Text of the determination
Amended Determination
Case number 773727
Financial firm Strata Unit Underwriters
Amended Determination | Case number: 773727 Page 1 of 12
Case number: 773727 4 November 2021
1 Determination overview
1.1 Complaint
The complainant owns a unit in a building insured under a strata insurance policy. A claim
was lodged under the policy for water damage in February 2020 to several units. The insurer
accepted liability and cash settled the strata body (insured) for the damage. The insurer has
also paid the complainant loss of rent for the period 2 February 2020 to 3 June 2021.
The complainant says the scope of works does not allow for all repairs, and the payment for
loss of rent is inadequate. He says the insurer caused delays, resulting in an increased claim
for loss of rent.
The insurer disputes AFCA’s jurisdiction to consider property damage. Further it says it has
fairly settled loss of rent and the complainant has not established his claim for further
damage.
1.2 Issues and key findings
Is AFCA able to consider the complaint?
Yes. The complainant is a third-party beneficiary of the policy under section 48 of the
Insurance Contracts Act 1984 (the Act). AFCA rule B.2.1(d) gives AFCA jurisdiction to
consider a complaint over an entitlement under a policy that refers to the complainant,
whether by name or otherwise, as a person to whom cover extends.
Is the insurer liable to increase its offer for the property damage?
Yes . The insurer’s cash settlement for property damage does not include all damage caused
by the insured event and the actions of its contractors.
Is the insurer liable for loss of rent?
Yes. The insurer is liable for loss of rent under the terms of the policy until the Unit is re-let.
The insurer is to pay loss of rent to the date of this determination and for a further 9 weeks.
Why is the outcome fair?
If the complainant had accepted the insurer’s offer, he would have been personally liable for
damage which should be covered under the policy. His refusal to accept this offer was
reasonable. In these circumstances it is fair the insurer increases its offer for property
damage and pays loss of rent until repairs are complete.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is liable to cover additional damage and loss of rent as set out under sections 2.2
and 2.3 of this determination. Interest is payable on the cash settlement for the additional
damage from 2 February 2021 until the date of settlement.
Amended Determination | Case number: 773727 Page 2 of 12
2 Reasons for determination
2.1 Is AFCA able to consider the complaint?
Yes. The complainant is a third-party beneficiary under section 48 of the Act as he is
specified or referred to in the policy by name or otherwise as a person to whom the benefit of
insurance cover provided by the policy extends. Under AFCA rule B.2.1(d) AFCA has
jurisdiction to consider a complaint over an entitlement under a policy that refers the
complainant, whether by name or otherwise, as a person to who cover extends.
Circumstances of the complaint
The policy covers a residential complex in which the complainant is a unit owner. The insured
is the strata plan, managed by the body corporate.
The claim is for water ingress damage to three units on 2 February 2020. There is no dispute
the claim is valid. The dispute is over whether the insurer’s cash settlement paid to the body
corporate is fair and sufficient to cover the damage to the complainant ’s unit.
Insurer says complaint does not arise from an entitlement under the policy
The insurer correctly notes the insured party is the strata plan, rather than the complainant. It
says the policy indirectly refers to the complainant, as a unit owner, in relation to a benefit for
loss of rent, but not for property damage. It says as there is no entitlement to cover for
property damage, AFCA may not consider the complaint.
The insurer says the contract, as set out in the policy wording (PDS), does not specify or refer
to the complainant in any way, therefore he is not a third-party beneficiary and is not entitled
to claim under the policy, or bring a complaint to AFCA.
The insurer says as the complaint does not arise from an entitlement or benefit under the
policy that refers to the complainant and therefore AFCA Rule B.2.1(b) and section 48 of the
Act do not apply.
Complainant is a third-party beneficiary
The PDS clearly explains there are two parts to the policy, the first contains important
information and the second (called The Policy) contains the terms and conditions. The cover
for property damage and loss of rent is included in Section 1.
Under Section 1, the policy covers accidental damage to the insured property.
Insured property is defined as buildings and common contents at the situation. Buildings are
defined to have the meaning of buildings as defined in any act or regulation governing strata
title, community title or similar-type property in the state or territory where the buildings are
located.
The relevant legislation in NSW defines building in relation to a strata scheme to mean a
building containing a Lot or proposed Lot. The complainant’s unit is clearly in a building as
defined and therefore covered under the terms of the policy.
Amended Determination | Case number: 773727 Page 3 of 12
Additional benefits under Section 1 include loss of rent cover for unit owners. The
complainant is a unit owner. There is no dispute the policy indirectly refers to the complainant
in relation to the loss of rent benefit.
The panel is satisfied the complainant is a third-party beneficiary under section 48 of the Act
as he is specified or referred to in the policy by name or otherwise as a person to whom the
benefit of insurance cover provided by the policy extends.
Complaint falls within AFCA’s jurisdiction
Under AFCA rule B.2.1(d) AFCA has jurisdiction to consider a complaint over an entitlement
under a policy that refers the complainant, whether by name or otherwise, as a person to who
cover extends. Relevant sections of the rules are set out in section 3 of this determination.
While under the terms of the policy a unit owner is only entitled to certain benefits (such as
loss of rent) and has no entitlement for property damage, there is an entitlement or benefit
under the policy for a unit owner. As such, under Rule B.2.1. (d), AFCA can consider the
complaint.
Given the complainant is referred to within the policy as a unit owner, and given the insured
party is the strata plan of which the complainant, being a unit owner, is a part y, the panel
considers the complainant is entitled to bring a complaint in relation to property damage and
loss of rent.
2.2 Is the insurer liable to increase its offer for the property
damage?
Yes . The insurer’s cash settlement for property damage does not include all damage caused
by the insured event and the actions of its contractors.
Insurer cash settled the insured for damaged property
There is no dispute that the unit has suffered damage within the terms of the policy. The issue
in dispute is the extent of the damage sustained.
The insurer offered to cash settle the damage. The complainant objected to the settlement
offer and says it did not include all the damage and did not allow for rectification of damage
caused by the insurer’s restorer. The panel accepts that the insurer is liable for damage
caused by its contactors regardless of the terms of the policy and this should reasonably form
part of the claim.
The insurer has increased its offer however the complainant says the offer is inadequate on
the basis:
certain damages caused by the storm are not included in the offer
the insurer has not paid for contents items which were damaged by its contractors
settlement is based on a low quote.
Insurer is liable for damage caused by its contractors to carpets
The complainant says the insurer’s contractors disposed of his carpets, denying him the
opportunity to salvage the carpet. He supplied a video he says is footage of a restoration firm
he engaged to remove water from the carpet, and an invoice from OM for $1,750 for ‘flood
cleaning and removal of water damage to flooring’. The complainant says the insurer must
replace the carpet as he was not afforded the opportunity to save it.
Amended Determination | Case number: 773727 Page 4 of 12
The insurer authorised restoration works, including disposal of carpets, to RW on 4 February
2020. It provided a copy of a letter from RW addressed to the complainant, dated 19 February
2020, which states the carpets could not be restored due to the amount of time that had
passed (48 hours) between the water ingress and RW attending.
During telephone discussions with the case manager, the insurer expressed doubts as to
whether the footage provided by the complainant clearly established he did attempt
restoration. However, it has provided no information to support this view. The insurer has not
investigated whether the carpet could have been restored.
The re is no information to dispute the complainant’s claim that he engaged a restoration firm
to remove water from the carpet. Presumably, OM considered the carpet was salvageable.
The available information suggests the complainant intended to save the carpet and made
efforts to do so.
In these circumstances the panel considers it is fair the insurer is liable for the cost of
replacing carpets. The complainant has supplied an estimate of $11,700 for the cost of
replacing carpet. He has also provided a quote f rom the insurer’s builder, RW, for $11,048.
The panel considers this quote should be relied upon for settlement of the carpets. The
amount should be increased by 15% to $12,705.20 to allow for contingencies.
Insurer liable to rectify damage to concrete floor
There is evidence the concrete floor was damaged when the carpets were removed. Masonry
tacks were left in the concrete, or had been ripped out, leaving holes and broken concrete.
The insurer’s submissions do not address this damage. The complainant has supplied a
$30,000 estimate to repair this damage, yet no quote.
Given the insurer removed the carpet as part of remediation, it should complete the job by
removing any remaining masonry tacks.
The panel notes it may be difficult to reinstall carpet if masonry tacks cannot be secured to
broken sections of concrete. The insurer should rectify this damage. However, the most
appropriate method of repair has not been established. The insurer is entitled to obtain a
quote to repair the concrete floor, and either repair the damage or cash settle for the
assessed quote plus an allowance of 15% for contingencies.
Insurer is liable for marks on walls caused by its restorer
CD, the insurer ’ s engineer, attended the unit to report on outstanding damage and found no
evidence of water staining.
However, the insured later engaged restorer GR to attend the property and quote the cost of
approved rectification works. GR provided a report dated 16 July 2021 which noted slight
discolouration to rendered walls and swirl marks possibly because of mould removal. The
insurer was provided with a copy of the GR report.
GR has identified damage attributable to restoration works which was not observed when CD
attended seven months earlier. There are not further reports relating to these swirl marks, and
no other reports on damage potentially caused by mould removal.
GR says a single coat of paint may resolve this issue and allowed $2,245 to carry out this
work. The complainant has supplied an estimate of $9,500. Based on the reports and
photographs, the panel considers the swirl marks are slight and a single quote of paint is a
Amended Determination | Case number: 773727 Page 5 of 12
reasonable fix. GR acts for the insured (as opposed to the complainant) and has provided
what appears to be a balanced opinion which was generally accepted by insurer.
On balance, given no other cause is suggested, the panel considers the marks were left from
mould removal. The insurer does not say any exclusions apply to this damage. The panel
considers it fair that the insurer meets the cost of rectification as quoted by GR of $2,245.
Insurer to increase offer for damaged kitchen cabinetry
The complainant says cabinetry was damaged during remedial works, and the insurer is liable
for rectification. The report from restorer GR appears to support this, although notes the quote
was carried out at the complainant’s request.
The insurer’s assessor (CF) discussed the quote with GR and says GR does not believe all
areas quoted are damaged or require repairs. CF says settlement should be limited to the
one damaged cabinet already included in settlement.
CF has allowed $1,815 for the cost of removing a splashback to facilitate benchtop
replacement. The insurer agreed to include this cost on the basis the benchtop could be
damaged during replacement.
GR notes that the stone benchtop must be removed to reinstall the splashback, and that the
benchtop will break when being removed. The GR scope does not allow for this work, nor
does the insurer’s settlement offer. Given the information suggest the benchtop will break, the
cost should be included.
The panel notes the insurer’s offers were made by email and include a comment that the offer
is in full and final settlement. The panel is concerned that the insurer sought to close the claim
with a full and final settlement offer whilst aware that the offer did not allow for all damage.
The submissions do not include a quote for replacing stone benchtops. The complainant has
supplied an estimate of $9,900 to $12,000, yet no quote. The insurer may choose to settle
based on the mean of these amounts ($10,950) or obtain a quote from GR for same.
It is fair in the circumstances that the insurer pays the complainant $1,815 allowed by CF to
remove the splashback. It should add to this the cost of replacing the stone benchtop, either
based on the complainant’s estimates ($10,950) or a quote from GR.
Insurer to increase settlement for damaged wardrobe
GR says the initial scope of works for wardrobe costs was low and recommended increasing
the initial quote of $8,082 by $470.00 to a total of $9,360.00. The panel is uncertain how a
figure of $470 was reached, when the difference is $1,278.
The insurer has not provided the requested clarification. As such, the insurer should pay a
further $1,278.
Insurer to test power point
The complainant notified CD that a power point was damaged due to water ingress. CD noted
burn marks on the power point yet could not determine if the power point was functional.
There is no information to indicate the damage is inconsistent with damage caused by water
ingress. The settlement offered includes the cost of testing. The complainant is to allow the
insurer access to the unit to conduct the further testing. If testing reveals the power point is
Amended Determination | Case number: 773727 Page 6 of 12
damaged, then the panel considers it fair that the insurer either repair the power point or
meets the cost to repair the power point.
Insurer entitled to deny liability for damage to ceiling
The complainant says the ceiling cracked because of water ingress and the ceiling and walls
require replacement.
The insurer engaged engineer CD to inspect the property and report on these and other
issues. In a report dated 4 January 2021, CD says the vermiculite ceiling has cracks at a
corner junction with a wall yet noted no water staining to the ceiling and says the cracking
was a result of wear and tear. CD observed no water staining to any walls or ceilings.
The panel has reviewed the photographs supplied by the complainant and has not identified
any staining of walls or ceilings. There are no reports or submissions suggesting staining or
water damage to walls and ceilings. As such, the panel is of the view the insurer is not liable
for this.
Insurer can deny liability for claim for oven and rangehood
The complainant says internal oven fittings (racks and hoods) were removed by the insurer’s
builder (RW), as well as rangehood filters, during the water extraction process. As
replacements cannot be sourced, the complainant says the insurer should replace the oven
and rangehood.
The is no information to establish RW or any other contractor disposed of these items,
therefore the insurer is not liable for its replacement. There is no indication that this was
reported to either RW or the insurer at the time.
The panel is not satisfied the complainant has established the items were removed as
claimed. The insurer is entitled to deny liability to replace the oven and rangehood.
No evidence bulkhead damaged in storm
CD reported on a deteriorated bulkhead lining on northern side wall of the bathroom. CD says
the damage is a result of leakage from the sewer pipe within the bulkhead. CD also identified
discolouration of grout in the bathroom yet says this is due to general wear and tear issues.
A review of photographs does not support a finding that it is a result of the storm and water
ingress. As such, the panel does not consider the insurer is liable for this damage.
No evidence of damage to laundry tiles
CD says while attending the property, the complainant highlighted tiles in the laundry which
he said were delaminating. CD says a knock sound test was carried out, and from this it was
established tiles are in excellent condition and not drummy.
There is no report or information to support the complainant’s assertion that tiles are
delaminating. The panel is satisfied a knock test is an acceptable means of identifying
drummy tiles. The insurer is not liable for this alleged damage.
Amended Determination | Case number: 773727 Page 7 of 12
Insurer not required to match materials
The complainant says that after repairs to the kitchen are complete, his undamaged,
overhead kitchen cabinets will not match the cabinets repaired by the insurer. He says the
insurer should pay for the undamaged cabinets to create a uniform appearance.
The policy stipulates that the insurer must try to match materials used to replace damaged
property. If original materials cannot be matched, the insurer will use the nearest equivalent
materials. The policy also states that the insurer will not pay any costs of replacing and
altering undamaged property, including costs which are incurred for colour matching or
creating a uniform appearance. Given this, the insurer is not liable for the cost of replacing
overhead kitchen cabinets.
Other damage
The complainant includes estimates for the following:
replacement of damaged laundry sink and tap
replacement of toilet seat damaged by contractors
re-grouting of bathrooms due to mould
removal and reinstall of stair rail to allow reinstallation of carpet
cost of reinstalling electric cooktop and oven
cracked doors and replacement of hinges
removing and replacing damaged render
replacement of bathroom window
waterproofing the kitchen and laundry after works are complete
replacing mould damaged blinds.
The panel has reviewed the photographs supplied by the complainant, as well as all available
reports. Overall, the panel gains the impression that the unit was neat and tidy before the
insured event, although somewhat worn.
The panel notes the policy covers building and common contents, and these are defined in
the policy (set out in section 3 of this determination). Curtains within units are not covered,
nor are carpets. While RW disposed of carpets, the submissions suggest curtains were still
inside the unit as at 4 January 2021. The curtains could have been removed by the
complainant and cleaned. The panel is not satisfied the mould on curtains is the fault of the
insurer, therefore it is not liable for this cost.
There is no evidence the insurer’s contractors damaged the toilet, laundry sink and tap or
cooktop and oven (via a chemical spill). Further, there is no information to show split doors or
the bathroom window were damaged because of the insured event or by contractors. The
insurer is not liable for these costs.
The panel considers that scuffing, scratches and other marks around doorframes including
rust at the base of the doorframe and on walls appear typical and wear and tear as opposed
to damage from the insured event. While there is mould on grout, there is no indication that it
cannot be cleaned as would any shower in which mould had built up.
Further there is no evidence the render is severely cracked and drummy. The insurer is not
liable for repairing all damage to render walls.
Insurer is to increase settlement for property damage
Within 21 days of the complainant’s acceptance of this determination the insurer is to
increase the cash settlement of the complainants claim for property damage as follows:
Amended Determination | Case number: 773727 Page 8 of 12
$12,705.20…. replacement of carpet
$2,245 ……... painting of rendered walls
$1,815……removal of kitchen splashback
$1,278 …... additional allowance for wardrobe
The insurer is to either cash settle the complainant for the replacement of the stone benchtop
based on the average of his estimates ($10,950.00) or obtain a quote from GR for the
replacement cost and cash settle based on that quote.
The insurer is to obtain a quote to repair the concrete floor, and either repair the damage or
cash settle for the assessed quote plus an allowance of 15% for contingencies.
Subject to the complainant allowing the insurer access to the unit, the insurer is to have the
power point accessed and if damaged either repair or cash settle the complainant for the cost
of the repair.
2.3 Is the insurer liable for loss of rent?
Yes. The insurer is liable for loss of rent under the terms of the policy until the Unit is re-let. It
is fair the insurer continues to pay loss of rent to date of this determination and for a further 9
weeks.
Policy covers loss of rent unless unit owner causes unreasonable delays
The policy covers loss of rent when a unit is damaged and uninhabitable. Cover is provided
until the unit is re-let following repairs, providing all efforts have been taken to re-let the unit.
The insurer paid the complainant for lost rent from 2 February 2020 until 4 February 2021. It
increased this by $9,257.49, extending cover until 26 April 2021 to allow for a 25-day repair
period plus a lead period of 10 business days. It says it has now paid loss of rent until 3 June
2021.
The policy stipulates that where a unit owner causes unreasonable delays in commencing or
completing repairs, payment will be reduced by the amounts which result from the delays.
Whether the insurer is liable for further loss of rent depends on whether the complainant
caused unreasonable delays.
Complainant’s refusal to accept settlement was reasonable
The insurer had previously agreed to increase settlement to include damage to kitchen
cabinets and built in robes. Given its scope increased, it extended cover for loss of rent.
The panel is of the view the insurer should also have included cover for swirl marks and
carpets. It also failed to include an allowance for the stone benchtop which available reports
clearly noted would break during repairs.
Should the complainant have accepted the insurer’s offer, he would have been liable for this
damage as the offers by the insurer were in full and final settlement of his claim. The panel
considers the complainant's refusal to accept settlement which does not include cover for
these items was reasonable.
Amended Determination | Case number: 773727 Page 9 of 12
Insurer is liable for loss of rent until repairs are complete
The panel is of the view the insurer is liable for loss of rent until the unit is re-let. It is not
possible to determine when this may be. In the circumstances as the majority of the claim is
to be cash settled, the panel considers it fair that a seven-week repair period be allowed and
a further 2 weeks be allowed to relet the property. The panel is also satisfied the amount
allowed for repair time, contingencies and re-letting is reasonable.
Accordingly, the panel determines the insurer is to continue to pay the complainant for the
loss of rent to the date of this determination and pay a further 9 weeks loss of rent from the
date of the determination in finalisation of the complainant’s loss of rent claim.
2.4 Why is the outcome fair?
The insurer may disagree with AFCA’s jurisdiction, yet this does not prevent it from acting to
ensure it had fully settled the claim. Indeed, the insurer proactively engaged its assessors to
address the complainant’s concerns despite the insured stating it did not authorise the
complainant to act.
Without the question of jurisdiction, the issue is simply whether the insurer fairly settled the
claimed property damage. The panel is satisfied that it did not, although does recognise it
made appropriate efforts. As the insurer’s settlement offer was inadequate to allow the
complainant to complete repairs, it would not be fair for the insurer to refuse to cover loss of
rent until the complainant has the opportunity to complete the repairs.
Amended Determination | Case number: 773727 Page 10 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience as a consumer representative
and a member with extensive industry.
3.2 AFCA Rules
B.2 Relationship giving rise to the complaint – other complaints
B.2.1 A complaint (other than a Superannuation Complaint) must arise from or
relate to:
….
d) an entitlement or benefit under a General Insurance Policy that
specifies or refers to the Complainant, whether by name, or
otherwise, as a person to whom the policy extends;
…
3.3 Insurance Contracts Act
Section 48 - Contracts of general insurance — entitlements of third party
beneficiaries
(1) A third party beneficiary under a contract of general insurance has a right to
recover from the insurer, in accordance with the contract, the amount of any loss
suffered by the third party beneficiary even though the third party beneficiary is
not a party to the contract.
…….
Amended Determination | Case number: 773727 Page 11 of 12
3.4 Policy wording
How we pay claims (pp 17)
Materials
We will try to match any material used to repair or replace Your Insured Property
with the original materials. If We cannot, We will use the nearest equivalent
available to the original materials.
Undamaged Property
We will not pay any costs for replacing, repairing, altering or modifying any
undamaged Insured Property or undamaged sections of Your Insured Property
including such costs which are incurred for the purpose of colour matching of or
creating a uniform appearance between undamaged Insured Property and
repaired or replaced Insured Property claimed under this Policy.
General definitions relating to all sections (pp 9)
Buildings
Buildings do not include: ….
temporary floor coverings, carpets, carpet underlay, curtains, blinds and
window coverings inside a Unit.
Additional benefits (property section) (pp 15)
Loss Of Rent, Reletting Costs, Temporary Accommodation And Removal
Costs
We will pay the following costs where Your Unit or Common Area suffers Damage
covered by this section and areas are uninhabitable or when reasonable access
to or occupancy of Your Unit or Common Area is prevented by Damage that
would be covered by this section happening to other property within the
immediate vicinity of Your Unit or Common Area:
Amended Determination | Case number: 773727 Page 12 of 12
(a) Loss of Rent
Where a Unit or Common Area is leased out, or You can provide evidence by
means of a signed agreement that it would have been leased out, We will pay
an amount equal to the actual Rent lost less any recoveries available from the
bond authority. We will pay up until the time Your Unit or Common Area is re-
leased following completion of reinstatement and/or repair of Your Insured
Property or access to Your Unit or Common Property is re-established provided
You can demonstrate that You have taken all necessary steps to re-let Your Unit
or Common Area including the active marketing of Your Unit or Common Area at
current market Rent.