Water damage claim declined; delay sought replacement of bathroom and laundry
Summary
A landlord's water damage claim was declined because the damage was caused by an excluded shower waterproofing failure. She alleged the insurer's delay in deciding increased the repair cost, and AFCA found the delay was not the insurer's fault and ordered nothing.
The policy excludes the waterproofing failure, and the insurer's investigation timeline was reasonable with the scope of repairs unchanged throughout the claim.
Issues
- Claim denial primary · not upheld“I determine the insurer is entitled to decline the claim in line with the policy and it is not obliged to cover the cost to replace the bathroom and laundry.”
- Delay secondary · not upheld“The insurer has not been shown to be responsible for a significant portion of the delays experienced under the claim.”
Subjects and remedies
home or building damageno remedy
Related
All Allianz Australia determinations · Find similar determinations
Text of the determination
Determination
Case number 773363
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 773363 Page 1 of 5
Case number: 773363 26 August 2021
1 Determination overview
1.1 Complaint
The complainant holds a landlord insurance policy (policy) with the financial firm (insurer). On
17 March 2020, a claim was lodged for water damage to the insured building. The insurer has
declined the claim.
The complainant does not dispute the insurer is entitled to decline the claim in line with the
policy provisions. However, she is of the view the insurer has unreasonably delayed informing
her of the decision to decline the claim, which has resulted in the further damage to the
insured building. She is seeking for the insurer to cover the cost of a complete replacement of
the bathroom and laundry, which the insurer has refused.
1.2 Issues and key findings
Is the insurer liable for the cost to replace the bathroom and laundry?
No. The available information indicates that the ins urer’s manageme nt of the claim has not
caused unreasonable delays. Further, the evidence does not show the insurer is responsible
for any additional works that may be required to repair the damage to the building.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim and is not required to any further action.
Determination | Case number: 773363 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer liable for the bathroom and laundry damage?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events, including ‘Water or other liquid damage’. Cover under these benefits is
subject to the conditions, limitations and exclusions specified in the product disclosure
statement (PDS).
The insurer is entitled to rely on the policy provisions
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
There is no dispute the damage is excluded under the policy
The complainant accepts the insurer is entitled to decline the cover for the original damage
claimed because it was due to a failure of the shower’s waterproofing membrane , which is
excluded under the policy.
However, she is of the view, given the time it took for the insurer to decline the claim, it should
be required to cover her for the cost to replace the damaged bathroom and laundry. The
complainant says the insurer should have informed her of the decision to decline the claim on
or about 8 April 2020. This is when she provided two consultants’ reports confirming the
reason for the damage was a failure of the shower’s waterproofing membrane.
The complainant says the insurer delayed informing her of the decision to decline the claim
until October 2020, which has increased the cost of repairs from less than $1,000 to close to
$20,000. For this reason, she believes the insurer should be required to cover the total repair
costs as they stand now.
The insurer disputes it is liable for the damage to the building
The insurer has refused liability for the damage to the bathroom in line with the policy
provisions. With respect to the delay in finalising the claim, the insurer says this was not due
to its failure because:
on lodgement of the claim the insurer appointed loss adjusters ‘SG’ to arrange for the
assessment of the insured building to determine the cause and extent of the damage
contact was made with the tenant of the property on 30 March 2020.Access to the property
was denied sighting concerns relating to COVID-19
on 8 April 2020, the insurer received two reports from the complainant’s appointed
consultants a dvising the damage is because of a failure of the shower’s waterproofing
the insurer says neither of these reports confirmed pressure testing of the bathrooms
plumbing to eliminate this as a possible cause for the damage
the insurer’s representatives made several attempts to contact the complainant and the
property manager to gain access to the property. However, access was not allowed until 9
June 2020
given the damage, initially makes safe works were authorised and subsequently
consultants were appointed to complete testing to the plumbing. This confirmed there were
Determination | Case number: 773363 Page 3 of 5
no leaks to the plumbing and the sole reason for the damage was a failure of the shower’s
waterproofing membrane, which is excluded from cover under the policy
the insurer informed the complainant of this in July 2020, however, the complainant has
raised concerns about the insurer’s management of the claim.
the complainant’s concerns were considered as well as the matter referred to the insurer’s
internal dispute resolution process
after this, the complainant was provided with a formal letter of declinature with respect to
the claim in October 2020, as well as, the insurer’s decision not to accept liability for the
bathroom and laundry relating to is management of the claim.
The insurer is entitled to decline the claim in its entirety
I have carefully considered all the information provided by the parties and am satisfied it
establishes, on balance:
the insurer is entitled to decline the claim for the water damage in line with the policy
the insurer has not been shown to be responsible for a significant portion of the delays
experienced under the claim
there is no evidence to show the scope of repairs needed to rectify the water damage have
increased any more than what was required at lodgement of the claim in March 2020.
I accept the claim has taken longer to finalise than what would reasonably be expected for a
claim of this nature. I accept the complainant provided the insurer with two reports providing
the opinion that the water damage was because of a failure of the shower’s waterproofing
membrane.
However, I accept the insurer’s position that in assessing the claim it is obliged to ensure a
complete investigation and assessment into the cause and extent of the damage is
completed. This, I accept, includes an inspection and pressure testing of the shower’s
plumbing, which the complainant’s consultants failed to complete.
Accordingly, I accept it was reasonable and in line with the insurer’s obligations under the
policy to undertake a complete and thorough investigation of the damage before providing the
complainant with a final decision under the claim.
Further, the available information shows the insurer acted within a reasonable timeframe in
appointing consultants to attend the insured property after the claim was lodged in March
2020, as well as, after it was granted access to the property in June 2020. The insurer
informed the complainant of its decision to decline the claim in July 2020, which again I
accept is a reasonable timeframe from when it was allowed access to the property.
The delay of several months between March 2020 and June 2020 is not the fault of the
insurer and more so relates to the unfortunate impact of the COVID-19 outbreak and a
reluctance of the tenant not to allow access to the property.
For the reasons discussed above, I am not satisfied it would be fair in all the circumstances to
require the insurer to cover the cost of the complete replacement of the bathroom and laundry
under the claim. Additionally, even if I were of this view which I am not, there is no evidence
which establishes the extent of repairs needed to repair the water damage to the insured
building have increased over time.
The evidence from SG and its appointed consultants provides that the repairs referred to by
the complainant at a cost under $1,000 relate to only a temporary solution i.e. sealing of the
shower recess and do not address the damaged waterproofing. However, the works needed
to actually repair the damaged waterproofing would have required stripping of the bathroom
Determination | Case number: 773363 Page 4 of 5
and laundry at all times. These were the works that were required at claim lodgement and
remained the same at the time the claim was declined. So, no prejudice has been caused
because of the time which has passed over the course of the claim. The complainant has not
provided any information refuting these findings and in the absence of compelling evidence to
the contrary, I accept the insurer’s position in this regard.
Accordingly, I determine the insurer is entitled to decline the claim in line with the policy and it
is not obliged to cover the cost to replace the bathroom and laundry because of its
management of the claim.
Why is the outcome fair?
The determination is fair in all the circumstances because:
the available information shows the water damage caused to the insured building is due to
the failed waterproofing membrane, which is excluded from cover
the available information does not establish the insured is liable for the significant portion
of the delay experienced under the claim; and
the available information shows the scope of works to repair the damaged waterproofing
membrane remained the same through the life of the claim and did not increase because
of the time it took for the claim to reach finality.
Determination | Case number: 773363 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.