Insurer declined storm damage to the SW wall of a garage and disputed claim preparation costs
Text of the determination
Determination
Case number 776687
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 776687 Page 1 of 9
Case number: 776687 6 September 2021
1 Determination overview
1.1 Complaint
The insured is a strata plan that holds an insurance policy with the financial firm (insurer). The
complainants lodged a claim with the insurer for storm damage to a free-standing double
garage.
The insurer assessed and declined the claim as it said the damage was due to a combination
of gradual deterioration and defective design.
The complainants disputed the insurer’s decision and engaged with a claim representative
(CP). They also obtained an independent engineer’s report from SR. The insurer reviewed
the complainants’ engineer’s report and accepted the garage damage.
The insurer notified the complainants it would cover the claim’s preparation costs
($11,624.14) and engineer’s report fees up until 11 June 2020.
A dispute continues as the insurer has declined the damage to the south western (SW) wall.
Further, the complainants are seeking the insurer to reimburse all the claim preparation costs
which have been incurred post 11 June 2020.
The insurer has offered to pay an additional $5,000 towards the claim preparation costs and
two engineering invoices totalling $3,432.
The damage to the garage slab is no longer in dispute.
1.2 Issues and key findings
Is the insurer entitled to decline the damage to the SW wall?
No. The evidence shows the cracking damage to the SW wall was due to the storm. The
insurer is required to assess the damage and determine the repair method. Accordingly, the
insurer is required to include this repair in its scope of work.
Is the insurer required to increase its offer towards claim preparation costs?
No. The insurer’s offer to pay an additional $5,000 towards claim preparation costs and
$3,432 towards engineer’s fees is reasonable in the circumstances. The insurer is not
required to pay any further costs towards claim preparation costs.
Are the complainants entitled for any non-financial loss?
Yes. the insurer is required to pay $2,000 in non-financial loss compensation.
Why is the outcome fair?
I am satisfied, on balance, the cracking damage to the SW wall is due to the storm. Given the
complainants ’ policy covers accidental damage and the insurer has not being able to
establish a valid exclusion, I am satisfied the acceptance of this damage by the insurer is fair.
Determination | Case number: 776687 Page 2 of 9
As the insurer has already paid $11,624.14 in claims preparation costs, I am satisfied the
insurer’s offer to pay an additional $5,000 towards claims preparation costs and $3,432
towards engineer’s costs is fair in the circumstances.
1.3 Determination
This determination is substantially in favour of the complainants.
The insurer is required to accept the damage to the SW wall, to be included with the damage
detailed in the amended scope of work. The insurer is to cash settle this aspect of the claim
and add a 15% uplift on the repairs, to cover contingencies.
In accordance with its existing offer, the insurer is required to pay an additional $5,000 in
claim preparation costs and $3,432 for the engineer’s fees.
The insurer is required to pay $2,000 in non-financial loss compensation.
Determination | Case number: 776687 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer entitled to decline damage to the SW wall?
Complainants have established a valid claim
The complainants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as
establishing a valid claim.
If the complainants can establish a valid claim, then the onus shifts to the insurer to show
that, on the balance of probabilities, it is entitled to decline the claim.
The complainants ’ policy is an accidental damage policy. The policy defines damage as
means any partial or total accidental physical loss of, or destruction of property
from any sudden and accidental cause not otherwise excluded by this policy.
The policy defines storm as
means a violent wind sometimes combined with thunder, heavy falls of rain, hail
or snow.
On 19 February 2020, the complainants lodged a claim for damage to a double garage
following a storm. There is no dispute the SW wall has a vertical crack. The complainants say
this crack is due to the storm. Further, the insurer has accepted damage to two walls and six
piers in the garage.
Accordingly, I am satisfied the complainants have established a valid claim.
Circumstances surrounding the claim
The insurer appointed its loss adjuster (IC) to assess the claim. IC appointed a builder (US) to
attend the property and determine the cause of damage.
US attended the property on 26 February 2020 and reported that the garage was damaged
due to lack of maintenance and poorly devised cladding of the breeze block.
The insurer determined the damage to be due to gradual deterioration and design issues.
Accordingly, it declined the claim based on exclusions for these causes, within the policy
coverage.
The complainants appointed an engineer (SR), to assess the damage.
SR reported a tree may have impacted the eastern wall of the garage on 9 February 2020,
resulting in its failure. SR reported the wind direction during this storm was east to south east.
Bureau of Meteorology data shows Sydney experienced wind speeds of 102 km/h and 104
km/h on 9 February and 18 February 2020 respectively.
Following review of SR’s report, the insurer accepted the claim and appointed its engineer
(IE) to determine the scope of work.
Determination | Case number: 776687 Page 4 of 9
A dispute has arisen as the insurer has declined the cracking damage to the south western
(SW) wall.
Scope of work was amended after the second meeting
IE attended the property on 24 June 2020, to determine the cause of damage. IE reported
direct damage was restricted to the two separate breeze block walls.
IE advised that apart from the eastern wall of the left side garage (eastern most of the two)
and the front wall of the right-side garage, the damage was limited.
IE reported the roof structure had non-compliant issues and the claim related repairs should
not proceed without the provision of sufficient tie-down capacity to all the roof elements. IE
also noticed timber purlins had decayed across the garage doors. It reported the garage
structure cannot be reinstated without this being repaired.
Accordingly, IE included minimum required roof upgrades to make the structure compliant
and included replacement of three timber posts on the sides of the left garage door.
The complainants disputed the scope of work and a combined site meeting was conducted on
22 September 2020.
Following that meeting, IE amended its scope of works and included replacement of two
walls, east and south, and six piers which were attached to both these walls.
Both parties’ engineers provide different cause of damage to the SW wall
IE noted the vertical crack in the SW wall is directly to the south of the separate pier. IE
believes this pier was installed after the construction of the breeze block wall.
IE reported the differential stiffnesses introduced into the wall by the pier and its partial
engagement, has caused the differential displacements under thermal and creep actions
resulting in the crack.
IE further reported that the crack has a uniform width and it is in the mortar beds only. IE
noted the shape, size and location of the crack is inconsistent with tree impact or wind
damage. IE says the crack is of no structural significance.
Accordingly, IE says the mortar crack in the SW wall is not due to the storm.
The complainants ’ engineer, SR, inspected the SW wall and noted the crack is tapered from
top to bottom. SR says this is consistent with the outward leaning of the south-west corner
pier.
The complainants disagree with IE and say no piers were installed after the garage’s
construction. The complainants say all piers were erected at the time of the garage ’s
construction.
The complainants say following the collapse of the eastern wall from the tree impact, the SW
wall took the brunt of the storm on 18 February 2020. The complainants say this caused
cracking in the SW wall.
SR confirmed its view that the damage to the SW wall and other sections of the damaged
walls and piers is consistent with the anticlockwise rotation of the roof panel due to the storm.
SR says the SW wall should be replaced. However, SR has not provided a scope of work for
the claim related damage.
Determination | Case number: 776687 Page 5 of 9
Insurer is required to accept damage to the SW wall
SR estimated that the thermal movement between the steel roof sheeting and breeze block
infill wall is 0.4 mm. It says this does not adequately explain the cracking in the SW wall which
is between two to three millimetres wide. IE agreed with SR, saying this has not caused the
cracking in the SW wall.
IE believes the differential stiffness introduced into the wall by the extra pier installation and
its partial engagement has caused the differential displacements through developed creep
and thermal stresses.
The insurer says the evidence shows the crack in the wall was not caused by a sudden event
during the period of insurance. It says the cracking is not consistent with the storm event.
Rather, it says the damage was the result of thermal and creep action.
The insurer says the policy excludes damage which is due to normal settling, creeping,
heaving, seepage, shrinkage or expansion in buildings. Accordingly, it says such damage is
excluded under the policy.
I am not satisfied the insurer has established any exclusions apply to decline the damage to
the SW wall.
I accept, on balance, that all piers were erected including the pier next to the subject cracking,
at the time of garage’s original construction. This is because the complainants say all piers
were constructed at the time of original construction and IE has not provided any evidence
which shows this pier was constructed later.
Hence, I am not satisfied IE’s report can be relied upon to decline the claim.
Further, noting the Bureau of Meteorology evidence, winds more than 102 km/h fall under the
category of a violent storm, within the Beaufort Scale. Under this category, widespread
damage is experienced on land.
Based on the available information, I am satisfied on balance, the cracking damage to the SW
wall is due to the storm.
The insurer says it can undertake and warrant the claim related repairs. However, as the
complainants are seeking a cash settlement and due to the breakdown in the relationship
between the parties, it is appropriate that the claim be settled on a cash basis.
I note that the amended scope of works has not been costed and does not include the SW
wall.
It is reasonable in the circumstances for the insurer to appoint a relevant expert to assess the
damage and determine the repair method.
Once the repair method has been determined, the insurer is required to obtain a new
quotation and settle the claim as per the terms and conditions of the policy and in accordance
with this determination, together with an uplift of 15% on the quotation, to cover
contingencies.
Determination | Case number: 776687 Page 6 of 9
2.2 Is the insurer required to increase its offer towards claim
preparation costs?
Policy covers claim preparation costs
The policy covers up to $30,000 for the reasonable cost of fees an insured necessarily incurs
in the preparation of a claim if the insurer provides written consent under the policy.
The complainants engaged a claim ’ s representative (CP) and SR after their claim was initially
declined by the insurer.
On 11 June 2020, the insurer agreed to pay the complainants $11,624.14 for the costs
incurred until that date. The insurer notified the complainants through their broker (CB) that
no further costs would be accepted for CP’s involvement post 11 June 2020.
The complainants say they had to engage CP and SR after 11 June 2020, because the
insurer ’s scope of works was inadequate. The complainants say it was due to the ir
representative’s involvement the scope of works almost doubled after the meeting on 22
September 2020.
Insurer’s offer is fair and reasonable
CP issued two invoices amounting to $13,552 for its services post 11 June 2020. SR issued
three invoices amounting to $3,960 for its services post 11 June 2020. SR charged the
complainants $660 for a site visit which happened on 22 September 2020, $2,772 f or
preparing a response to the Authority and $528 for participating in the conciliation arranged
by the Authority.
The insurer says CP’s involvement was not necessary. The insurer says the findings of SR
resulted in it overturning the decision. The insurer says the complainants could have engaged
an engineer without the involvement of CP.
The insurer made a final offer of an additional $5,000 to the complainants for the claim
preparation costs. The insurer also offered to pay two SR invoices, amounting to $3,432.
While there is no dispute the policy covers claim preparation costs up to $30,000, the policy is
clear in stating that the complainants are required to obtain written consent from the insurer
prior to incurring these costs.
As the insurer notified the complainants it would not accept any further claim preparation
costs post 11 June 2020, I am satisfied the insurer’s offer to pay an additional $5,000 towards
claim preparation costs on top of the $11,624.14, is fair and reasonable in the circumstances.
I agree with the insurer to the extent that the complainants could have engaged SR
themselves and it was the conclusions of SR, rather than the contribution of CP, that led to
the amended scope of work.
I accept the involvement of SR was instrumental in overturning the insurer’ s decision.
However, I’m not satisfied that SR was necessary at the conciliation. As the insurer has
agreed to pay SR’s other two invoices for its involvement post 11 June 2020, I am satisfied
t he insurer’s offer is fair and reasona ble in the circumstances.
Determination | Case number: 776687 Page 7 of 9
2.3 Are the complainants entitled for any non-financial loss?
Compensation awarded in certain circumstances
AFCA may award compensation (capped at $5,000) if there has been an unusual degree or
extent of physical inconvenience, time taken to resolve a complaint or interference with the
complainants’ expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainants have suffered some inconvenience and anxiety.
AFCA expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
Fair the insurer pays $2,000 compensation
The claim was made on 19 February 2020. The insurer appointed its builder to assess the
damage in a timely manner. The insurer initially declined the claim based on US’s report and
overturned its decision after receiving the complainants ’ report.
The initial scope of work was amended by the insurer after it was disputed by the
complainants. Further, the insurer incorrectly declined the claim for cracking damage to the
SW wall.
I accept the claim ’ s experience would have caused some physical inconvenience and stress
to the complainants. Considering what is fair in the circumstances, I accept it is fair the
insurer pays the complainants $2,000 non-financial loss compensation.
2.4 Why is the outcome fair?
I am satisfied, on balance, the cracking damage to the SW wall is due to the storm. Given the
complainants policy covers accidental damage and the insurer has not been able to establish
a valid exclusion, I am satisfied this decision is fair for the insurer to accept that damage.
As the insurer has already paid $11,624.14 in claim preparation costs, I am satisfied the
insurer’s offer to pay an additional $5,000 towards claim preparation costs and $3,432
towards the engineer’s costs is fair in the circumstances.
Determination | Case number: 776687 Page 8 of 9
3 Supporting information
3.1 Process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
Pages Wording
8 Policy Wording
…
Damage, Damaged
Determination | Case number: 776687 Page 9 of 9
means any partial or tot al accident al physical loss of, or destruction of
property from any sudden and accidental cause not otherwise excluded by
this Policy.
14 Claim preparation costs and fees
We will pay up to $30,000 for the reasonable cost of fees You necessarily
incur with Our written cons ent in the preparation of a claim under this Policy.
Claims Condition 4 - Claim preparation costs and fees does not apply to
Policy 4 - Workers Compensation and Policy 9 – Government Audit Costs,
Appeal Expenses and Legal Defenc e Expenses.