the assessor as being dismissive of a mould patch in the bedroom. Despite the above, the claim notes show the insurer did not start looking for temporary accommodation until 6 February 2021 when it emailed PIB asking it to arrange alternative accommodation for the complainant as it was unable to confirm if the property was liveable. The panel acknowledges that temporary accommodation is payable under the policy terms if the property is unliveable and this was not yet confirmed by the insurer. However, given the circumstances where the complainant also mentioned he was getting nose bleeds in Janu ary 2021. The insurer ought to have acted sooner in placing the complainant into temporary accommodation based on what it already knew. In addition to the above, the panel is satisfied that additional delays occurred during this AFCA complaint where the insurer ’s payment for the temporary accommodation was missed resulting in added stress and inconvenience to the complainant. The panel is satisfied the insurer’s actions have resulted in an unusual degree or extent of physical inconvenience, time taken to resolve the claim and interference with the complainant’s peace of mind. Therefore, the insurer is required to pay the compla inant $2,000 in recognition of this. 2.6 Why is the outcome fair? This outcome is fair because the complainant has a valid claim under the policy which the parties could not agree on a method to resolve. Given the complainant’s particular circumstances, and the delays in managing the claim, it is also fair that compensation for non-financial loss to be awarded. Determination | Case number: 776722 Page 13 of 14 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in the insurance industry. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 776722 Page 14 of 14 3.2 Relevant policy provisions

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.