Home / Suncorp Group / Determination 773384
Determination 773384
flood damage claim - costs of preventive works and boundary fence
Summary
The complainant claimed over $140,000 for preventive flood works after a storm-damaged home claim, plus compensation for poor claims handling. AFCA ordered the insurer to pay $13,376 for the boundary fence and $5,000 for non-financial loss, but rejected reimbursement of the preventive works.
The policy covers only damage caused by insured events, so preventive works to address pre-existing design faults are the insured's responsibility, while the insurer's delays warranted non-financial loss compensation.
Issues
- Claim denial primary · not upheld
“The insurer is not liable for the repairs undertaken by the complainant; costs were incurred to prevent future flooding, not to repair insured damage.”
- Claim amount dispute secondary · upheld
“The insurer is required to pay the complainant $13,376 for the boundary fence.”
- Poor claim handling secondary · upheld
“The insurer has not handled the claim in a fair and reasonable manner. The insurer is required to pay $5,000 as compensation.”
- Delay secondary · upheld
“The claim sat unreviewed until March 2019. This period is unacceptably lengthy.”
Subjects and remedies
business interruptionhome or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 773384
Financial firm AAI Limited
Determination | Case number: 773384 Page 2 of 7
Case number: 773384 3 March 2022
1 Determination overview
1.1 Complaint
On 28 November 2018 the complainant lodged a claim on his home and contents
insurance p o l i c yfor flooding damage to his property following a storm. The financial firm
(insurer) accepted the claim.
The complainant subsequently incurred costs in excess of $140,000 to prevent future flash
flooding which the insurer‟s builder said had to be done before the necessary damage
repairs could be undertaken. The complainant is seeking the insurer reimburse these costs.
The complainant also says the claim was poorly handled which caused him and his family
stress and inconvenience.
1.2 Issues and key findings
Is the insurer liable for the repairs undertaken by the complainant?
No. I am satisfied these costs were not incurred to repair damage resulting from an insured
event. Rather, these costs were incurred to prevent future flooding. Accordingly, I am satisfied
the insurer is not liable for the repairs undertaken by the complainant.
Is the insurer liable for any further claim related repairs?
Yes. The insurer is required to pay the complainant $13,376 for the boundary fence.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer has not handled the claim in a fair and reasonable manner. The insurer is
required to pay the complainant $5,000 as compensation for the mishandling of the claim.
Why is the outcome fair?
There was delay and mishandling by the insurer which caused substantial distress and it is
fair the complainant be compensated for the stress and inconvenience. The additional works
however were not to repair damage from the insured event and are therefore not covered
under the terms of the policy.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to pay the complainant $13,376 for boundary fencing plus $5,000
as compensation for non-financial loss. The insurer is otherwise entitled to deny the
balance ofthe complainants claim.
Determination | Case number: 773384 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer liable for the repairs undertaken by the
complainant?
No. I am satisfied these costs were not incurred to repair damage resulting from an insured
event. Rather, these costs were incurred to prevent future flooding. Accordingly, I am satisfied
the insurer is not liable for the repairs undertaken by the complainant.
Circumstances surrounding the claim
On 28 November 2018, the complainant lodged a claim for damage to his property following
astorm. Over 100mm of rain fell in Sydney within one hour resulting in stormwater drains
overflowing and water entering the insured property.
The insurer appointed its builders (HR and ES) to undertake a make safe and carry out
an assessment of the property. Substantial delays with assessment of the loss occurred.
Theunderfloor area remained damp.
On 17 April 2019, the restorer installed drying equipment as there was mould present
insidethe property. On 18 April 2019, the insurer notified the complainant the property was
mould-affected and uninhabitable. The insurer asked the complainant to arrange his
temporary accommodation and vacate the property.
Following assessment, the builders confirmed damage to floorboards, wall linings and
thearchitraves. The insurer appointed a new builder (JG) to provide a quotation for the
claim related repairs due to the size and complexity of the job.
On 19 June 2019, the insurer‟s assessor (AT) met with the complainant and JG‟s
representatives to confirm the next steps. AT noticed the following building defects which
hebelieved would affect JG‟s ability to reinstate the timber flooring throughout the property:
insufficient subfloor clearance between natural ground level and bearers and joist
insufficient clearance between external ground level and internal floor level
insufficient subfloor ventilation.
My viewing of photographs show the floor level in the property is very close to ground
level.The house appears to have been constructed prior to current building requirements.
JG notified the complainant that prior to it starting the flooring repairs, the complainant
would need to undertake repairs to the retaining wall, driveway and drainage around the
property toprevent any future flash flooding.
The complainant appointed a hydraulic engineer who recommended ways to prevent future
flash flood. The recommendations included to install a retaining wall and the driveway to be
replaced and made higher than before. The complainant informed the insurer‟s builder of
thecomments of the expert. The complainant says the builder then stopped work and said
we won‟t do repairs until you do the work described by the engineer.
The complainant says that with repairs unfinished after several months delay, he felt he had
no choice but to proceed to undertake the work as recommended. This work cost him
around
$143,000. He claims these monies from the insurer.
Determination | Case number: 773384 Page 4 of 7
Complainant says poor claims handling resulted in additional works
The complainant says the additional works around the property were only required due to the
delays and poor claims handling by the insurer. The complainant says there were multiple site
assessments conducted by several trades people and the insufficient sub-floor clearance and
inadequate drainage were not raised until the site attendance undertaken by the insurer‟s
assessor (AT) on 19 June 2019, some several months after the storm
The complainant says the property has had no flooding issues for the last 22 years. The
complainant says due to the inaction by the insurer and its builders, the property was severely
impacted by mould which resulted in major mould remediation works.
The complainant says that had the mould remediation and repairs started in a timely manner,
none of the external works would have been required.
Insurer is not liable for the additional works
The complainant says he had no choice but to complete the additional works recommended
by the hydraulic engineer. He says this was due to the poor claims handling as the property
became mould affected resulting in major mould remediation works. Accordingly, the
complainant says the additional works should be considered as part of the claim.
The insurer says it offered the complainant a cash settlement for the claim related repairs
because JG was not able to warrant the repairs, if the additional works around the property
were not completed by the complainant. There is doubt as to the adequacy of the amount of
the cash settlement offered.
While I empathise with the complainant, it is not unreasonable that the insurer was unwilling
to itself undertake the claim related repairs if that work could not be warranted and was at risk
of future storm damage.
The insurer relies on the policy language which requires the insured keep the property „well -
maintained and in good condition‟. The policy says this means:
the building does not have any faults or defects that might cause loss or damage
to the building, loss or damage to property of others or injury to people. ….
The hydraulic engineer (engaged by the complainant) recommended design changes to
prevent future flash flooding, I am satisfied this is maintenance and/or correcting an existing
design problem and which is the insured‟s responsibility. The work by the complainant is in
effect a significant improvement to the property.
The policy is clear in stating it only covers damage caused by insured events. I believe the
complainant felt he had little choice other than to attend to the work identified by his hydraulic
engineer. However, he was aware the work would (at least initially) be at his cost. There was
no promise by the insurer to cover these costs. Nor is there evidence to argue that the issues
identified by the hydraulic engineer arose due to the insurer‟s inaction. However, these issues
should have been identified much earlier.
Accordingly, I am satisfied the insurer is not required to pay for these repairs.
2.2 Is the insurer liable for any further claim related repairs?
Yes. The insurer is required to pay the complainant $13,376 for the boundary fence.
Determination | Case number: 773384 Page 5 of 7
Insurer required to pay $13,367 for the boundary fence
The insurer appointed an engineer (SE) to inspect the property and provide a causation
report on the structural damage to the fences and garden shed. SE attended on 16 October
2019 and noticed the boundary fence and shed had been demolished to facilitate the
additional works. Accordingly, it could not visually confirm any resultant damage to the
original fence and shed from the storm.
SE reported the water flow would have been insufficient to apply pressure on the garden shed
or boundary fence. SE reported it would have expected minor damage to the fence but that
there was insufficient evidence to confirm if the boundary fence and garden shed were
damaged due to the storm. SE said that, if there was minor damage to the boundary fence
due to the storm, it would expect repair/replacement of 50 lineal metres of the reed fence.
I have reviewed the scope of works formulated by ES, which includes the shed underpinning
and 12 lineal metres of boundary fence. The insurer has already paid $4,752 for the
underpinning and the boundary fence. SE and ES have provided different measurements for
the boundary fence. I am prepared to accept the 50 metres indicated by SE as the correct
measure.
ES quoted $2,112 including GST for 12 lineal metres of boundary fence, which is $176 for
one lineal metre for each neighbouring owner. The complainant has pointed out and the
insurer agrees that the remaining 38 metres is not a shared boundary and the correct rate to
apply is therefore $352 per lineal metre which comes to $13,376.
The complainant also requested compensation for costs he incurred on an hydraulic engineer
and surveyor. These costs related to non-insured works and I do not consider it appropriate
these costs be footed by the insurer.
Insurer is required to pay for the garden shed replacement
The complainant obtained a quotation for the demolition and replacement of the garden shed
amounting to $10,725. It is not disputed the garden shed had to be removed to undertake the
work recommended by the hydraulic engineer. The insurer has already paid for the shed‟s
underpinning ($2,640 including GST). Other than the underpinning, there is no evidence
available to show any other damage to the shed caused by the storm.
2.3 Is the complainant entitled to compensation for non-
financial loss?
Yes. The insurer has not handled the claim in a fair and reasonable manner. T he insurer is
required to pay the complainant $5,000 as compensation for the mishandling of the claim.
Insurers claims handling caused complainant an unusual degree of
inconvenience and time taken to resolve the situation
The claim was lodged on 28 Novembe r 2018. The insurer‟s assessor (AT) states in his
report of 10 October 2019, the claim sat unreviewed until March 2019. This period is
unacceptably lengthy. Due to the size and complexity of the work needed, the insurer then
needed to appoint another builder (JG) to assess the damage and undertake repairs.
However, it was not until almost 8 months after the storm that the loss adjuster advised that
the lack of sub- floor space would be a problem. In the meantime, it seems no advice was
given by the insurer to the complainant to take the very basic steps required to avoid the
mould problem.
Determination | Case number: 773384 Page 6 of 7
In my view the initial “make safe and damage assessment” proved woefully inadequate. The
evidence suggests the insurer should have engaged a hydraulic engineer as soon as
possibleafter the storm damage. It should not have taken several months for the lack of sub
floor space to be raised as an issue. Nor was it appropriate for the insurer and its contractors
to tellthe complainant to engage the hydraulic engineer. This is a cost that should have
been borne by the insurer.
The overall delay resulted in a bad mould problem which jeopardised the complainant‟s
family‟s health. The insurer‟s restorer took more than seven months to remediate the
mould.The complainant says he moved back to his property on 20 January 2020 and
found the repairs required further rectification.
I accept the insurer‟s builder had to wait for the complainant to complete the additional
works around the property. It is also noted that the insurer paid the complainant for
temporary accommodation whilst the property was being repaired. Whilst I accept some
delays were notin the control of the insurer, I am of the view there was a failure to promptly
and properly identify the difficulties in undertaking satisfactory repairs and that this caused
an unusual degree of physical inconvenience and anxiety to the complainant and his family.
Considering all the circumstances, the insurer is required to pay $5,000 as compensation
tothe complainant. This is close to the maximum that AFCA has the power to award.
2.4 Why is the outcome fair?
There was delay and mishandling by the insurer which caused substantial distress and it is
fair the complainant be compensated for the stress and inconvenience. The additional
workshowever were not to repair damage from the insured event and are therefore not
covered under the terms of the policy.
Determination | Case number: 773384 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances,
havingregard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and
eachparty has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted
this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or
torequire third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
If there are conflicting recollections and these are evenly weighted, we may find that a
claimcannot be established.